Review WEEK 26
JULI 2022
JOB SITE BAS – TANJUNG ENIM
PT MANGGALA
ENGINEERING DEPARTMENT
2022
PRODUC TI ON REVI EW ALL PI T
PRODUC TI ON REVI EW ALL PI T
PRODUC T I ON REV I EW
RAI N
SL I PPERY
PRODUC T I ON CAPACI T Y ANALYSI S OB
PRODUC T I ON CAPACI T Y ANALYSI S OB
WAT ERFAL L ANALYSI S LOADER
WAT ERFAL L ANALYSI S HAUL ER
PARETO LOSS of UA LOADER
PARETO LOSS of UA HAUL ER
PHYSI CAL AVAI L AB I L I T Y REV I EW
USED OF AVAI L AB I L I T Y REV I EW
PA UNI T SUPPORT
UA UNI T SUPPORT
PRODUC T I V I T Y REV I EW LOADER
PRODUC T I V I T Y REV I EW HAUL ER
PRODUC T I V I T Y PROB L EM LOADER
PLAN WEEK 27
JULY 2022
JOB SITE BAS – TANJUNG ENIM
PT MANGGALA
ENGINEERING DEPARTMENT
2022
OB REMOVAL
ROST ER WEEK 2 7
Unit 4/Jul 5/Jul 6/Jul 7/Jul 8/Jul 9/Jul 10/Jul Total
day 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00
day -
day 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00
hr 24.00 24.00 24.00 24.00 24.00 24.00 24.00 168.00
hr 1.22 1.22 1.22 1.22 1.22 1.22 1.22 8.54
hr 0.49 0.49 0.49 0.49 0.49 0.49 0.49 3.42
hr 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00
hr 2.00 2.00 2.00 2.00 2.00 2.00 2.00 14.00
hr - - - - 1.00 3.00 - 4.00
hr - - - 1.00 - - - 1.00
hr - - - - - - - -
hr 0.50 0.50 0.50 0.50 0.50 0.50 0.50 3.50
hr 5.21 5.21 5.21 6.21 6.21 8.21 5.21 41.46
hr 5.21 5.21 5.21 6.21 6.21 8.21 5.21 41.46
hr 4.72 4.72 4.72 5.72 5.72 7.72 4.72 38.04
hr 18.79 18.79 18.79 17.79 17.79 15.79 18.79 126.54
hr 18.79 18.79 18.79 17.79 17.79 15.79 18.79 126.54
hr 19.28 19.28 19.28 18.28 18.28 16.28 19.28 129.96
Fasting
Fuel, Oil, Grease
Excavator Standby Hours
Hauler Standby Hours
Support Standby Hours
Excavator Available Hours
Hauler Available Hours
Support Available Hours
Safety Talk
Subject
Calendar Days
Holiday/Shutdown
Available Days
MOHH
Standby Hours
Rain
Slippery
Shift Change+P5M+P2H
Meal & Rest
Friday Pray
PLAN PA WEEK 27
NO EQUIPMENT
NO EQUIPMENT TYPE POPULASI PA OPERASI PA
1 EXCAVATOR Qty PA Qty PA
ZX1200 1 81% 1 81%
` EXHC12001 1 81% 1 81%
ZX870 4 47% 2 62%
EXHC87002 1 42% 0 42%
EXHC87003 1 75% 1 75%
EXHC87004 1 0% 0 0%
EXHC87006 1 70% 1 70%
DS700 2 41% 1 81%
SN500LC-V 2 83% 2 83%
2 HAULER
TR100 5 32% 2 81%
TR60 5 63% 4 79%
EH1100 17 22% 5 63%
HD465-7R 2 30% 1 60%
CAT773 2 77% 2 77%
SN90S 37 54% 25 77%
3 BULLDOZER
D10T 1 0% 0 0%
DZShantui 2 0% 0 0%
D8R 1 35% 1 70%
D6R 3 31% 2 63%
D85ESS-2 2 35% 1 70%
XBDSN230 2 82% 2 82%
4 MOTOR GRADER
GD160 0 0% 0 0%
GD705 2 55% 1 0%
5 COMPACTOR
5 WATER PUMP
MINE PUMP 2 84% 2 84%
MPSW15002 1 84% 1 84%
MPKS15003 1 84% 1 84%
6 FUEL TRUCK
2528C 1 85% 1 89%
7 LUBE TRUCK
PS130HD 0 0% 0 0%
2528C 1 85% 1 90%
9 CRANE TRUCK
8 TOWER LAMP
RL4000 3 90% 1 90%
VT8 0 0% 0 0%
MT20KVA 3 60% 1 90%
