August 9, 2012
City Council Meeting
ORIGINAL 1949
STRUCTURE
 Staffrecognized that many of the maintenance
 issues were being caused by differential
 settlement

 Lastsignificant renovation took place in the
 early 1980’s

 Councilapproved a SLA in the Public Works
 Budget for FY 2012 to complete an evaluation
 Determine  the current condition of the facility –
 structural, electrical, mechanical, plumbing, cos
 metic finishes, & site

 Identify
        issues in the facility that need to be
 upgraded to meet the current building code

 Identify
         the main causes of the differential
 movement and develop solutions to minimize
 settlement in the future

 Develop
        a cost estimate for recommended
 improvements and modifications
 Originalstructure is wood framed building
 supported on cast-in-place perimeter beams
 on concrete footings and interior concrete
 footings

 Buildingaddition was constructed primarily
 with a steel frame supported on drilled priers
 with cast-in-place beams and precast
 concrete planks
   Roof Structure
       Roof framed with 2x6 rafters on 24-inch centers
       2x4 ceiling joists on 24-inch centers
       Ceiling joists are connected to the rafters with
        periodic vertical supports
       HVAC units on the roof
       Roof surface appeared uneven and soft in areas
       Standing water was noted near the larger HVAC Units
   In its current state, the engineer felt that the
    roof structure over the original building was
    inadequate and needs to be addressed for the
    building to be occupied
 Severalitems noted in the attic framing
 contributed to this conclusion
    Rafters were spliced along the span instead of over
     a support
    Rafters were cut incorrectly to allow for the
     installation of HVAC equipment
    The additional loading of the HVAC and standing
     water on the roof compounded the problem
    The rafters in this building, even if properly placed,
     would not be sufficient to support the structural
     loads on the roof for these spans (21’-8”)
 Interior   wood walls
     Corridor walls are double framed with 2x4 studs
     Top walls are open where a top plate is typically
      placed
     Consistent blocking was not noted between the
      faces of the walls
     This may result in unstable walls in which the
      studs do not exhibit group action and the faces
      of the walls act independently
 Floor   structure
     Wood framing consists of 2x10 joists spanning
      from the concrete perimeter beam over two
      triple 2x10 beams.
     Preliminary analysis of the floor system indicates
      that the floor framing is insufficient for the
      current building use and current building code


 Insufficient
             earth retention around the
 perimeter has led to the moisture infiltration
 and soil subsidence.
 Foundation
 Floor  framing system
 Address site issues surrounding structure
 Remove and replace the roof structure
 Modify the interior walls to ensure stability
 New finishes on the interior once the roof
  system is installed
 Once this work has been completed, there will
  likely be differential movement that causes
  continual maintenance issues
 Anticipated cost to remediate the original 1949
 structure is likely to range from $1.16M to
 $1.33M

 Thesite work around the facility is likely to
 range from $270K to $486K

 Total
      project cost to remediate the Conference
 Center is likely to range from $1.43M - $1.82M
REFERENCE MATERIAL
   2000 – “Duro Last” roof replacement

   2004 - Exterior painting

   2005 - HVAC unit replacements (9 units)

   2005 - Room 127 laminate flooring installed

   2007 - Interior painting (all areas)

   2008 - Carpet replacement

   2012 - Main electrical panel replacement
College Station Conference Center Evaluation
College Station Conference Center Evaluation

More Related Content

What's hot

BuildingPermitting_012215
BuildingPermitting_012215BuildingPermitting_012215
BuildingPermitting_012215
Lanii Dennis (laniiwrites at gmail)
 
Leed & Historic Tax Credit Certification
Leed & Historic Tax Credit CertificationLeed & Historic Tax Credit Certification
Leed & Historic Tax Credit Certification
Heritage Ohio
 
WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...
WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...
WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...
Graham Finch
 
Chambers Murphy & Burge Restoration
Chambers Murphy & Burge RestorationChambers Murphy & Burge Restoration
Chambers Murphy & Burge Restoration
Heritage Ohio
 
High Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal BridgingHigh Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal Bridging
Graham Finch
 
