Project on clean street
In
Zone-one, Addis ababa
Prepared By:
Fikru Tessema
(Project Coordinator)
OCTOBER 1999
HEALTH BUREAU
ADDIS ABABA
TABLE OF CONTENT
Contents Page
INTRODUCTION................................................. 1
PROBLEM STATEMENT.................................... 1
GOAL AND OBJECTIVES.................................. 2
IMPLEMENTATION STRATEGY...................... 3
IMPLEMENTATION SCHEDULE...................... 4
MONITORING & EVALUATION...................... 4
PROJECT BUDGET............................................. 5
REFERENCE........................................................ 7
i
EXECUTIVE SUMMARY
PROJECT ON CLEAN STREET IN ZONE -- 1, ADDIS ABABA
(Fikru Tessema and Demissie W/Giorgis)
Clean street is essential if cities are to be environmentally attractive. Waste
management is one of the most requirement and important service to make the urban
centers clean places, which will help to promote the health of the population to
enhance its creative and productive capacities.
Addis Ababa is one of the major urban centers of Ethiopia and the capital city of the
country. Its population is 2.5 million and divided into 6 zones, 28 woredas and 303
kebeles.
Zone-1 is one of the six zones in the city and located at the middle of the city. It is also
the business center for both the city and the country. Due to this position, the waste
generation is not only from the residences of the zone. The highest portion of waste
generation is from market places and institutions.
According to the 1994 population and housing census, the total population of zone-1
is about 314 565 and the total housing units are 53 341. Out of these housing units,
43 674 have some type of sanitary facilities.
Of the total solid waste collected in the city, 25% is from this zone. The resources
daily allocated to give solid waste collection services are 6 garbage container lifter
and 4 side loader trucks, 99 and 200 communal containers of size 8 cu. m and 1.1 cu.
M respectively and 78 street cleaners. There are also 22 public toilets, which serve
about 5 290 people per toilet per day.
In general, the zone lacks proper waste management, which requires proper resource
allocation, management and integrated approach. Most drainage lines are open
ditches, which are often used for receiving any type of refuses, storm and waste water.
Most drainage appurtenances are not functional and need maintenance. These
conditions contributed to the pronounced odor and unsighty condition and deposit of
waste on the side and pavement of the street. As a result, it affects human health and
comfort and aggravates pollution of the environment in general and street in
particular.
The goal of the project is to decrease communicable diseases and avoid unsighty
condition by improving poor environmental condition and poor street cleanliness of
the zone through integrating different sectors and participating the community to
create conducive and attractive environment to the residents and visitors.
The strategies for the implementation of the project are empowering and participating
the community and integrating stakeholders. This is intended to be done by
formulating the coordinating committee of the zone. The committee is supposed to
invite governmental and non-governmental organizations, businessmen and any
ii
interested individuals or groups to participate in keeping their environment clean in
general and street in particular.
This project has two phases. The project components for the first phase are awareness
creation, street cleaning and guarding the polluters; and for the second phase
construction and maintenance of open ditches, roads and sewerage lines.
The outputs of the project are reduction of communicable diseases, creation and
sharing of responsibility, sighty and attractive environment in general and clean
street in particular.
The project will be implemented by the Zonal & Woreda Administration. Zonal Health
Department is the coordinator of the project. It is intended to be implemented in the
coming 5 years starting from the end of 1999 through 2004. Activities of the first
phase of the project will be implemented in the first 2 years and the second phase in
the last 3 years.
The project will be monitored and evaluated by the experts of Health Bureau and
Zonal Health Department jointly. The reports will be submitted to the project
coordinating committee and Health Bureau to finalize the evaluation.
All the resources of the project are expected from governmental, non-governmental
