SlideShare a Scribd company logo
1 of 8
Page 1 of 8
Curriculum Vitae
Proposed Position:
Name of firm:
Name of Staff Member:
Department
Date of Birth:
Contact No
Email ID
Skype ID
Experience :
Current Salary:
Notice period:
Expected Salary:
Current Location:
Relocation:
Passport No:
Visa Type
Detailed Tasks Assigned:
Sr.QA/QC Engineer
Metito Overseas Ltd.
Shailendra Kailashnath Shukla
QHSE Operation
08 April 1980
00971567197925, 00919730448800
Shailendrashukla2004@rediffmail.com
shailensss
10+ Years
------------
30 days
Negotiable
Abudhabi United Arab Emirates
Anywhere in the world
Z3102571
Work Visa UAE
- Review Contract requirements and procedure.
- Prepare and implement Project Specific Quality Plan.
- Review Method Statement & prepare Inspection Test Plan.
- Ensure all inspection and tests are carried for different stages of
work by the third party laboratory as per approved test plan.
- Monitoring and ensuring activities are ongoing as per approved
Method Statements using approved material and latest
approved drawing.
- Coordinate with consultant /client for all inspection , QA/QC
matter and meetings
- Supervise sub contractor QA/QC team.
- Conduct Supplier Evaluation.
- Issuing non conformance reports and controls them.
- Review / Approve propose corrective and preventive action and
insure they are taken.
- Facilitate and coordinate Internal and Client Audits.
- Participate in internal and external audit. Carry out audit for
different Division / Departments
- Preparation and submission of QA/QC report as per client
requirements.
- Ensure all quality control documentation is complied and
completed for as built handover.
- Comply with legal and HSE requirements and procedure.
- IMS and ISO 9002-2008 documentation preparation/ updating.
Nationality: Indian
Page 2 of 8
Country of Residence: UAE
Education: Bachelor of Engineering ( B.E. Mechanical )
Dr. Babasaheb Ambedkar Marathwada University Aurangabad
Maharashtra India (Year 2003) with 64%
Professional Qualification CSWIP 3.1 Certificate number
92271 Valid Up to July 2019
TWI DUBAI UAE year 2014
ASNT Level II in RT, UT,PT and
MPT
FOURM consultants Mumbai
INDIA year 2010
Tropical Basic Offshore Safety
Induction and Emergency
Training ( OPITO) Cert no 43444
Emirates Technical And Safety
Development Centre Abudhabi
UAE year 2014
Safety Induction Training at
OPTIMA NUMBER 561870
ZADCO Abudhabi UAE year 2014
Employment Record:  From June 2013 – up to date
Company:- Ms Metito Overseas LLC
Position :-QA/QC Engineer
Responsibilities:
- Preparation of ITP, PQP and Procedures.
- Co ordinate with clients for documents approval inspection and
testing activities.
- Review of Test (Hydro Test Procedure/Inspections/Pneumatics
Etc)
- Review of WPS, PQR and WPQ.
- Stage wise inspection of U Stamped Pressure Vessels, Piping,
and Structural Steel work as per approved ITP.
- Carry out receipt inspection of materials.
- Review Material Certificates/ NDT procedures/NDT
Reports/Stage Inspection reports.
- Co ordination with Third Party Inspection Agencies and
Client/consultant for inspections.
- Raising the NCR and co ordinate with Projects Team and
Client/Consultant for corrective/preventive action.
- Support Project Team in preparation of QA/QC Dossier.
Major Projects handled
1. Baghdad water treatment plant –
Horizontal Sand filter 2400mm OD X 9710mm Length (24 Nos )
Fabrication, inspection and testing of Sand filters including
Radiography, Magnetic Particle testing, Penetrant testing,
Lifting load test, Pneumatic test, Hydro test, Surface
preparation and painting inspection and testing.
Client – Bagdad Governorate , Iraq
2. Ras Abu Fontas Qatar- DM Power Plant
CO2 absorber (3600mm OD X 10936mm Hight) (2 Nos )
Page 3 of 8
Sodium hydroxide tanks (2400mm OD X 3400mm HIGH),(3 Nos )
Fabrication, inspection and testing including Vacuum box test,
Penetrates testing, Water fill up test, Rubber lining test, surface
preparation and painting inspection and testing.
Client – Hitachi Zosen
3. Lusail City water pumping station Doha QATAR.
Site inspection, coordination, ISO and IMS implementation.
Audit for site , for 6 Pumping station of Lusail city.
Client - ASHGHAL
4. Alkhor Pumping station Alkhor Site Alkhor Qatar
Client- ASHGHAL