9 WATER TRUCK
FM260 2 73% 1 55%
POPULASI OPERASI
EQUI PMENT DI STRI BUTION WEEK 27
No Loader EGI Code Number Quantity Block Disposal Distance (m) PA UA
Total
Working
Days
Prod'ty (Bcm/hrs)
Available
Hours
Delay & Idle
Hours
Eff. Working
Hours
Production
(Bcm)
Kebutuhan DT
1 ZX1200 EXHC12001 1 PIT SELATAN OPD3 3,100 81.2% 72.1% 7.0 450 136 38 98 44,274 6
2 ZX869 EXHC870 03 1 PIT SELATAN OPD3 3,100 75.2% 69.9% 7.0 300 126 38 88.3 26,492 6
4 ZX870 EXHC870 06 1 PIT SELATAN OPD3 3,100 69.7% 67.5% 7.0 300 117 38 79 23,720
5 DS700 EXHC700 01 1 PIT SELATAN OPD3 1,800 81.2% 72.1% 7.0 250 136 38 98.4 24,597
5 SN500 XSNX05 1 PIT SELATAN OPD3 3,000 82.7% 72.6% 7.0 200 139 38 101 20,194 5
6 SN500 XSNX06 1 PIT SELATAN OPD3 1,500 82.7% 72.6% 7.0 200 139 38 101 20,194 6
6 2,684 67.5% 61.0% 921 266 654 159,472 28
No Hauler EGI Material QTY Active Eff Running Pit PA UA
Total
Working
Days
Available
Hours
Delay & Idle
Hours
Eff. Working
Hours
1 TR100 OB 5 2 2 BAS 80.7% 72.0% 7.0 136 38 98
2 TR60 OB 5 4 3 BAS 78.7% 71.2% 7.0 132 38 94
3 EH1100 OB 17 5 3 BAS 63.5% 64.3% 7.0 107 38 69
4 CAT 773 OB 2 2 2 BAS 77.2% 70.7% 7.0 130 38 92
5 HD465-7R OB 2 1 1 BAS 60.3% 62.5% 7.0 101 38 63
6 SANY90S OB 37 25 19 BAS 77.2% 70.7% 7.0 130 38 92
68 39 29 BAS 72.9% 68.6% 735 228 507 143,585
Digger - OB
Hauler EGI
TR100+HD60T class
SKT90S
HD60T class
TR100+HD60T class+SKT90S
SKT90S
SKT90S
Total Avg Total
91 17,754
50 18,837
47 16,120
Hauler
Prod'ty (Bcm/hrs or Ton/Hr) Production (Bcm)
Total OB Total OB
53 9,616
34 77,905
53 3,354
PLAN PRODUC TI ON WEEK 27
PRODUCTION SUMMARY
PRODUCTION PROJECTION
Details 4/Jul 5/Jul 6/Jul 7/Jul 8/Jul 9/Jul 10/Jul Total
Overburden Capacity 21,322.69 21,322.69 21,322.69 20,188.02 20,188.02 17,918.68 21,322.69 143,585.46
Loader 23,681.79 23,681.79 23,681.79 22,421.58 22,421.58 19,901.17 23,681.79 159,471.50
Hauler 21,322.69 21,322.69 21,322.69 20,188.02 20,188.02 17,918.68 21,322.69 143,585.46
Coal Exposed - - - - - - - -
SR Exposed - - - - - - - -
Stripping Ratio
DESCRIPTION OB (BCM) COAL (TON) SR OB (BCM)/day
MTD; 3 JULY 2022 (by TC) 43,485 - 0.00
Plan July 2022 563,626 93,333 6.04 20,129
Total Proj. End of JULY 2022 607,111 93,333 6.50
Plan JULY 2022 603,885 100,000 6.04
Est. Ach JULY 2022 101% 93%
SEQ UENCE WEEK 2 7
AREA COAL WASTE SR
A 21,273 32,364 1.521353
B 0 14,677 0
C 0 57,190 0
TOTAL 21,273 104,231 4.899649
SEQ UENCE WEEK 2 7
NAME SUBNAME_2
INTERVAL INTRRMASS
INTDILUTION
INTLOSS TOTBURDVOLUME
COAL WASTE SR
A RL046 I1 33.24561 1.562348 3.124697 41.66866 37 43 1.18
A RL046 I2 1712.546 16.26322 32.52644 37.1035 1,748 53 0.03
A RL046 I3U 1403.393 59.04029 118.0806 2027.6 1,533 2,087 1.36
A RL046 I3 1335.769 18.08053 36.16105 611.6182 1,376 630 0.46
