The document summarizes an engineering evaluation of a city conference center building originally constructed in 1949. The evaluation found deficiencies in the roof structure, interior walls, and floor framing that do not meet current building codes. It also noted issues with differential settlement caused by insufficient earth retention. The engineer recommends remediating the foundation, replacing the roof structure, modifying walls for stability, and other repairs. Total project costs to address the structural and site issues are estimated to be between $1.43 million to $1.82 million.