5. RAS Abu Fontas DM Plant Site Doha Qatar Client Hitachi
6. Qatar Gas at Rasalfan Doha Qatar Client QATAR GAS
7. ZADCO on Zirku Island from Jan 2015 to up-till now
Containerised UF RO Water Treatment Plant at Zirku Island for
Zirku Petroleum Abudhabi UAE with capacity of 1263 M3 per
day
Responsibilities: At supplier place (Onshore site )
PQP, ITP, MS, Procedure preparation.
Equipment inspection at supplier place.
Tank and vessel inspection at supplier end, Valves , Pump,
Bower, Piping and piping skids, structure skid, Pressure parts,
Rotary parts.
Piping fabrication stainless steel , Duplex steel; GRP ,
FRP, GRE pipe installation and erection check at site ,
Hydro test and test pack
RT , UT, MPT, DPT , NDT checks
Welding inspection ,
Painting inspection , Testing
Supplier Audit. Supplier Evaluation.
IMS System, ISO 9002-2008 management.
NCR system for the non conformance. CAPA.
Responsibilities: At Zirku Island (Offshore)
PQP, ITP, MS, Procedure preparation.
Mechanical Equipment, Instrument, electrical and civil material
receipt inspection at site.
Site installation and erection for the tanks Storage Tank,
Pressure Vessel Valves, Pump, Blower, Piping and Piping skids,
Chemical dosing skid, Pressure parts, Rotary parts instruments
and tubing.
Page 4 of 8
Piping fabrication of stainless steel , Duplex steel; GRP ,
FRP, GRE pipe installation , Lamination and boding inspection at
site by client and consultant.
Piping fabrication for the metallic and non metallic joints.
Weld map , NDT reports , joint summary preparation and
inspection, Material history chart preparation.
GRE pipe fabrication Lamination joints and TB/TS joint
Inspection, Joint summary, material history chart preparation.
RT , UT, MPT, DPT , NDT checks
Welding inspection for whole system.
Piping and piping skid installation
Storage tanks pressure Tanks, Pumps installation, valve
installation and inspection. Verification with TBM and civil Co-
ordinates.
Instrument installation and electrical installation inspection.
Commissioning and pre-commissioning Check.
Leak test, Hydro test witness and Test pack preparation.
Pneumatic test for the instruments for plant and utility air
piping
Painting inspection , and testing
Supplier Audit for site supplier.
Audit for the site team (Department wise).
NCR if find some non-conformance. Corrective and preventive
action. Correction proposal.
Corrective action proposes to client /consultant, closing fo NCR.
Closing of observation raised by Client.
Client- ZADCO ( ZAKUM DEVELOPMENT COMPANY) ZBRFP ZRIP
Consultant – Wood Group Kenny PMC
 From August 2011 to May 2013
Company :-Demag Cranes And Component Private Limited, Pune
Maharashtra - India
Position :-QA/QC Engineer
Responsibilities
- Preparation of QA Plan.
- Inspection of incoming Materials of projects.
- Review of material certificates, Material test reports, etc.
- Inspection of daily fabrication and welding activities as per QA
Plan.
- Preparing inspection reports.
- Arranging third party NDT requirement (RT, UT, LPT, MPI and
PWHT).
- Witness Non Destructive Testing (LPT, MPI, UT)
- Issuing and Control of NCRs.
Page 5 of 8
- Review weld map and prepare weld Inspection report.
- Preparation of QA/QC Dossier.
- Coordinate with TPI and client for inspection at supplier
premises.
- Conduct Supplier evaluation.
Major Projects handled:
1. Process Cranes of capacity ranging from 10 ton to 50 tons SWL
for Tyre manufacturing unit
Client Michelin Tyre Limited, Chennai Tamilnadu - India.
2. 150 Ton SWL Twin Girder Open Winch Crane
Client Jindal Steel Work Limited, Chhattisgarh - India.
3. Container Freight Stations , Container movement and handling
at port by multipurpose process crane
Client Project Management Consultants India Limited, Mundra
Port Gujrat - India.
4. 160 Ton SWL Twin Girder Overhead Crane.
Client Siemens Limited, Gujarat - India.
5. 110 Ton SWL Twin Girder Overhead Crane
Client Gammon India Limited, Kolkata West Bengal - India.
6. 150 Ton SWL Twin Girder Overhead Crane
Client Bharat heavy electrical Limited, Bhopal
Madhyaparadesh - India.
 November 2009 to July 2011
Company :- Thermax India Limited Enviro Division Pune
Maharashtra - India
Position :-QA/QC Engineer
Responsibilities
- Preparation of QA Plan, and Procedures.
