SlideShare a Scribd company logo
1 of 5
Download to read offline
1. PROPOSED POSITION :
2. NAME : MARK JOHN D. DEUNA
3. DATE OF BIRTH : 06 June 1990
4. NATIONALITY : Filipino
5. EDUCATION : Bachelor of Science in Civil Engineering,
Sorsogon State College (2006-2011)
6. COMPUTER LITERACY : AutoCAD(Advanced), AutoCAD Civil 3D(Intermediate), EPANET
2.0 ,MS Office Word, MS Office Excel, MS Office PowerPoint,
HEC-RAS, HEC-HMS
7. OTHER TRAINING/
SEMINARS ATTENDED :
In-house Seminar on “Brief Grammar Review and Basic Technical
Writing Course” conducted by Pacific Management Forum, Makati
City, April 11, 2014
In-house training course titled “SewerCadd”
DCCD Training Room, Makati City, April 2012
In-house training course titled “AutoCad Civil 3D”
DCCD Training Room, Makati City, April 2012
8. LANGUAGE AND
DEGREE OF
PROFICIENCY : Filipino – Mother Tongue
English – Proficient
9. MEMBERSHIP IN
PROFESSIONAL
SOCIETIES : Registered Civil Engineer, 2011
PRC License No.: 0121080/December 01, 2011
10. COUNTRIES OF
WORK EXPERIENCE : Philippines
11. EMPLOYMENT RECORD
FROM - TO : January 2016 – Present
EMPLOYER : DCCD Engineering Corporation (Main Office)
POSITION HELD : Design Engineer III
PROJECTS UNDERTAKEN :
• SLI 39.56Ha Palo Alto Property - Hydrology and Flood Study
and Geo-Resistivity Survey
• RLC 18Ha. Mitsubishi Car Plant - Hydrology and Flood Study
• DamLI 41Ha. Mixed-Use Development in Anflo City -
Conceptual Masterplan & DED
• HTLI Tipolo Creek Low Flow By-Pass Line – DED
• RLC 1.1Ha Caloocan Property - Hydrology and Flood Study
DCCD Deuna, M.J.D. / Page 2 of 5
• MC 35Ha. Centrale (Pasudeco) Property - Hydrology and Flood
Study
• DMFSI Proposed JAKA Foods Corporation Food Processing
Plant-Architectural & DED
DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site
grading, water supply, storm drainage, and sanitary sewer systems
of the land development projects.
Prepared the storm water drainage system, water supply system,
and sewer system layout, and develop profiles of the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents for the Hydrology and Flood
Study Projects.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
Prepares the necessary engineering design calculations for the
storm water drainage system and sewer system and support
facilities using appropriate software.
Attends weekly coordination meeting to discuss design issues and
concerns with the client and other party involved.
FROM - TO : January 2015 – Present
EMPLOYER : DCCD Engineering Corporation (Main Office)
POSITION HELD : Design Engineer II-III
PROJECTS UNDERTAKEN :
• DamLI 90Ha. Panabo Township Development - Conceptual
Engineering Design
• JEM MWMP-12-04: 46MLD Cupang STP in Muntinlupa (Design
and Build) – DED
• DLI 121Ha. Napsan Esplandor Land Development Project -
Conceptual Infrastructure, Utilities Masterplan and DED
• LPU 7.80Ha. LPU Davao Campus - Technical Due Diligence and
DED
DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site
grading, water supply, storm drainage, and sanitary sewer systems
of the land development projects.
Prepared the storm water drainage system, water supply system,
and sewer system layout, and develop profiles of the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
DCCD Deuna, M.J.D. / Page 3 of 5
Prepares the necessary engineering design calculations for the
storm water drainage system and sewer system and support
facilities using appropriate software.
