SlideShare a Scribd company logo
CONSTRUCTION EQUIPMENTS IN
EARTHWORK
BY ABHISHEK KADVE
 Selection of equipment for earth work
 Earth moving operations
 Types of earthwork equipment
 Tractors
 Motor graders
 Scrapers
 Front end waders
 Earth movers
 Equipment for foundation and pile driving.
 Equipment for compaction
 Batching and mixing and concreting
 Equipment for material handling and erection of
structures
 Equipment for dredging, trenching, tunneling,
1. USE OF EQUIPMENT AVAILABLE WITH THE
ORGANIZATION.
2. SUITABILITY FOR JOB CONDITION WITH
SPECIAL REFERENCE TO CLIMATIC AND
OPERATING CONDITIONS.
3. UNIFORMITY OF TYPE.
4. SIZE OF EQUIPMENT.
5. USE OF STANDARD EQUIPMENT.
6. COUNTRY OF ORIGIN.
7. UNIT COST OF PRODUCTION.
8. AVAILABILITY OF SPARE PARTS AND
SELECTION OF MANUFACTURERS.
9. SUITABILITY OF LOCAL LABOUR FOR
OPERATION.
1. EARTH MOVING EQUIPMENT.
2. HAULING EQUIPMENT.
3. CONVEYING EQUIPMENT.
4. AGGREGATE AND CONCRETE
PRODUCTION EQUIPMENT.
5. PILE DRIVING EQUIPMENT.
6. TUNNELING AND ROCK DRILLING
EQUIPMENT.
7. PUMPING AND DEWATERING
EQUIPMENT.
CLASSIFICATION:
 EXCAVATING EQUIPMENT.
 EXCAVATING AND EARTH MOVING
EQUIPMENT.
1. POWER SHOVEL.
2. BACK HOE.
LONG-LASTING.
EXCAVATE ALL TYPES OF EARTH EXCEPT HARD
ROCK.
TYPES:
WHEEL MOUNTED (HIGH SPEED).
CRAWLER MOUNTED (LOW SPEED).
BASIC PARTS:
*TRACK SYSTEM *CABIN
*CABLES *RACK & STICK
*BOOM FOOT PIN *SADDLE BLOCK
*BOOM POINT SHEAVE *BUCKET
OPERATION:
 CABLE CONTROLLED.
APPLICATIONS:
 CLOSE RANGE OF WORK.
 VERY HARD MATERIALS, BIG SIZED BOULDERS.
FACTORS CONTROLLING OUTPUT:
*CLASS OF MATERIAL *DEPTH OF CUTTING
*ANGLE OF SWING *SKILL OF OPERATOR
 ALSO TERMED AS HOE, BACK SHOVEL AND
PULL SHOVEL.
 USED TO EXCAVATE BELOW THE SURFACE
OF EQUIPMENT-IT CAVES INTO THE
GROUND.
BASIC PARTS:
*BOOM *JACK BOOM
*BOOM FOOT DRUM *BOOM SHEAVE
*STICK, BUCKET *BUCKET SHEAVE
OPERATION:
SIMILAR TO SHOVEL EXCEPT IT MAKES
OUTWARD STROKES WHILE DIGGING.
APPLICATION:
TRENCHES, FOOTINGS, BASEMENTS.
TO TRIM THE SURFACE.
 MOTOR GRADERS.
 CRANES.
 THEY MAY BE EITHER TOWED OR MOTORISED.
 USUALLY SELF PROPULSIVE.
CONSTRUCTION:
 FRONT OF THE GRADER FRAME IS SUPPORTED ON A PAIR
OF FRONT WHEELS & REAR ON TANDEM WHEELS.
 CURVED BLADE IS SUPPORTED ON THE CIRCLE AND BE
TURNED THROUGH 360 DEGREE.
 BLADE HAS REPLACEBLE EDGES.
CUTTING DEPTH - 2-4CMS.
SPEED
LIGHT DUTY - 6-10 KM/HR.
HEAVY DUTY - 2-3 KM/HR.
NORMAL DUTY - 4-6 KM/HR.
USES:
*GRAVEL ROAD REPAIRING *ROAD SHOULDER RESHAPING
*BANK CUTTING *DITCH FILLING
*BASE COURSE SPREADING *MATERIAL MIXING
*SNOW, LAND CLEARANCE *FROZEN TOP SOIL, ASPHALT
BREAKING
 USED IN CONSTRUCTION PROJECTS, SHIPPING,
INDUSTRIES ETC.
 THEY MAY BE ELECTRICALLY OPERATED, DIESEL
OPERATED OR DIESEL-ELECTRIC DRIVE.
CLASSIFICATION:
 DERRICK CRANES.
 MOBILE CRANES.
 OVERHEAD OR GANTRY CRANES.
 TRAVELLER CRANES.
 TOWER CRANES.
PARTS:
 MAST.
 BOOM.
 BULL WHEEL.
TYPES:
 GUY-DERRICK.
 STIFF LEG DERRICK.
OPERATION:
 THE BOOM CAN REVOLVE THROUGH 360 DEGREE.
 IT CAN CARRY LOADS UPTO 200 TONS.
 WHEN THE LOAD IS LESS THAN 50 TONS GUY ROPES ARE
REPLACED BY TRUSSED STRUCTURE.
 STIFF LEG DERRICK CAN CARRY 7-50 TONS.
USES:
 LOADING AND UNLOADING CARGOES AT PORTS.
 TO HANDLE LOOSE MATERIALS LIKE SAND, BALLAST,
COAL.
 IN CONSTRUCTION PROJECTS, INDUSTRIAL,
MULTISTOREYED BUILDING CONSTRUCTION.
 PLANT ERRECTION.
 THEY ARE EITHER CRAWLER MOUNTED
OR WHEEL MOUNTED.
 CRAWLER MOUNTED ARE HIGHLY
MANEOUVERABILE AND OPERATE ON
UNMADE GROUND.
 SUITABLE FOR ROUGH TERRAINS.
 OPERATE IN A LIMITED AREA.
 TRUCK MOUNTED CRANES HAVE HIGH
MOBILITY.
SPEED
70-75 KM/HR.
 USED FOR HANDLING LOADS OVER A LONG
RECTANGULAR AREA.
 IT CONSISTS OF STRUCTURAL BRIDGE
SUPPORT ON ELEVATED TRACTS AND
SUPPORTING A LIFTING BLOCK.
TRAVELLER CRANES
 THESE HAVE THEIR CRABS MOVING ON
GIRDERS SUPPORTED ON LEGS.
TOWER CRANES
 IT HAS A TRUSS STRUCTURE WELDED FROM
ANGLE BARS AND CHANNELS.
