SlideShare a Scribd company logo
CHANDRAYAAN 3
A Mission Of Hope For The Future Of Space Exploration.
Chandrayaan 3 is India's third lunar mission
to soft land on the lunar south pole region.
The mission will conduct scientific
experiments to study the lunar geology,
atmosphere, and environment.
Introduction Of
Chandrayaan 3
Three Mission Objectives
Demonstrate safe and
soft landing on the lunar
surface
Conduct rover
operations on the
Moon
Conduct on-site
experiments on the
lunar surface
1 2 3
Key Technologies
Hazard Detection and Avoidance
Lander Hazard Detection & Avoidance
Camera and Processing Algorithm Landing
Leg Mechanism.
Inertial Measurement
Laser Gyro based Inertial referencing and
Accelerometer package
Altimeters
Laser & RF based Altimeters
Propulsion System
800N Throttleable Liquid Engines, 58N
attitude thrusters & Throttleable Engine
Control Electronics
Velocimeters
Laser Doppler Velocimeter & Lander
Horizontal Velocity Camera
Navigation, Guidance & Control
Powered Descent Trajectory design and
associate software elements
1 2 3
4 5 6
Lander Special Tests
Integrated Cold Test: For the demonstration of
Integrated Sensors & Navigation performance test
using helicopter as test platform
Integrated Hot test: For the demonstration of closed
loop performance test with sensors, actuators and
NGC using Tower crane as test platform
Lander Leg mechanism performance test on a lunar
simulant test bed simulating different touch down
conditions.
Mission Components
Propulsion module
This module is responsible for carrying the
lander and rover configuration to the Moon. It
also has a scientific payload that will study the
Earth from lunar orbit.
Lander module
This module will land on the Moon and deploy
the rover. It also has a scientific payload that
will study the lunar surface.
Rover
This is a small, mobile vehicle that will conduct
on-site experiments on the lunar surface. It is
equipped with a variety of scientific
instruments, including a seismometer, a
spectrometer, and a camera.
Specifications For Chandrayaan-3
Sl No. Parameter Specifications Sl No. Parameter Specifications
1. Mission Life (Lander & Rover) One lunar day (~14 Earth days) 7. Communication
1.Propulsion Module: Communicates with IDSN
2.Lander Module: Communicates with IDSN and Rover. Chandrayaan-2 Orbiter is also planned for
contingency link.
3.Rover: Communicates only with Lander.
2. Landing Site (Prime) 4 km x 2.4 km 69.367621 S, 32.348126 E 8. Lander Sensors
1.Laser Inertial Referencing and Accelerometer Package (LIRAP)
2.Ka-Band Altimeter (KaRA)
3.Lander Position Detection Camera (LPDC)
4.LHDAC (Lander Hazard Detection & Avoidance Camera)
5.Laser Altimeter (LASA)
6.Laser Doppler Velocimeter (LDV)
7.Lander Horizontal Velocity Camera (LHVC)
8.Micro Star sensor
9.Inclinometer & Touchdown sensors
3. Science Payloads
1.Lander:Radio Anatomy of Moon Bound Hypersensitive ionosphere and
Atmosphere (RAMBHA)
2.Chandra’s Surface Thermo physical Experiment (ChaSTE)
3.Instrument for Lunar Seismic Activity (ILSA)
4.Laser Retroreflector Array (LRA) Rover:
5.Alpha Particle X-Ray Spectrometer (APXS)
6.Laser Induced Breakdown Spectroscope (LIBS) Propulsion Module:
7.Spectro-polarimetry of HAbitable Planet Earth (SHAPE)
9. Lander Actuators Reaction wheels – 4 nos (10 Nms & 0.1 Nm)
4. Two Module Configuration
1.Propulsion Module (Carries Lander from launch injection to Lunar orbit)
2.Lander Module (Rover is accommodated inside the Lander)
10. Lander Propulsion System
Bi-Propellant Propulsion System (MMH + MON3), 4 nos. of 800 N Throttleable engines & 8 nos. of 58 N;
Throttleable Engine Control Electronics
5. Mass
1.Propulsion Module: 2148 kg
2.Lander Module: 1752 kg including Rover of 26 kg
3.Total: 3900 kg
11. Lander Mechanisms
1.Lander leg
2.Rover Ramp (Primary & Secondary)
3.Rover
4.ILSA, Rambha & Chaste Payloads
5.Umbilical connector Protection Mechanism,
6.X- Band Antenna
6. Power generation
1.Propulsion Module: 758 W
2.Lander Module: 738W, WS with Bias
3.Rover: 50W
12. Lander Touchdown specifications
1.Vertical velocity: ≤ 2 m / sec
2.Horizontal velocity: ≤ 0.5 m / sec
3.Slope: ≤ 120
Objectives Of Scientific Payloads
SI. No Lander Payloads Objectives
1.
Radio Anatomy of Moon Bound
Hypersensitive ionosphere and
Atmosphere (RAMBHA)
Langmuir probe (LP)
To measure the near surface plasma (ions and electrons)
density and its changes with time
2.
Chandra’s Surface Thermo physical
Experiment (ChaSTE)
To carry out the measurements of thermal properties of lunar surface near polar
region.
3.
Instrument for Lunar Seismic Activity
(ILSA)
To measure seismicity around the landing site and delineating the structure of the
lunar crust and mantle.
4. LASER Retroreflector Array (LRA) It is a passive experiment to understand the dynamics of Moon system.
SI. No Rover Payloads Objectives
1.
LASER Induced Breakdown
Spectroscope (LIBS)
Qualitative and quantitative
elemental analysis & To derive
the chemical Composition and
infer mineralogical composition
to further our understanding of
Lunar-surface.
2.
Alpha Particle X-ray
Spectrometer (APXS)
To determine the elemental
composition (Mg, Al, Si, K, Ca,Ti,
Fe) of Lunar soil and rocks
around the lunar landing site.
Sl. No
Propulsion Module
Payload
Objectives
1.
Spectro-polarimetry of HAbitable
Planet Earth (SHAPE)
Future discoveries of
smaller planets in
reflected light would
allow us to probe into
variety of Exo-planets
which would qualify for
habitability (or for
presence of life).
Launch And Landing
Of Chandrayaan-3
Chandrayaan-3 was launched on July 14,
2023. It entered a lunar transfer orbit on July
15, 2023. The lander is expected to land on
