This document provides a list of materials and instructions to build a cold frame. It includes a list of 22 items needed with descriptions and quantities. Diagrams show how to assemble the base frame from PVC pipes and plastic sheeting. Hinges are added to connect the top frame, which is also made from PVC pipes and plastic sheeting. The top frame attaches to the base to complete the cold frame structure. Openings can be cut in the top sheeting to control air and temperature inside.
USA classified ads posting – best classified sites in usa.pdf
Cold frame
1. v
.
m n
s
l
l
Cold Frame
.c
c
p
p
m
p
o
a
m
n
Material List:
v
c
Page 1 of 2
s
.c
c
l
a
a
o
Item Qty Description
.c p
p
o
v
v
m n
s
l
l
A 8 1" 3-way Connector
.c
c
.c
p
p
o
p
m
.c p
a
B 4 1"x47" PVC Pipe
n
v
s
c
C 4 1"x27-1/2" PVC Pipe
s
c
l
a
o
p
o
p
D 4 1"x11" PVC Pipe
m n
v
v
p m n
s
l
E 1 65"x84" 6mil Plastic Sheet
.c
c
G
p
p
o
m
p
a
n
F 17 1-1/4" Snap Clamps 4" Glue 3 of Items F and G
v
s
s
together with Item H
.c
c
G 30 1" Snap Clamps 4"
l
a
o
F to create hinges
p
p
H 1 PVC Glue Small Bottle
v
m n
m n
v
s
as shown in Fig.1
l
I 6 3/4" 3-way Connector
.c
c
p
p
a
p
a
o
m
n
J 4 3/4" 45deg. Ell
v
s
c
l
.c
l
K 3 3/4"x48 PVC Pipe
a
p
o
p
L 2 3/4"x28-1/4" PVC Pipe
v
m n
m n
Fig. 1
s
l
c
M 4 3/4"x6" PVC Pipe
.c
o
p
p
a
a
o
m
n
P 4 3/4"x20" PVC Pipe
v
.c
s
c
.c
l
l
S 1 65"x57" 4mil Clear Plastic
a
p
.c p
.c p
o
T 2 38"x26" 4mil Clear Plastic
v
m n
s
s
l
c
c
.c
o
o
m
p
.c p
a
n
B
v
v
C Fig. 2
s
c
l
a
o
p
p
p
.c p
Assemble Base Frame
v
m n
s
s
l
as shown in Fig. 2
c
c
A
p
m
p
o
a
n
n
v
v
Place Item E inside of
s
c
l
B
a
a
assembled base frame
o
p
p
p
v
m n
.
and secure with Items F
s
s
l
l
.c
c
as shown in Fig. 3
p
p
a
m
m
o
n
n
D
v
s
c
l
.c
Locate Hinges
a
a
.c p
p
o
o
p
as shown below
v
m n
A
s
l
l
c
.c
p
o
p
a
m
p
m
m n
v
Hinge
s
c
l
c
a
a
p
p
o
o
v
m n
v
s
l
l
.c
c
.c
F
p
p
o
Fig. 3
p
a
p
n
Hinges
v
s
c
s
.c
l
c
a
o
p
p
o
v
m n
n
v
s
l
.c
.c
c
p
p
a
o
m
p
n
v
s
c
s
.c
l
a
p
p
o
v
m n
v
m n
s
l
c
.c
p
p
a
p
o
a
m
n
v
s
.c
c
l
l
a
p
p
p
o
v
m n
m n
s
l
c
c
.c
p
o
m
p
a
o
a
n
v
Plans prepared by: Dean Hunt/JC Designs
.c
s
c
.c
l
l
hunt4jc@ncws.com March 2002
a
o
p
p
p
v
n
s
s
l
.c
c
c
o
p
o
p
a
2. .c
c
p
p
m
p
o
a
m
n
n
Cold Frame
v
c
s
.c
c
l
a
m
a
o
.c p
p
o
Page 2 of 2
v
v
m n
s
l
l
.c
c
.c
p
p
o
m
p
m
.c p
a
n
v
s
c
s
c
l
Fig. 1
a
o
p
o
p
Assemble Top Frame
n
v
v
p m n
K
s
l
as shown in Fig.1
.c
c
I
p
p
o
m
p
a
n
v
P
s
c
s
.c
c
l
m
a
o
p
.c p
v
m n
m n
v
M
s
l
J
.c
c
p
p
a
p
a
o
m
n
K
v
s
s
c
l
l
a
p
o
p
v
m n
m n
s
l
c
.c
o
p
p
a
a
o
m
n
v
K
.c
S
s
c
.c
Fig. 2
l
l
a
p
.c p
p
I
o
v
m n
s
s
l
c
c
.c
o
o
m
p
.c p
a
L
n
v
v
.c
s
c
l
l
T
a
o
p
p
p
p
v
m n
s
s
l
c
c
p
m
p
o
a
n
n
v
v
s
c
.c
.c
l
a
a
o
p
p
p
v
m n
s
s
l
l
.c
c
p
p
a
m
m
o
n
n
G
v
v
s
c
l
.c
a
a
Fig. 3
.c p
p
o
o
p
v
m n
s
l
l
c
.c
p
o
p
a
m
p
m
Attach Items "T" to both ends of
m n
v
Top Frame and Item "S" over
s
c
l
c
a
o la
Top surface using Items "G"
p
p
o
o
v
m n
v
as shown in Fig.2
s
l
.c
c
.c
p
p
o
p
a
m
.c p
n
v
s
c
s
.c
l
c
Assembled Top
a
p
p
o
v
m n
n
Attach Assembled Top to
v
s
l
Assembled Base with Hinges Assembled Base
.c
c
p
p
a
o
m
p
n
as shown in Fig. 3
v
s
c
s
c
.c
l
a
p
p
o
A Variety of materials may be
v
m n
v
m n
s
used to cover Top.
l
c
.c
p
p
a
p
o
a
m
n
v
Cut slits in Top material as
s
.c
c
l
s
l
a
needed to provide air and
p
p
p
o
v
m n
m n
temperature control.
s
l
c
c
.c
p
o
m
p
a
o
a
n
v
.c
s
c
.c
l
l
a
o
p
p
p
Plans prepared by: Dean Hunt/JC Designs
v
n
hunt4jc@ncws.com March 2002
s
s
l
.c
c
c
o
p
o
p
m
a
n
v
v
s
c
c
c
l