 LADDERS ARE PROVIDED FOR EASE.
 THEY CAN BE ASSEMBLED AND DISMENTLED.
 SCRAPERS.
 BULL DOZERS.
 TRACTORS.
 COMPROMISE BETWEEN BEST LOADING AND BEST
HAULING MACHINES.
 UNIQUE FOR LONG DISTANCE HAULING
 IT ITSELF DIGS, HAULS, DEPOSIT THE MATERIALS IN
UNIFORM THICK LAYERS.
TYPES:
 CRAWLER TRACTOR PULLED.
 WHEEL TRACTOR PULLED.
BASIC PARTS:
 BOWL, APRON, EJECTOR (TAIL GATE).
CAPACITY:
 HEAPED CAPACITY OF THE BOWL.
OPERATION:
 WHILE DIGGING CUTTING EDGE ENTERS THE GROUND BY
LOWERING THE BOWL, THE FRONT APRON IS RAISED
 EDGE IS RAISED, APRON IS LOWED WHILE HAULING.
 WHILE DUMPING EJECTOR IS USED.
 VERSATILE EQUIPMENT- ESSENTIALLY A HEAVY STEEL BLADE
MOUNTED ON THE FRONT OF TRACTOR.
CLASSIFICATION BASED ON:
 POSITION OF BLADES - PERPENDICULAR BLADES.
- BLADES AT AN ANGLE.
 MOUNTING -WHEEL MOUNTED.
-CRAWLER MOUNTED.
 CONTROL -CABLE CONTROL.
-HYDRAULIC CONTROL.
CONSTRUCTION:
CONSIST OF HEAVY BLADE WITH CONCAVE PROFILE.
BLADE IS ATTACHED TO THE BODY WITH TWO ARMS, A
SUPPORTING FRAME & HELD BY TWO PUSH ARMS
APPLICATION:
 SPREADING EARTH FILL.
 CLEARING, OPENING UP PILOT ROADS.
 BACK FILLING TRENCHES.
 MULTI PURPOSE MACHINES MAINLY
USED FOR PULLING AND PUSHING OTHER
MACHINES FOR AGRICULTURAL
PURPOSES.
TYPES:
1. WHEEL TYPE
2. CRAWLER TYPE
CRAWLER TYPE WHEELED TYPE
1. SLOW SPEED
2. CAN HANDLE HEAVY
JOBS
3. COSTLY
4. REQUIRES SKILL TO
OPERATE
5. STICK CONTROL FOR
STEERING
6. ONLY ON ROUGH
ROADS
1. GREATER SPEED
2. ONLY LIGHTER JOBS
3. CHEAPER
4. LESSER SKILL FOR
OPERATION
5. WHEEL CONTROL
FOR STEERING
6. ON ROUGH AS WELL
AS GOOD ROADS
1. SMOOTH – WHEEL ROLLERS
2. SHEEP – FOOT ROLLERS
3. PNEUMATIC TYRED ROLLERS
 PLAIN STEEL ROLLERS
 SELF – PROPELLED (5 TO 25 TONNES)
 NO DEEP COMPACTION
 REAR WHEELS ARE LARGER IN DIAMETER
AND THE FRONT ONES ARE WIDER
 DIESEL ENGINE TYPE
 COMPACTION IS BY STATIC WEIGHT OF
ROLLER
SUITABILITY:
1. GRANULAR SOILS
2. SAND
3. GRAVEL
4. CRUSHED STONES
*HOLLOW STEEL DRUM WITH PROJECTED
FEET MOUNTED AT 100 TO 200 MMC/C
*WEIGHT 15TONNES
*SPEED 25KM/HR
*COMPACTION IS BY KNEADING ACTION
*IN CONVERTIBLE ROLLERS THE FOOT
PLATE CAN BE REMOVED
*IN TURN FOOT ROLLERS THE INDIVIDUAL
SHEEP FOOT CAN BE CHANGED
SUITABILITY:
CLAY,PREDOMINANTLY COHESIVE AND
IMPERVIOUS SOIL
*CONSISTS OF A BASE PLATFORM MOUNTED
BETWEEN TWO AXLES
*TRACKS OF THE REAR WHEEL LIE
INBETWEEN THE TRACKS OF THE FRONT
WHEEL
*COMPACTION IS BY CONTROLLING THE
GROUND CONTACT PRESSURE
*WEIGHT OR WIDTH OF THE WHEEL CAN BE
SUITABLY INCREASED
SUITABILITY:
FINE GRAINED AND WELL GRADED
SANDS
 DUMP TRUCKS
 DUMPERS
 CONVEYORS
TYPES
1. SIDE DUMP TRUCK
2. BOTTOM DUMP TRUCKS
SIDE DUMP TRUCK:
*DUMPING IS THROUGH THE SIDES OF THE
TRUCK
*SUITABLE FOR HAULING WET CLAY, SAND,
GRAVEL, QUARRY ROCKS.
BOTTOM DUMP TRUCKS:
*DUMPING IS BY OPENING THE BOTTOM OF THE
TRUCK
*SUITABLE FOR FREE FLOWING MATERIALS
SUCH AS SAND, GRAVEL, DRY EARTH, HARD
CLAY.
*HIGH SPED PNEUMATIC WHEELED TRUCKS
WITH SHORT CHASIS.
*SUITABLE FOR SHORT HAULS ON ROUGH
ROADS AND SPECIALLY WHERE A
SHUTTLE MOVEMENT IS REQUIRED
*TRANSMITTING MATERIALS OVER A
STATIONARY STRUCTURE
ADVANTAGES:
1. INCREASES OUTPUT
2. CONTINUITY IN OPERATION
3. TIME SAVING
TYPES:
1. BELT CONVEYOR
2. SCREW CONVEYOR
3. BUCKET CONVEYOR
*MOST POPULAR
* CONSISTS OF A BELT RUNNING OVER A PAIR
OF END DRUMS SUPPORTED BY A SERIES OF
ROLLERS CALLED IDLERS
*MIDDLE SAG IS PROVIDED TO PREVENT THE
SPILLING OF MATERIALS
ADVANTAGES:
 CAN HANDLE LIGHT,HEAVY, DRY, WET,
SOFT, COARSE MATERIALS
 HIGH SPEED
 CARRIES HORIZONTALLY AND INCLINED
 LIGHTER IN WEIGHT
 CONTROLLED DISCHARG
*USED FOR HANDLING GRANULAR OR
PULVARISED MATERIALS
*LOW COST
*CONSISTS OF A HELIX MOUNTED ON A
BEARING AT THE ENDS AND AT
INTERMEDIATE POINTS
*LENGTH IS 65M WITH AN INCLINATION
UPTO 35 DEGREES
*MATERIAL IS TRANSFERRED THROUGH A
SERIES OF BUCKETS
*LENGTH IS LIMITED TO 25M
*WEIGHT DEPENDS UPON THE STRENGTH
OF CHAINS