organizations, interested individuals, groups or donors. The total cost of the project
for the first phase is Birr 1 987 172 for a year and Birr 3 974 344 for two years; and
for the second phase it will be given in its project document.
1
Project on Street Cleaning in Zone - 1, Addis Ababa
1. Introduction
Clean street is essential if cities are to be environmentally attractive. Waste
management is one of the most requirement and important service to make the urban
centers clean places, which will help to promote the health of the population to
enhance its creative and productive capacities.
An effective and efficient waste management requires sufficient resource
allocation and management. Waste management is complex and expensive. To sustain
the operation, it demands few skilled and a lot of unskilled staffs, population
cooperation and integration of different stakeholders.
Street cleaning is one of the major activities of solid waste management. Due
to poor roads' condition, drainage system and lack of parking areas and awareness,
keeping streets clean is very difficult in the city in general. It, therefore, needs an
integrated action to keep all streets clean. Since applying this program to the whole
city is not easy, it is designed to be conducted as a pilot project in one part of the city.
2. Problem Statement:
Addis Ababa is the capital city of the country with a population of 2.5 million.
The majority of the population live in unplanned, poor housing condition and mixed
commercial and residential areas. It is divided into 6 zones, 28 woerdas and 303.
Zone-1 is one of the six zones in the city with 314 565 population, 53 341
housing units of 53 341 and 43 674 housing units with some type of sanitary facilities
(1994 P.H.C) and it is located at the middle of the city. It is also the business center
for both the city and the country. Due to this position, the waste generation is not only
from the residents of the zone, but also from the visitors. The highest portion of waste
generation is from market places and institutions.
The Solid Waste Management Team with its 8 garbage lifter and 4 side loader
trucks, 99 & 200 communal containers of 8 cu. M and 1.1 cu. M size respectively and
78 street cleaners are collecting solid waste, which are 25% of the total solid waste
collected from the city per day. Out of the total solid waste collected, 8% is from
street cleaning.
The zone lacks clean environment in general and street in particular. Due to its
position of being the largest open market of the country, its solid waste generation per
day is very high. Since the solid waste collection service coverage is also low, large
portion of solid waste is disposed of on streets, in drainage lines and rivers, which
enhances communicable diseases' transmission and creates odor and unsighty
environment to its residents and visitors.
2
There are about 120 km long roads in the Zone, which need routine cleaning.
The Solid Waste Management Team is cleaning about 40% of roads and the rest 60%
need cleaning that requires additional inputs.
3. Goal and Objectives
Goal:
The overall goal of this project is to decrease communicable diseases and
avoid unsighty condition by improving poor environmental condition and poor street
cleanliness of the zone.
Objectives:
 Clean the street to create conducive and attractive environment to the residents and
visitors.
 Enhance the job opportunities for unemployed residents of the zone.
 Keep the environment clean through raising the awareness of the community and
guarding the polluters.
 Expand the program to the other areas of the city.
4. Beneficiaries
The residents of the zone are potential beneficiaries. The benefits obtained
from the implementation of the project include the improved health and sanitation,
protection from pollution and deterioration of the environment and employment
opportunity.
The benefits, therefore, have environmental, economical and health
implication in the broader sense.
5. Implementation Strategy
Strategies are options of different courses of action that will help to meet and
achieve the goal and objectives of the program and sustain the program in the project
area.
The project area is Zone - 1. This project has two phases to implement the
program. Different course of action will also be employed for each phase.
The expected outputs of the project are reduction of communicable diseases,
creation and sharing of responsibilities, sighty environment, clean street and job
opportunities.
3
The implementation strategies for the first phase of the program:
Strategies Activities Responsible Institution Area of Responsibility Role of Health Bureau