Daniel McCormick resume 2
Daniel McCormick resume 2Daniel McCormick resume 2
Daniel McCormick resume 2
Daniel McCormick
 
CE 165 Poster Final
CE 165 Poster FinalCE 165 Poster Final
CE 165 Poster Final
Qudsia Wahab, EIT
 
Moving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
Moving Towards More Energy Efficient Building Enclosures - Part 9 and BeyondMoving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
Moving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
Graham Finch
 
Astec Project Updates
Astec Project UpdatesAstec Project Updates
Astec Project Updates
Tony Loup
 
Building Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings TodayBuilding Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings Today
Graham Finch
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building Enclosures
RDH Building Science
 
Pile Chapter 11 Technical Ym
Pile Chapter 11   Technical   YmPile Chapter 11   Technical   Ym
Pile Chapter 11 Technical Ym
Galala University
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofits
Pembina Institute
 
Leed brochure sherryl jacobs
Leed brochure   sherryl jacobsLeed brochure   sherryl jacobs
Leed brochure sherryl jacobs
Sherryl Jacobs
 
Multifamily Energy Audit Sample Report
Multifamily Energy Audit Sample ReportMultifamily Energy Audit Sample Report
Multifamily Energy Audit Sample Report
JHuntley82
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
Christian Akl
 
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy SavingsAesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
energytrustor
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
Christian Akl
 
Comfort engineered systems, inc make it right houses
Comfort engineered systems, inc make it right housesComfort engineered systems, inc make it right houses
Comfort engineered systems, inc make it right houses
Linear Solar INC
 
Malcolm's golf shop-en
Malcolm's golf shop-enMalcolm's golf shop-en
Malcolm's golf shop-en
libnam
 

What's hot (20)

BuildingPermitting_012215
BuildingPermitting_012215BuildingPermitting_012215
BuildingPermitting_012215
 
Leed & Historic Tax Credit Certification
Leed & Historic Tax Credit CertificationLeed & Historic Tax Credit Certification
Leed & Historic Tax Credit Certification
 
WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...
WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...
WoodWorks 2013 Vancouver - Energy-Efficient Building Enclosure Design Guideli...
 
Chambers Murphy & Burge Restoration
Chambers Murphy & Burge RestorationChambers Murphy & Burge Restoration
Chambers Murphy & Burge Restoration
 
High Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal BridgingHigh Performance Walls - Solutions for Thermal Bridging
High Performance Walls - Solutions for Thermal Bridging
 
Daniel McCormick resume 2
Daniel McCormick resume 2Daniel McCormick resume 2
Daniel McCormick resume 2
 
CE 165 Poster Final
CE 165 Poster FinalCE 165 Poster Final
CE 165 Poster Final
 
Moving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
Moving Towards More Energy Efficient Building Enclosures - Part 9 and BeyondMoving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
Moving Towards More Energy Efficient Building Enclosures - Part 9 and Beyond
 
Astec Project Updates
Astec Project UpdatesAstec Project Updates
Astec Project Updates
 
Building Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings TodayBuilding Enclosures For the Future - Building Tomorrows Buildings Today
Building Enclosures For the Future - Building Tomorrows Buildings Today
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building Enclosures
 
Pile Chapter 11 Technical Ym
Pile Chapter 11   Technical   YmPile Chapter 11   Technical   Ym
Pile Chapter 11 Technical Ym
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofits
 
Leed brochure sherryl jacobs
Leed brochure   sherryl jacobsLeed brochure   sherryl jacobs
Leed brochure sherryl jacobs
 
Multifamily Energy Audit Sample Report
Multifamily Energy Audit Sample ReportMultifamily Energy Audit Sample Report
Multifamily Energy Audit Sample Report
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy SavingsAesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Comfort engineered systems, inc make it right houses
Comfort engineered systems, inc make it right housesComfort engineered systems, inc make it right houses
Comfort engineered systems, inc make it right houses
 
Malcolm's golf shop-en
Malcolm's golf shop-enMalcolm's golf shop-en
Malcolm's golf shop-en
 