A RL046 I3L 1903.339 50.14247 100.2849 334.6138 2,014 385 0.19
A RL046 H 850.8532 5.749108 11.49822 7333.892 864 7,340 8.50
A RL048 I1 354.7174 16.78398 33.56796 1041.799 392 1,059 2.70
A RL048 I2 2820.496 26.86468 53.72936 204.5271 2,880 231 0.08
A RL048 I3U 1138.403 49.17001 98.34001 3011.114 1,247 3,060 2.45
A RL048 I3 845.7043 11.53601 23.07201 530.9098 871 542 0.62
A RL048 I3L 1486.807 38.50943 77.01885 278.8286 1,572 317 0.20
A RL048 H 313.0738 2.082856 4.165713 4404.178 318 4,406 13.87
A RL050 I1 428.1583 20.75143 41.50286 2311.688 474 2,332 4.92
A RL050 I2 2361.269 22.66975 45.33951 445.9791 2,411 469 0.19
A RL050 I3U 719.1821 31.41152 62.82303 1854.278 788 1,886 2.39
A RL050 I3 85.47896 1.171183 2.342367 153.3722 88 155 1.76
A RL050 I3L 345.4506 9.008571 18.01714 157.5821 365 167 0.46
A RL050 H 0 0 0 2074.138 0 2,074 0.00
A RL052 I1 543.5609 28.08652 56.17303 2162.866 605 2,191 3.62
A RL052 I2 607.6858 5.911602 11.8232 374.6038 621 381 0.61
A RL052 I3U 148.6709 6.643692 13.28738 719.2346 163 726 4.45
A RL052 I3L 298.5434 7.734255 15.46851 86.74226 316 94 0.30
A RL052 H 0 0 0 789.1511 0 789 0.00
A RL054 I1 14.41368 0.92228 1.844561 433.612 16 435 26.43
A RL054 I2 86.01179 0.831516 1.663033 80.13107 88 81 0.92
A RL054 I3U 78.24325 3.424396 6.848792 92.33725 86 96 1.12
A RL054 I3L 255.0777 6.47974 12.95948 51.28454 269 58 0.21
A RL054 H 0 0 0 212.8978 0 213 0.00
A RL056 I1 0 0 0 36.89121 0 37 0.00
A RL056 I3L 126.2901 3.179985 6.35997 0 133 3 0.02
A RL054 I3U 78.24325 3.424396 6.848792 92.33725 86 96 1.12
A RL054 I3L 255.0777 6.47974 12.95948 51.28454 269 58 0.21
A RL054 H 0 0 0 212.8978 0 213 0.00
A RL056 I1 0 0 0 36.89121 0 37 0.00
A RL056 I3L 126.2901 3.179985 6.35997 0 133 3 0.02
A RL058 I1 0 0 0 25.18556 0 25 0.00
A RL060 I1 0 0 0 0.228852 0 0 0.00
B RL062 I1 0 0 0 10353.89 0 10,354 0.00
B RL064 I1 0 0 0 3853.501 0 3,854 0.00
B RL066 I1 0 0 0 343.0444 0 343 0.00
B RL068 I1 0 0 0 108.5279 0 109 0.00
B RL070 I1 0 0 0 17.8254 0 18 0.00
C RL072 I1 0 0 0 19760.75 0 19,761 0.00
C RL074 I1 0 0 0 14450.79 0 14,451 0.00
C RL076 I1 0 0 0 10087.53 0 10,088 0.00
C RL078 I1 0 0 0 7702.783 0 7,703 0.00
C RL080 I1 0 0 0 3989.237 0 3,989 0.00
C RL082 I1 0 0 0 1142.67 0 1,143 0.00
C RL084 I1 0 0 0 56.63825 0 57 0.00
21,273 104,231 4.90
SEQ UENCE WEEK 4 0
W27 DISPOSAL
GENERAL PLAN
NO WORK UNIT 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul REMARK
1 MAINTENANCE AKSES PIT SELATAN 1X DZ85CLASS
2 PROGRESS PARKIRAN 1X PC400CLASS
3 PERIMETER DITCH 1X PC400CLASS
4 LOADING SPOIL UNTUK PELEBARAN JALAN 1X PC400CLASS
6 LOADING BLIND SPOT SIMPANG MULALI & STOCKROM 1X PC400CLASS
Review W 26 & Plan Week 27 2022_MUM.pptx