Empowering and
participating the
community
 Formulate Zonal Project
Coordinating Committee
 Health Bureau and Zonal
Health Department
 Coordinate community
leaders & different
stakeholders to formulate the
committee
 Coordinate the activities
Intersectoral
collaboration
 Participate different
stakeholder
 Coordinating committee
 Zonal Health Department
 Invite stakeholders to
participate in the program
 Coordinate NGOs & GOs
Enforcement  Teach and enforce the
community to exercise rules
and regulations
 Kebele Administration  Penalize polluters  Prepare forum for discussion
and information sharing and
advocacy
Awareness creation  Promote hygiene and
environmental education
 Zonal Coordinating
Committee and Kebele
Administration
 Control and evaluate
community educators
 Give training for hygiene
educators and technical
assistance
Street cleaning  Sweep streets, market places,
etc
 Zonal Coordinating
committee
 Kebele Administration
 Hire street cleaners
 Control and evaluate cleaners
 Give technical assistance
Guarding polluters  Guard roads, schools, market
places, churches, mosques, etc
 Zonal coordinating
committee
 Kebele Administration
 Hire sanitary guards
 Control and evaluate guards
 Give training for sanitary
guards and technical
assistance
4
Implementation Schedule:
The time frame for the implementation of the project:
Se.
No.
Activities Duration 1999/ 00 - 2003/04
1999/00 2000/01 2001/02 2002/03 2003/04
1 Phase - 1:
 Formulate Zonal project
coordinating committee
X
 Participate different
stakeholders
X X X X X
 Enforce the community to
exercise rules & regulations
X X X X X
 Promote hygiene and
environmental education
X X
 Sweep streets, market
places, etc.
X X X X X
 Guard roads, schools,
market places, churches,
mosques, etc.
X X X X X
2 Phase - 2:
 Construction &
maintenance of open
ditches
X X X
 Construction &
maintenance of roads
X X X
 Construction of sewerage
lines X X X
6. Monitoring and evaluation
6.1. Monitoring:
The project will be monitored by Zonal Environmental Health Service
Coordinating Team. It will be done by field visits, group discussion and
weekly report.
5
6.2. Evaluation:
The project will be evaluated quarterly by the Environmental Health Experts of
the Health Bureau. The out comes of the evaluation will be submitted to the
coordinating committee and Health Bureau.
7. Project Budget:
The budget for the first phase is given below and for the second phase, it will
be given in its project document.
7.1. Cost of materials:
Se.
No.
Item Unit Qty. Unit
cost
(Birr)
Total
cost
(Birr)
Source
Comm NGOs
1 Wheel Barrow No 88 250 22 000
2 Shovel “ 88 60 5280
3 Fork “ 88 50 4400
4 Broom “ 11 800 5 59 000
5 Total 86 280
6 10% contingency 8 628
7 G. Total for a year 94 908
8 G. Total for 2 years 189 816
7.2. Cost of working clothes and wages for street cleaners
Se.
No.
Item Unit Qty. Unit cost
(Birr per
month)
Total cost
(Birr per
year)
Source
Comm. NGOs
1 Wage of street
cleaners No. 240 250 720 000
2 Wage of foreman “ 20 350 84 000
3 Hardship allowance “
260 60 187 200
4 Working cloth per
year
“ 520 350 182 000
5 Total 1 173 200
6 10% contingency 117 320
7 G. Total for a year 1 290 520
8 G. Total for 2 years. 2 581 040
6
7.3. Cost for wages and uniform of sanitary guards
Se.
No.
Item Unit Qty. Unit cost
(Birr per
month)
Total cost
(Birr per
year)
Source
Comm. NGOs
1 Wage of sanitary
guards No. 104 230 287 040
2 Uniform per year “ 208 350 72 800
3 Total 359 840
4 10% for contingency 35 984
5 Grand total for a year 395 824
6 Grand total for 2 years 791 648
7.4. Cost for incentives of hygiene educators:
Se.
No.
Item Unit Qty. Unit cost
(Birr per
month)
Total cost
(Birr per
year)
Source
Comm. NGOs
1 Hygiene and
environmental
educators
No. 104 150 187 200
2 10% contingency 18 720
3 Total for a year 205 920
4 Total for 2 years 411 840
7.5. Cost summary:
Se.
No.
Type of cost Budget of
a year
Budget of
2 years
Source
Comm. NGOs
1 For material for street
cleaning 94 908 189 816
2 For wage & working
cloth of street cleaners 1 290 520 2 581 040
3 For wage & uniform for
sanitary guards 395 824 791 648
4 For incentives of
7
educators for awareness
creation 205 920 411 840
5 Total cost 1 987 172 3 974 344
8. References:
1. Addis Ababa Health Bureau activities reports.
2. Kumie A. An overview of Addis Ababa solid waste management.
3. Nor consult, Addis Ababa solid waste management study 1982.
4. Luisberger consult, Addis Ababa solid waste management study
1994 & 1995.
5. UNDP-World Bank water and Sanitation Program flied note on
Addis Ababa-1996.