Viewers also liked

Sterling Heights Rezoning
Sterling Heights RezoningSterling Heights Rezoning
Sterling Heights Rezoning
City of College Station
 
Land Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. SouthLand Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. South
City of College Station
 
Lick Creek Hike & Bike Trail Update
Lick Creek Hike & Bike Trail UpdateLick Creek Hike & Bike Trail Update
Lick Creek Hike & Bike Trail Update
City of College Station
 
Parkland Dedication and Development Fees
Parkland Dedication and Development FeesParkland Dedication and Development Fees
Parkland Dedication and Development Fees
City of College Station
 
Recommended Rentral Registration Program Changes
Recommended Rentral Registration Program ChangesRecommended Rentral Registration Program Changes
Recommended Rentral Registration Program Changes
City of College Station
 
Utility Dispatch Phone System Upgrade
Utility Dispatch Phone System UpgradeUtility Dispatch Phone System Upgrade
Utility Dispatch Phone System Upgrade
City of College Station
 
On-Street Parking – Toni Court
On-Street Parking – Toni CourtOn-Street Parking – Toni Court
On-Street Parking – Toni Court
City of College Station
 
Stripes Rezoning
Stripes RezoningStripes Rezoning
Stripes Rezoning
City of College Station
 
Gateway Subdivision Rezoning
Gateway Subdivision RezoningGateway Subdivision Rezoning
Gateway Subdivision Rezoning
City of College Station
 
Lincoln Recreation Center Expansion
Lincoln Recreation Center ExpansionLincoln Recreation Center Expansion
Lincoln Recreation Center Expansion
City of College Station
 
Wastewater Rate Increase
Wastewater Rate IncreaseWastewater Rate Increase
Wastewater Rate Increase
City of College Station
 
Neighborhood Integrity Advisory Group
Neighborhood Integrity Advisory Group Neighborhood Integrity Advisory Group
Neighborhood Integrity Advisory Group
City of College Station
 
Rental Registration Ordinance
Rental Registration OrdinanceRental Registration Ordinance
Rental Registration Ordinance
City of College Station
 
Carters Creek Wastewater Treatment Plant Headworks Project
Carters Creek Wastewater Treatment Plant Headworks ProjectCarters Creek Wastewater Treatment Plant Headworks Project
Carters Creek Wastewater Treatment Plant Headworks Project
City of College Station
 
Annual Action Plan and Budget
Annual Action Plan and Budget Annual Action Plan and Budget
Annual Action Plan and Budget
City of College Station
 
2013 City Employee Recognition
2013 City Employee Recognition2013 City Employee Recognition
2013 City Employee Recognition
City of College Station
 
Keep Brazos Beautiful Update
Keep Brazos Beautiful UpdateKeep Brazos Beautiful Update
Keep Brazos Beautiful Update
City of College Station
 
College Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance ReviewCollege Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance Review
City of College Station
 
Multi-Family and Mixed-Use zoning
Multi-Family and Mixed-Use zoningMulti-Family and Mixed-Use zoning
Multi-Family and Mixed-Use zoning
City of College Station
 

Viewers also liked (19)

Sterling Heights Rezoning
Sterling Heights RezoningSterling Heights Rezoning
Sterling Heights Rezoning
 
Land Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. SouthLand Use Change for 2560 Earl Rudder Fwy. South
Land Use Change for 2560 Earl Rudder Fwy. South
 
Lick Creek Hike & Bike Trail Update
Lick Creek Hike & Bike Trail UpdateLick Creek Hike & Bike Trail Update
Lick Creek Hike & Bike Trail Update
 
Parkland Dedication and Development Fees
Parkland Dedication and Development FeesParkland Dedication and Development Fees
Parkland Dedication and Development Fees
 
Recommended Rentral Registration Program Changes
Recommended Rentral Registration Program ChangesRecommended Rentral Registration Program Changes
Recommended Rentral Registration Program Changes
 
Utility Dispatch Phone System Upgrade
Utility Dispatch Phone System UpgradeUtility Dispatch Phone System Upgrade
Utility Dispatch Phone System Upgrade
 
