Change and Release
Management
Change Management
Overview
Roles and Responsibilities
Normal Change Steps
Other Change Types
Supporting Tools
Description and Goal
• Description
• Addition, modification or removal of any hardware, software or network
component that could have an effect on IT services and/or computerized
systems.
• Process responsible for controlling the lifecycle of all changes to minimize the
risk of disruption to IT services
• Goal
• Ensure Changes to the services and underlying technology managed by IT are
handled in a consistent, controlled, and compliant manner to reduce the risk
and impact to the business while maintaining efficiency, effectiveness, and
timely delivery
Importance of Well Planned Change
Management
“Through 2015, 80% of outages impacting mission-critical services will
be caused by people and process issues, and more than 50% of those
outages will be caused by Change/
Configuration/Release integration and hand-off issues.”
"80% of unplanned outages are due to ill-planned Changes made by
administrators (‘operations staff’) or developers."
Purpose
• Reduces the likelihood of outages, failures, rework, frustrated stakeholders
• Avoids undermining the stability and integrity of the changed environment
• Facilitates coordination, communication, and overall awareness of the
activities happening
• Simplifies troubleshooting and service restoration
• Ensures change are appropriately planned, reviewed, approved, and
documented
• Supports adherence to regulatory requirements
Types of Changes
• Normal
• Planned Change that is built, and tested prior to being implemented
• There are times, typically infrastructure related, that do not required a build
and test phase
• Standard
• Pre-authorized Change that is low risk, relatively common, and follows a pre-
defined procedure or work instruction
• Emergency
• Created to assist in the resolution of a Priority 1 or 2 Incident
Change and Release Management
Overview
Roles and Responsibilities
Normal Change Steps
Other Change Types
Supporting Tools
Key Roles
• Global Change and Release Manager
• Change and Release Manager
• Change and Release Coordinator
• Assignment Group
• Service CAB
• Global CAB
• ECAB
• Approvers
• Creating, maintaining, and improving the process
• Monitoring compliance of the process through regular audits
• Chairing the Global CAB meetings
• Ensuring the outcomes of the process line up with business objectives
Global Change and Release
Manager
Change and Release Manager
• Confirm inclusion of affected CIs, risks assessment, identification of all
stakeholders and implementation tasks are defined and appropriate
• Determine need for build and test phase and if Change can go through the
phase
• Submit Changes for approval
• Approve Standard Change
• Review executed Emergency Changes
• Conduct Post Implementation Reviews
• Approve Changes to be closed
• Create approvals for compliance groups for Changes to regulated systems
Change and Release Co-ordinator
• Determine the type of Change required
• Create and oversee Normal, Standard and Emergency Changes
• Create plan, build/test, and deploy Tasks
• Coordinate and overseeing all activities and resources throughout the
life of Changes
• Creating Child Changes
• Provide input into the Post Implementation Review
CAB Groups
• Service CAB
• Review Changes that are High or Very High risk, but only impact their
service/functional area
• Global CAB
• Review Changes that are High or Very High risk that impact across multiple
services or have wide spread impact on a weekly basis
• ECAB
• Review and approve emergency Change requests that are intended to assist
in the resolution of a Priority 1 or 2 incident
Standard – Documented , Low risk
• A pre-authorized Change that is low risk, relatively common, and
follows a pre-defined procedure or work instruction
• A repeatable activity and may also be referred to as “a housekeeping
change”
• Before a Standard Change can be approved as a Standard Change, it
must first follow the Normal Change flow successfully
• Unless agreed upon by all impacted parties, Standard Changes must
not have a backout plan or implementation plan which may impact a
live production system/service
Emergency Change
• Emergency Changes are required to assist in the resolution of a
Priority 1 or 2 Incident
• Emergency changes must be opened and approved by the ECAB prior
to implementing the Change
• ECAB is assigned based on the Assignment Group of the CI
• Notifications will be sent to impacted CIs just as they would for any
other Change
• Once the Change is approved, the Change and Release Coordinator
has 24 hours to document the complete details of the Change and
submit for retrospective review

