SlideShare a Scribd company logo
1 of 13
CONTENTS
1. Chapter 1. SOLID WASTE MANAGEMENT.............................................................................................3
1 Waste Management Problem in Addis Ababa .................................................................................3
2 Main Causes of waste Management Problem ..................................................................................3
3 Detail about the Causes of waste Management Problem............................................................3
4 Effects of waste Management Problem..............................................................................................4
5 Means of solution for waste Management Problem .....................................................................4
2. Chapter 2. Requirements Collection.........................................................................................................8
1 Detail Focus Areas Requirements Collection...................................................................................8
I. Urban Settlement Areas .......................................................................................................................8
II. Schools.........................................................................................................................................................8
III. For Houses.............................................................................................................................................8
IV. FOR SCHOOLS......................................................................................................................................9
V. VOLUNTEERS............................................................................................................................................9
3. Chapter 3. PROJECT BUDGET AND ESTIMATION BASICS ..........................................................12
1. CHAPTER 1. SOLID WASTE MANAGEMENT
1 Waste Management Problem in Addis Ababa
Addis Ababa is the capital city of Ethiopia, it established before 100 years ago.
Kirkos Sub City is one of the sub cities in Addis Ababa. We choose this sub city
because of the major problem in this sub city. But the Waste Management is a
major challenge. Concerning waste management system, there are many
governmental and non-governmental bureaus working on the problem. But none
of them can manage it. Therefore everyone of as should start thinking to solve
the problem.
2 Main Causes of waste Management Problem
There are a lot of poor waste management system causes, some of those are:
 Poor Culture of waste management system,
 Population Settlements Management and Urbanization,
 Low awareness,
 No Proper location, Descriptive and not Enough Waste collection
materials,
 Law, regulation and legislation implementations are not effectively
applicable,
 Collection and transportation problem of waste management.
3 Detail about the Causes of waste Management Problem
 Poor Culture of waste management system
Communities Culture and Tradition has a big influence on waste
management system. In our culture, there is a low concept and
awareness or know how to handle waste. The poor culture of waste
management causes bad impact on the living standards and on the
environment. The reckless behavior of the community on Solid waste
management make our city dirty.
 PopulationSettlements ManagementandUrbanization
To control the adverse impact of waste a good urbanization is required. Poor
urban settlement causes a sophisticate environment. If there is no planned
solid waste management system; sewerage system; water supply distribution
systems; and other necessary infrastructure, it make a negative impact on
waste management system. Unplanned population settlement causes
pollution to the environment.
 Low awareness
A low awareness is given concerning waste management from
households, schools, public or private sectors. Every sector leave its
waste disposal outside of its fence.
 No Proper location, Descriptive and not Enough Waste
collectionmaterials,
To handle a waste properly, there should be manageable collection
system. It requires to put the collection materials in equal distance and
sufficiently. But in our cases there is collection materials in some corners.
But not properly puts in order to distance; also not inviting to put in to it.
It is not enough to handle the waste.
 Law, regulation and legislation implementation is not
effectively applicable,
There is a proclamation about solid waste management proclamation no.
513/2007. But there is no effective implementation and knowledge of
the proclamation.
4 Effects of waste Management Problem
 It causes health problem for the community;
 It causes a negative environmental impact;