On-Street Parking – Toni Court
On-Street Parking – Toni CourtOn-Street Parking – Toni Court
On-Street Parking – Toni Court
 
Stripes Rezoning
Stripes RezoningStripes Rezoning
Stripes Rezoning
 
Gateway Subdivision Rezoning
Gateway Subdivision RezoningGateway Subdivision Rezoning
Gateway Subdivision Rezoning
 
Lincoln Recreation Center Expansion
Lincoln Recreation Center ExpansionLincoln Recreation Center Expansion
Lincoln Recreation Center Expansion
 
Wastewater Rate Increase
Wastewater Rate IncreaseWastewater Rate Increase
Wastewater Rate Increase
 
Neighborhood Integrity Advisory Group
Neighborhood Integrity Advisory Group Neighborhood Integrity Advisory Group
Neighborhood Integrity Advisory Group
 
Rental Registration Ordinance
Rental Registration OrdinanceRental Registration Ordinance
Rental Registration Ordinance
 
Carters Creek Wastewater Treatment Plant Headworks Project
Carters Creek Wastewater Treatment Plant Headworks ProjectCarters Creek Wastewater Treatment Plant Headworks Project
Carters Creek Wastewater Treatment Plant Headworks Project
 
Annual Action Plan and Budget
Annual Action Plan and Budget Annual Action Plan and Budget
Annual Action Plan and Budget
 
2013 City Employee Recognition
2013 City Employee Recognition2013 City Employee Recognition
2013 City Employee Recognition
 
Keep Brazos Beautiful Update
Keep Brazos Beautiful UpdateKeep Brazos Beautiful Update
Keep Brazos Beautiful Update
 
College Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance ReviewCollege Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance Review
 
Multi-Family and Mixed-Use zoning
Multi-Family and Mixed-Use zoningMulti-Family and Mixed-Use zoning
Multi-Family and Mixed-Use zoning
 

Similar to College Station Conference Center Evaluation

Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
Lwj Welson
 
Simmons Nov 2014
Simmons Nov 2014Simmons Nov 2014
Simmons Nov 2014
Keith Simmons
 
Envelope Design Training
Envelope Design TrainingEnvelope Design Training
Envelope Design Training
melanie_bissonnette
 
final dcc
final dccfinal dcc
final dcc
Jack Lambourne
 
2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times
Amber Joan Wood
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Blake Johnson
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
sauravavantador
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
Arafat Akash
 
Winter Panel Complete Guide
Winter Panel Complete GuideWinter Panel Complete Guide
Winter Panel Complete Guide
WinterPanelChile
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiber
jamieram
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor Center
Ray Rankin
 
ICF Commercial Presentation
ICF Commercial PresentationICF Commercial Presentation
ICF Commercial Presentation
BenKeim
 
Construction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardConstruction Technology Essay Sample Harvard
Construction Technology Essay Sample Harvard
Writers Per Hour
 
Contractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing UpdateContractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing Update
TheChamber
 
A Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of AikenA Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of Aiken
Maclay Architects
 
drainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assembliesdrainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assemblies
Amiran Bokhua
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design
Amber Joan Wood
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
Tonyamis
 
Instacon tower mohali
Instacon tower mohaliInstacon tower mohali
Instacon tower mohali
vibha goyal
 
Solar panel integration – vertical wall cladding la build expo 2015
Solar panel integration – vertical wall cladding   la build expo 2015Solar panel integration – vertical wall cladding   la build expo 2015
Solar panel integration – vertical wall cladding la build expo 2015
Bill Harris
 

Similar to College Station Conference Center Evaluation (20)

Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
 
Simmons Nov 2014
Simmons Nov 2014Simmons Nov 2014
Simmons Nov 2014
 
Envelope Design Training
Envelope Design TrainingEnvelope Design Training
Envelope Design Training
 
final dcc
final dccfinal dcc
final dcc
 
2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
Winter Panel Complete Guide
Winter Panel Complete GuideWinter Panel Complete Guide
Winter Panel Complete Guide
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiber
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor Center
 