the lunar south pole region on August 23 or
August 24, 2023.
Event Date
Launch July 14, 2023
Lunar transfer orbit July 15, 2023
Landing on the lunar
south pole region
August 23-24,
2023
First Indian mission
to land on the lunar
south pole region
First Indian mission
to carry a rover Advances India's
space exploration
capabilities
Promotes
international
cooperation in space
exploration
The Significance
Of Chandrayaan-3
Mission Life
Propulsion Module
3 to 6 months
Lander Rover
1 Lunar Day
Landing Site
69.36 degree S, 32.34 degree E; slightly off the site
for Chandrayaan-2
Integrated Module Phase
Lunar Transfer Trajectory
Injectio
n Orbit
EBNs
Lunar Orbit Insertion
Lunar Orbit
Lander
Deboost
Lander Propulsion
Model Separation
Touchdown
Mission Profile
Mission Profile
Animation of Chandrayaan-3
Chandrayaan-3 Earth Moon
The Earth-Moon average distance is
roughly 384,400 kilometers. To save fuel,
Chandrayaan-3 has chosen a longer route
to the Moon. This adjusted path aims to
ensure a gentle landing of the mission's
Vikram lander on the Moon's South Pole
area. The expected timeline for this soft
touchdown is approximately 42 days after
launch, specifically around August 23 or 24.
Trajectory
01
02
03
04
05
06 07
Nominal Flight
Sequence
S.No Event Flight Time (s) Altitude (km)
Inertial Velocity
(km/s)
1 2xS200 Ignition 0.00 0.024 0.452
2 L110 Ignition 108.10 44.668 1.788
3 2xS200 Separation 127.00 62.171 1.969
4 PLF Separation 194.96 114.805 2.560
5 L110 Separation 305.56 175.352 4.623
6 C25 Ignition 307.96 176.573 4.621
7 C25 Shut-off 954.42 174.695 10.242
8 Satellite Separation 969.42 179.192 10.269
LVM3-M4-Chandrayaan-3 Mission Timeline
July 14, 2023
LVM3 M4 vehicle successfully launched Chandrayaan-3 into orbit. Chandrayaan-3, in its
precise orbit, has begun its journey to the Moon. Health of the Spacecraft is normal.
July 22, 2023
The fourth orbit-raising maneuver (Earth-bound perigee firing) is completed. The
spacecraft is now in a 71351 km x 233 km orbit.
August 06, 2023
LBN#2 is successfully completed. The spacecarft is in 170 km x 4313 km orbit around the
moon
July 25, 2023
Orbit-raising maneuver performed on July 25, 2023. Next firing (TransLunar Injection), is
planned for August 1, 2023.
July 15, 2023
The first orbit-raising maneuver (Earthbound firing-1) is successfully performed
at ISTRAC/ISRO, Bengaluru. Spacecraft is now in 41762 km x 173 km orbit.
July 17, 2023
The second orbit-raising maneuver performed. The spacecraft is now in 41603
km x 226 km orbit.
August 05, 2023
Chandrayaan-3 is successfully inserted into the lunar orbit. The orbit achieved
is 164 km x 18074 km, as intended.
August 01, 2023
The spacecraft is inserted into the translunar orbit. The orbit achieved is 288
km x 369328 km. Lunar-Orbit Insertion (LOI) is planned for Aug 5, 2023.
LVM3-M4-Chandrayaan-3 Mission Timeline
August 09, 2023
Chandrayaan-3's orbit is reduced to 174 km x 1437 km following a manuevre performed
on August 9, 2023
August 17, 2023
Lander Module is successfully separated from the Propulsion Module. Deboosting
planned for August 18, 2023
August 19, 2023
The Lander Module is in 113 km x 157 km orbit around the moon. Second de-boosting
is planned for August 20, 2023.
August 14, 2023
The mission is in the orbit circularisation phase. The spacecraft is in 151 km x
179 km orbit.
August 16, 2023
The spacecraft is in an orbit of 153 km x 163 km after the firing on August 16,
2023.
August 23, 2023
Powered descent to commence on August 23, 2023, around 1745 Hrs. IST
August 20, 2023
The Lander Module is in 25 km x 134 km orbit.
Chandrayaan-3 Capture First Image
The Moon, as viewed by Chandrayaan-3 during Lunar Orbit Insertion
Chandrayaan-3 Mission Success
The Chandrayaan-3 mission was a success,
and India became the first country in the
world to land a spacecraft on the Moon's
south pole. The lander, named Vikram,
touched down on the lunar surface at 18:04
IST (12:34 UTC) on August 23, 2023. The
rover, named Pragyan, will now explore the
lunar surface for the next 14 days.
After the Vikram lander successfully lands on
the Moon, it will wait for a while to let the
lunar dust settle. This is to prevent the rover
from getting stuck in the dust. After about 4
hours, the Pragyan rover will be released
from the lander and will begin its journey to
explore the lunar surface.
Vikram Lander
After Landing
The rover's rollout was delayed to let Moon
dust settle after the lander's touchdown.
Moon's weaker gravity makes dust clearance
slower, ensuring rover instrument protection
was ISRO's focus.
Rover's Rollout Delay
The Pragyan rover rolled out of the Vikram
lander on the Moon at approximately 12:30
AM IST on August 24, 2023. This was about 3
hours and 25 minutes after the Vikram lander
touched down on the lunar surface.
Pragyan Rover
Rolled Out
Pragyan is crafted to mark the national
emblem and ISRO's logo on the lunar surface.
It will traverse unexplored lunar terrain,
transmitting data and visuals after its landing.
Pragyan's Symbolic
Imprints
The Vikram lander and Pragyan rover will have a
mission life of one lunar day (about 14 Earth days).
During this time, they will conduct a variety of
scientific experiments, including studying the lunar
surface, the lunar atmosphere, and the lunar water
resources.
About 14 Earth Days
ChaSTE (Chandra's Surface Thermophysical
Experiment) measures lunar topsoil temperature near
the pole, using a 10 cm depth-capable probe with 10
sensors. The graph shows temperature variations at
various depths, marking the first profile for the lunar
south pole, with ongoing detailed observations.