More Related Content

What's hot

The Sustainable Development Framework
The Sustainable Development FrameworkThe Sustainable Development Framework
The Sustainable Development Framework
UNDP Eurasia
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
Abhishek Rajput
 

What's hot (20)

The Sustainable Development Framework
The Sustainable Development FrameworkThe Sustainable Development Framework
The Sustainable Development Framework
 
Solid Waste Generation and Handling
Solid Waste Generation and HandlingSolid Waste Generation and Handling
Solid Waste Generation and Handling
 
Environmental Concerns of developing and developed countries
Environmental Concerns of developing and developed countriesEnvironmental Concerns of developing and developed countries
Environmental Concerns of developing and developed countries
 
URBANIZATION - PROBLEM OF RICH AND POOR.pptx
URBANIZATION - PROBLEM OF RICH AND POOR.pptxURBANIZATION - PROBLEM OF RICH AND POOR.pptx
URBANIZATION - PROBLEM OF RICH AND POOR.pptx
 
EIA
EIAEIA
EIA
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
Sustainable Cities
Sustainable CitiesSustainable Cities
Sustainable Cities
 
Comprehensive Development Plan
Comprehensive Development PlanComprehensive Development Plan
Comprehensive Development Plan
 
EIA M9 highway
EIA M9 highwayEIA M9 highway
EIA M9 highway
 
Sustainable development
Sustainable developmentSustainable development
Sustainable development
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planning
 
Sustainable Development Goals (SDG) - Conference 2015 with Philippine Goals
Sustainable Development Goals (SDG) - Conference 2015 with Philippine GoalsSustainable Development Goals (SDG) - Conference 2015 with Philippine Goals
Sustainable Development Goals (SDG) - Conference 2015 with Philippine Goals
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
 
Effects of disposal of solids waste
Effects of disposal of solids wasteEffects of disposal of solids waste
Effects of disposal of solids waste
 
Gender and climate change adaptation
Gender and climate change adaptationGender and climate change adaptation
Gender and climate change adaptation
 
Ecological Footprint (1).pptx
Ecological Footprint (1).pptxEcological Footprint (1).pptx
Ecological Footprint (1).pptx
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
Sustainable Transportation
Sustainable TransportationSustainable Transportation
Sustainable Transportation
 
Environmental Governance
Environmental GovernanceEnvironmental Governance
Environmental Governance
 
Sustainable cities
Sustainable cities Sustainable cities
Sustainable cities
 

Viewers also liked (10)

Street cleaning
Street cleaningStreet cleaning
Street cleaning
 
Complete Cleaning Equipments
Complete Cleaning EquipmentsComplete Cleaning Equipments
Complete Cleaning Equipments
 
Self Regulating Streets
Self Regulating StreetsSelf Regulating Streets
Self Regulating Streets
 
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
 
Session 33 Kaarle Kupiainen
Session 33 Kaarle KupiainenSession 33 Kaarle Kupiainen
Session 33 Kaarle Kupiainen
 
30_8.14_Street Cleaning_1800
30_8.14_Street Cleaning_180030_8.14_Street Cleaning_1800
30_8.14_Street Cleaning_1800
 
Street Sweeping
Street SweepingStreet Sweeping
Street Sweeping
 
solid waste management
solid waste managementsolid waste management
solid waste management
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to Clean street project

Similar to Clean street project (20)

Project ghg
Project ghgProject ghg
Project ghg
 
Tor for assessing impact of radio programmes
Tor for assessing impact of radio programmesTor for assessing impact of radio programmes
Tor for assessing impact of radio programmes
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design
 
Edited solid waste managment
Edited solid waste managmentEdited solid waste managment
Edited solid waste managment
 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
 
impact assesment .pptx
impact assesment .pptximpact assesment .pptx
impact assesment .pptx
 
Department of environment(DOE),Bangladesh
Department of environment(DOE),BangladeshDepartment of environment(DOE),Bangladesh
Department of environment(DOE),Bangladesh
 
PPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptxPPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptx
 
Interior services unit 4
Interior services unit 4Interior services unit 4
Interior services unit 4
 
Eco2 Cities
Eco2 CitiesEco2 Cities
Eco2 Cities
 
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
 
Urbanization
UrbanizationUrbanization
Urbanization
 
Concept note: Pan-African landscape restoration program
Concept note: Pan-African landscape restoration programConcept note: Pan-African landscape restoration program
Concept note: Pan-African landscape restoration program
 
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
 
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
 
Hazardous waste in Bangladesh
Hazardous waste in BangladeshHazardous waste in Bangladesh
Hazardous waste in Bangladesh
 