*MAINLY USED FOR HANDLING COAL
*PROPORTIONATING THE INGREDIENTS OF
CONCRETE FOR A PARTICULAR MIX
*WEIGH BATCHING IS COMMONLY USED
TYPES:
1. MANUAL BATCHING
2. SEMI - AUTOMATIC BATCHING
3. AUTOMATIC BATCHING
*MIXING ALL THE INGREDIENTS OF CONCRETE
TO MAKE A MIX OF SPECIFIED CONSISTENCY
FACTORS GOVERNING MIXING:
1. CORRECT SETTING OF MACHINE
2. PROPER CLEANING OF BLADES
3. SEQUENCE OF MATERIAL CHARGED
4. TIMELY SUPPLY OF WATER
5. DIRECTION OF IN - FLOW
6. SPEED AND TIME OF MIXING
TYPES:
 DRUM TYPE MIXERS - *TILTING
*NON - TILTING
 PAN TYPE MIXERS
 USUALLY DONE THROUGH BUCKETS
CARRIED ON RAIL ROADS OR TRACKS
 DUMP TRUCKS AND BELT CONVEYORS
ARE ALSO USED
 CABLE WAYS CAN BE USED OR THE
HOISTING OF BUCKETS MAY BE DONE
WITH THE HELP OF CRANES
 THESE ARE HEAVY DIRECT PUMPS USED IN
INACCESIBLE SITES SUCH AS TUNNELS,
UNDERWATER, SUBWAYS
 PUMPS CAN BE MOUNTED ON TRUCKS OR
TRAILERS
PNEUMATIC CONCRETE
PLACERS
 IT CONSISTS OF A PRESSURE VESSEL OPEN AT
THE TOP AND CONICAL AT THE BOTTOM
 COMPRESSED AIR IS USED TO PUSH THE
CONCRETE THROUGH PIPELINES
 PILE IS A STRUCTURAL MEMBER DRIVEN
INTO THE GROUND FOR THE PURPOSE OF
TRANSFERRING SURFACE LOADS
 THEY ARE EFFECTIVE AT AN
ECONOMICAL COST
TYPES:
1. PILE DRIVEN RIGS
- SKID MOUNTED
- CRANE MOUNTED
- FLOATING RIGS
2. PILE DRIVING HAMMERS
 USED FOR EXCAVATION FROM RIVER BED,
LAKE, SED FOR THE PURPOSE OF
DEEPENING THEM
TYPES:
1. DIPPER DREDGER
2. LADDER DREDGER
3. SUCTION DREDGER
 IT IS USUALY MOUNTED ON A FLOATING
PLATFORM
 THE BOOM CAN ROTATE THROUGH 180
DEGREES
 PRODUCTION RATE - 50 CU M/HR
 BUCKET SIZE - 12.5 CU M
 DUMPING RANGE - 30 M
 DEPTH - 15 TO 18 M
 IT IS EQUIPED WITH BUCKET ELEVATOR
MOUNTED ON A BARGE
 IT IS SUSPENDED ON A STEEL LADDER
 SUITABLE FOR EXCAVATING SOFT
GROUND, SAND OR GRAVEL
SUCTION DREDGER
1. SIMILAR IN OPERATION EXCEPT IT
CONSISTS OF A PUMP EXCAVATOR
MOUNTED ON A BARGE WITH SUCTION
LINE,SUPPORTED ON A LADDER.
 IT HAS A LIGHT CRANE BOOM AND THE BUCKET IS
LOOSLY ATTACHED TO THE BOOM THROUGH
CABLES
BASIC PARTS:
*BOOM *HOIST CABLE
*DRAG CABLE *DRAG CHAIN
*BUCKET
TYPES:
1. WHEEL MOUNTED
2. TRUCK MOUNTED
3. CRAWLER MOUNTED
OPERATION:
CABLE OPERATED
FACTORS AFFECTING OUTPUT:
*LENGTH OF BOOM *ANGLE OF SWING
*DEPTH OF CUT *SIZE OF UNIT
 THE BUCKET RESEMBLES TO A CALM WHICH IS
LIKE SHELL – FISH
BASIC PARTS
*CLOSING LINE *HOIST LINE
*SHEAVES *BRACKETS
*SHELL *HINGE
OPERATION
BY MANIPULATING THE CABLES SUITABLY
USES
1. FOR CRUSHED STONES, GRAVEL, COAL
2. FOR VERTICAL LIFTING OF MATERIALS
3. FOR REMOVING MATERIALS FROM COFERDAMS,
SEWER MANHOALS, WELL FOUNDATIONS.
 CONSISTS OF A PAIR OF CIRCULAR RIMS
CONNECTED BY U SHAPED BUCKETS OR
CUTTERS
 SELF PROPELLED
 THE EXCAVATING DEVICE IS CONNECTED TO A
MEANS OF CONVEYING
WIDTH - 12 M
DEPTH - 3 M
OPERATION
CABLE DRIVE
USES
FOR LAYING
1. WATER, GAS, OIL PIPE LINES
2. TELEPHONE CABLES
3. DRINAGE
4. SEWERS
 SIMILAR TO WHEEL TRENCHER EXCEPT
BUCKETS ARE PROVIDED WITH CHAIN
LINKS ON LADDER TYPE FRAME OR BOOM
ADVANTAGES:
1. FASTER AND CHEAPER
2. DIGS NECESSARY DEPTH
3. CONTINUOUS PROCESS
NEED FOR TUNNELLING
 FOR UNDERGROUND TRAFIC
 CONDUIT FOR WATER
 ACCESS TO MINES
 CONDUIT FOR UTILITY SERVICES
 SUBWAYS,UNDERGROUND TRAFFIC
1. CIRCULAR
2. ELLIPTICAL
3. SEMICIRCULAR
4. ARCH
5. CIRCULAR ARCH
6. SEMICIRCULAR ARCH
7. HORSE – SHOE SHAPED
 FULL FACE HEADING
 HEADING AND BENCH METHOD
 DRIFTS METHOD
 PILOT TUNNEL METHOD
1. SETTING UP AND DRILLING
2. LOADING THE HOLES WITH EXPLOSIVES
AND FIRING
3. VENTILATING AND REMOVING DUST
4. LOADING AND HAULING THE MUCK
5. REMOVING GROUNDWATER IF NECESSARY
6. ERRECTION OF SUPPORTS
7. PLACINF REINFORCEMENTS
8. PLACING CONCRETE LINING
9. CURRING
10. SHUTTERING REMOVAL
 THE MODERN TREND IS THE USE OF
LASER
 THESE ARE ACCURATE TO POSITION AND
PROVIDE CORRECT DIRECTION
 HELPS IN GUIDING THE MOLE IN
CORRECT DIRECTION AS NOT IN
CONVENTIONAL METHOD OF
TUNNELING