Attends weekly coordination meeting to discuss design issues and
concerns with the client and other party involved.
FROM - TO : January 2012 – January 2015
EMPLOYER : DCCD Engineering Corporation
POSITION HELD : Design Engineer II
PROJECTS UNDERTAKEN :
2014
• RoLC 28Ha. Development of Robinsons Land Corporation
along C5 - Conceptual Infrastructure and Site Utilities and
DED
• RoLC Robinsons 9.30 Hectare Woodsville Project – DED
• HEDC HEIP 398Ha. Mixed-use Development-Phase 2 Design
Revision for Roads and Site Utilities – DED
• JEM MWMP-12-04: 46MLD Cupang STP in Muntinlupa
(Design and Build) – DED
• TPVDC 20Ha. Razon Property - Hydrology and
Drainage/Flood Study
• HTLI 20Ha. Mandaue Property Development Project - DED
• OTV 60 MLD Valenzuela STP - Design & Build – DED
DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site
grading, water supply, storm drainage, and sanitary sewer systems
of the land development projects.
Prepared the storm water drainage system, water supply system,
and sewer system layout, and develop profiles of the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
Prepares the necessary engineering design calculations for the
storm water drainage system and sewer system and support
facilities using appropriate software.
Attends weekly coordination meeting to discuss design issues and
concerns with the client and other party involved.
PROJECTS UNDERTAKEN :
2013
• MDC 74Ha. Ayala Land Development Project - DED
• PDODC 31Ha. Masterson Avenue, Brgy. Lumbia, Cagayan de
Oro City - DED
DCCD Deuna, M.J.D. / Page 4 of 5
• FLC Playa Calatagan and Terrazas De Punta Fuego Site
Integration
• MDC-BP 91.1Ha. Lapanday Property - Hydrology and Flood
Study
• SPPI 200Ha. Industrial Estate Project - Site Infrastructure,
Utilities Masterplanning and DED
• LGU-PP Puerto Princesa Drainage System - FS & MP
DESCRIPTION OF DUTIES : Perform hydrologic and hydraulic analysis using Log Pearson Type
III, Rational Method and HEC RAS to determine the flood
magnitude at the site and establish minimum finish ground
elevation for the site grading works. Design the size and location of
detention pond to mitigate river siltation at the downstream areas.
Design the size of realigned canal to prevent overflowing. Prepare
the draft report for the hydrological and flood study of the project
area.
Conducts site investigations, data collection, and field interviews
necessary for technical studies and engineering design projects.
PROJECTS UNDERTAKEN :
2012
• MDC Santierra Blue and Grey Cisterns and Pump Station – DED
• LPC 144 Ha. Aplaya Laiya Conceptual – DED
• MDC Nuvali Elaro Lift Stations in Cabuyao, Laguna – DED
• MDC Nuvali Potable and Grey Water Reservoirs and Pump
Stations – DED
• MDC Elaro Reservoirs in Nuvali, Calamba – DED
• MDC 60Ha. Land Development Project - Utilities
Masterplanning
• MDC 21Ha. Land Development Project in Kapideco – Utilities
and Masterplanning, DED
DESCRIPTION OF DUTIES Prepared the detailed engineering design drawings of the water
supply, storm drainage, and sanitary sewer systems of the land
development projects.
Prepared the storm water drainage system and develop profiles of
the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
Prepares the necessary engineering design calculations for the
storm water drainage system and support facilities using
appropriate software.
DCCD Deuna, M.J.D. / Page 5 of 5
Attends coordination meeting to discuss design issues and
concerns with the client and other party involved.