Bangkok Green Zone(1)
Bangkok Green Zone(1)Bangkok Green Zone(1)
Bangkok Green Zone(1)
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 

More from Fikru Tessema

Effect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeEffect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptake
Fikru Tessema
 
Network full-engllish
Network full-engllishNetwork full-engllish
Network full-engllish
Fikru Tessema
 
Health system reform overall
Health system reform overallHealth system reform overall
Health system reform overall
Fikru Tessema
 
Eeo health and environment-final
Eeo health and environment-finalEeo health and environment-final
Eeo health and environment-final
Fikru Tessema
 
National wm strategy and poa sa
National wm strategy and poa saNational wm strategy and poa sa
National wm strategy and poa sa
Fikru Tessema
 
Water supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-finalWater supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-final
Fikru Tessema
 
Ethiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measuresEthiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measures
Fikru Tessema
 
Emission ch4 solid waste
Emission ch4 solid wasteEmission ch4 solid waste
Emission ch4 solid waste
Fikru Tessema
 
Hcwm guidelines ethiopia final
Hcwm guidelines ethiopia finalHcwm guidelines ethiopia final
Hcwm guidelines ethiopia final
Fikru Tessema
 
Fikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitmentFikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitment
Fikru Tessema
 
Wb swm psp- main report final
Wb swm  psp- main report finalWb swm  psp- main report final
Wb swm psp- main report final
Fikru Tessema
 
School based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassaSchool based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassa
Fikru Tessema
 
Ethiopia households water supply survey report
Ethiopia households water supply survey reportEthiopia households water supply survey report
Ethiopia households water supply survey report
Fikru Tessema
 
Employee retention initiatives_study_report-rev
Employee retention initiatives_study_report-revEmployee retention initiatives_study_report-rev
Employee retention initiatives_study_report-rev
Fikru Tessema
 
Ethiopia baseline review for water mdg
Ethiopia baseline review for water mdgEthiopia baseline review for water mdg
Ethiopia baseline review for water mdg
Fikru Tessema
 
Fikru presentation m&e
Fikru presentation m&eFikru presentation m&e
Fikru presentation m&e
Fikru Tessema
 

More from Fikru Tessema (20)

Effect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeEffect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptake
 
Effect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeEffect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptake
 
M&e system
M&e systemM&e system
M&e system
 
Network full-engllish
Network full-engllishNetwork full-engllish
Network full-engllish
 
Health system reform overall
Health system reform overallHealth system reform overall
Health system reform overall
 
Eeo health and environment-final
Eeo health and environment-finalEeo health and environment-final
Eeo health and environment-final
 
National wm strategy and poa sa
National wm strategy and poa saNational wm strategy and poa sa
National wm strategy and poa sa
 
Swm ethiopia
Swm ethiopiaSwm ethiopia
Swm ethiopia
 
Water supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-finalWater supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-final
 
Ethiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measuresEthiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measures
 
Emission ch4 solid waste
Emission ch4 solid wasteEmission ch4 solid waste
Emission ch4 solid waste
 
Aa swm-overviw
Aa swm-overviwAa swm-overviw
Aa swm-overviw
 
Hcwm guidelines ethiopia final
Hcwm guidelines ethiopia finalHcwm guidelines ethiopia final
Hcwm guidelines ethiopia final
 
Fikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitmentFikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitment
 
Wb swm psp- main report final
Wb swm  psp- main report finalWb swm  psp- main report final
Wb swm psp- main report final
 
School based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassaSchool based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassa
 
Ethiopia households water supply survey report
Ethiopia households water supply survey reportEthiopia households water supply survey report
Ethiopia households water supply survey report
 
Employee retention initiatives_study_report-rev
Employee retention initiatives_study_report-revEmployee retention initiatives_study_report-rev
Employee retention initiatives_study_report-rev
 
Ethiopia baseline review for water mdg
Ethiopia baseline review for water mdgEthiopia baseline review for water mdg
Ethiopia baseline review for water mdg
 
Fikru presentation m&e
Fikru presentation m&eFikru presentation m&e
Fikru presentation m&e
 

Recently uploaded

Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Open Access Research Paper
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Open Access Research Paper
 
Green house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptxGreen house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptx
ViniHema
 
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
exehay
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 

Recently uploaded (20)

Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
Bhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of deathBhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of death
 
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
@@how to Join @occult for money ritual..☎️+2349022657119.
@@how to Join @occult for money ritual..☎️+2349022657119.@@how to Join @occult for money ritual..☎️+2349022657119.
@@how to Join @occult for money ritual..☎️+2349022657119.
 