- Co ordinate with clients for documents approval and
inspection and testing activities.
- Review of Test (Hydro Test Procedure/Inspections/Pneumatics
Etc)
- Review of WPS, PQR and WPQ.
- Stage wise inspection of U Stamped Pressure Vessels, Pollution
control equipments and Structural Steel work as per approved
ITP.
- Review Material Certificates/ NDT procedures/NDT
Reports/Stage Inspection reports.
- Co ordination with Third Party Inspection Agencies and
Page 6 of 8
Client/consultant for inspections.
- Raising the NCR and co ordinate with Projects Team and
Client/Consultant for corrective/preventive action Site action
reports.
- Support Project Team in preparation of QA/QC Dossier.
- Coordinate with TPI and client inspection at supplier Premises
- Conduct Supplier evaluation.
Major Projects handled
1. Ventury Meter and Mechanical scrubber for extracting the SS
burr comes out in Machining process )
Client Jindal Steel and Power Limited, Jharsuguda - Orissa
India.
2. Heat Exchanger Floating head and tube sheet type for steel
plant
Client Bhilai Ispat Limited, Chhattisgarh - India
Consultant Punj loyd India.
3. Electro Static Precipitator for circulating fluidised bed
combustion boiler 4X500 TPH boiler package
Client Reliance Utility and Power Private Limited, Dahej
Gujarat - India.
4. Electro Static Precipitator for stock house application in blast
furnace
Client Larsen and Toubro Limited, Mumbai Maharashtra -
India
Consultant Mecom Limited India.
5. Electro Static Precipitator Coal Based Captive Power Plant for
500 TPH CFBC Boiler
Client Reliance utility and power Private Limited, Gujarat -
India
Consultant Bechtel Power Corporation USA.
6. Bag filter for the paper mill
Client Andhra Pradesh Paper Mill Limited, Kadiam - Andhra
Pradesh - India.
 From September 2006 to November 2009
Company :- Inspection Consultancy Services Pune Maharashtra –
India
Position :- Surveyor
Responsibilities
- Preparation of QA Plan.
- Review of WPS/PQR/WPQ
Page 7 of 8
- Preparing inspection reports.
- Preparation of weld inspection report
- Arranging third party NDT requirement (RT, UT, LPT, MPI and
PWHT).
- Witness Non Destructive Testing (LPT, MPI, UT)
- Witnessing Hydro test and Pneumatic Test as per approved
procedures.
- Communicate third party lab test results to clients through
professional reports.
- Raising the NCR and co ordinate with Projects Team from Client
for corrective/preventive action Site action reports
- Preparation of QA/QC Dossier.
Major Projects handled
1. Multimedia Mass Mobile Radar for Defence Ministry India
Client:- Bharat Electrical Limited, Uttarpradesh - India.
2. Gas metering skid at Rajahmundry Andhrapradesh India
Client:- Gas Authority of India Limited India Limited.
Consultant Daniel Measurement Solution private Limited.
3. Chemical Storage tanks, Stirrer tanks, Structure base frame.
Client:- CMI FPE Limited, Mumbai Maharashtra - India.
4. Pipe Support and Pipe Hangers for power plants
Client:- Siemens Limited, Vadodara Gujarat - India.
5. Hydraulic valve and lined pressure Vessel
Client:- Aqua Tech Asia Private Limited Pune Maharashtra -
India.
6. Hydraulic fitting and valves
Client:- Kirloskar Pneumatic Limited, Pune Maharashtra - India.
7. Pipe line
Client:- York India Limited, Pune Maharashtra - India.
 From September 2003 to July 2006
Company :-AutoLine Industries Limited (formally known as AutoLine
Stamping Private Limited , Press Shop and load body Unit) Pune
Maharashtra India .
Position :- Production Planning and control Engineer
- Production planning and control work to achieve the desire
target.
- Work allocation and Utilization of resources.
Page 8 of 8
- Maintain the working environment and control the Quality.
- Trial piece assembly testing and analysis
- Maintain the records of rejection log.
- Maintain the production log DPR(Daily production report),
PPM(Product per million ) and MBR (Machine breakdown
reports), etc.
Client details :-
1. Tata Motor Limited (Auto components press part fender ,
Bumper , Door , Tailgate , and load body of Tata Ace vehicle ,
TATA 407 , TATA 709, and Heavy Motor Vehicle )
2. Bajaj Auto Limited (Mudguard for Two Wheeler)
3. Mahindra and Mahindra Limited (Auto component of Utility
Vehicles )
Languages: English, Hindi, Marathi