First Observations From
The Chaste Payload
Chandrayaan-3 Rover's LIBS instrument achieved
the first in-situ measurements of the lunar south
pole, confirming the presence of Aluminum (Al),
Sulphur (S), Calcium (Ca), Iron (Fe), Chromium (Cr),
Titanium (Ti), and later, manganese (Mn), silicon (Si),
and oxygen (O). Hydrogen investigation ongoing..
LIBS Confirms The
Presence Of Sulphur
APXS identified minor elements, including
Sulfur, alongside expected major ones like
Aluminum, Silicon, Calcium, and Iron. LIBS
also confirmed Sulfur's presence. Detailed
analysis is ongoing.
APXS Detects
Minor Elements
The RAMBHA-LP payload on the Chandrayaan-3
Lander has achieved a historic milestone by
conducting the first-ever measurements of the
lunar near-surface plasma environment in the
south polar region.
RAMBHA-LP On-board
Measures Plasma
ISRO stated that the Instrument for Lunar
Seismic Activity (ILSA) on Chandrayaan 3 is the
moon's first Micro Electro Mechanical Systems
(MEMS) technology-based instrument. It has
captured vibrations from the Rover and other
payloads' movements.
ILSA Monitors
Landing Site Activity
In a significant update, the Indian Space Research
Organization (ISRO) has confirmed that the 'Vikram
Lander' was placed in sleep mode around 08 AM
(Indian Standard Time) on Monday. ISRO reported
that data from the payloads has been transmitted to
Earth, and the payloads are now powered off.
Sleep Mode
On September 2, the space organization
confirmed that Pragyan had finished its tasks
and was safely parked in sleep mode, with its
receiver active. ISRO further noted that Vikram
would enter sleep mode alongside Pragyan
once its solar power was depleted and the
battery was drained.
Why Sleep Mode?
Hop Experiment
The Indian Space Research Organisation (ISRO) reported on
Tuesday that the lander had executed a successful hop
experiment. Upon receiving the command, it initiated its engines,
achieving the expected elevation of approximately 40 cm, and
safely landed at a distance of 30–40 cm from its starting point.
After conducting the experiment, the ISRO reported that the
Ramp, ChaSTE, and ILSA were initially retracted and then
successfully redeployed.
This successful hop experiment and its
promising results could have a profound
impact on future lunar missions with the
primary goal of collecting moon samples,
as well as upcoming human expeditions
to our celestial neighbor.
Hop Experiment
Impacts
ISRO also shared that they anticipate the
next sunrise, which is expected to awaken
the equipment on September 22, 2023, and
they are hopeful for a successful restart to
undertake a new set of tasks.
Rover Wake Up
Conclusion Of
Chandrayaan 3
The success of Chandrayaan-3 is a major
milestone for India's space program and a
testament to the hard work and dedication
of the ISRO team. It also opens up new
possibilities for scientific research on the
Moon.
Icons
Icons
You can add and edit some shapes to your presentation to present your data in a visual way.
● Choose your favourite infographic and insert it in your presentation using Ctrl C + Ctrl V or Cmd C +
Cmd V in Mac.
● Select one of the parts and ungroup it by right-clicking and choosing “Ungroup”.
● Change the color by clicking on the paint bucket.
● Then resize the element by clicking and dragging one of the square-shaped points of its bounding
box (the cursor should look like a double-headed arrow). Remember to hold Shift while dragging to
keep the proportions.
● Group the elements again by selecting them, right-clicking and choosing “Group”.
● Repeat the steps above with the other parts and when you’re done editing, copy the end result and
paste it into your presentation.
● Remember to choose the “Keep source formatting” option so that it keeps the design. For more
info, please visit Slideegg (Tips & Tricks).
How To Edit Shapes
Terms Of Use (Free Users)
If you are a free subscriber, you should credit SlideEgg by keeping the “Thank You” slide.
Kindly refer to the following slide for the Terms of Use for premium users.
You can:
• Customize or edit this template
• Use this template for both business and personal endeavors.
You can not:
• Sell, rent, or second-license SlideEgg content or its altered version.
Promulgate, unless explicitly permitted, SlideEgg content, by SlideEgg.
• Incorporate SlideEgg content in any database or file online or offline.
• Obtain SlideEgg content’s copyright.
Kindly refer to our Tutorial page or FAQ for advanced slide modification guidelines.
Terms Of Use (Premium Users)
Being a premium subscriber, you have the privilege of using this PPT template
without giving attribution to SlideEgg or keeping the “Thank You” slide.
You can:
• Customize or edit this template.
• Use this template for both business and personal endeavors.
• Circulate or share the editable format of this template with anyone you want.
You can not:
• Sell, rent or second-license SlideEgg content or the altered version of it.
Promulgate or include the templates in any other services database
• that performs as distribution or resale platform, unless explicitly permitted, by SlideEgg.
• Incorporate the elements used in SlideEgg templates separately.
• Obtain SlideEgg copyright for the elements used in this template as a logo or trademark.
Kindly refer to our Tutorial page or FAQ for advanced slide modification guidelines.
www.slideegg.com
Thank You!
We respect your valuable time with SlideEgg!
If you have any questions, please reach us
CREDIT: SlideEgg created this PowerPoint template.
Let this slide be kept for attribution.
Do you have a design request, please visit our redesign page.