More Related Content

What's hot

AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2Ashwin Beosumbar
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)apwacoachellavalley
 
CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016Osama Hamad
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khansikandar Khan
 
Dlb Resume
Dlb ResumeDlb Resume
Dlb Resumedbliss
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick ResumeRudy Wick
 
Phil Keeley's resume_1
Phil Keeley's resume_1Phil Keeley's resume_1
Phil Keeley's resume_1Philip Keeley
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CVDave Ramos
 
Proposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - ShortProposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - ShortRick Rice
 
CV_Structure Engineer
CV_Structure EngineerCV_Structure Engineer
CV_Structure EngineerAli Muhammad
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy
 
New (Civ) Ehsan
New (Civ) EhsanNew (Civ) Ehsan
New (Civ) EhsanEhsan Haq
 

What's hot (14)

AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2
 
RBF Summer 2010
RBF Summer 2010RBF Summer 2010
RBF Summer 2010
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)
 
CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
Dlb Resume
Dlb ResumeDlb Resume
Dlb Resume
 
Rudy Wick Resume
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
 
Phil Keeley's resume_1
Phil Keeley's resume_1Phil Keeley's resume_1
Phil Keeley's resume_1
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CV
 
Proposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - ShortProposal Manager_Writer_Editor - Rick A Rice (111416) - Short
Proposal Manager_Writer_Editor - Rick A Rice (111416) - Short
 
CV_Structure Engineer
CV_Structure EngineerCV_Structure Engineer
CV_Structure Engineer
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CV
 
New (Civ) Ehsan
New (Civ) EhsanNew (Civ) Ehsan
New (Civ) Ehsan
 

Viewers also liked

Viewers also liked (20)

Scannen0218[2]
Scannen0218[2]Scannen0218[2]
Scannen0218[2]
 
Epidemiologia modelos-saude doenca
Epidemiologia modelos-saude doencaEpidemiologia modelos-saude doenca
Epidemiologia modelos-saude doenca
 
Funnel
FunnelFunnel
Funnel
 
Horta Comum - EB1 Pavia
Horta Comum - EB1 PaviaHorta Comum - EB1 Pavia
Horta Comum - EB1 Pavia
 
Catálogo Organizando sua Festa em Curitiba
Catálogo Organizando sua Festa em CuritibaCatálogo Organizando sua Festa em Curitiba
Catálogo Organizando sua Festa em Curitiba
 
Apresentacao git
Apresentacao gitApresentacao git
Apresentacao git
 
nestor
nestornestor
nestor
 
Prueba1 slide share
Prueba1 slide sharePrueba1 slide share
Prueba1 slide share
 
Resultset
ResultsetResultset
Resultset
 
Actus10GoldenRulesofMgmt
Actus10GoldenRulesofMgmtActus10GoldenRulesofMgmt
Actus10GoldenRulesofMgmt
 
Sunshine school rajkot
Sunshine school rajkotSunshine school rajkot
Sunshine school rajkot
 
Scannen0217[1]
Scannen0217[1]Scannen0217[1]
Scannen0217[1]
 
Trabal. de c.a. de veronica
Trabal. de c.a. de veronicaTrabal. de c.a. de veronica
Trabal. de c.a. de veronica
 
Coisas do Coração
Coisas do Coração Coisas do Coração
Coisas do Coração
 
Immigration solution et fédération européenne
Immigration solution et fédération européenneImmigration solution et fédération européenne
Immigration solution et fédération européenne
 
Matheus e Bredom
Matheus e BredomMatheus e Bredom
Matheus e Bredom
 
Aby
AbyAby
Aby
 
Planing gijon cup
Planing gijon cupPlaning gijon cup
Planing gijon cup
 
Quality manament
Quality manamentQuality manament
Quality manament
 
All lawson
All lawsonAll lawson
All lawson
 

Similar to MJDDeuna_CV

Similar to MJDDeuna_CV (20)

Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
Neel weragala gen_cv_0416
Neel weragala gen_cv_0416Neel weragala gen_cv_0416
Neel weragala gen_cv_0416
 
Dennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 MarchDennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 March
 
Hydrologist-CV
Hydrologist-CVHydrologist-CV
Hydrologist-CV
 
Sunil resume
Sunil resumeSunil resume
Sunil resume
 
SanazSarafrazResumeMay2015
SanazSarafrazResumeMay2015SanazSarafrazResumeMay2015
SanazSarafrazResumeMay2015
 
Logan McDowell Resume
Logan McDowell ResumeLogan McDowell Resume
Logan McDowell Resume
 
CV Darlington
CV DarlingtonCV Darlington
CV Darlington
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
RESUME_ARCHITH_SANKER_ATKINS
RESUME_ARCHITH_SANKER_ATKINSRESUME_ARCHITH_SANKER_ATKINS
RESUME_ARCHITH_SANKER_ATKINS
 
Resume-Cristian Alvarez
Resume-Cristian AlvarezResume-Cristian Alvarez
Resume-Cristian Alvarez
 