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
Use of Raffias’ species (Raphia spp.) and its impact on socioeconomic charact...
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
Major-Environmental-Problems and Proven Solutions.pdf
Major-Environmental-Problems and Proven Solutions.pdfMajor-Environmental-Problems and Proven Solutions.pdf
Major-Environmental-Problems and Proven Solutions.pdf
 
Green house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptxGreen house gases GlobalWarmingPotential.pptx
Green house gases GlobalWarmingPotential.pptx
 
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
一比一原版EUR毕业证鹿特丹伊拉斯姆斯大学毕业证成绩单如何办理
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 

Clean street project

  • 1. Project on clean street In Zone-one, Addis ababa Prepared By: Fikru Tessema (Project Coordinator) OCTOBER 1999 HEALTH BUREAU ADDIS ABABA
  • 2. TABLE OF CONTENT Contents Page INTRODUCTION................................................. 1 PROBLEM STATEMENT.................................... 1 GOAL AND OBJECTIVES.................................. 2 IMPLEMENTATION STRATEGY...................... 3 IMPLEMENTATION SCHEDULE...................... 4 MONITORING & EVALUATION...................... 4 PROJECT BUDGET............................................. 5 REFERENCE........................................................ 7
  • 3. i EXECUTIVE SUMMARY PROJECT ON CLEAN STREET IN ZONE -- 1, ADDIS ABABA (Fikru Tessema and Demissie W/Giorgis) Clean street is essential if cities are to be environmentally attractive. Waste management is one of the most requirement and important service to make the urban centers clean places, which will help to promote the health of the population to enhance its creative and productive capacities. Addis Ababa is one of the major urban centers of Ethiopia and the capital city of the country. Its population is 2.5 million and divided into 6 zones, 28 woredas and 303 kebeles. Zone-1 is one of the six zones in the city and located at the middle of the city. It is also the business center for both the city and the country. Due to this position, the waste generation is not only from the residences of the zone. The highest portion of waste generation is from market places and institutions. According to the 1994 population and housing census, the total population of zone-1 is about 314 565 and the total housing units are 53 341. Out of these housing units, 43 674 have some type of sanitary facilities. Of the total solid waste collected in the city, 25% is from this zone. The resources daily allocated to give solid waste collection services are 6 garbage container lifter and 4 side loader trucks, 99 and 200 communal containers of size 8 cu. m and 1.1 cu. M respectively and 78 street cleaners. There are also 22 public toilets, which serve about 5 290 people per toilet per day. In general, the zone lacks proper waste management, which requires proper resource allocation, management and integrated approach. Most drainage lines are open ditches, which are often used for receiving any type of refuses, storm and waste water. Most drainage appurtenances are not functional and need maintenance. These conditions contributed to the pronounced odor and unsighty condition and deposit of waste on the side and pavement of the street. As a result, it affects human health and comfort and aggravates pollution of the environment in general and street in particular. The goal of the project is to decrease communicable diseases and avoid unsighty condition by improving poor environmental condition and poor street cleanliness of the zone through integrating different sectors and participating the community to create conducive and attractive environment to the residents and visitors. The strategies for the implementation of the project are empowering and participating the community and integrating stakeholders. This is intended to be done by formulating the coordinating committee of the zone. The committee is supposed to invite governmental and non-governmental organizations, businessmen and any
  • 4. ii interested individuals or groups to participate in keeping their environment clean in general and street in particular. This project has two phases. The project components for the first phase are awareness creation, street cleaning and guarding the polluters; and for the second phase construction and maintenance of open ditches, roads and sewerage lines. The outputs of the project are reduction of communicable diseases, creation and sharing of responsibility, sighty and attractive environment in general and clean street in particular. The project will be implemented by the Zonal & Woreda Administration. Zonal Health Department is the coordinator of the project. It is intended to be implemented in the coming 5 years starting from the end of 1999 through 2004. Activities of the first phase of the project will be implemented in the first 2 years and the second phase in the last 3 years. The project will be monitored and evaluated by the experts of Health Bureau and Zonal Health Department jointly. The reports will be submitted to the project coordinating committee and Health Bureau to finalize the evaluation. All the resources of the project are expected from governmental, non-governmental organizations, interested individuals, groups or donors. The total cost of the project for the first phase is Birr 1 987 172 for a year and Birr 3 974 344 for two years; and for the second phase it will be given in its project document.