More Related Content

What's hot

Indian space research organisation, (ISRO) 8102408728 call me
Indian space research organisation, (ISRO) 8102408728 call meIndian space research organisation, (ISRO) 8102408728 call me
Indian space research organisation, (ISRO) 8102408728 call me
amit_shanu
 
Chandrayan 2
Chandrayan 2Chandrayan 2
Chandrayan 2
BazlaKausar
 
Mangalyaan presentation
Mangalyaan presentationMangalyaan presentation
Mangalyaan presentation
Priya dharshini
 
Mars Mission of india (MANGALYAN)
Mars Mission of india (MANGALYAN)Mars Mission of india (MANGALYAN)
Mars Mission of india (MANGALYAN)
Pravin Dahale
 
Chandrayaan 2
Chandrayaan 2Chandrayaan 2
Chandrayaan 2
PUNEETCHOPADE1
 
ISRO
ISROISRO
Chandrayaan 1
Chandrayaan 1Chandrayaan 1
Chandrayaan 1
STUDYSCAN
 
Indian space research organisation (ISRO)
Indian space research organisation (ISRO)Indian space research organisation (ISRO)
Indian space research organisation (ISRO)
Vaddi Aditya
 
CHANDRAYAAN 1 AND 2
 CHANDRAYAAN 1 AND 2 CHANDRAYAAN 1 AND 2
CHANDRAYAAN 1 AND 2
pranjeet
 
ACHIEVEMENTS OF ISRO
ACHIEVEMENTS OF ISROACHIEVEMENTS OF ISRO
ACHIEVEMENTS OF ISRO
Amarendra Kumar
 
ISRO
ISROISRO
Chandrayaan 2 By, Er. Swapnil V. Kaware
Chandrayaan 2 By, Er. Swapnil V. KawareChandrayaan 2 By, Er. Swapnil V. Kaware
Chandrayaan 2 By, Er. Swapnil V. Kaware
Prof. Swapnil V. Kaware
 
Chandrayaan
ChandrayaanChandrayaan
ChandrayaanWipro
 
SlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptxSlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptx
MohdTabish42
 
Artificial Satellites
Artificial SatellitesArtificial Satellites
Artificial Satellites
VioletBlack11
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
ManjunathaM65
 
Chandryaan 2
Chandryaan 2Chandryaan 2
Chandryaan 2
AhmadAlImaad
 
Chandrayaan 2
Chandrayaan 2Chandrayaan 2
Chandrayaan 2
salonibansal26
 
Chandrayaan 3
Chandrayaan 3Chandrayaan 3
Chandrayaan 3
Shubham Sharma
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
EducationView
 

What's hot (20)

Indian space research organisation, (ISRO) 8102408728 call me
Indian space research organisation, (ISRO) 8102408728 call meIndian space research organisation, (ISRO) 8102408728 call me
Indian space research organisation, (ISRO) 8102408728 call me
 
Chandrayan 2
Chandrayan 2Chandrayan 2
Chandrayan 2
 
Mangalyaan presentation
Mangalyaan presentationMangalyaan presentation
Mangalyaan presentation
 
Mars Mission of india (MANGALYAN)
Mars Mission of india (MANGALYAN)Mars Mission of india (MANGALYAN)
Mars Mission of india (MANGALYAN)
 
Chandrayaan 2
Chandrayaan 2Chandrayaan 2
Chandrayaan 2
 
ISRO
ISROISRO
ISRO
 
Chandrayaan 1
Chandrayaan 1Chandrayaan 1
Chandrayaan 1
 
Indian space research organisation (ISRO)
Indian space research organisation (ISRO)Indian space research organisation (ISRO)
Indian space research organisation (ISRO)
 