More Related Content

What's hot

CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfRAMPRASADBALLAV1
 
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2Jone Prakash
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)Rajeev Kumar
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,InspEZAZ ALAM
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanShabin Shajahan
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015rashid Arafat
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )Ganesan Sivam
 

What's hot (20)

CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
 
NDT Resume
NDT ResumeNDT Resume
NDT Resume
 
Babbu jakir resume
Babbu jakir resumeBabbu jakir resume
Babbu jakir resume
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
 
Vinu cv august 16
Vinu cv august 16Vinu cv august 16
Vinu cv august 16
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Qaiser Cv 2016
Qaiser Cv 2016Qaiser Cv 2016
Qaiser Cv 2016
 
Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)
 
N.Sadhasivam_CV
N.Sadhasivam_CVN.Sadhasivam_CV
N.Sadhasivam_CV
 
N.Sadhasivam_CV
N.Sadhasivam_CVN.Sadhasivam_CV
N.Sadhasivam_CV
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
 
Mario Gali Cv
Mario Gali CvMario Gali Cv
Mario Gali Cv
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 

Similar to CV_Format_-_Shailendra_Shukla_16_07_2016

Similar to CV_Format_-_Shailendra_Shukla_16_07_2016 (20)

CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
CV QC
CV QCCV QC
CV QC
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
Sujit TPI CV
Sujit TPI CVSujit TPI CV
Sujit TPI CV
 
my cv
my cvmy cv
my cv
 
Resume_Anjanna
Resume_AnjannaResume_Anjanna
Resume_Anjanna
 
FARHAN CV
FARHAN CVFARHAN CV
FARHAN CV
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
INSPECTION COORDINATOR
INSPECTION COORDINATORINSPECTION COORDINATOR
INSPECTION COORDINATOR
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wp
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 