More Related Content

What's hot

Civil engineering disciplines and building classification
Civil engineering disciplines and building classificationCivil engineering disciplines and building classification
Civil engineering disciplines and building classification
Anjana R Menon
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
Gaurav Baviskar
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
Manit Agarwal
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
KHUSHBU SHAH
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
lotuseye
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
SOURAV4798
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tenders
gayu pandian
 
Types of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimatorTypes of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimator
AshwiniChaudhari13
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
Shankar Ramasamy
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
Bhavik A Shah
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
malang1214
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
murali mohan
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
Divya Vishnoi
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
Nikhil Kumar
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
Susitra Anandan
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
srinivas2036
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
Parth Desani
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
MaddelaSiddhardha
 

What's hot (20)

Civil engineering disciplines and building classification
Civil engineering disciplines and building classificationCivil engineering disciplines and building classification
Civil engineering disciplines and building classification
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tenders
 
Types of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimatorTypes of estimates, checklist of items of work, role of estimator
Types of estimates, checklist of items of work, role of estimator
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
 

Similar to CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT

CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
Suyash Awasthi
 
CONSTRUCTION EQUIPMENTS.pptx
CONSTRUCTION EQUIPMENTS.pptxCONSTRUCTION EQUIPMENTS.pptx
CONSTRUCTION EQUIPMENTS.pptx
HarkamalSingh18266
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
Safiullah Khan
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
Shankar Ramasamy
 
Bulldozer
BulldozerBulldozer
Bulldozer
Jenil Patel
 
EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTS
sauravchandel1
 
POWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITYPOWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITY
COACHINGCLASSTUITION
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
SuMitt MaNdla
 
Advance Construction equipment's reports
Advance Construction equipment's reports Advance Construction equipment's reports
Advance Construction equipment's reports
ssuser061280
 
HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT
venugopal battula
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
Sagar Radadiya
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
Mijanur Rahman
 