CHANDRAYAAN 1 AND 2
 CHANDRAYAAN 1 AND 2 CHANDRAYAAN 1 AND 2
CHANDRAYAAN 1 AND 2
 
ACHIEVEMENTS OF ISRO
ACHIEVEMENTS OF ISROACHIEVEMENTS OF ISRO
ACHIEVEMENTS OF ISRO
 
ISRO
ISROISRO
ISRO
 
Chandrayaan 2 By, Er. Swapnil V. Kaware
Chandrayaan 2 By, Er. Swapnil V. KawareChandrayaan 2 By, Er. Swapnil V. Kaware
Chandrayaan 2 By, Er. Swapnil V. Kaware
 
Chandrayaan
ChandrayaanChandrayaan
Chandrayaan
 
SlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptxSlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptx
 
Artificial Satellites
Artificial SatellitesArtificial Satellites
Artificial Satellites
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
 
Chandryaan 2
Chandryaan 2Chandryaan 2
Chandryaan 2
 
Chandrayaan 2
Chandrayaan 2Chandrayaan 2
Chandrayaan 2
 
Chandrayaan 3
Chandrayaan 3Chandrayaan 3
Chandrayaan 3
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
 

Similar to Chandrayaan 3.pptx

chandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptxchandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptx
ArinGanjoo
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
Asif Iqbal
 
Chandrayan
Chandrayan Chandrayan
Chandrayan
SCET
 
sourav jee.docx
sourav jee.docxsourav jee.docx
sourav jee.docx
SouravGorai19
 
Chandrayan final
Chandrayan finalChandrayan final
Chandrayan final
Rupesh Kumar Tiwari
 
mars orbitter mission success
mars orbitter mission successmars orbitter mission success
mars orbitter mission success
Janglin Solaman C
 
Journey of Mangalyaan
Journey of MangalyaanJourney of Mangalyaan
Mars Mission
Mars MissionMars Mission
Mars Mission
agarwalkartikey21
 
Chandrayaan.pdf
Chandrayaan.pdfChandrayaan.pdf
Chandrayaan.pdf
MSVictoryClasses
 
Aksh's PPT.pptx
Aksh's PPT.pptxAksh's PPT.pptx
Aksh's PPT.pptx
YugKapoor2
 
M.O.M
M.O.MM.O.M
Mars orbiter Mission
Mars orbiter MissionMars orbiter Mission
Chandrayaan II
Chandrayaan IIChandrayaan II
Chandrayaan II
Dashiya Foundation
 
Chandrayaan - 3
Chandrayaan - 3Chandrayaan - 3
Chandrayaan - 3
mail2basita
 
Chandryan 2 : The Indian Orbiter
Chandryan 2  : The Indian OrbiterChandryan 2  : The Indian Orbiter
Chandryan 2 : The Indian Orbiter
Vishal Bhaskar
 
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptxLVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
SiddhPanchori
 
Mangalyaan - wiki
Mangalyaan - wikiMangalyaan - wiki
Mangalyaan - wiki
bsmukunth
 
chandrayaan3.pdf
chandrayaan3.pdfchandrayaan3.pdf
chandrayaan3.pdf
rohitgautam105831
 
Chandrayaan I
Chandrayaan IChandrayaan I
Chandrayaan I
guest19e6440
 
Chandrayan-3.pptx
Chandrayan-3.pptxChandrayan-3.pptx
Chandrayan-3.pptx
Sanya Kumari
 

Similar to Chandrayaan 3.pptx (20)

chandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptxchandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptx
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
 
Chandrayan
Chandrayan Chandrayan
Chandrayan
 
sourav jee.docx
sourav jee.docxsourav jee.docx
sourav jee.docx
 
Chandrayan final
Chandrayan finalChandrayan final
Chandrayan final
 
mars orbitter mission success
mars orbitter mission successmars orbitter mission success
mars orbitter mission success
 
Journey of Mangalyaan
Journey of MangalyaanJourney of Mangalyaan
Journey of Mangalyaan
 
Mars Mission
Mars MissionMars Mission
Mars Mission
 
Chandrayaan.pdf
Chandrayaan.pdfChandrayaan.pdf
Chandrayaan.pdf
 
Aksh's PPT.pptx
Aksh's PPT.pptxAksh's PPT.pptx
Aksh's PPT.pptx
 
M.O.M
M.O.MM.O.M
M.O.M
 
Mars orbiter Mission
Mars orbiter MissionMars orbiter Mission
Mars orbiter Mission
 
Chandrayaan II
Chandrayaan IIChandrayaan II
Chandrayaan II
 
Chandrayaan - 3
Chandrayaan - 3Chandrayaan - 3
Chandrayaan - 3
 
Chandryan 2 : The Indian Orbiter
Chandryan 2  : The Indian OrbiterChandryan 2  : The Indian Orbiter
Chandryan 2 : The Indian Orbiter
 
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptxLVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
 
Mangalyaan - wiki
Mangalyaan - wikiMangalyaan - wiki
Mangalyaan - wiki
 
chandrayaan3.pdf
chandrayaan3.pdfchandrayaan3.pdf
chandrayaan3.pdf
 
Chandrayaan I
Chandrayaan IChandrayaan I
Chandrayaan I
 
Chandrayan-3.pptx
Chandrayan-3.pptxChandrayan-3.pptx
Chandrayan-3.pptx
 

Recently uploaded

Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
ViralQR
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
Vlad Stirbu
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 