CV_Format_-_Shailendra_Shukla_16_07_2016

  • 1. Page 1 of 8 Curriculum Vitae Proposed Position: Name of firm: Name of Staff Member: Department Date of Birth: Contact No Email ID Skype ID Experience : Current Salary: Notice period: Expected Salary: Current Location: Relocation: Passport No: Visa Type Detailed Tasks Assigned: Sr.QA/QC Engineer Metito Overseas Ltd. Shailendra Kailashnath Shukla QHSE Operation 08 April 1980 00971567197925, 00919730448800 Shailendrashukla2004@rediffmail.com shailensss 10+ Years ------------ 30 days Negotiable Abudhabi United Arab Emirates Anywhere in the world Z3102571 Work Visa UAE - Review Contract requirements and procedure. - Prepare and implement Project Specific Quality Plan. - Review Method Statement & prepare Inspection Test Plan. - Ensure all inspection and tests are carried for different stages of work by the third party laboratory as per approved test plan. - Monitoring and ensuring activities are ongoing as per approved Method Statements using approved material and latest approved drawing. - Coordinate with consultant /client for all inspection , QA/QC matter and meetings - Supervise sub contractor QA/QC team. - Conduct Supplier Evaluation. - Issuing non conformance reports and controls them. - Review / Approve propose corrective and preventive action and insure they are taken. - Facilitate and coordinate Internal and Client Audits. - Participate in internal and external audit. Carry out audit for different Division / Departments - Preparation and submission of QA/QC report as per client requirements. - Ensure all quality control documentation is complied and completed for as built handover. - Comply with legal and HSE requirements and procedure. - IMS and ISO 9002-2008 documentation preparation/ updating. Nationality: Indian
  • 2. Page 2 of 8 Country of Residence: UAE Education: Bachelor of Engineering ( B.E. Mechanical ) Dr. Babasaheb Ambedkar Marathwada University Aurangabad Maharashtra India (Year 2003) with 64% Professional Qualification CSWIP 3.1 Certificate number 92271 Valid Up to July 2019 TWI DUBAI UAE year 2014 ASNT Level II in RT, UT,PT and MPT FOURM consultants Mumbai INDIA year 2010 Tropical Basic Offshore Safety Induction and Emergency Training ( OPITO) Cert no 43444 Emirates Technical And Safety Development Centre Abudhabi UAE year 2014 Safety Induction Training at OPTIMA NUMBER 561870 ZADCO Abudhabi UAE year 2014 Employment Record:  From June 2013 – up to date Company:- Ms Metito Overseas LLC Position :-QA/QC Engineer Responsibilities: - Preparation of ITP, PQP and Procedures. - Co ordinate with clients for documents approval inspection and testing activities. - Review of Test (Hydro Test Procedure/Inspections/Pneumatics Etc) - Review of WPS, PQR and WPQ. - Stage wise inspection of U Stamped Pressure Vessels, Piping, and Structural Steel work as per approved ITP. - Carry out receipt inspection of materials. - Review Material Certificates/ NDT procedures/NDT Reports/Stage Inspection reports. - Co ordination with Third Party Inspection Agencies and Client/consultant for inspections. - Raising the NCR and co ordinate with Projects Team and Client/Consultant for corrective/preventive action. - Support Project Team in preparation of QA/QC Dossier. Major Projects handled 1. Baghdad water treatment plant – Horizontal Sand filter 2400mm OD X 9710mm Length (24 Nos ) Fabrication, inspection and testing of Sand filters including Radiography, Magnetic Particle testing, Penetrant testing, Lifting load test, Pneumatic test, Hydro test, Surface preparation and painting inspection and testing. Client – Bagdad Governorate , Iraq 2. Ras Abu Fontas Qatar- DM Power Plant CO2 absorber (3600mm OD X 10936mm Hight) (2 Nos )