More Related Content

Similar to Review W 26 & Plan Week 27 2022_MUM.pptx

Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptxChinelo Ezenwa
 
Presentación energía linea industrial
Presentación energía linea industrialPresentación energía linea industrial
Presentación energía linea industrialGUSTAVO HURTADO
 
Unite steel tool joints mechanical property
Unite steel tool joints mechanical propertyUnite steel tool joints mechanical property
Unite steel tool joints mechanical propertyShanghai Unite Steel
 
Complete catalogue
Complete catalogueComplete catalogue
Complete catalogueCathy Hsu
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwarePratap Bikram Shahi
 
APC in thermal power plant
APC in thermal power plant APC in thermal power plant
APC in thermal power plant Molla Morshad
 
Operation - OR for JAN 23.pptx
Operation - OR for JAN 23.pptxOperation - OR for JAN 23.pptx
Operation - OR for JAN 23.pptxPowerMurugan
 
Bosch fuel pump_web
Bosch fuel pump_webBosch fuel pump_web
Bosch fuel pump_webmrjayppl
 
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 308. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3Menadžment Centar Beograd
 
Elecon Wrom Gear Catalogue| Sumit Engineers
Elecon  Wrom Gear Catalogue| Sumit EngineersElecon  Wrom Gear Catalogue| Sumit Engineers
Elecon Wrom Gear Catalogue| Sumit EngineersSUMITCHUGH8
 

Similar to Review W 26 & Plan Week 27 2022_MUM.pptx (20)

Dyeing
DyeingDyeing
Dyeing
 
Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptx
 
Final-report
Final-reportFinal-report
Final-report
 
Presentación energía linea industrial
Presentación energía linea industrialPresentación energía linea industrial
Presentación energía linea industrial
 
Unite steel tool joints mechanical property
Unite steel tool joints mechanical propertyUnite steel tool joints mechanical property
Unite steel tool joints mechanical property
 
Complete catalogue
Complete catalogueComplete catalogue
Complete catalogue
 
Tabel uap
Tabel uapTabel uap
Tabel uap
 
Properties table
Properties tableProperties table
Properties table
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
 
APC in thermal power plant
APC in thermal power plant APC in thermal power plant
APC in thermal power plant
 
Operation - OR for JAN 23.pptx
Operation - OR for JAN 23.pptxOperation - OR for JAN 23.pptx
Operation - OR for JAN 23.pptx
 
Cp 24062018 2241
Cp 24062018 2241Cp 24062018 2241
Cp 24062018 2241
 
Backwash blower-room
Backwash blower-roomBackwash blower-room
Backwash blower-room
 
anexos.pdf
anexos.pdfanexos.pdf
anexos.pdf
 
Bosch fuel pump_web
Bosch fuel pump_webBosch fuel pump_web
Bosch fuel pump_web
 
catalog
catalogcatalog
catalog
 
catalog
catalogcatalog
catalog
 
08. icv sastanak (microsoft) miroslav nps3
08. icv sastanak (microsoft) miroslav nps308. icv sastanak (microsoft) miroslav nps3
08. icv sastanak (microsoft) miroslav nps3
 
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 308. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
08. ICV sastanak (Microsoft) Miroslav Jovković NPS 3
 
Elecon Wrom Gear Catalogue| Sumit Engineers
Elecon  Wrom Gear Catalogue| Sumit EngineersElecon  Wrom Gear Catalogue| Sumit Engineers
Elecon Wrom Gear Catalogue| Sumit Engineers
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