Recently uploaded (20)

Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 

Chandrayaan 3.pptx

  • 1. CHANDRAYAAN 3 A Mission Of Hope For The Future Of Space Exploration.
  • 2. Chandrayaan 3 is India's third lunar mission to soft land on the lunar south pole region. The mission will conduct scientific experiments to study the lunar geology, atmosphere, and environment. Introduction Of Chandrayaan 3
  • 3. Three Mission Objectives Demonstrate safe and soft landing on the lunar surface Conduct rover operations on the Moon Conduct on-site experiments on the lunar surface 1 2 3
  • 4. Key Technologies Hazard Detection and Avoidance Lander Hazard Detection & Avoidance Camera and Processing Algorithm Landing Leg Mechanism. Inertial Measurement Laser Gyro based Inertial referencing and Accelerometer package Altimeters Laser & RF based Altimeters Propulsion System 800N Throttleable Liquid Engines, 58N attitude thrusters & Throttleable Engine Control Electronics Velocimeters Laser Doppler Velocimeter & Lander Horizontal Velocity Camera Navigation, Guidance & Control Powered Descent Trajectory design and associate software elements 1 2 3 4 5 6
  • 5. Lander Special Tests Integrated Cold Test: For the demonstration of Integrated Sensors & Navigation performance test using helicopter as test platform Integrated Hot test: For the demonstration of closed loop performance test with sensors, actuators and NGC using Tower crane as test platform Lander Leg mechanism performance test on a lunar simulant test bed simulating different touch down conditions.
  • 6. Mission Components Propulsion module This module is responsible for carrying the lander and rover configuration to the Moon. It also has a scientific payload that will study the Earth from lunar orbit. Lander module This module will land on the Moon and deploy the rover. It also has a scientific payload that will study the lunar surface. Rover This is a small, mobile vehicle that will conduct on-site experiments on the lunar surface. It is equipped with a variety of scientific instruments, including a seismometer, a spectrometer, and a camera.
  • 7. Specifications For Chandrayaan-3 Sl No. Parameter Specifications Sl No. Parameter Specifications 1. Mission Life (Lander & Rover) One lunar day (~14 Earth days) 7. Communication 1.Propulsion Module: Communicates with IDSN 2.Lander Module: Communicates with IDSN and Rover. Chandrayaan-2 Orbiter is also planned for contingency link. 3.Rover: Communicates only with Lander. 2. Landing Site (Prime) 4 km x 2.4 km 69.367621 S, 32.348126 E 8. Lander Sensors 1.Laser Inertial Referencing and Accelerometer Package (LIRAP) 2.Ka-Band Altimeter (KaRA) 3.Lander Position Detection Camera (LPDC) 4.LHDAC (Lander Hazard Detection & Avoidance Camera) 5.Laser Altimeter (LASA) 6.Laser Doppler Velocimeter (LDV) 7.Lander Horizontal Velocity Camera (LHVC) 8.Micro Star sensor 9.Inclinometer & Touchdown sensors 3. Science Payloads 1.Lander:Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA) 2.Chandra’s Surface Thermo physical Experiment (ChaSTE) 3.Instrument for Lunar Seismic Activity (ILSA) 4.Laser Retroreflector Array (LRA) Rover: 5.Alpha Particle X-Ray Spectrometer (APXS) 6.Laser Induced Breakdown Spectroscope (LIBS) Propulsion Module: 7.Spectro-polarimetry of HAbitable Planet Earth (SHAPE) 9. Lander Actuators Reaction wheels – 4 nos (10 Nms & 0.1 Nm) 4. Two Module Configuration 1.Propulsion Module (Carries Lander from launch injection to Lunar orbit) 2.Lander Module (Rover is accommodated inside the Lander) 10. Lander Propulsion System Bi-Propellant Propulsion System (MMH + MON3), 4 nos. of 800 N Throttleable engines & 8 nos. of 58 N; Throttleable Engine Control Electronics 5. Mass 1.Propulsion Module: 2148 kg 2.Lander Module: 1752 kg including Rover of 26 kg 3.Total: 3900 kg 11. Lander Mechanisms 1.Lander leg 2.Rover Ramp (Primary & Secondary) 3.Rover 4.ILSA, Rambha & Chaste Payloads 5.Umbilical connector Protection Mechanism, 6.X- Band Antenna 6. Power generation 1.Propulsion Module: 758 W 2.Lander Module: 738W, WS with Bias 3.Rover: 50W 12. Lander Touchdown specifications 1.Vertical velocity: ≤ 2 m / sec 2.Horizontal velocity: ≤ 0.5 m / sec 3.Slope: ≤ 120
  • 8. Objectives Of Scientific Payloads SI. No Lander Payloads Objectives 1. Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA) Langmuir probe (LP) To measure the near surface plasma (ions and electrons) density and its changes with time 2. Chandra’s Surface Thermo physical Experiment (ChaSTE) To carry out the measurements of thermal properties of lunar surface near polar region. 3. Instrument for Lunar Seismic Activity (ILSA) To measure seismicity around the landing site and delineating the structure of the lunar crust and mantle. 4. LASER Retroreflector Array (LRA) It is a passive experiment to understand the dynamics of Moon system. SI. No Rover Payloads Objectives 1. LASER Induced Breakdown Spectroscope (LIBS) Qualitative and quantitative elemental analysis & To derive the chemical Composition and infer mineralogical composition to further our understanding of Lunar-surface. 2. Alpha Particle X-ray Spectrometer (APXS) To determine the elemental composition (Mg, Al, Si, K, Ca,Ti, Fe) of Lunar soil and rocks around the lunar landing site. Sl. No Propulsion Module Payload Objectives 1. Spectro-polarimetry of HAbitable Planet Earth (SHAPE) Future discoveries of smaller planets in reflected light would allow us to probe into variety of Exo-planets which would qualify for habitability (or for presence of life).