Mine Power & Drainage System
Mine Power & Drainage SystemMine Power & Drainage System
Mine Power & Drainage System
Ghulam Mehdi
 
Construction materials.
Construction materials.Construction materials.
Construction materials.
Hassan Mahar
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
VATSAL PATEL
 
Introduction to dredging
Introduction to dredgingIntroduction to dredging
DREDGING
DREDGINGDREDGING
DREDGING
Ahmed Ishfaq
 
Coal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and MachinesCoal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and Machines
Charles Jojo Besitan
 
Heavy construction equipment
Heavy construction equipmentHeavy construction equipment
Heavy construction equipment
Pritesh Parmar
 
Tunnel boring machine ppt
Tunnel boring machine pptTunnel boring machine ppt
Tunnel boring machine ppt
RohitGhosh42
 

Similar to CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT (20)

CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
 
CONSTRUCTION EQUIPMENTS.pptx
CONSTRUCTION EQUIPMENTS.pptxCONSTRUCTION EQUIPMENTS.pptx
CONSTRUCTION EQUIPMENTS.pptx
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 
Bulldozer
BulldozerBulldozer
Bulldozer
 
EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTS
 
POWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITYPOWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITY
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Advance Construction equipment's reports
Advance Construction equipment's reports Advance Construction equipment's reports
Advance Construction equipment's reports
 
HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
 
Mine Power & Drainage System
Mine Power & Drainage SystemMine Power & Drainage System
Mine Power & Drainage System
 
Construction materials.
Construction materials.Construction materials.
Construction materials.
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
Introduction to dredging
Introduction to dredgingIntroduction to dredging
Introduction to dredging
 
DREDGING
DREDGINGDREDGING
DREDGING
 
Coal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and MachinesCoal Mining Surface Equipment and Machines
Coal Mining Surface Equipment and Machines
 
Heavy construction equipment
Heavy construction equipmentHeavy construction equipment
Heavy construction equipment
 
Tunnel boring machine ppt
Tunnel boring machine pptTunnel boring machine ppt
Tunnel boring machine ppt
 

Recently uploaded

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 

Recently uploaded (20)