 It make re cycling difficult.
5 Means of solution for waste Management Problem
As we discussed the causes and effects, there are solutions to implement. These
solutions are:-
 Poor Culture of waste management systemand Low
awareness
To develop a good traditions and awareness the solution is education. Teaching and
practices should be done in every family, community, schools, in public or in private
sectors. Everyone needs to be responsible to manage every disposals of waste. By
making traditions, we will make our environment clean.
 No Proper location, Descriptive and not Enough Waste
collectionmaterials,
To solve this problem, we need to put the collection materials
 Put enough amount of materials and in calculated distance wise,
 Clearly descriptive, where to put recyclable or other materials,
 Easy and accessible to put wastes in to in it,
 Central collecting materials are required in villages, and
 The transportation system of waste should be properly planned and
manageable.
 Law, regulation and legislation implementation is not
effectively applicable,
As we discussed above, we have a proclamation concerning waste management. It
should implement and control properly.
Some of our stakeholders are the beneficiaries (the community), Addis Ababa water
Supply and Sanitation Authority, Addis Ababa City Administration, Addis Ababa Police,
Community Policing, Kebeles, Weredas, and etc…
By putting those stakeholders for discussion, we should aware why and what should do
to solve the Solid Waste Management System applicable
I. 1. General Project Information
Project Name: SOLID WASTE DISPOSAL
Executive Sponsors: Cherkos Subcity Adminstration
Department Sponsor:
Impact of project: To create a better solid waste desposal system and safe,clean and healthyenvironment.
II. 2. Project Team
III. Name Department Telephone E-mail
Project
Manager:
Team
Members:
1. Tsedey
2. Saba Yimer
3. Mulugeta Yirdaw
4. Biruh Mulugeta
5. Bethelehem
Samson
6. Marsha Nega
IV. 3. Stakeholders (e.g., thosewith a significant interest in or who will besignificantly affected by this project)
1. Cherkos Subcity’s Society
2. Cherkos Subcity Adminstration
3. School deans and Students
4. Reagulatoryand Legislative Bodies
V. 4. Project Scope Statement
ProjectPurpose
The purpose of the SOLID WASTE DISPOSAL Project is to ensure solid waste is managed in such a way
that protects both public health and the environment. This project works hard to help all societies of
Cherkos Subcity to manage better their solid wastes.
Objectives (in business terms) Describe the measurable outcomes of the project, e.g., reduce costby xxxx orincrease quality toyyyy
To ensure clean city that protects both public health and the environment by delivering waste collecting
materials in short distance gap and awaring the society and students together with city administration
and other stakeholders.
Deliverables List the high-level “products” to be created(e.g., improvedxxxx process, employeemanual onyyyy)
Creating clean and green city
Scope List what the projectwill andwill notaddress (e.g., this projectaddresses units thatreport into theOffice of Executive Vice President. Units
that report into the Provosts Office are not included)
This projectwill consistofcreating a clean city by delivering waste collecting materials and byawaing Kirkos sub city socity
and students. Money comics on our website.The project will be completed untill August15, 2020.
ProjectMilestones Propose start and end dates forProject Phases (e.g., Inception, Planning, Construction, Delivery) and othermajormilestones
This projectwill start January 1, 2020 and ends untill August15 2020
Major Known Risks (includingsignificant Assumptions) Identify obstacles that may cause the project tofail.
Risk Risk Rating (Hi, Med, Lo)
By a poor beaurocrasyofstakeholders High
If the communityis unwillng to cooperate Medium
Constraints List any conditions that may limit the project team’s options with respectto resources, personnel, orschedule (e.g., predetermined
budget orproject enddate, limit onnumberof staff thatmay beassignedto the project).
Budgetis the mostcritical constraintof this projectand also lack of communitycooperation may also be a big challenge .
External Dependencies Will project success depend oncoordination of efforts betweenthe project team andoneormore otherindividuals or
groups?Has everyone involved agreedto this interaction?
VI. 5. Communication Strategy (specify how the projectmanager willcommunicate to the Executive Sponsor,Project Team members and
Stakeholders, e.g.,frequency ofstatus reports, frequency ofProjectTeam meetings, etc.
Communicates bydaily,weekly and monthlystatus reports.
Communicates bymeetings.
Communicates byphone calls.
VII. 6. Sign-off
VIII. IX. Name X. Signature XI. Date
(MM/DD
/YYYY)
XII. Executive Sponsor