Review W 26 & Plan Week 27 2022_MUM.pptx

  • 1. Review WEEK 26 JULI 2022 JOB SITE BAS – TANJUNG ENIM PT MANGGALA ENGINEERING DEPARTMENT 2022
  • 2. PRODUC TI ON REVI EW ALL PI T
  • 3. PRODUC TI ON REVI EW ALL PI T
  • 4. PRODUC T I ON REV I EW
  • 7. PRODUC T I ON CAPACI T Y ANALYSI S OB
  • 8. PRODUC T I ON CAPACI T Y ANALYSI S OB
  • 9. WAT ERFAL L ANALYSI S LOADER
  • 10. WAT ERFAL L ANALYSI S HAUL ER
  • 11. PARETO LOSS of UA LOADER
  • 12. PARETO LOSS of UA HAUL ER
  • 13. PHYSI CAL AVAI L AB I L I T Y REV I EW
  • 14. USED OF AVAI L AB I L I T Y REV I EW
  • 15. PA UNI T SUPPORT
  • 16. UA UNI T SUPPORT
  • 17. PRODUC T I V I T Y REV I EW LOADER
  • 18. PRODUC T I V I T Y REV I EW HAUL ER
  • 19. PRODUC T I V I T Y PROB L EM LOADER
  • 20. PLAN WEEK 27 JULY 2022 JOB SITE BAS – TANJUNG ENIM PT MANGGALA ENGINEERING DEPARTMENT 2022
  • 21. OB REMOVAL ROST ER WEEK 2 7 Unit 4/Jul 5/Jul 6/Jul 7/Jul 8/Jul 9/Jul 10/Jul Total day 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00 day - day 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00 hr 24.00 24.00 24.00 24.00 24.00 24.00 24.00 168.00 hr 1.22 1.22 1.22 1.22 1.22 1.22 1.22 8.54 hr 0.49 0.49 0.49 0.49 0.49 0.49 0.49 3.42 hr 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00 hr 2.00 2.00 2.00 2.00 2.00 2.00 2.00 14.00 hr - - - - 1.00 3.00 - 4.00 hr - - - 1.00 - - - 1.00 hr - - - - - - - - hr 0.50 0.50 0.50 0.50 0.50 0.50 0.50 3.50 hr 5.21 5.21 5.21 6.21 6.21 8.21 5.21 41.46 hr 5.21 5.21 5.21 6.21 6.21 8.21 5.21 41.46 hr 4.72 4.72 4.72 5.72 5.72 7.72 4.72 38.04 hr 18.79 18.79 18.79 17.79 17.79 15.79 18.79 126.54 hr 18.79 18.79 18.79 17.79 17.79 15.79 18.79 126.54 hr 19.28 19.28 19.28 18.28 18.28 16.28 19.28 129.96 Fasting Fuel, Oil, Grease Excavator Standby Hours Hauler Standby Hours Support Standby Hours Excavator Available Hours Hauler Available Hours Support Available Hours Safety Talk Subject Calendar Days Holiday/Shutdown Available Days MOHH Standby Hours Rain Slippery Shift Change+P5M+P2H Meal & Rest Friday Pray
  • 22. PLAN PA WEEK 27 NO EQUIPMENT NO EQUIPMENT TYPE POPULASI PA OPERASI PA 1 EXCAVATOR Qty PA Qty PA ZX1200 1 81% 1 81% ` EXHC12001 1 81% 1 81% ZX870 4 47% 2 62% EXHC87002 1 42% 0 42% EXHC87003 1 75% 1 75% EXHC87004 1 0% 0 0% EXHC87006 1 70% 1 70% DS700 2 41% 1 81% SN500LC-V 2 83% 2 83% 2 HAULER TR100 5 32% 2 81% TR60 5 63% 4 79% EH1100 17 22% 5 63% HD465-7R 2 30% 1 60% CAT773 2 77% 2 77% SN90S 37 54% 25 77% 3 BULLDOZER D10T 1 0% 0 0% DZShantui 2 0% 0 0% D8R 1 35% 1 70% D6R 3 31% 2 63% D85ESS-2 2 35% 1 70% XBDSN230 2 82% 2 82% 4 MOTOR GRADER GD160 0 0% 0 0% GD705 2 55% 1 0% 5 COMPACTOR 5 WATER PUMP MINE PUMP 2 84% 2 84% MPSW15002 1 84% 1 84% MPKS15003 1 84% 1 84% 6 FUEL TRUCK 2528C 1 85% 1 89% 7 LUBE TRUCK PS130HD 0 0% 0 0% 2528C 1 85% 1 90% 9 CRANE TRUCK 8 TOWER LAMP RL4000 3 90% 1 90% VT8 0 0% 0 0% MT20KVA 3 60% 1 90% 9 WATER TRUCK FM260 2 73% 1 55% POPULASI OPERASI