More Related Content

Similar to Change and Release Management_V1.pdf

Baibhav Raj_Change Management
Baibhav Raj_Change ManagementBaibhav Raj_Change Management
Baibhav Raj_Change Management
Baibhav Raj
 
Change, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptxChange, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptx
AdilPatel34
 
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
OmnaCool
 
ScenarioChanging access controls can have some undesirable effec.docx
ScenarioChanging access controls can have some undesirable effec.docxScenarioChanging access controls can have some undesirable effec.docx
ScenarioChanging access controls can have some undesirable effec.docx
gemaherd
 
Access Controls Procedure Guide Scenario Changing access.docx
Access Controls Procedure Guide Scenario Changing access.docxAccess Controls Procedure Guide Scenario Changing access.docx
Access Controls Procedure Guide Scenario Changing access.docx
ronak56
 
9 Trng6_Change_Management_CIT.pdf
9 Trng6_Change_Management_CIT.pdf9 Trng6_Change_Management_CIT.pdf
9 Trng6_Change_Management_CIT.pdf
RatheshPriyanK1
 
sfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.ppt
sfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.pptsfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.ppt
sfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.ppt
ssuser2d043c
 

Similar to Change and Release Management_V1.pdf (20)

Numara change & approval mgmt
Numara change & approval mgmtNumara change & approval mgmt
Numara change & approval mgmt
 
Professional and Motivated
Professional and MotivatedProfessional and Motivated
Professional and Motivated
 
Configuration Management
Configuration ManagementConfiguration Management
Configuration Management
 
Baibhav Raj_Change Management
Baibhav Raj_Change ManagementBaibhav Raj_Change Management
Baibhav Raj_Change Management
 
Optimize your Change Management Process
Optimize your Change Management ProcessOptimize your Change Management Process
Optimize your Change Management Process
 
knowledge Byte -IT change management
knowledge Byte -IT change managementknowledge Byte -IT change management
knowledge Byte -IT change management
 
SRE Week-14.pptx
SRE Week-14.pptxSRE Week-14.pptx
SRE Week-14.pptx
 
Change, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptxChange, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptx
 
Change Management Methodology
Change Management MethodologyChange Management Methodology
Change Management Methodology
 
Change Management ITIL
Change Management ITILChange Management ITIL
Change Management ITIL
 
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
 
Change control
Change controlChange control
Change control
 
Change management and control lessons from a consent decree
Change management and control lessons from a consent decreeChange management and control lessons from a consent decree
Change management and control lessons from a consent decree
 
ITIL Best Practice for Software Companies
ITIL Best Practice for Software CompaniesITIL Best Practice for Software Companies
ITIL Best Practice for Software Companies
 
ScenarioChanging access controls can have some undesirable effec.docx
ScenarioChanging access controls can have some undesirable effec.docxScenarioChanging access controls can have some undesirable effec.docx
ScenarioChanging access controls can have some undesirable effec.docx
 
Access Controls Procedure Guide Scenario Changing access.docx
Access Controls Procedure Guide Scenario Changing access.docxAccess Controls Procedure Guide Scenario Changing access.docx
Access Controls Procedure Guide Scenario Changing access.docx
 
9 Trng6_Change_Management_CIT.pdf
9 Trng6_Change_Management_CIT.pdf9 Trng6_Change_Management_CIT.pdf
9 Trng6_Change_Management_CIT.pdf
 
sfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.ppt
sfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.pptsfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.ppt
sfdgdfgfgfdgvsdfdsfedrfewsfdsfsfterfdcm.ppt
 
181015 plan maintainability in total cost of ownership
181015 plan maintainability in total cost of ownership181015 plan maintainability in total cost of ownership
181015 plan maintainability in total cost of ownership
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
 

Recently uploaded

Recently uploaded (20)

The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
NLC-2024-Orientation-for-RO-SDO (1).pptx
NLC-2024-Orientation-for-RO-SDO (1).pptxNLC-2024-Orientation-for-RO-SDO (1).pptx
NLC-2024-Orientation-for-RO-SDO (1).pptx
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
NCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdfNCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdf
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matrices
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 