XIII. Department Sponsor
XIV. Project Manager
XV. 7. Notes
2. CHAPTER 2. REQUIREMENTS COLLECTION
1 Detail Focus Areas Requirements Collection
 We needto considerthe followingthingsto requirementcollectioncase:-
 Benchmarking review the latest papers and systems in Addis Ababa and other similar
cities,
 Dissections will made with stakeholders, to justify the requirements and prepare the
processingprocedures,
 Use or Identify innovative ideas and solutions for the solid waste management problems,
 Needtodefine howtoteachthe community,
 Surveyingthe village topography,
 Selectthe materialstobe use forsmall mediumandlargercollections,
 Selecthousesforthe purpose of commoncollectionlocation,
 SelectGreenAreaslocationandplacestoput the collectionsbyusingthe masterplan,
 Prepare Operationsmanuals,
 Since our main focus areas are schools and Urban settlement areas :-
XVI.Urban SettlementAreas
1. Interviewingcore stakeholders
1.1 cityadministrator
1.2 the community
1.3 healthcenter
1.4 employeesworkingoncollectingwastes
2. Observingwhichareaismore dirtyand know the reasonwhy
3. Observingwhatkindof people throw dirtaround
XVII. Schools
1. Interviewingcore stakeholders
1.1 students
1.2 school administers
1.3 volunteer
XVIII. For Houses
 How doesthe cityadministratormanage the collectionof solidwastesaroundkirkos?
 How manygarbage are setaround housingsettlements?
 Withwhat periodof time isthe waste collected?
 Doesthe communityclearlyunderstandanddifferentiate the type of wastes?
 How many people are affected because of lack of neatness? And which age area is the
mostexposed?
 What is the communities feedback if a garbage is settled in a specific area for a certain
households?
XIX.FOR SCHOOLS
 Is there an initiation done in the school for the students to improve their habit of
cleaningtheirenvironment?if there is whatkind?
 What if schools prepare a day for the whole school community to involve in cleaning the
school environment by working with volunteers so that this will help the coming
generationtoimprove the habitof creatingacleanenvironment.thisprocess is:
 Done withA minimumcost
 Will cause a longlastingeffectsince kidsare the nextgeneration(bestquality)
XX. VOLUNTEERS
 Doesthe volunteerfocusongivingawarenessaboutsolidwaste management?
 What will be the outcome if volunteerare involvedwith schoolsongivingawareness
WBS (work breakdown structure)
This project has three major work areas
1. Stakeholdermeeting
- Meeting with stakeholders
- Discussion with community representatives
- Discussion with schooldeans and student representatives
- Discussion with regulatory and legislative representatives
- Overall awareness giving training willbe held
2. Designandprojectteam workflow
- Projectteam discussion
- Design of a new waste disposal collectionmaterial
- Material selection
- Selection of production industries for the new design
- Approval and Outsourcing the production
- Prototypeproduction
- Approve prototype
- Initiate mass production
- Follow-upongoing production
- Finalizing products
- Receiving all the products
3. Implementation
- preparing motivational posters
- sticking the prepared posters on the product
- installing the new designed products
- installing in every 150 meter distance
- checking up progress Discussion
Job # Description Immediate
predecessors
Time
(weeks)
A Start 0
B Conceptual design A 2
C Design Appraisal A 2
D Material Selection B,C 4
E Selection of production industries D 1
F Outsourcing the production E 1
G Prototype production E,F 2
H Approval of prototype G 1
I Initiate mass production/start production G,H 30
J Follow-up ongoing production I 15
K Finalizing products J 1
L Receiving all products J,K 1
M Finish L 0
3. CHAPTER 3. PROJECT BUDGET AND
ESTIMATION BASICS
Estimating of project budget is essential, therefore we here estimate the rough
estimation of our project.
Cost is require for a lot things. Some of these costs are for following purposes
 For stakeholder meeting purposes
 Allowances,
 Coffee, tea and other ceremonies
 other un seen events and fees
 for Innovationand sample materials preparation
 reviewing computing innovative ideas
 Selecting and preparing materials
 other unseen payments and contingencies
 Implementing the project
 It takes the major cost of the project
To summarize the above cases we use the following table
Temporary Rough Cost Estimation
Type Cost in Birr
stakeholder meetings 1,500,000.00
Innovation and sample material preparation 3,000,000.00
Implementation of the project 45,000,000.00
Sub Total 49,500,000.00
10% contingencies 4,950,000.00
20% Management contingencies 9,900,000.00
15% VAT 7,425,000.00
Total Amount of Cost 71,775,000.00
The rough estimated cost of our project is 71,775,000.00 ( Seventy One Million
Seven Hundred Seventy Five Thousands Birr Only)