ICF Commercial Presentation
ICF Commercial PresentationICF Commercial Presentation
ICF Commercial Presentation
 
Construction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardConstruction Technology Essay Sample Harvard
Construction Technology Essay Sample Harvard
 
Contractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing UpdateContractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing Update
 
A Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of AikenA Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of Aiken
 
drainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assembliesdrainage capabilities and heat loss of different inverted roof assemblies
drainage capabilities and heat loss of different inverted roof assemblies
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
 
Instacon tower mohali
Instacon tower mohaliInstacon tower mohali
Instacon tower mohali
 
Solar panel integration – vertical wall cladding la build expo 2015
Solar panel integration – vertical wall cladding   la build expo 2015Solar panel integration – vertical wall cladding   la build expo 2015
Solar panel integration – vertical wall cladding la build expo 2015
 

More from City of College Station

Gus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant PresentationGus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant Presentation
City of College Station
 
2020 BVEDC Compliance Report
2020 BVEDC Compliance Report2020 BVEDC Compliance Report
2020 BVEDC Compliance Report
City of College Station
 
College Station Community Recreation Center Update
College Station Community Recreation Center UpdateCollege Station Community Recreation Center Update
College Station Community Recreation Center Update
City of College Station
 
Gus Roy Road Land Use
Gus Roy Road Land UseGus Roy Road Land Use
Gus Roy Road Land Use
City of College Station
 
Debt Parameters Ordinance
Debt Parameters OrdinanceDebt Parameters Ordinance
Debt Parameters Ordinance
City of College Station
 
Historical Marker No. 106
Historical Marker No. 106Historical Marker No. 106
Historical Marker No. 106
City of College Station
 
Historical Cemetery Project
Historical Cemetery ProjectHistorical Cemetery Project
Historical Cemetery Project
City of College Station
 
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use PathTxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
City of College Station
 
Creek Meadows PUE Abandonment
Creek Meadows PUE AbandonmentCreek Meadows PUE Abandonment
Creek Meadows PUE Abandonment
City of College Station
 
Semi Annual Report on Impact Fees
Semi Annual Report on Impact FeesSemi Annual Report on Impact Fees
Semi Annual Report on Impact Fees
City of College Station
 
Name Change for Part of Royder Road
Name Change for Part of Royder Road Name Change for Part of Royder Road
Name Change for Part of Royder Road
City of College Station
 
Options to Preserve Neighborhood Integrity
Options to Preserve Neighborhood IntegrityOptions to Preserve Neighborhood Integrity
Options to Preserve Neighborhood Integrity
City of College Station
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
City of College Station
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown Crossing
City of College Station
 
Housing of Fowl Animal Ordinance
Housing of Fowl Animal OrdinanceHousing of Fowl Animal Ordinance
Housing of Fowl Animal Ordinance
City of College Station
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
City of College Station
 
FY 21 City Council Strategic Plan
FY 21 City Council Strategic PlanFY 21 City Council Strategic Plan
FY 21 City Council Strategic Plan
City of College Station
 
Pet Sales Ordinance
Pet Sales OrdinancePet Sales Ordinance
Pet Sales Ordinance
City of College Station
 
Unlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation AssistanceUnlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation Assistance
City of College Station
 
Rental Registration Fee Consideration
Rental Registration Fee ConsiderationRental Registration Fee Consideration
Rental Registration Fee Consideration
City of College Station
 

More from City of College Station (20)

Gus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant PresentationGus Roy Road Land Use Applicant Presentation
Gus Roy Road Land Use Applicant Presentation
 
2020 BVEDC Compliance Report
2020 BVEDC Compliance Report2020 BVEDC Compliance Report
2020 BVEDC Compliance Report
 
College Station Community Recreation Center Update
College Station Community Recreation Center UpdateCollege Station Community Recreation Center Update
College Station Community Recreation Center Update
 
Gus Roy Road Land Use
Gus Roy Road Land UseGus Roy Road Land Use
Gus Roy Road Land Use
 
Debt Parameters Ordinance
Debt Parameters OrdinanceDebt Parameters Ordinance
Debt Parameters Ordinance
 
