1. 1. PROPOSED POSITION :
2. NAME : MARK JOHN D. DEUNA
3. DATE OF BIRTH : 06 June 1990
4. NATIONALITY : Filipino
5. EDUCATION : Bachelor of Science in Civil Engineering,
Sorsogon State College (2006-2011)
6. COMPUTER LITERACY : AutoCAD(Advanced), AutoCAD Civil 3D(Intermediate), EPANET
2.0 ,MS Office Word, MS Office Excel, MS Office PowerPoint,
HEC-RAS, HEC-HMS
7. OTHER TRAINING/
SEMINARS ATTENDED :
In-house Seminar on “Brief Grammar Review and Basic Technical
Writing Course” conducted by Pacific Management Forum, Makati
City, April 11, 2014
In-house training course titled “SewerCadd”
DCCD Training Room, Makati City, April 2012
In-house training course titled “AutoCad Civil 3D”
DCCD Training Room, Makati City, April 2012
8. LANGUAGE AND
DEGREE OF
PROFICIENCY : Filipino – Mother Tongue
English – Proficient
9. MEMBERSHIP IN
PROFESSIONAL
SOCIETIES : Registered Civil Engineer, 2011
PRC License No.: 0121080/December 01, 2011
10. COUNTRIES OF
WORK EXPERIENCE : Philippines
11. EMPLOYMENT RECORD
FROM - TO : January 2016 – Present
EMPLOYER : DCCD Engineering Corporation (Main Office)
POSITION HELD : Design Engineer III
PROJECTS UNDERTAKEN :
• SLI 39.56Ha Palo Alto Property - Hydrology and Flood Study
and Geo-Resistivity Survey
• RLC 18Ha. Mitsubishi Car Plant - Hydrology and Flood Study
• DamLI 41Ha. Mixed-Use Development in Anflo City -
Conceptual Masterplan & DED
• HTLI Tipolo Creek Low Flow By-Pass Line – DED
• RLC 1.1Ha Caloocan Property - Hydrology and Flood Study
2. DCCD Deuna, M.J.D. / Page 2 of 5
• MC 35Ha. Centrale (Pasudeco) Property - Hydrology and Flood
Study
• DMFSI Proposed JAKA Foods Corporation Food Processing
Plant-Architectural & DED
DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site
grading, water supply, storm drainage, and sanitary sewer systems
of the land development projects.
Prepared the storm water drainage system, water supply system,
and sewer system layout, and develop profiles of the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents for the Hydrology and Flood
Study Projects.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
Prepares the necessary engineering design calculations for the
storm water drainage system and sewer system and support
facilities using appropriate software.
Attends weekly coordination meeting to discuss design issues and
concerns with the client and other party involved.
FROM - TO : January 2015 – Present
EMPLOYER : DCCD Engineering Corporation (Main Office)
POSITION HELD : Design Engineer II-III
PROJECTS UNDERTAKEN :
• DamLI 90Ha. Panabo Township Development - Conceptual
Engineering Design
• JEM MWMP-12-04: 46MLD Cupang STP in Muntinlupa (Design
and Build) – DED
• DLI 121Ha. Napsan Esplandor Land Development Project -
Conceptual Infrastructure, Utilities Masterplan and DED
• LPU 7.80Ha. LPU Davao Campus - Technical Due Diligence and
DED
DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site
grading, water supply, storm drainage, and sanitary sewer systems
of the land development projects.
Prepared the storm water drainage system, water supply system,
and sewer system layout, and develop profiles of the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
3. DCCD Deuna, M.J.D. / Page 3 of 5
Prepares the necessary engineering design calculations for the
storm water drainage system and sewer system and support
facilities using appropriate software.
Attends weekly coordination meeting to discuss design issues and
concerns with the client and other party involved.
FROM - TO : January 2012 – January 2015
EMPLOYER : DCCD Engineering Corporation
POSITION HELD : Design Engineer II
PROJECTS UNDERTAKEN :
2014
• RoLC 28Ha. Development of Robinsons Land Corporation
along C5 - Conceptual Infrastructure and Site Utilities and
DED
• RoLC Robinsons 9.30 Hectare Woodsville Project – DED
• HEDC HEIP 398Ha. Mixed-use Development-Phase 2 Design
Revision for Roads and Site Utilities – DED
• JEM MWMP-12-04: 46MLD Cupang STP in Muntinlupa
(Design and Build) – DED
• TPVDC 20Ha. Razon Property - Hydrology and
Drainage/Flood Study
• HTLI 20Ha. Mandaue Property Development Project - DED
• OTV 60 MLD Valenzuela STP - Design & Build – DED
DESCRIPTION OF DUTIES : Prepared the detailed engineering design drawings of the site
grading, water supply, storm drainage, and sanitary sewer systems
of the land development projects.
Prepared the storm water drainage system, water supply system,
and sewer system layout, and develop profiles of the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
Prepares the necessary engineering design calculations for the
storm water drainage system and sewer system and support
facilities using appropriate software.
Attends weekly coordination meeting to discuss design issues and
concerns with the client and other party involved.
PROJECTS UNDERTAKEN :
2013
• MDC 74Ha. Ayala Land Development Project - DED
• PDODC 31Ha. Masterson Avenue, Brgy. Lumbia, Cagayan de
Oro City - DED
4. DCCD Deuna, M.J.D. / Page 4 of 5
• FLC Playa Calatagan and Terrazas De Punta Fuego Site
Integration
• MDC-BP 91.1Ha. Lapanday Property - Hydrology and Flood
Study
• SPPI 200Ha. Industrial Estate Project - Site Infrastructure,
Utilities Masterplanning and DED
• LGU-PP Puerto Princesa Drainage System - FS & MP
DESCRIPTION OF DUTIES : Perform hydrologic and hydraulic analysis using Log Pearson Type
III, Rational Method and HEC RAS to determine the flood
magnitude at the site and establish minimum finish ground
elevation for the site grading works. Design the size and location of
detention pond to mitigate river siltation at the downstream areas.
Design the size of realigned canal to prevent overflowing. Prepare
the draft report for the hydrological and flood study of the project
area.
Conducts site investigations, data collection, and field interviews
necessary for technical studies and engineering design projects.
PROJECTS UNDERTAKEN :
2012
• MDC Santierra Blue and Grey Cisterns and Pump Station – DED
• LPC 144 Ha. Aplaya Laiya Conceptual – DED
• MDC Nuvali Elaro Lift Stations in Cabuyao, Laguna – DED
• MDC Nuvali Potable and Grey Water Reservoirs and Pump
Stations – DED
• MDC Elaro Reservoirs in Nuvali, Calamba – DED
• MDC 60Ha. Land Development Project - Utilities
Masterplanning
• MDC 21Ha. Land Development Project in Kapideco – Utilities
and Masterplanning, DED
DESCRIPTION OF DUTIES Prepared the detailed engineering design drawings of the water
supply, storm drainage, and sanitary sewer systems of the land
development projects.
Prepared the storm water drainage system and develop profiles of
the system.
Provides technical inputs and assistance during the preparation of
the project’s design concept. Assists in the preparation of project
presentation materials and documents.
Responsible in coordinating all the project concerns of each group
components with the Project Principal/Manager
Prepares the necessary engineering design calculations for the
storm water drainage system and support facilities using
appropriate software.
5. DCCD Deuna, M.J.D. / Page 5 of 5
Attends coordination meeting to discuss design issues and
concerns with the client and other party involved.