More Related Content

What's hot

Solid waste management 6
Solid waste management 6Solid waste management 6
Solid waste management 6maxiee
 
waste management
waste management waste management
waste management SUhsUnStHa
 
Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...
Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...
Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...Liwayway Memije-Cruz
 
Solid waste management practices in Pakistan and Solutions for proper managem...
Solid waste management practices in Pakistan and Solutions for proper managem...Solid waste management practices in Pakistan and Solutions for proper managem...
Solid waste management practices in Pakistan and Solutions for proper managem...cutiepie39
 
Internship report
Internship reportInternship report
Internship reportKati Kokab
 
Capsule proposal in Waste Segregation: It's Benefits to the Enviroment
Capsule proposal in Waste Segregation: It's Benefits to the EnviromentCapsule proposal in Waste Segregation: It's Benefits to the Enviroment
Capsule proposal in Waste Segregation: It's Benefits to the EnviromentKate Sevilla
 
Terrestrial resource plan
Terrestrial resource planTerrestrial resource plan
Terrestrial resource planlanderson79
 
Future Agenda Future Of Waste
Future Agenda   Future Of WasteFuture Agenda   Future Of Waste
Future Agenda Future Of WasteFuture Agenda
 
NewarkSustainabilityActionPlan_2013
NewarkSustainabilityActionPlan_2013NewarkSustainabilityActionPlan_2013
NewarkSustainabilityActionPlan_2013Jessica Buendia
 
Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...
Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...
Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...Oswar Mungkasa
 
Waste Management in Blantyre City-Polytechnic Students
Waste Management in Blantyre City-Polytechnic StudentsWaste Management in Blantyre City-Polytechnic Students
Waste Management in Blantyre City-Polytechnic StudentsBlessings Chiepa
 
UST NSTP
UST NSTP UST NSTP
UST NSTP ustnstp
 
Long term environmental support
Long term environmental supportLong term environmental support
Long term environmental supportLars Westholm
 
Waste Management in the GTA Final Thesis
Waste Management in the GTA Final ThesisWaste Management in the GTA Final Thesis
Waste Management in the GTA Final ThesisBrian Nogaro
 
Greening our City: Improved Health and Sustainability, Economic Stability in ...
Greening our City: Improved Health and Sustainability, Economic Stability in ...Greening our City: Improved Health and Sustainability, Economic Stability in ...
Greening our City: Improved Health and Sustainability, Economic Stability in ...ElisaMendelsohn
 
Case study report participatory development-Rajistan India
Case study report participatory development-Rajistan IndiaCase study report participatory development-Rajistan India
Case study report participatory development-Rajistan IndiaRashidabdullah2014
 

What's hot (20)

Solid waste management 6
Solid waste management 6Solid waste management 6
Solid waste management 6
 
Shadrack dessert final
Shadrack dessert finalShadrack dessert final
Shadrack dessert final
 
waste management
waste management waste management
waste management
 
Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...
Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...
Zero Waste Management for Schools: A module prepared by Prof. Liwayway Memije...
 
Solid waste management practices in Pakistan and Solutions for proper managem...
Solid waste management practices in Pakistan and Solutions for proper managem...Solid waste management practices in Pakistan and Solutions for proper managem...
Solid waste management practices in Pakistan and Solutions for proper managem...
 
Internship report
Internship reportInternship report
Internship report
 
Capsule proposal in Waste Segregation: It's Benefits to the Enviroment
Capsule proposal in Waste Segregation: It's Benefits to the EnviromentCapsule proposal in Waste Segregation: It's Benefits to the Enviroment
Capsule proposal in Waste Segregation: It's Benefits to the Enviroment
 
Terrestrial resource plan
Terrestrial resource planTerrestrial resource plan
Terrestrial resource plan
 
pu_141sm
pu_141smpu_141sm
pu_141sm
 
Future Agenda Future Of Waste
Future Agenda   Future Of WasteFuture Agenda   Future Of Waste
Future Agenda Future Of Waste
 
NewarkSustainabilityActionPlan_2013
NewarkSustainabilityActionPlan_2013NewarkSustainabilityActionPlan_2013
NewarkSustainabilityActionPlan_2013
 
Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...
Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...
Community-Based Solid Waste Management. Indonesia Water and Sanitation magazi...
 
Waste Management in Blantyre City-Polytechnic Students
Waste Management in Blantyre City-Polytechnic StudentsWaste Management in Blantyre City-Polytechnic Students
Waste Management in Blantyre City-Polytechnic Students
 
UST NSTP
UST NSTP UST NSTP
UST NSTP
 
Long term environmental support
Long term environmental supportLong term environmental support
Long term environmental support
 
Community Based Disaster Management
Community  Based Disaster ManagementCommunity  Based Disaster Management
Community Based Disaster Management
 
Green agenda vs brown agenda
Green agenda vs brown agendaGreen agenda vs brown agenda
Green agenda vs brown agenda
 
Waste Management in the GTA Final Thesis
Waste Management in the GTA Final ThesisWaste Management in the GTA Final Thesis
Waste Management in the GTA Final Thesis
 
Greening our City: Improved Health and Sustainability, Economic Stability in ...
Greening our City: Improved Health and Sustainability, Economic Stability in ...Greening our City: Improved Health and Sustainability, Economic Stability in ...
Greening our City: Improved Health and Sustainability, Economic Stability in ...
 