  • 9. Launch And Landing Of Chandrayaan-3 Chandrayaan-3 was launched on July 14, 2023. It entered a lunar transfer orbit on July 15, 2023. The lander is expected to land on the lunar south pole region on August 23 or August 24, 2023. Event Date Launch July 14, 2023 Lunar transfer orbit July 15, 2023 Landing on the lunar south pole region August 23-24, 2023
  • 10. First Indian mission to land on the lunar south pole region First Indian mission to carry a rover Advances India's space exploration capabilities Promotes international cooperation in space exploration The Significance Of Chandrayaan-3
  • 11. Mission Life Propulsion Module 3 to 6 months Lander Rover 1 Lunar Day Landing Site 69.36 degree S, 32.34 degree E; slightly off the site for Chandrayaan-2
  • 12. Integrated Module Phase Lunar Transfer Trajectory Injectio n Orbit EBNs Lunar Orbit Insertion Lunar Orbit Lander Deboost Lander Propulsion Model Separation Touchdown Mission Profile
  • 13. Mission Profile Animation of Chandrayaan-3 Chandrayaan-3 Earth Moon
  • 14. The Earth-Moon average distance is roughly 384,400 kilometers. To save fuel, Chandrayaan-3 has chosen a longer route to the Moon. This adjusted path aims to ensure a gentle landing of the mission's Vikram lander on the Moon's South Pole area. The expected timeline for this soft touchdown is approximately 42 days after launch, specifically around August 23 or 24. Trajectory
  • 15. 01 02 03 04 05 06 07 Nominal Flight Sequence S.No Event Flight Time (s) Altitude (km) Inertial Velocity (km/s) 1 2xS200 Ignition 0.00 0.024 0.452 2 L110 Ignition 108.10 44.668 1.788 3 2xS200 Separation 127.00 62.171 1.969 4 PLF Separation 194.96 114.805 2.560 5 L110 Separation 305.56 175.352 4.623 6 C25 Ignition 307.96 176.573 4.621 7 C25 Shut-off 954.42 174.695 10.242 8 Satellite Separation 969.42 179.192 10.269
  • 16. LVM3-M4-Chandrayaan-3 Mission Timeline July 14, 2023 LVM3 M4 vehicle successfully launched Chandrayaan-3 into orbit. Chandrayaan-3, in its precise orbit, has begun its journey to the Moon. Health of the Spacecraft is normal. July 22, 2023 The fourth orbit-raising maneuver (Earth-bound perigee firing) is completed. The spacecraft is now in a 71351 km x 233 km orbit. August 06, 2023 LBN#2 is successfully completed. The spacecarft is in 170 km x 4313 km orbit around the moon July 25, 2023 Orbit-raising maneuver performed on July 25, 2023. Next firing (TransLunar Injection), is planned for August 1, 2023. July 15, 2023 The first orbit-raising maneuver (Earthbound firing-1) is successfully performed at ISTRAC/ISRO, Bengaluru. Spacecraft is now in 41762 km x 173 km orbit. July 17, 2023 The second orbit-raising maneuver performed. The spacecraft is now in 41603 km x 226 km orbit. August 05, 2023 Chandrayaan-3 is successfully inserted into the lunar orbit. The orbit achieved is 164 km x 18074 km, as intended. August 01, 2023 The spacecraft is inserted into the translunar orbit. The orbit achieved is 288 km x 369328 km. Lunar-Orbit Insertion (LOI) is planned for Aug 5, 2023.
  • 17. LVM3-M4-Chandrayaan-3 Mission Timeline August 09, 2023 Chandrayaan-3's orbit is reduced to 174 km x 1437 km following a manuevre performed on August 9, 2023 August 17, 2023 Lander Module is successfully separated from the Propulsion Module. Deboosting planned for August 18, 2023 August 19, 2023 The Lander Module is in 113 km x 157 km orbit around the moon. Second de-boosting is planned for August 20, 2023. August 14, 2023 The mission is in the orbit circularisation phase. The spacecraft is in 151 km x 179 km orbit. August 16, 2023 The spacecraft is in an orbit of 153 km x 163 km after the firing on August 16, 2023. August 23, 2023 Powered descent to commence on August 23, 2023, around 1745 Hrs. IST August 20, 2023 The Lander Module is in 25 km x 134 km orbit.
  • 18. Chandrayaan-3 Capture First Image The Moon, as viewed by Chandrayaan-3 during Lunar Orbit Insertion
  • 19. Chandrayaan-3 Mission Success The Chandrayaan-3 mission was a success, and India became the first country in the world to land a spacecraft on the Moon's south pole. The lander, named Vikram, touched down on the lunar surface at 18:04 IST (12:34 UTC) on August 23, 2023. The rover, named Pragyan, will now explore the lunar surface for the next 14 days.
  • 20. After the Vikram lander successfully lands on the Moon, it will wait for a while to let the lunar dust settle. This is to prevent the rover from getting stuck in the dust. After about 4 hours, the Pragyan rover will be released from the lander and will begin its journey to explore the lunar surface. Vikram Lander After Landing
  • 21. The rover's rollout was delayed to let Moon dust settle after the lander's touchdown. Moon's weaker gravity makes dust clearance slower, ensuring rover instrument protection was ISRO's focus. Rover's Rollout Delay