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 

CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT

  • 2.  Selection of equipment for earth work  Earth moving operations  Types of earthwork equipment  Tractors  Motor graders  Scrapers  Front end waders  Earth movers  Equipment for foundation and pile driving.  Equipment for compaction  Batching and mixing and concreting  Equipment for material handling and erection of structures  Equipment for dredging, trenching, tunneling,
  • 3. 1. USE OF EQUIPMENT AVAILABLE WITH THE ORGANIZATION. 2. SUITABILITY FOR JOB CONDITION WITH SPECIAL REFERENCE TO CLIMATIC AND OPERATING CONDITIONS. 3. UNIFORMITY OF TYPE. 4. SIZE OF EQUIPMENT. 5. USE OF STANDARD EQUIPMENT. 6. COUNTRY OF ORIGIN. 7. UNIT COST OF PRODUCTION. 8. AVAILABILITY OF SPARE PARTS AND SELECTION OF MANUFACTURERS. 9. SUITABILITY OF LOCAL LABOUR FOR OPERATION.
  • 4. 1. EARTH MOVING EQUIPMENT. 2. HAULING EQUIPMENT. 3. CONVEYING EQUIPMENT. 4. AGGREGATE AND CONCRETE PRODUCTION EQUIPMENT. 5. PILE DRIVING EQUIPMENT. 6. TUNNELING AND ROCK DRILLING EQUIPMENT. 7. PUMPING AND DEWATERING EQUIPMENT.
  • 5. CLASSIFICATION:  EXCAVATING EQUIPMENT.  EXCAVATING AND EARTH MOVING EQUIPMENT.
  • 7. LONG-LASTING. EXCAVATE ALL TYPES OF EARTH EXCEPT HARD ROCK. TYPES: WHEEL MOUNTED (HIGH SPEED). CRAWLER MOUNTED (LOW SPEED). BASIC PARTS: *TRACK SYSTEM *CABIN *CABLES *RACK & STICK *BOOM FOOT PIN *SADDLE BLOCK *BOOM POINT SHEAVE *BUCKET OPERATION:  CABLE CONTROLLED. APPLICATIONS:  CLOSE RANGE OF WORK.  VERY HARD MATERIALS, BIG SIZED BOULDERS. FACTORS CONTROLLING OUTPUT: *CLASS OF MATERIAL *DEPTH OF CUTTING *ANGLE OF SWING *SKILL OF OPERATOR
  • 8.
  • 9.  ALSO TERMED AS HOE, BACK SHOVEL AND PULL SHOVEL.  USED TO EXCAVATE BELOW THE SURFACE OF EQUIPMENT-IT CAVES INTO THE GROUND. BASIC PARTS: *BOOM *JACK BOOM *BOOM FOOT DRUM *BOOM SHEAVE *STICK, BUCKET *BUCKET SHEAVE OPERATION: SIMILAR TO SHOVEL EXCEPT IT MAKES OUTWARD STROKES WHILE DIGGING. APPLICATION: TRENCHES, FOOTINGS, BASEMENTS. TO TRIM THE SURFACE.
  • 10.
  • 12.  THEY MAY BE EITHER TOWED OR MOTORISED.  USUALLY SELF PROPULSIVE. CONSTRUCTION:  FRONT OF THE GRADER FRAME IS SUPPORTED ON A PAIR OF FRONT WHEELS & REAR ON TANDEM WHEELS.  CURVED BLADE IS SUPPORTED ON THE CIRCLE AND BE TURNED THROUGH 360 DEGREE.  BLADE HAS REPLACEBLE EDGES. CUTTING DEPTH - 2-4CMS. SPEED LIGHT DUTY - 6-10 KM/HR. HEAVY DUTY - 2-3 KM/HR. NORMAL DUTY - 4-6 KM/HR. USES: *GRAVEL ROAD REPAIRING *ROAD SHOULDER RESHAPING *BANK CUTTING *DITCH FILLING *BASE COURSE SPREADING *MATERIAL MIXING *SNOW, LAND CLEARANCE *FROZEN TOP SOIL, ASPHALT BREAKING
  • 13.
  • 14.  USED IN CONSTRUCTION PROJECTS, SHIPPING, INDUSTRIES ETC.  THEY MAY BE ELECTRICALLY OPERATED, DIESEL OPERATED OR DIESEL-ELECTRIC DRIVE. CLASSIFICATION:  DERRICK CRANES.  MOBILE CRANES.  OVERHEAD OR GANTRY CRANES.  TRAVELLER CRANES.  TOWER CRANES.
  • 15. PARTS:  MAST.  BOOM.  BULL WHEEL. TYPES:  GUY-DERRICK.  STIFF LEG DERRICK. OPERATION:  THE BOOM CAN REVOLVE THROUGH 360 DEGREE.  IT CAN CARRY LOADS UPTO 200 TONS.  WHEN THE LOAD IS LESS THAN 50 TONS GUY ROPES ARE REPLACED BY TRUSSED STRUCTURE.  STIFF LEG DERRICK CAN CARRY 7-50 TONS. USES:  LOADING AND UNLOADING CARGOES AT PORTS.  TO HANDLE LOOSE MATERIALS LIKE SAND, BALLAST, COAL.  IN CONSTRUCTION PROJECTS, INDUSTRIAL, MULTISTOREYED BUILDING CONSTRUCTION.  PLANT ERRECTION.
  • 16.
  • 17.  THEY ARE EITHER CRAWLER MOUNTED OR WHEEL MOUNTED.  CRAWLER MOUNTED ARE HIGHLY MANEOUVERABILE AND OPERATE ON UNMADE GROUND.  SUITABLE FOR ROUGH TERRAINS.  OPERATE IN A LIMITED AREA.  TRUCK MOUNTED CRANES HAVE HIGH MOBILITY. SPEED 70-75 KM/HR.
  • 18.
  • 19.  USED FOR HANDLING LOADS OVER A LONG RECTANGULAR AREA.  IT CONSISTS OF STRUCTURAL BRIDGE SUPPORT ON ELEVATED TRACTS AND SUPPORTING A LIFTING BLOCK. TRAVELLER CRANES  THESE HAVE THEIR CRABS MOVING ON GIRDERS SUPPORTED ON LEGS. TOWER CRANES  IT HAS A TRUSS STRUCTURE WELDED FROM ANGLE BARS AND CHANNELS.  LADDERS ARE PROVIDED FOR EASE.  THEY CAN BE ASSEMBLED AND DISMENTLED.
  • 20.
  • 21.