Case study report participatory development-Rajistan India
Case study report participatory development-Rajistan IndiaCase study report participatory development-Rajistan India
Case study report participatory development-Rajistan India
 

Similar to Edited solid waste managment

MCB Internship report
MCB Internship reportMCB Internship report
MCB Internship reportimranpugc
 
Task 5 nur amalina binti zabidi a142031
Task 5 nur amalina binti zabidi a142031Task 5 nur amalina binti zabidi a142031
Task 5 nur amalina binti zabidi a142031amalinazabidi
 
Relationship between environmental issues and human behaviour in low-income ...
Relationship between environmental issues and human  behaviour in low-income ...Relationship between environmental issues and human  behaviour in low-income ...
Relationship between environmental issues and human behaviour in low-income ...Kunal Ashar
 
Waste management strategies in a local community
Waste management strategies in a local communityWaste management strategies in a local community
Waste management strategies in a local communitywetoc46795
 
solid and hazardous waste management for education
solid and hazardous waste management for educationsolid and hazardous waste management for education
solid and hazardous waste management for educationEphremChekole1
 
Solid Waste Management
Solid Waste ManagementSolid Waste Management
Solid Waste Managementmihretdananto
 
Report on solid waste management
Report on solid waste managementReport on solid waste management
Report on solid waste managementKalashAggarwal3
 
WSSO IEC Tools PPT.ppt
WSSO IEC Tools PPT.pptWSSO IEC Tools PPT.ppt
WSSO IEC Tools PPT.pptHamdinaRage
 
WSSO IEC Tools PPT (1).ppt
WSSO IEC Tools PPT (1).pptWSSO IEC Tools PPT (1).ppt
WSSO IEC Tools PPT (1).pptHamdinaRage
 
Clean street project
Clean street projectClean street project
Clean street projectFikru Tessema
 
INTRODUCTION TO MUNICIPAL SOLID WASTE
INTRODUCTION TO MUNICIPAL SOLID WASTEINTRODUCTION TO MUNICIPAL SOLID WASTE
INTRODUCTION TO MUNICIPAL SOLID WASTEGARYCRUSH
 
Waste management project proposal for sri lanka
Waste management project proposal for sri lankaWaste management project proposal for sri lanka
Waste management project proposal for sri lankaLahiru Dilshan
 
2Gender and Wildlife and Biodiversity Projects
2Gender and Wildlife and Biodiversity Projects2Gender and Wildlife and Biodiversity Projects
2Gender and Wildlife and Biodiversity ProjectsNancy Drost
 

Similar to Edited solid waste managment (20)

Proper waste disposal
Proper waste disposalProper waste disposal
Proper waste disposal
 
Proper waste disposal
Proper waste disposalProper waste disposal
Proper waste disposal
 
MCB Internship report
MCB Internship reportMCB Internship report
MCB Internship report
 
Task 5 nur amalina binti zabidi a142031
Task 5 nur amalina binti zabidi a142031Task 5 nur amalina binti zabidi a142031
Task 5 nur amalina binti zabidi a142031
 
Waste management project
Waste management  projectWaste management  project
Waste management project
 
Relationship between environmental issues and human behaviour in low-income ...
Relationship between environmental issues and human  behaviour in low-income ...Relationship between environmental issues and human  behaviour in low-income ...
Relationship between environmental issues and human behaviour in low-income ...
 
Waste management strategies in a local community
Waste management strategies in a local communityWaste management strategies in a local community
Waste management strategies in a local community
 
SeattleEquityAgenda
SeattleEquityAgendaSeattleEquityAgenda
SeattleEquityAgenda
 
solid and hazardous waste management for education
solid and hazardous waste management for educationsolid and hazardous waste management for education
solid and hazardous waste management for education
 
Solid Waste Management
Solid Waste ManagementSolid Waste Management
Solid Waste Management
 
Report on solid waste management
Report on solid waste managementReport on solid waste management
Report on solid waste management
 
WSSO IEC Tools PPT.ppt
WSSO IEC Tools PPT.pptWSSO IEC Tools PPT.ppt
WSSO IEC Tools PPT.ppt
 
WSSO IEC Tools PPT (1).ppt
WSSO IEC Tools PPT (1).pptWSSO IEC Tools PPT (1).ppt
WSSO IEC Tools PPT (1).ppt
 