Historical Marker No. 106
Historical Marker No. 106Historical Marker No. 106
Historical Marker No. 106
 
Historical Cemetery Project
Historical Cemetery ProjectHistorical Cemetery Project
Historical Cemetery Project
 
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use PathTxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
TxDOT Grant Resolution -- Harvey Mitchell Parkway Shared-Use Path
 
Creek Meadows PUE Abandonment
Creek Meadows PUE AbandonmentCreek Meadows PUE Abandonment
Creek Meadows PUE Abandonment
 
Semi Annual Report on Impact Fees
Semi Annual Report on Impact FeesSemi Annual Report on Impact Fees
Semi Annual Report on Impact Fees
 
Name Change for Part of Royder Road
Name Change for Part of Royder Road Name Change for Part of Royder Road
Name Change for Part of Royder Road
 
Options to Preserve Neighborhood Integrity
Options to Preserve Neighborhood IntegrityOptions to Preserve Neighborhood Integrity
Options to Preserve Neighborhood Integrity
 
Northgate Study and Operations Plan
Northgate Study and Operations PlanNorthgate Study and Operations Plan
Northgate Study and Operations Plan
 
Lick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown CrossingLick Creek Hike & Bike Trail Midtown Crossing
Lick Creek Hike & Bike Trail Midtown Crossing
 
Housing of Fowl Animal Ordinance
Housing of Fowl Animal OrdinanceHousing of Fowl Animal Ordinance
Housing of Fowl Animal Ordinance
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
 
FY 21 City Council Strategic Plan
FY 21 City Council Strategic PlanFY 21 City Council Strategic Plan
FY 21 City Council Strategic Plan
 
Pet Sales Ordinance
Pet Sales OrdinancePet Sales Ordinance
Pet Sales Ordinance
 
Unlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation AssistanceUnlimited Potential Request for Rehabilitation Assistance
Unlimited Potential Request for Rehabilitation Assistance
 
Rental Registration Fee Consideration
Rental Registration Fee ConsiderationRental Registration Fee Consideration
Rental Registration Fee Consideration
 

Recently uploaded

Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
LUMINATIVE MEDIA/PROJECT COUNSEL MEDIA GROUP
 
Youngest c m in India- Pema Khandu Biography
Youngest c m in India- Pema Khandu BiographyYoungest c m in India- Pema Khandu Biography
Youngest c m in India- Pema Khandu Biography
VoterMood
 
13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
Essential Tools for Modern PR Business .pptx
Essential Tools for Modern PR Business .pptxEssential Tools for Modern PR Business .pptx
Essential Tools for Modern PR Business .pptx
Pragencyuk
 
2015pmkemenhub163.pdf 2015pmkemenhub163.pdf
2015pmkemenhub163.pdf 2015pmkemenhub163.pdf2015pmkemenhub163.pdf 2015pmkemenhub163.pdf
2015pmkemenhub163.pdf 2015pmkemenhub163.pdf
CIkumparan
 
MAGNA CARTA (minimum 40 characters required)
MAGNA CARTA (minimum 40 characters required)MAGNA CARTA (minimum 40 characters required)
MAGNA CARTA (minimum 40 characters required)
Filippo64
 
Gabriel Whitley's Motion Summary Judgment
Gabriel Whitley's Motion Summary JudgmentGabriel Whitley's Motion Summary Judgment
Gabriel Whitley's Motion Summary Judgment
Abdul-Hakim Shabazz
 
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
ckn2izdm
 

Recently uploaded (8)

Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
Howard Fineman, Veteran Political Journalist and TV Pundit, Dies at 75
 
Youngest c m in India- Pema Khandu Biography
Youngest c m in India- Pema Khandu BiographyYoungest c m in India- Pema Khandu Biography
Youngest c m in India- Pema Khandu Biography
 
13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf13062024_First India Newspaper Jaipur.pdf
13062024_First India Newspaper Jaipur.pdf
 