Masterplan.pptx
Masterplan.pptxMasterplan.pptx
Masterplan.pptx
 
Hemant_CV
Hemant_CVHemant_CV
Hemant_CV
 
T.Steinbach-Resume
T.Steinbach-Resume T.Steinbach-Resume
T.Steinbach-Resume
 
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
 
Phil Douche CV
Phil Douche CVPhil Douche CV
Phil Douche CV
 
Gana Khaidav -May-2015
Gana Khaidav -May-2015Gana Khaidav -May-2015
Gana Khaidav -May-2015
 

MJDDeuna_CV

  • 1. 1. PROPOSED POSITION : 2. NAME : MARK JOHN D. DEUNA 3. DATE OF BIRTH : 06 June 1990 4. NATIONALITY : Filipino 5. EDUCATION : Bachelor of Science in Civil Engineering, Sorsogon State College (2006-2011) 6. COMPUTER LITERACY : AutoCAD(Advanced), AutoCAD Civil 3D(Intermediate), EPANET 2.0 ,MS Office Word, MS Office Excel, MS Office PowerPoint, HEC-RAS, HEC-HMS 7. OTHER TRAINING/ SEMINARS ATTENDED : In-house Seminar on “Brief Grammar Review and Basic Technical Writing Course” conducted by Pacific Management Forum, Makati City, April 11, 2014 In-house training course titled “SewerCadd” DCCD Training Room, Makati City, April 2012 In-house training course titled “AutoCad Civil 3D” DCCD Training Room, Makati City, April 2012 8. LANGUAGE AND DEGREE OF PROFICIENCY : Filipino – Mother Tongue English – Proficient 9. MEMBERSHIP IN PROFESSIONAL SOCIETIES : Registered Civil Engineer, 2011 PRC License No.: 0121080/December 01, 2011 10. COUNTRIES OF WORK EXPERIENCE : Philippines 11. EMPLOYMENT RECORD FROM - TO : January 2016 – Present EMPLOYER : DCCD Engineering Corporation (Main Office) POSITION HELD : Design Engineer III PROJECTS UNDERTAKEN : • SLI 39.56Ha Palo Alto Property - Hydrology and Flood Study and Geo-Resistivity Survey • RLC 18Ha. Mitsubishi Car Plant - Hydrology and Flood Study • DamLI 41Ha. Mixed-Use Development in Anflo City - Conceptual Masterplan & DED • HTLI Tipolo Creek Low Flow By-Pass Line – DED • RLC 1.1Ha Caloocan Property - Hydrology and Flood Study
  • 2. DCCD Deuna, M.J.D. / Page 2 of 5 • MC 35Ha. Centrale (Pasudeco) Property - Hydrology and Flood Study • DMFSI Proposed JAKA Foods Corporation Food Processing Plant-Architectural & DED DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site grading, water supply, storm drainage, and sanitary sewer systems of the land development projects. Prepared the storm water drainage system, water supply system, and sewer system layout, and develop profiles of the system. Provides technical inputs and assistance during the preparation of the project’s design concept. Assists in the preparation of project presentation materials and documents for the Hydrology and Flood Study Projects. Responsible in coordinating all the project concerns of each group components with the Project Principal/Manager Prepares the necessary engineering design calculations for the storm water drainage system and sewer system and support facilities using appropriate software. Attends weekly coordination meeting to discuss design issues and concerns with the client and other party involved. FROM - TO : January 2015 – Present EMPLOYER : DCCD Engineering Corporation (Main Office) POSITION HELD : Design Engineer II-III PROJECTS UNDERTAKEN : • DamLI 90Ha. Panabo Township Development - Conceptual Engineering Design • JEM MWMP-12-04: 46MLD Cupang STP in Muntinlupa (Design and Build) – DED • DLI 121Ha. Napsan Esplandor Land Development Project - Conceptual Infrastructure, Utilities Masterplan and DED • LPU 7.80Ha. LPU Davao Campus - Technical Due Diligence and DED DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site grading, water supply, storm drainage, and sanitary sewer systems of the land development projects. Prepared the storm water drainage system, water supply system, and sewer system layout, and develop profiles of the system. Provides technical inputs and assistance during the preparation of the project’s design concept. Assists in the preparation of project presentation materials and documents. Responsible in coordinating all the project concerns of each group components with the Project Principal/Manager