Clean street project
Clean street projectClean street project
Clean street project
 
INTRODUCTION TO MUNICIPAL SOLID WASTE
INTRODUCTION TO MUNICIPAL SOLID WASTEINTRODUCTION TO MUNICIPAL SOLID WASTE
INTRODUCTION TO MUNICIPAL SOLID WASTE
 
Community Engagement Framework by Sophie Malkin (Australia)
Community Engagement Framework by Sophie Malkin (Australia)Community Engagement Framework by Sophie Malkin (Australia)
Community Engagement Framework by Sophie Malkin (Australia)
 
Full Paper Presentation
Full Paper PresentationFull Paper Presentation
Full Paper Presentation
 
Waste management project proposal for sri lanka
Waste management project proposal for sri lankaWaste management project proposal for sri lanka
Waste management project proposal for sri lanka
 
2Gender and Wildlife and Biodiversity Projects
2Gender and Wildlife and Biodiversity Projects2Gender and Wildlife and Biodiversity Projects
2Gender and Wildlife and Biodiversity Projects
 
Zero waste doc
Zero waste docZero waste doc
Zero waste doc
 

Recently uploaded

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 

Recently uploaded (20)

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 

Edited solid waste managment

  • 1.
  • 2. CONTENTS 1. Chapter 1. SOLID WASTE MANAGEMENT.............................................................................................3 1 Waste Management Problem in Addis Ababa .................................................................................3 2 Main Causes of waste Management Problem ..................................................................................3 3 Detail about the Causes of waste Management Problem............................................................3 4 Effects of waste Management Problem..............................................................................................4 5 Means of solution for waste Management Problem .....................................................................4 2. Chapter 2. Requirements Collection.........................................................................................................8 1 Detail Focus Areas Requirements Collection...................................................................................8 I. Urban Settlement Areas .......................................................................................................................8 II. Schools.........................................................................................................................................................8 III. For Houses.............................................................................................................................................8 IV. FOR SCHOOLS......................................................................................................................................9 V. VOLUNTEERS............................................................................................................................................9 3. Chapter 3. PROJECT BUDGET AND ESTIMATION BASICS ..........................................................12
  • 3. 1. CHAPTER 1. SOLID WASTE MANAGEMENT 1 Waste Management Problem in Addis Ababa Addis Ababa is the capital city of Ethiopia, it established before 100 years ago. Kirkos Sub City is one of the sub cities in Addis Ababa. We choose this sub city because of the major problem in this sub city. But the Waste Management is a major challenge. Concerning waste management system, there are many governmental and non-governmental bureaus working on the problem. But none of them can manage it. Therefore everyone of as should start thinking to solve the problem. 2 Main Causes of waste Management Problem There are a lot of poor waste management system causes, some of those are:  Poor Culture of waste management system,  Population Settlements Management and Urbanization,  Low awareness,  No Proper location, Descriptive and not Enough Waste collection materials,  Law, regulation and legislation implementations are not effectively applicable,  Collection and transportation problem of waste management. 3 Detail about the Causes of waste Management Problem  Poor Culture of waste management system Communities Culture and Tradition has a big influence on waste management system. In our culture, there is a low concept and awareness or know how to handle waste. The poor culture of waste management causes bad impact on the living standards and on the environment. The reckless behavior of the community on Solid waste management make our city dirty.  PopulationSettlements ManagementandUrbanization To control the adverse impact of waste a good urbanization is required. Poor urban settlement causes a sophisticate environment. If there is no planned solid waste management system; sewerage system; water supply distribution systems; and other necessary infrastructure, it make a negative impact on