  • 23. EQUI PMENT DI STRI BUTION WEEK 27 No Loader EGI Code Number Quantity Block Disposal Distance (m) PA UA Total Working Days Prod'ty (Bcm/hrs) Available Hours Delay & Idle Hours Eff. Working Hours Production (Bcm) Kebutuhan DT 1 ZX1200 EXHC12001 1 PIT SELATAN OPD3 3,100 81.2% 72.1% 7.0 450 136 38 98 44,274 6 2 ZX869 EXHC870 03 1 PIT SELATAN OPD3 3,100 75.2% 69.9% 7.0 300 126 38 88.3 26,492 6 4 ZX870 EXHC870 06 1 PIT SELATAN OPD3 3,100 69.7% 67.5% 7.0 300 117 38 79 23,720 5 DS700 EXHC700 01 1 PIT SELATAN OPD3 1,800 81.2% 72.1% 7.0 250 136 38 98.4 24,597 5 SN500 XSNX05 1 PIT SELATAN OPD3 3,000 82.7% 72.6% 7.0 200 139 38 101 20,194 5 6 SN500 XSNX06 1 PIT SELATAN OPD3 1,500 82.7% 72.6% 7.0 200 139 38 101 20,194 6 6 2,684 67.5% 61.0% 921 266 654 159,472 28 No Hauler EGI Material QTY Active Eff Running Pit PA UA Total Working Days Available Hours Delay & Idle Hours Eff. Working Hours 1 TR100 OB 5 2 2 BAS 80.7% 72.0% 7.0 136 38 98 2 TR60 OB 5 4 3 BAS 78.7% 71.2% 7.0 132 38 94 3 EH1100 OB 17 5 3 BAS 63.5% 64.3% 7.0 107 38 69 4 CAT 773 OB 2 2 2 BAS 77.2% 70.7% 7.0 130 38 92 5 HD465-7R OB 2 1 1 BAS 60.3% 62.5% 7.0 101 38 63 6 SANY90S OB 37 25 19 BAS 77.2% 70.7% 7.0 130 38 92 68 39 29 BAS 72.9% 68.6% 735 228 507 143,585 Digger - OB Hauler EGI TR100+HD60T class SKT90S HD60T class TR100+HD60T class+SKT90S SKT90S SKT90S Total Avg Total 91 17,754 50 18,837 47 16,120 Hauler Prod'ty (Bcm/hrs or Ton/Hr) Production (Bcm) Total OB Total OB 53 9,616 34 77,905 53 3,354
  • 24. PLAN PRODUC TI ON WEEK 27 PRODUCTION SUMMARY PRODUCTION PROJECTION Details 4/Jul 5/Jul 6/Jul 7/Jul 8/Jul 9/Jul 10/Jul Total Overburden Capacity 21,322.69 21,322.69 21,322.69 20,188.02 20,188.02 17,918.68 21,322.69 143,585.46 Loader 23,681.79 23,681.79 23,681.79 22,421.58 22,421.58 19,901.17 23,681.79 159,471.50 Hauler 21,322.69 21,322.69 21,322.69 20,188.02 20,188.02 17,918.68 21,322.69 143,585.46 Coal Exposed - - - - - - - - SR Exposed - - - - - - - - Stripping Ratio DESCRIPTION OB (BCM) COAL (TON) SR OB (BCM)/day MTD; 3 JULY 2022 (by TC) 43,485 - 0.00 Plan July 2022 563,626 93,333 6.04 20,129 Total Proj. End of JULY 2022 607,111 93,333 6.50 Plan JULY 2022 603,885 100,000 6.04 Est. Ach JULY 2022 101% 93%
  • 25. SEQ UENCE WEEK 2 7 AREA COAL WASTE SR A 21,273 32,364 1.521353 B 0 14,677 0 C 0 57,190 0 TOTAL 21,273 104,231 4.899649