  • 5. 1 Project on Street Cleaning in Zone - 1, Addis Ababa 1. Introduction Clean street is essential if cities are to be environmentally attractive. Waste management is one of the most requirement and important service to make the urban centers clean places, which will help to promote the health of the population to enhance its creative and productive capacities. An effective and efficient waste management requires sufficient resource allocation and management. Waste management is complex and expensive. To sustain the operation, it demands few skilled and a lot of unskilled staffs, population cooperation and integration of different stakeholders. Street cleaning is one of the major activities of solid waste management. Due to poor roads' condition, drainage system and lack of parking areas and awareness, keeping streets clean is very difficult in the city in general. It, therefore, needs an integrated action to keep all streets clean. Since applying this program to the whole city is not easy, it is designed to be conducted as a pilot project in one part of the city. 2. Problem Statement: Addis Ababa is the capital city of the country with a population of 2.5 million. The majority of the population live in unplanned, poor housing condition and mixed commercial and residential areas. It is divided into 6 zones, 28 woerdas and 303. Zone-1 is one of the six zones in the city with 314 565 population, 53 341 housing units of 53 341 and 43 674 housing units with some type of sanitary facilities (1994 P.H.C) and it is located at the middle of the city. It is also the business center for both the city and the country. Due to this position, the waste generation is not only from the residents of the zone, but also from the visitors. The highest portion of waste generation is from market places and institutions. The Solid Waste Management Team with its 8 garbage lifter and 4 side loader trucks, 99 & 200 communal containers of 8 cu. M and 1.1 cu. M size respectively and 78 street cleaners are collecting solid waste, which are 25% of the total solid waste collected from the city per day. Out of the total solid waste collected, 8% is from street cleaning. The zone lacks clean environment in general and street in particular. Due to its position of being the largest open market of the country, its solid waste generation per day is very high. Since the solid waste collection service coverage is also low, large portion of solid waste is disposed of on streets, in drainage lines and rivers, which enhances communicable diseases' transmission and creates odor and unsighty environment to its residents and visitors.
  • 6. 2 There are about 120 km long roads in the Zone, which need routine cleaning. The Solid Waste Management Team is cleaning about 40% of roads and the rest 60% need cleaning that requires additional inputs. 3. Goal and Objectives Goal: The overall goal of this project is to decrease communicable diseases and avoid unsighty condition by improving poor environmental condition and poor street cleanliness of the zone. Objectives:  Clean the street to create conducive and attractive environment to the residents and visitors.  Enhance the job opportunities for unemployed residents of the zone.  Keep the environment clean through raising the awareness of the community and guarding the polluters.  Expand the program to the other areas of the city. 4. Beneficiaries The residents of the zone are potential beneficiaries. The benefits obtained from the implementation of the project include the improved health and sanitation, protection from pollution and deterioration of the environment and employment opportunity. The benefits, therefore, have environmental, economical and health implication in the broader sense. 5. Implementation Strategy Strategies are options of different courses of action that will help to meet and achieve the goal and objectives of the program and sustain the program in the project area. The project area is Zone - 1. This project has two phases to implement the program. Different course of action will also be employed for each phase. The expected outputs of the project are reduction of communicable diseases, creation and sharing of responsibilities, sighty environment, clean street and job opportunities.