  • 4. waste management system. Unplanned population settlement causes pollution to the environment.  Low awareness A low awareness is given concerning waste management from households, schools, public or private sectors. Every sector leave its waste disposal outside of its fence.  No Proper location, Descriptive and not Enough Waste collectionmaterials, To handle a waste properly, there should be manageable collection system. It requires to put the collection materials in equal distance and sufficiently. But in our cases there is collection materials in some corners. But not properly puts in order to distance; also not inviting to put in to it. It is not enough to handle the waste.  Law, regulation and legislation implementation is not effectively applicable, There is a proclamation about solid waste management proclamation no. 513/2007. But there is no effective implementation and knowledge of the proclamation. 4 Effects of waste Management Problem  It causes health problem for the community;  It causes a negative environmental impact;  It make re cycling difficult. 5 Means of solution for waste Management Problem As we discussed the causes and effects, there are solutions to implement. These solutions are:-  Poor Culture of waste management systemand Low awareness To develop a good traditions and awareness the solution is education. Teaching and practices should be done in every family, community, schools, in public or in private sectors. Everyone needs to be responsible to manage every disposals of waste. By making traditions, we will make our environment clean.
  • 5.  No Proper location, Descriptive and not Enough Waste collectionmaterials, To solve this problem, we need to put the collection materials  Put enough amount of materials and in calculated distance wise,  Clearly descriptive, where to put recyclable or other materials,  Easy and accessible to put wastes in to in it,  Central collecting materials are required in villages, and  The transportation system of waste should be properly planned and manageable.  Law, regulation and legislation implementation is not effectively applicable, As we discussed above, we have a proclamation concerning waste management. It should implement and control properly. Some of our stakeholders are the beneficiaries (the community), Addis Ababa water Supply and Sanitation Authority, Addis Ababa City Administration, Addis Ababa Police, Community Policing, Kebeles, Weredas, and etc… By putting those stakeholders for discussion, we should aware why and what should do to solve the Solid Waste Management System applicable
  • 6. I. 1. General Project Information Project Name: SOLID WASTE DISPOSAL Executive Sponsors: Cherkos Subcity Adminstration Department Sponsor: Impact of project: To create a better solid waste desposal system and safe,clean and healthyenvironment. II. 2. Project Team III. Name Department Telephone E-mail Project Manager: Team Members: 1. Tsedey 2. Saba Yimer 3. Mulugeta Yirdaw 4. Biruh Mulugeta 5. Bethelehem Samson 6. Marsha Nega IV. 3. Stakeholders (e.g., thosewith a significant interest in or who will besignificantly affected by this project) 1. Cherkos Subcity’s Society 2. Cherkos Subcity Adminstration 3. School deans and Students 4. Reagulatoryand Legislative Bodies V. 4. Project Scope Statement ProjectPurpose The purpose of the SOLID WASTE DISPOSAL Project is to ensure solid waste is managed in such a way that protects both public health and the environment. This project works hard to help all societies of Cherkos Subcity to manage better their solid wastes. Objectives (in business terms) Describe the measurable outcomes of the project, e.g., reduce costby xxxx orincrease quality toyyyy To ensure clean city that protects both public health and the environment by delivering waste collecting materials in short distance gap and awaring the society and students together with city administration and other stakeholders. Deliverables List the high-level “products” to be created(e.g., improvedxxxx process, employeemanual onyyyy) Creating clean and green city
  • 7. Scope List what the projectwill andwill notaddress (e.g., this projectaddresses units thatreport into theOffice of Executive Vice President. Units that report into the Provosts Office are not included) This projectwill consistofcreating a clean city by delivering waste collecting materials and byawaing Kirkos sub city socity and students. Money comics on our website.The project will be completed untill August15, 2020. ProjectMilestones Propose start and end dates forProject Phases (e.g., Inception, Planning, Construction, Delivery) and othermajormilestones This projectwill start January 1, 2020 and ends untill August15 2020 Major Known Risks (includingsignificant Assumptions) Identify obstacles that may cause the project tofail. Risk Risk Rating (Hi, Med, Lo) By a poor beaurocrasyofstakeholders High If the communityis unwillng to cooperate Medium Constraints List any conditions that may limit the project team’s options with respectto resources, personnel, orschedule (e.g., predetermined budget orproject enddate, limit onnumberof staff thatmay beassignedto the project). Budgetis the mostcritical constraintof this projectand also lack of communitycooperation may also be a big challenge . External Dependencies Will project success depend oncoordination of efforts betweenthe project team andoneormore otherindividuals or groups?Has everyone involved agreedto this interaction? VI. 5. Communication Strategy (specify how the projectmanager willcommunicate to the Executive Sponsor,Project Team members and Stakeholders, e.g.,frequency ofstatus reports, frequency ofProjectTeam meetings, etc. Communicates bydaily,weekly and monthlystatus reports. Communicates bymeetings. Communicates byphone calls. VII. 6. Sign-off VIII. IX. Name X. Signature XI. Date (MM/DD /YYYY) XII. Executive Sponsor XIII. Department Sponsor XIV. Project Manager XV. 7. Notes