Change and Release Management_V1.pdf

  • 2. Change Management Overview Roles and Responsibilities Normal Change Steps Other Change Types Supporting Tools
  • 3. Description and Goal • Description • Addition, modification or removal of any hardware, software or network component that could have an effect on IT services and/or computerized systems. • Process responsible for controlling the lifecycle of all changes to minimize the risk of disruption to IT services • Goal • Ensure Changes to the services and underlying technology managed by IT are handled in a consistent, controlled, and compliant manner to reduce the risk and impact to the business while maintaining efficiency, effectiveness, and timely delivery
  • 4. Importance of Well Planned Change Management “Through 2015, 80% of outages impacting mission-critical services will be caused by people and process issues, and more than 50% of those outages will be caused by Change/ Configuration/Release integration and hand-off issues.” "80% of unplanned outages are due to ill-planned Changes made by administrators (‘operations staff’) or developers."
  • 5. Purpose • Reduces the likelihood of outages, failures, rework, frustrated stakeholders • Avoids undermining the stability and integrity of the changed environment • Facilitates coordination, communication, and overall awareness of the activities happening • Simplifies troubleshooting and service restoration • Ensures change are appropriately planned, reviewed, approved, and documented • Supports adherence to regulatory requirements
  • 6. Types of Changes • Normal • Planned Change that is built, and tested prior to being implemented • There are times, typically infrastructure related, that do not required a build and test phase • Standard • Pre-authorized Change that is low risk, relatively common, and follows a pre- defined procedure or work instruction • Emergency • Created to assist in the resolution of a Priority 1 or 2 Incident
  • 7. Change and Release Management Overview Roles and Responsibilities Normal Change Steps Other Change Types Supporting Tools
  • 8. Key Roles • Global Change and Release Manager • Change and Release Manager • Change and Release Coordinator • Assignment Group • Service CAB • Global CAB • ECAB • Approvers
  • 9. • Creating, maintaining, and improving the process • Monitoring compliance of the process through regular audits • Chairing the Global CAB meetings • Ensuring the outcomes of the process line up with business objectives Global Change and Release Manager
  • 10. Change and Release Manager • Confirm inclusion of affected CIs, risks assessment, identification of all stakeholders and implementation tasks are defined and appropriate • Determine need for build and test phase and if Change can go through the phase • Submit Changes for approval • Approve Standard Change • Review executed Emergency Changes • Conduct Post Implementation Reviews • Approve Changes to be closed • Create approvals for compliance groups for Changes to regulated systems
  • 11. Change and Release Co-ordinator • Determine the type of Change required • Create and oversee Normal, Standard and Emergency Changes • Create plan, build/test, and deploy Tasks • Coordinate and overseeing all activities and resources throughout the life of Changes • Creating Child Changes • Provide input into the Post Implementation Review
  • 12. CAB Groups • Service CAB • Review Changes that are High or Very High risk, but only impact their service/functional area • Global CAB • Review Changes that are High or Very High risk that impact across multiple services or have wide spread impact on a weekly basis • ECAB • Review and approve emergency Change requests that are intended to assist in the resolution of a Priority 1 or 2 incident
  • 13. Standard – Documented , Low risk • A pre-authorized Change that is low risk, relatively common, and follows a pre-defined procedure or work instruction • A repeatable activity and may also be referred to as “a housekeeping change” • Before a Standard Change can be approved as a Standard Change, it must first follow the Normal Change flow successfully • Unless agreed upon by all impacted parties, Standard Changes must not have a backout plan or implementation plan which may impact a live production system/service
  • 14. Emergency Change • Emergency Changes are required to assist in the resolution of a Priority 1 or 2 Incident • Emergency changes must be opened and approved by the ECAB prior to implementing the Change • ECAB is assigned based on the Assignment Group of the CI • Notifications will be sent to impacted CIs just as they would for any other Change • Once the Change is approved, the Change and Release Coordinator has 24 hours to document the complete details of the Change and submit for retrospective review