  • 26. SEQ UENCE WEEK 2 7 NAME SUBNAME_2 INTERVAL INTRRMASS INTDILUTION INTLOSS TOTBURDVOLUME COAL WASTE SR A RL046 I1 33.24561 1.562348 3.124697 41.66866 37 43 1.18 A RL046 I2 1712.546 16.26322 32.52644 37.1035 1,748 53 0.03 A RL046 I3U 1403.393 59.04029 118.0806 2027.6 1,533 2,087 1.36 A RL046 I3 1335.769 18.08053 36.16105 611.6182 1,376 630 0.46 A RL046 I3L 1903.339 50.14247 100.2849 334.6138 2,014 385 0.19 A RL046 H 850.8532 5.749108 11.49822 7333.892 864 7,340 8.50 A RL048 I1 354.7174 16.78398 33.56796 1041.799 392 1,059 2.70 A RL048 I2 2820.496 26.86468 53.72936 204.5271 2,880 231 0.08 A RL048 I3U 1138.403 49.17001 98.34001 3011.114 1,247 3,060 2.45 A RL048 I3 845.7043 11.53601 23.07201 530.9098 871 542 0.62 A RL048 I3L 1486.807 38.50943 77.01885 278.8286 1,572 317 0.20 A RL048 H 313.0738 2.082856 4.165713 4404.178 318 4,406 13.87 A RL050 I1 428.1583 20.75143 41.50286 2311.688 474 2,332 4.92 A RL050 I2 2361.269 22.66975 45.33951 445.9791 2,411 469 0.19 A RL050 I3U 719.1821 31.41152 62.82303 1854.278 788 1,886 2.39 A RL050 I3 85.47896 1.171183 2.342367 153.3722 88 155 1.76 A RL050 I3L 345.4506 9.008571 18.01714 157.5821 365 167 0.46 A RL050 H 0 0 0 2074.138 0 2,074 0.00 A RL052 I1 543.5609 28.08652 56.17303 2162.866 605 2,191 3.62 A RL052 I2 607.6858 5.911602 11.8232 374.6038 621 381 0.61 A RL052 I3U 148.6709 6.643692 13.28738 719.2346 163 726 4.45 A RL052 I3L 298.5434 7.734255 15.46851 86.74226 316 94 0.30 A RL052 H 0 0 0 789.1511 0 789 0.00 A RL054 I1 14.41368 0.92228 1.844561 433.612 16 435 26.43 A RL054 I2 86.01179 0.831516 1.663033 80.13107 88 81 0.92 A RL054 I3U 78.24325 3.424396 6.848792 92.33725 86 96 1.12 A RL054 I3L 255.0777 6.47974 12.95948 51.28454 269 58 0.21 A RL054 H 0 0 0 212.8978 0 213 0.00 A RL056 I1 0 0 0 36.89121 0 37 0.00 A RL056 I3L 126.2901 3.179985 6.35997 0 133 3 0.02 A RL054 I3U 78.24325 3.424396 6.848792 92.33725 86 96 1.12 A RL054 I3L 255.0777 6.47974 12.95948 51.28454 269 58 0.21 A RL054 H 0 0 0 212.8978 0 213 0.00 A RL056 I1 0 0 0 36.89121 0 37 0.00 A RL056 I3L 126.2901 3.179985 6.35997 0 133 3 0.02 A RL058 I1 0 0 0 25.18556 0 25 0.00 A RL060 I1 0 0 0 0.228852 0 0 0.00 B RL062 I1 0 0 0 10353.89 0 10,354 0.00 B RL064 I1 0 0 0 3853.501 0 3,854 0.00 B RL066 I1 0 0 0 343.0444 0 343 0.00 B RL068 I1 0 0 0 108.5279 0 109 0.00 B RL070 I1 0 0 0 17.8254 0 18 0.00 C RL072 I1 0 0 0 19760.75 0 19,761 0.00 C RL074 I1 0 0 0 14450.79 0 14,451 0.00 C RL076 I1 0 0 0 10087.53 0 10,088 0.00 C RL078 I1 0 0 0 7702.783 0 7,703 0.00 C RL080 I1 0 0 0 3989.237 0 3,989 0.00 C RL082 I1 0 0 0 1142.67 0 1,143 0.00 C RL084 I1 0 0 0 56.63825 0 57 0.00 21,273 104,231 4.90
  • 27. SEQ UENCE WEEK 4 0 W27 DISPOSAL
  • 28. GENERAL PLAN NO WORK UNIT 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul REMARK 1 MAINTENANCE AKSES PIT SELATAN 1X DZ85CLASS 2 PROGRESS PARKIRAN 1X PC400CLASS 3 PERIMETER DITCH 1X PC400CLASS 4 LOADING SPOIL UNTUK PELEBARAN JALAN 1X PC400CLASS 6 LOADING BLIND SPOT SIMPANG MULALI & STOCKROM 1X PC400CLASS

Editor's Notes

  1. GD 0 NIA