  • 3. Page 3 of 8 Sodium hydroxide tanks (2400mm OD X 3400mm HIGH),(3 Nos ) Fabrication, inspection and testing including Vacuum box test, Penetrates testing, Water fill up test, Rubber lining test, surface preparation and painting inspection and testing. Client – Hitachi Zosen 3. Lusail City water pumping station Doha QATAR. Site inspection, coordination, ISO and IMS implementation. Audit for site , for 6 Pumping station of Lusail city. Client - ASHGHAL 4. Alkhor Pumping station Alkhor Site Alkhor Qatar Client- ASHGHAL 5. RAS Abu Fontas DM Plant Site Doha Qatar Client Hitachi 6. Qatar Gas at Rasalfan Doha Qatar Client QATAR GAS 7. ZADCO on Zirku Island from Jan 2015 to up-till now Containerised UF RO Water Treatment Plant at Zirku Island for Zirku Petroleum Abudhabi UAE with capacity of 1263 M3 per day Responsibilities: At supplier place (Onshore site ) PQP, ITP, MS, Procedure preparation. Equipment inspection at supplier place. Tank and vessel inspection at supplier end, Valves , Pump, Bower, Piping and piping skids, structure skid, Pressure parts, Rotary parts. Piping fabrication stainless steel , Duplex steel; GRP , FRP, GRE pipe installation and erection check at site , Hydro test and test pack RT , UT, MPT, DPT , NDT checks Welding inspection , Painting inspection , Testing Supplier Audit. Supplier Evaluation. IMS System, ISO 9002-2008 management. NCR system for the non conformance. CAPA. Responsibilities: At Zirku Island (Offshore) PQP, ITP, MS, Procedure preparation. Mechanical Equipment, Instrument, electrical and civil material receipt inspection at site. Site installation and erection for the tanks Storage Tank, Pressure Vessel Valves, Pump, Blower, Piping and Piping skids, Chemical dosing skid, Pressure parts, Rotary parts instruments and tubing.
  • 4. Page 4 of 8 Piping fabrication of stainless steel , Duplex steel; GRP , FRP, GRE pipe installation , Lamination and boding inspection at site by client and consultant. Piping fabrication for the metallic and non metallic joints. Weld map , NDT reports , joint summary preparation and inspection, Material history chart preparation. GRE pipe fabrication Lamination joints and TB/TS joint Inspection, Joint summary, material history chart preparation. RT , UT, MPT, DPT , NDT checks Welding inspection for whole system. Piping and piping skid installation Storage tanks pressure Tanks, Pumps installation, valve installation and inspection. Verification with TBM and civil Co- ordinates. Instrument installation and electrical installation inspection. Commissioning and pre-commissioning Check. Leak test, Hydro test witness and Test pack preparation. Pneumatic test for the instruments for plant and utility air piping Painting inspection , and testing Supplier Audit for site supplier. Audit for the site team (Department wise). NCR if find some non-conformance. Corrective and preventive action. Correction proposal. Corrective action proposes to client /consultant, closing fo NCR. Closing of observation raised by Client. Client- ZADCO ( ZAKUM DEVELOPMENT COMPANY) ZBRFP ZRIP Consultant – Wood Group Kenny PMC  From August 2011 to May 2013 Company :-Demag Cranes And Component Private Limited, Pune Maharashtra - India Position :-QA/QC Engineer Responsibilities - Preparation of QA Plan. - Inspection of incoming Materials of projects. - Review of material certificates, Material test reports, etc. - Inspection of daily fabrication and welding activities as per QA Plan. - Preparing inspection reports. - Arranging third party NDT requirement (RT, UT, LPT, MPI and PWHT). - Witness Non Destructive Testing (LPT, MPI, UT) - Issuing and Control of NCRs.
  • 5. Page 5 of 8 - Review weld map and prepare weld Inspection report. - Preparation of QA/QC Dossier. - Coordinate with TPI and client for inspection at supplier premises. - Conduct Supplier evaluation. Major Projects handled: 1. Process Cranes of capacity ranging from 10 ton to 50 tons SWL for Tyre manufacturing unit Client Michelin Tyre Limited, Chennai Tamilnadu - India. 2. 150 Ton SWL Twin Girder Open Winch Crane Client Jindal Steel Work Limited, Chhattisgarh - India. 3. Container Freight Stations , Container movement and handling at port by multipurpose process crane Client Project Management Consultants India Limited, Mundra Port Gujrat - India. 4. 160 Ton SWL Twin Girder Overhead Crane. Client Siemens Limited, Gujarat - India. 5. 110 Ton SWL Twin Girder Overhead Crane Client Gammon India Limited, Kolkata West Bengal - India. 6. 150 Ton SWL Twin Girder Overhead Crane Client Bharat heavy electrical Limited, Bhopal Madhyaparadesh - India.  November 2009 to July 2011 Company :- Thermax India Limited Enviro Division Pune Maharashtra - India Position :-QA/QC Engineer Responsibilities - Preparation of QA Plan, and Procedures. - Co ordinate with clients for documents approval and inspection and testing activities. - Review of Test (Hydro Test Procedure/Inspections/Pneumatics Etc) - Review of WPS, PQR and WPQ. - Stage wise inspection of U Stamped Pressure Vessels, Pollution control equipments and Structural Steel work as per approved ITP. - Review Material Certificates/ NDT procedures/NDT Reports/Stage Inspection reports. - Co ordination with Third Party Inspection Agencies and