  • 22.  SCRAPERS.  BULL DOZERS.  TRACTORS.
  • 23.  COMPROMISE BETWEEN BEST LOADING AND BEST HAULING MACHINES.  UNIQUE FOR LONG DISTANCE HAULING  IT ITSELF DIGS, HAULS, DEPOSIT THE MATERIALS IN UNIFORM THICK LAYERS. TYPES:  CRAWLER TRACTOR PULLED.  WHEEL TRACTOR PULLED. BASIC PARTS:  BOWL, APRON, EJECTOR (TAIL GATE). CAPACITY:  HEAPED CAPACITY OF THE BOWL. OPERATION:  WHILE DIGGING CUTTING EDGE ENTERS THE GROUND BY LOWERING THE BOWL, THE FRONT APRON IS RAISED  EDGE IS RAISED, APRON IS LOWED WHILE HAULING.  WHILE DUMPING EJECTOR IS USED.
  • 24.
  • 25.  VERSATILE EQUIPMENT- ESSENTIALLY A HEAVY STEEL BLADE MOUNTED ON THE FRONT OF TRACTOR. CLASSIFICATION BASED ON:  POSITION OF BLADES - PERPENDICULAR BLADES. - BLADES AT AN ANGLE.  MOUNTING -WHEEL MOUNTED. -CRAWLER MOUNTED.  CONTROL -CABLE CONTROL. -HYDRAULIC CONTROL. CONSTRUCTION: CONSIST OF HEAVY BLADE WITH CONCAVE PROFILE. BLADE IS ATTACHED TO THE BODY WITH TWO ARMS, A SUPPORTING FRAME & HELD BY TWO PUSH ARMS APPLICATION:  SPREADING EARTH FILL.  CLEARING, OPENING UP PILOT ROADS.  BACK FILLING TRENCHES.
  • 26.
  • 27.  MULTI PURPOSE MACHINES MAINLY USED FOR PULLING AND PUSHING OTHER MACHINES FOR AGRICULTURAL PURPOSES. TYPES: 1. WHEEL TYPE 2. CRAWLER TYPE
  • 28. CRAWLER TYPE WHEELED TYPE 1. SLOW SPEED 2. CAN HANDLE HEAVY JOBS 3. COSTLY 4. REQUIRES SKILL TO OPERATE 5. STICK CONTROL FOR STEERING 6. ONLY ON ROUGH ROADS 1. GREATER SPEED 2. ONLY LIGHTER JOBS 3. CHEAPER 4. LESSER SKILL FOR OPERATION 5. WHEEL CONTROL FOR STEERING 6. ON ROUGH AS WELL AS GOOD ROADS
  • 29.
  • 30.
  • 31. 1. SMOOTH – WHEEL ROLLERS 2. SHEEP – FOOT ROLLERS 3. PNEUMATIC TYRED ROLLERS
  • 32.  PLAIN STEEL ROLLERS  SELF – PROPELLED (5 TO 25 TONNES)  NO DEEP COMPACTION  REAR WHEELS ARE LARGER IN DIAMETER AND THE FRONT ONES ARE WIDER  DIESEL ENGINE TYPE  COMPACTION IS BY STATIC WEIGHT OF ROLLER SUITABILITY: 1. GRANULAR SOILS 2. SAND 3. GRAVEL 4. CRUSHED STONES
  • 33.
  • 34. *HOLLOW STEEL DRUM WITH PROJECTED FEET MOUNTED AT 100 TO 200 MMC/C *WEIGHT 15TONNES *SPEED 25KM/HR *COMPACTION IS BY KNEADING ACTION *IN CONVERTIBLE ROLLERS THE FOOT PLATE CAN BE REMOVED *IN TURN FOOT ROLLERS THE INDIVIDUAL SHEEP FOOT CAN BE CHANGED SUITABILITY: CLAY,PREDOMINANTLY COHESIVE AND IMPERVIOUS SOIL
  • 35.
  • 36. *CONSISTS OF A BASE PLATFORM MOUNTED BETWEEN TWO AXLES *TRACKS OF THE REAR WHEEL LIE INBETWEEN THE TRACKS OF THE FRONT WHEEL *COMPACTION IS BY CONTROLLING THE GROUND CONTACT PRESSURE *WEIGHT OR WIDTH OF THE WHEEL CAN BE SUITABLY INCREASED SUITABILITY: FINE GRAINED AND WELL GRADED SANDS
  • 37.
  • 38.
  • 39.  DUMP TRUCKS  DUMPERS  CONVEYORS
  • 40. TYPES 1. SIDE DUMP TRUCK 2. BOTTOM DUMP TRUCKS SIDE DUMP TRUCK: *DUMPING IS THROUGH THE SIDES OF THE TRUCK *SUITABLE FOR HAULING WET CLAY, SAND, GRAVEL, QUARRY ROCKS. BOTTOM DUMP TRUCKS: *DUMPING IS BY OPENING THE BOTTOM OF THE TRUCK *SUITABLE FOR FREE FLOWING MATERIALS SUCH AS SAND, GRAVEL, DRY EARTH, HARD CLAY.
  • 41.
  • 42.
  • 43. *HIGH SPED PNEUMATIC WHEELED TRUCKS WITH SHORT CHASIS. *SUITABLE FOR SHORT HAULS ON ROUGH ROADS AND SPECIALLY WHERE A SHUTTLE MOVEMENT IS REQUIRED
  • 44. *TRANSMITTING MATERIALS OVER A STATIONARY STRUCTURE ADVANTAGES: 1. INCREASES OUTPUT 2. CONTINUITY IN OPERATION 3. TIME SAVING TYPES: 1. BELT CONVEYOR 2. SCREW CONVEYOR 3. BUCKET CONVEYOR
  • 45. *MOST POPULAR * CONSISTS OF A BELT RUNNING OVER A PAIR OF END DRUMS SUPPORTED BY A SERIES OF ROLLERS CALLED IDLERS *MIDDLE SAG IS PROVIDED TO PREVENT THE SPILLING OF MATERIALS ADVANTAGES:  CAN HANDLE LIGHT,HEAVY, DRY, WET, SOFT, COARSE MATERIALS  HIGH SPEED  CARRIES HORIZONTALLY AND INCLINED  LIGHTER IN WEIGHT  CONTROLLED DISCHARG
  • 46.
  • 47. *USED FOR HANDLING GRANULAR OR PULVARISED MATERIALS *LOW COST *CONSISTS OF A HELIX MOUNTED ON A BEARING AT THE ENDS AND AT INTERMEDIATE POINTS *LENGTH IS 65M WITH AN INCLINATION UPTO 35 DEGREES
  • 48.
  • 49. *MATERIAL IS TRANSFERRED THROUGH A SERIES OF BUCKETS *LENGTH IS LIMITED TO 25M *WEIGHT DEPENDS UPON THE STRENGTH OF CHAINS *MAINLY USED FOR HANDLING COAL