Essential Tools for Modern PR Business .pptx
Essential Tools for Modern PR Business .pptxEssential Tools for Modern PR Business .pptx
Essential Tools for Modern PR Business .pptx
 
2015pmkemenhub163.pdf 2015pmkemenhub163.pdf
2015pmkemenhub163.pdf 2015pmkemenhub163.pdf2015pmkemenhub163.pdf 2015pmkemenhub163.pdf
2015pmkemenhub163.pdf 2015pmkemenhub163.pdf
 
MAGNA CARTA (minimum 40 characters required)
MAGNA CARTA (minimum 40 characters required)MAGNA CARTA (minimum 40 characters required)
MAGNA CARTA (minimum 40 characters required)
 
Gabriel Whitley's Motion Summary Judgment
Gabriel Whitley's Motion Summary JudgmentGabriel Whitley's Motion Summary Judgment
Gabriel Whitley's Motion Summary Judgment
 
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
在线办理(latrobe毕业证书)拉筹伯大学毕业证Offer一模一样
 

College Station Conference Center Evaluation

  • 1. August 9, 2012 City Council Meeting
  • 2.
  • 4.  Staffrecognized that many of the maintenance issues were being caused by differential settlement  Lastsignificant renovation took place in the early 1980’s  Councilapproved a SLA in the Public Works Budget for FY 2012 to complete an evaluation
  • 5.  Determine the current condition of the facility – structural, electrical, mechanical, plumbing, cos metic finishes, & site  Identify issues in the facility that need to be upgraded to meet the current building code  Identify the main causes of the differential movement and develop solutions to minimize settlement in the future  Develop a cost estimate for recommended improvements and modifications
  • 6.
  • 7.
  • 8.
  • 9.  Originalstructure is wood framed building supported on cast-in-place perimeter beams on concrete footings and interior concrete footings  Buildingaddition was constructed primarily with a steel frame supported on drilled priers with cast-in-place beams and precast concrete planks
  • 10. Roof Structure  Roof framed with 2x6 rafters on 24-inch centers  2x4 ceiling joists on 24-inch centers  Ceiling joists are connected to the rafters with periodic vertical supports  HVAC units on the roof  Roof surface appeared uneven and soft in areas  Standing water was noted near the larger HVAC Units  In its current state, the engineer felt that the roof structure over the original building was inadequate and needs to be addressed for the building to be occupied
  • 11.  Severalitems noted in the attic framing contributed to this conclusion  Rafters were spliced along the span instead of over a support  Rafters were cut incorrectly to allow for the installation of HVAC equipment  The additional loading of the HVAC and standing water on the roof compounded the problem  The rafters in this building, even if properly placed, would not be sufficient to support the structural loads on the roof for these spans (21’-8”)
  • 12.
  • 13.
  • 14.  Interior wood walls  Corridor walls are double framed with 2x4 studs  Top walls are open where a top plate is typically placed  Consistent blocking was not noted between the faces of the walls  This may result in unstable walls in which the studs do not exhibit group action and the faces of the walls act independently
  • 15.  Floor structure  Wood framing consists of 2x10 joists spanning from the concrete perimeter beam over two triple 2x10 beams.  Preliminary analysis of the floor system indicates that the floor framing is insufficient for the current building use and current building code  Insufficient earth retention around the perimeter has led to the moisture infiltration and soil subsidence.
  • 16.
  • 17.  Foundation  Floor framing system  Address site issues surrounding structure  Remove and replace the roof structure  Modify the interior walls to ensure stability  New finishes on the interior once the roof system is installed  Once this work has been completed, there will likely be differential movement that causes continual maintenance issues
  • 18.  Anticipated cost to remediate the original 1949 structure is likely to range from $1.16M to $1.33M  Thesite work around the facility is likely to range from $270K to $486K  Total project cost to remediate the Conference Center is likely to range from $1.43M - $1.82M
  • 20. 2000 – “Duro Last” roof replacement  2004 - Exterior painting  2005 - HVAC unit replacements (9 units)  2005 - Room 127 laminate flooring installed  2007 - Interior painting (all areas)  2008 - Carpet replacement  2012 - Main electrical panel replacement