  • 7. 3 The implementation strategies for the first phase of the program: Strategies Activities Responsible Institution Area of Responsibility Role of Health Bureau Empowering and participating the community  Formulate Zonal Project Coordinating Committee  Health Bureau and Zonal Health Department  Coordinate community leaders & different stakeholders to formulate the committee  Coordinate the activities Intersectoral collaboration  Participate different stakeholder  Coordinating committee  Zonal Health Department  Invite stakeholders to participate in the program  Coordinate NGOs & GOs Enforcement  Teach and enforce the community to exercise rules and regulations  Kebele Administration  Penalize polluters  Prepare forum for discussion and information sharing and advocacy Awareness creation  Promote hygiene and environmental education  Zonal Coordinating Committee and Kebele Administration  Control and evaluate community educators  Give training for hygiene educators and technical assistance Street cleaning  Sweep streets, market places, etc  Zonal Coordinating committee  Kebele Administration  Hire street cleaners  Control and evaluate cleaners  Give technical assistance Guarding polluters  Guard roads, schools, market places, churches, mosques, etc  Zonal coordinating committee  Kebele Administration  Hire sanitary guards  Control and evaluate guards  Give training for sanitary guards and technical assistance
  • 8. 4 Implementation Schedule: The time frame for the implementation of the project: Se. No. Activities Duration 1999/ 00 - 2003/04 1999/00 2000/01 2001/02 2002/03 2003/04 1 Phase - 1:  Formulate Zonal project coordinating committee X  Participate different stakeholders X X X X X  Enforce the community to exercise rules & regulations X X X X X  Promote hygiene and environmental education X X  Sweep streets, market places, etc. X X X X X  Guard roads, schools, market places, churches, mosques, etc. X X X X X 2 Phase - 2:  Construction & maintenance of open ditches X X X  Construction & maintenance of roads X X X  Construction of sewerage lines X X X 6. Monitoring and evaluation 6.1. Monitoring: The project will be monitored by Zonal Environmental Health Service Coordinating Team. It will be done by field visits, group discussion and weekly report.
  • 9. 5 6.2. Evaluation: The project will be evaluated quarterly by the Environmental Health Experts of the Health Bureau. The out comes of the evaluation will be submitted to the coordinating committee and Health Bureau. 7. Project Budget: The budget for the first phase is given below and for the second phase, it will be given in its project document. 7.1. Cost of materials: Se. No. Item Unit Qty. Unit cost (Birr) Total cost (Birr) Source Comm NGOs 1 Wheel Barrow No 88 250 22 000 2 Shovel “ 88 60 5280 3 Fork “ 88 50 4400 4 Broom “ 11 800 5 59 000 5 Total 86 280 6 10% contingency 8 628 7 G. Total for a year 94 908 8 G. Total for 2 years 189 816 7.2. Cost of working clothes and wages for street cleaners Se. No. Item Unit Qty. Unit cost (Birr per month) Total cost (Birr per year) Source Comm. NGOs 1 Wage of street cleaners No. 240 250 720 000 2 Wage of foreman “ 20 350 84 000 3 Hardship allowance “ 260 60 187 200 4 Working cloth per year “ 520 350 182 000 5 Total 1 173 200 6 10% contingency 117 320 7 G. Total for a year 1 290 520 8 G. Total for 2 years. 2 581 040
  • 10. 6 7.3. Cost for wages and uniform of sanitary guards Se. No. Item Unit Qty. Unit cost (Birr per month) Total cost (Birr per year) Source Comm. NGOs 1 Wage of sanitary guards No. 104 230 287 040 2 Uniform per year “ 208 350 72 800 3 Total 359 840 4 10% for contingency 35 984 5 Grand total for a year 395 824 6 Grand total for 2 years 791 648 7.4. Cost for incentives of hygiene educators: Se. No. Item Unit Qty. Unit cost (Birr per month) Total cost (Birr per year) Source Comm. NGOs 1 Hygiene and environmental educators No. 104 150 187 200 2 10% contingency 18 720 3 Total for a year 205 920 4 Total for 2 years 411 840 7.5. Cost summary: Se. No. Type of cost Budget of a year Budget of 2 years Source Comm. NGOs 1 For material for street cleaning 94 908 189 816 2 For wage & working cloth of street cleaners 1 290 520 2 581 040 3 For wage & uniform for sanitary guards 395 824 791 648 4 For incentives of
  • 11. 7 educators for awareness creation 205 920 411 840 5 Total cost 1 987 172 3 974 344 8. References: 1. Addis Ababa Health Bureau activities reports. 2. Kumie A. An overview of Addis Ababa solid waste management. 3. Nor consult, Addis Ababa solid waste management study 1982. 4. Luisberger consult, Addis Ababa solid waste management study 1994 & 1995. 5. UNDP-World Bank water and Sanitation Program flied note on Addis Ababa-1996.