  • 6. Page 6 of 8 Client/consultant for inspections. - Raising the NCR and co ordinate with Projects Team and Client/Consultant for corrective/preventive action Site action reports. - Support Project Team in preparation of QA/QC Dossier. - Coordinate with TPI and client inspection at supplier Premises - Conduct Supplier evaluation. Major Projects handled 1. Ventury Meter and Mechanical scrubber for extracting the SS burr comes out in Machining process ) Client Jindal Steel and Power Limited, Jharsuguda - Orissa India. 2. Heat Exchanger Floating head and tube sheet type for steel plant Client Bhilai Ispat Limited, Chhattisgarh - India Consultant Punj loyd India. 3. Electro Static Precipitator for circulating fluidised bed combustion boiler 4X500 TPH boiler package Client Reliance Utility and Power Private Limited, Dahej Gujarat - India. 4. Electro Static Precipitator for stock house application in blast furnace Client Larsen and Toubro Limited, Mumbai Maharashtra - India Consultant Mecom Limited India. 5. Electro Static Precipitator Coal Based Captive Power Plant for 500 TPH CFBC Boiler Client Reliance utility and power Private Limited, Gujarat - India Consultant Bechtel Power Corporation USA. 6. Bag filter for the paper mill Client Andhra Pradesh Paper Mill Limited, Kadiam - Andhra Pradesh - India.  From September 2006 to November 2009 Company :- Inspection Consultancy Services Pune Maharashtra – India Position :- Surveyor Responsibilities - Preparation of QA Plan. - Review of WPS/PQR/WPQ
  • 7. Page 7 of 8 - Preparing inspection reports. - Preparation of weld inspection report - Arranging third party NDT requirement (RT, UT, LPT, MPI and PWHT). - Witness Non Destructive Testing (LPT, MPI, UT) - Witnessing Hydro test and Pneumatic Test as per approved procedures. - Communicate third party lab test results to clients through professional reports. - Raising the NCR and co ordinate with Projects Team from Client for corrective/preventive action Site action reports - Preparation of QA/QC Dossier. Major Projects handled 1. Multimedia Mass Mobile Radar for Defence Ministry India Client:- Bharat Electrical Limited, Uttarpradesh - India. 2. Gas metering skid at Rajahmundry Andhrapradesh India Client:- Gas Authority of India Limited India Limited. Consultant Daniel Measurement Solution private Limited. 3. Chemical Storage tanks, Stirrer tanks, Structure base frame. Client:- CMI FPE Limited, Mumbai Maharashtra - India. 4. Pipe Support and Pipe Hangers for power plants Client:- Siemens Limited, Vadodara Gujarat - India. 5. Hydraulic valve and lined pressure Vessel Client:- Aqua Tech Asia Private Limited Pune Maharashtra - India. 6. Hydraulic fitting and valves Client:- Kirloskar Pneumatic Limited, Pune Maharashtra - India. 7. Pipe line Client:- York India Limited, Pune Maharashtra - India.  From September 2003 to July 2006 Company :-AutoLine Industries Limited (formally known as AutoLine Stamping Private Limited , Press Shop and load body Unit) Pune Maharashtra India . Position :- Production Planning and control Engineer - Production planning and control work to achieve the desire target. - Work allocation and Utilization of resources.
  • 8. Page 8 of 8 - Maintain the working environment and control the Quality. - Trial piece assembly testing and analysis - Maintain the records of rejection log. - Maintain the production log DPR(Daily production report), PPM(Product per million ) and MBR (Machine breakdown reports), etc. Client details :- 1. Tata Motor Limited (Auto components press part fender , Bumper , Door , Tailgate , and load body of Tata Ace vehicle , TATA 407 , TATA 709, and Heavy Motor Vehicle ) 2. Bajaj Auto Limited (Mudguard for Two Wheeler) 3. Mahindra and Mahindra Limited (Auto component of Utility Vehicles ) Languages: English, Hindi, Marathi