  • 8. 2. CHAPTER 2. REQUIREMENTS COLLECTION 1 Detail Focus Areas Requirements Collection  We needto considerthe followingthingsto requirementcollectioncase:-  Benchmarking review the latest papers and systems in Addis Ababa and other similar cities,  Dissections will made with stakeholders, to justify the requirements and prepare the processingprocedures,  Use or Identify innovative ideas and solutions for the solid waste management problems,  Needtodefine howtoteachthe community,  Surveyingthe village topography,  Selectthe materialstobe use forsmall mediumandlargercollections,  Selecthousesforthe purpose of commoncollectionlocation,  SelectGreenAreaslocationandplacestoput the collectionsbyusingthe masterplan,  Prepare Operationsmanuals,  Since our main focus areas are schools and Urban settlement areas :- XVI.Urban SettlementAreas 1. Interviewingcore stakeholders 1.1 cityadministrator 1.2 the community 1.3 healthcenter 1.4 employeesworkingoncollectingwastes 2. Observingwhichareaismore dirtyand know the reasonwhy 3. Observingwhatkindof people throw dirtaround XVII. Schools 1. Interviewingcore stakeholders 1.1 students 1.2 school administers 1.3 volunteer XVIII. For Houses  How doesthe cityadministratormanage the collectionof solidwastesaroundkirkos?  How manygarbage are setaround housingsettlements?  Withwhat periodof time isthe waste collected?  Doesthe communityclearlyunderstandanddifferentiate the type of wastes?  How many people are affected because of lack of neatness? And which age area is the mostexposed?
  • 9.  What is the communities feedback if a garbage is settled in a specific area for a certain households? XIX.FOR SCHOOLS  Is there an initiation done in the school for the students to improve their habit of cleaningtheirenvironment?if there is whatkind?  What if schools prepare a day for the whole school community to involve in cleaning the school environment by working with volunteers so that this will help the coming generationtoimprove the habitof creatingacleanenvironment.thisprocess is:  Done withA minimumcost  Will cause a longlastingeffectsince kidsare the nextgeneration(bestquality) XX. VOLUNTEERS  Doesthe volunteerfocusongivingawarenessaboutsolidwaste management?  What will be the outcome if volunteerare involvedwith schoolsongivingawareness WBS (work breakdown structure) This project has three major work areas 1. Stakeholdermeeting - Meeting with stakeholders - Discussion with community representatives - Discussion with schooldeans and student representatives - Discussion with regulatory and legislative representatives - Overall awareness giving training willbe held 2. Designandprojectteam workflow - Projectteam discussion - Design of a new waste disposal collectionmaterial - Material selection - Selection of production industries for the new design - Approval and Outsourcing the production - Prototypeproduction - Approve prototype - Initiate mass production - Follow-upongoing production - Finalizing products - Receiving all the products 3. Implementation - preparing motivational posters - sticking the prepared posters on the product - installing the new designed products - installing in every 150 meter distance - checking up progress Discussion
  • 10.
  • 11. Job # Description Immediate predecessors Time (weeks) A Start 0 B Conceptual design A 2 C Design Appraisal A 2 D Material Selection B,C 4 E Selection of production industries D 1 F Outsourcing the production E 1 G Prototype production E,F 2 H Approval of prototype G 1 I Initiate mass production/start production G,H 30 J Follow-up ongoing production I 15 K Finalizing products J 1 L Receiving all products J,K 1 M Finish L 0
  • 12. 3. CHAPTER 3. PROJECT BUDGET AND ESTIMATION BASICS Estimating of project budget is essential, therefore we here estimate the rough estimation of our project. Cost is require for a lot things. Some of these costs are for following purposes  For stakeholder meeting purposes  Allowances,  Coffee, tea and other ceremonies  other un seen events and fees  for Innovationand sample materials preparation  reviewing computing innovative ideas  Selecting and preparing materials  other unseen payments and contingencies  Implementing the project  It takes the major cost of the project To summarize the above cases we use the following table Temporary Rough Cost Estimation Type Cost in Birr stakeholder meetings 1,500,000.00 Innovation and sample material preparation 3,000,000.00 Implementation of the project 45,000,000.00 Sub Total 49,500,000.00 10% contingencies 4,950,000.00 20% Management contingencies 9,900,000.00 15% VAT 7,425,000.00 Total Amount of Cost 71,775,000.00
  • 13. The rough estimated cost of our project is 71,775,000.00 ( Seventy One Million Seven Hundred Seventy Five Thousands Birr Only)