  • 50.
  • 51. *PROPORTIONATING THE INGREDIENTS OF CONCRETE FOR A PARTICULAR MIX *WEIGH BATCHING IS COMMONLY USED TYPES: 1. MANUAL BATCHING 2. SEMI - AUTOMATIC BATCHING 3. AUTOMATIC BATCHING
  • 52.
  • 53. *MIXING ALL THE INGREDIENTS OF CONCRETE TO MAKE A MIX OF SPECIFIED CONSISTENCY FACTORS GOVERNING MIXING: 1. CORRECT SETTING OF MACHINE 2. PROPER CLEANING OF BLADES 3. SEQUENCE OF MATERIAL CHARGED 4. TIMELY SUPPLY OF WATER 5. DIRECTION OF IN - FLOW 6. SPEED AND TIME OF MIXING TYPES:  DRUM TYPE MIXERS - *TILTING *NON - TILTING  PAN TYPE MIXERS
  • 54.
  • 55.  USUALLY DONE THROUGH BUCKETS CARRIED ON RAIL ROADS OR TRACKS  DUMP TRUCKS AND BELT CONVEYORS ARE ALSO USED  CABLE WAYS CAN BE USED OR THE HOISTING OF BUCKETS MAY BE DONE WITH THE HELP OF CRANES
  • 56.
  • 57.  THESE ARE HEAVY DIRECT PUMPS USED IN INACCESIBLE SITES SUCH AS TUNNELS, UNDERWATER, SUBWAYS  PUMPS CAN BE MOUNTED ON TRUCKS OR TRAILERS PNEUMATIC CONCRETE PLACERS  IT CONSISTS OF A PRESSURE VESSEL OPEN AT THE TOP AND CONICAL AT THE BOTTOM  COMPRESSED AIR IS USED TO PUSH THE CONCRETE THROUGH PIPELINES
  • 58.  PILE IS A STRUCTURAL MEMBER DRIVEN INTO THE GROUND FOR THE PURPOSE OF TRANSFERRING SURFACE LOADS  THEY ARE EFFECTIVE AT AN ECONOMICAL COST TYPES: 1. PILE DRIVEN RIGS - SKID MOUNTED - CRANE MOUNTED - FLOATING RIGS 2. PILE DRIVING HAMMERS
  • 59.
  • 60.  USED FOR EXCAVATION FROM RIVER BED, LAKE, SED FOR THE PURPOSE OF DEEPENING THEM TYPES: 1. DIPPER DREDGER 2. LADDER DREDGER 3. SUCTION DREDGER
  • 61.
  • 62.  IT IS USUALY MOUNTED ON A FLOATING PLATFORM  THE BOOM CAN ROTATE THROUGH 180 DEGREES  PRODUCTION RATE - 50 CU M/HR  BUCKET SIZE - 12.5 CU M  DUMPING RANGE - 30 M  DEPTH - 15 TO 18 M
  • 63.  IT IS EQUIPED WITH BUCKET ELEVATOR MOUNTED ON A BARGE  IT IS SUSPENDED ON A STEEL LADDER  SUITABLE FOR EXCAVATING SOFT GROUND, SAND OR GRAVEL SUCTION DREDGER 1. SIMILAR IN OPERATION EXCEPT IT CONSISTS OF A PUMP EXCAVATOR MOUNTED ON A BARGE WITH SUCTION LINE,SUPPORTED ON A LADDER.
  • 64.  IT HAS A LIGHT CRANE BOOM AND THE BUCKET IS LOOSLY ATTACHED TO THE BOOM THROUGH CABLES BASIC PARTS: *BOOM *HOIST CABLE *DRAG CABLE *DRAG CHAIN *BUCKET TYPES: 1. WHEEL MOUNTED 2. TRUCK MOUNTED 3. CRAWLER MOUNTED OPERATION: CABLE OPERATED FACTORS AFFECTING OUTPUT: *LENGTH OF BOOM *ANGLE OF SWING *DEPTH OF CUT *SIZE OF UNIT
  • 65.
  • 66.  THE BUCKET RESEMBLES TO A CALM WHICH IS LIKE SHELL – FISH BASIC PARTS *CLOSING LINE *HOIST LINE *SHEAVES *BRACKETS *SHELL *HINGE OPERATION BY MANIPULATING THE CABLES SUITABLY USES 1. FOR CRUSHED STONES, GRAVEL, COAL 2. FOR VERTICAL LIFTING OF MATERIALS 3. FOR REMOVING MATERIALS FROM COFERDAMS, SEWER MANHOALS, WELL FOUNDATIONS.
  • 67.
  • 68.
  • 69.  CONSISTS OF A PAIR OF CIRCULAR RIMS CONNECTED BY U SHAPED BUCKETS OR CUTTERS  SELF PROPELLED  THE EXCAVATING DEVICE IS CONNECTED TO A MEANS OF CONVEYING WIDTH - 12 M DEPTH - 3 M OPERATION CABLE DRIVE USES FOR LAYING 1. WATER, GAS, OIL PIPE LINES 2. TELEPHONE CABLES 3. DRINAGE 4. SEWERS
  • 70.
  • 71.  SIMILAR TO WHEEL TRENCHER EXCEPT BUCKETS ARE PROVIDED WITH CHAIN LINKS ON LADDER TYPE FRAME OR BOOM ADVANTAGES: 1. FASTER AND CHEAPER 2. DIGS NECESSARY DEPTH 3. CONTINUOUS PROCESS
  • 72. NEED FOR TUNNELLING  FOR UNDERGROUND TRAFIC  CONDUIT FOR WATER  ACCESS TO MINES  CONDUIT FOR UTILITY SERVICES  SUBWAYS,UNDERGROUND TRAFFIC
  • 73. 1. CIRCULAR 2. ELLIPTICAL 3. SEMICIRCULAR 4. ARCH 5. CIRCULAR ARCH 6. SEMICIRCULAR ARCH 7. HORSE – SHOE SHAPED
  • 74.  FULL FACE HEADING  HEADING AND BENCH METHOD  DRIFTS METHOD  PILOT TUNNEL METHOD
  • 75. 1. SETTING UP AND DRILLING 2. LOADING THE HOLES WITH EXPLOSIVES AND FIRING 3. VENTILATING AND REMOVING DUST 4. LOADING AND HAULING THE MUCK 5. REMOVING GROUNDWATER IF NECESSARY 6. ERRECTION OF SUPPORTS 7. PLACINF REINFORCEMENTS 8. PLACING CONCRETE LINING 9. CURRING 10. SHUTTERING REMOVAL
  • 76.  THE MODERN TREND IS THE USE OF LASER  THESE ARE ACCURATE TO POSITION AND PROVIDE CORRECT DIRECTION  HELPS IN GUIDING THE MOLE IN CORRECT DIRECTION AS NOT IN CONVENTIONAL METHOD OF TUNNELING