  • 3. DCCD Deuna, M.J.D. / Page 3 of 5 Prepares the necessary engineering design calculations for the storm water drainage system and sewer system and support facilities using appropriate software. Attends weekly coordination meeting to discuss design issues and concerns with the client and other party involved. FROM - TO : January 2012 – January 2015 EMPLOYER : DCCD Engineering Corporation POSITION HELD : Design Engineer II PROJECTS UNDERTAKEN : 2014 • RoLC 28Ha. Development of Robinsons Land Corporation along C5 - Conceptual Infrastructure and Site Utilities and DED • RoLC Robinsons 9.30 Hectare Woodsville Project – DED • HEDC HEIP 398Ha. Mixed-use Development-Phase 2 Design Revision for Roads and Site Utilities – DED • JEM MWMP-12-04: 46MLD Cupang STP in Muntinlupa (Design and Build) – DED • TPVDC 20Ha. Razon Property - Hydrology and Drainage/Flood Study • HTLI 20Ha. Mandaue Property Development Project - DED • OTV 60 MLD Valenzuela STP - Design & Build – DED DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site grading, water supply, storm drainage, and sanitary sewer systems of the land development projects. Prepared the storm water drainage system, water supply system, and sewer system layout, and develop profiles of the system. Provides technical inputs and assistance during the preparation of the project’s design concept. Assists in the preparation of project presentation materials and documents. Responsible in coordinating all the project concerns of each group components with the Project Principal/Manager Prepares the necessary engineering design calculations for the storm water drainage system and sewer system and support facilities using appropriate software. Attends weekly coordination meeting to discuss design issues and concerns with the client and other party involved. PROJECTS UNDERTAKEN : 2013 • MDC 74Ha. Ayala Land Development Project - DED • PDODC 31Ha. Masterson Avenue, Brgy. Lumbia, Cagayan de Oro City - DED
  • 4. DCCD Deuna, M.J.D. / Page 4 of 5 • FLC Playa Calatagan and Terrazas De Punta Fuego Site Integration • MDC-BP 91.1Ha. Lapanday Property - Hydrology and Flood Study • SPPI 200Ha. Industrial Estate Project - Site Infrastructure, Utilities Masterplanning and DED • LGU-PP Puerto Princesa Drainage System - FS & MP DESCRIPTION OF DUTIES : Perform hydrologic and hydraulic analysis using Log Pearson Type III, Rational Method and HEC RAS to determine the flood magnitude at the site and establish minimum finish ground elevation for the site grading works. Design the size and location of detention pond to mitigate river siltation at the downstream areas. Design the size of realigned canal to prevent overflowing. Prepare the draft report for the hydrological and flood study of the project area. Conducts site investigations, data collection, and field interviews necessary for technical studies and engineering design projects. PROJECTS UNDERTAKEN : 2012 • MDC Santierra Blue and Grey Cisterns and Pump Station – DED • LPC 144 Ha. Aplaya Laiya Conceptual – DED • MDC Nuvali Elaro Lift Stations in Cabuyao, Laguna – DED • MDC Nuvali Potable and Grey Water Reservoirs and Pump Stations – DED • MDC Elaro Reservoirs in Nuvali, Calamba – DED • MDC 60Ha. Land Development Project - Utilities Masterplanning • MDC 21Ha. Land Development Project in Kapideco – Utilities and Masterplanning, DED DESCRIPTION OF DUTIES Prepared the detailed engineering design drawings of the water supply, storm drainage, and sanitary sewer systems of the land development projects. Prepared the storm water drainage system and develop profiles of the system. Provides technical inputs and assistance during the preparation of the project’s design concept. Assists in the preparation of project presentation materials and documents. Responsible in coordinating all the project concerns of each group components with the Project Principal/Manager Prepares the necessary engineering design calculations for the storm water drainage system and support facilities using appropriate software.
  • 5. DCCD Deuna, M.J.D. / Page 5 of 5 Attends coordination meeting to discuss design issues and concerns with the client and other party involved.