  • 22. The Pragyan rover rolled out of the Vikram lander on the Moon at approximately 12:30 AM IST on August 24, 2023. This was about 3 hours and 25 minutes after the Vikram lander touched down on the lunar surface. Pragyan Rover Rolled Out
  • 23. Pragyan is crafted to mark the national emblem and ISRO's logo on the lunar surface. It will traverse unexplored lunar terrain, transmitting data and visuals after its landing. Pragyan's Symbolic Imprints
  • 24. The Vikram lander and Pragyan rover will have a mission life of one lunar day (about 14 Earth days). During this time, they will conduct a variety of scientific experiments, including studying the lunar surface, the lunar atmosphere, and the lunar water resources. About 14 Earth Days
  • 25. ChaSTE (Chandra's Surface Thermophysical Experiment) measures lunar topsoil temperature near the pole, using a 10 cm depth-capable probe with 10 sensors. The graph shows temperature variations at various depths, marking the first profile for the lunar south pole, with ongoing detailed observations. First Observations From The Chaste Payload
  • 26. Chandrayaan-3 Rover's LIBS instrument achieved the first in-situ measurements of the lunar south pole, confirming the presence of Aluminum (Al), Sulphur (S), Calcium (Ca), Iron (Fe), Chromium (Cr), Titanium (Ti), and later, manganese (Mn), silicon (Si), and oxygen (O). Hydrogen investigation ongoing.. LIBS Confirms The Presence Of Sulphur
  • 27. APXS identified minor elements, including Sulfur, alongside expected major ones like Aluminum, Silicon, Calcium, and Iron. LIBS also confirmed Sulfur's presence. Detailed analysis is ongoing. APXS Detects Minor Elements
  • 28. The RAMBHA-LP payload on the Chandrayaan-3 Lander has achieved a historic milestone by conducting the first-ever measurements of the lunar near-surface plasma environment in the south polar region. RAMBHA-LP On-board Measures Plasma
  • 29. ISRO stated that the Instrument for Lunar Seismic Activity (ILSA) on Chandrayaan 3 is the moon's first Micro Electro Mechanical Systems (MEMS) technology-based instrument. It has captured vibrations from the Rover and other payloads' movements. ILSA Monitors Landing Site Activity
  • 30. In a significant update, the Indian Space Research Organization (ISRO) has confirmed that the 'Vikram Lander' was placed in sleep mode around 08 AM (Indian Standard Time) on Monday. ISRO reported that data from the payloads has been transmitted to Earth, and the payloads are now powered off. Sleep Mode
  • 31. On September 2, the space organization confirmed that Pragyan had finished its tasks and was safely parked in sleep mode, with its receiver active. ISRO further noted that Vikram would enter sleep mode alongside Pragyan once its solar power was depleted and the battery was drained. Why Sleep Mode?
  • 32. Hop Experiment The Indian Space Research Organisation (ISRO) reported on Tuesday that the lander had executed a successful hop experiment. Upon receiving the command, it initiated its engines, achieving the expected elevation of approximately 40 cm, and safely landed at a distance of 30–40 cm from its starting point. After conducting the experiment, the ISRO reported that the Ramp, ChaSTE, and ILSA were initially retracted and then successfully redeployed.
  • 33. This successful hop experiment and its promising results could have a profound impact on future lunar missions with the primary goal of collecting moon samples, as well as upcoming human expeditions to our celestial neighbor. Hop Experiment Impacts
  • 34. ISRO also shared that they anticipate the next sunrise, which is expected to awaken the equipment on September 22, 2023, and they are hopeful for a successful restart to undertake a new set of tasks. Rover Wake Up
  • 35. Conclusion Of Chandrayaan 3 The success of Chandrayaan-3 is a major milestone for India's space program and a testament to the hard work and dedication of the ISRO team. It also opens up new possibilities for scientific research on the Moon.
  • 36. Icons
  • 37. Icons
  • 38. You can add and edit some shapes to your presentation to present your data in a visual way. ● Choose your favourite infographic and insert it in your presentation using Ctrl C + Ctrl V or Cmd C + Cmd V in Mac. ● Select one of the parts and ungroup it by right-clicking and choosing “Ungroup”. ● Change the color by clicking on the paint bucket. ● Then resize the element by clicking and dragging one of the square-shaped points of its bounding box (the cursor should look like a double-headed arrow). Remember to hold Shift while dragging to keep the proportions. ● Group the elements again by selecting them, right-clicking and choosing “Group”. ● Repeat the steps above with the other parts and when you’re done editing, copy the end result and paste it into your presentation. ● Remember to choose the “Keep source formatting” option so that it keeps the design. For more info, please visit Slideegg (Tips & Tricks). How To Edit Shapes
  • 39. Terms Of Use (Free Users) If you are a free subscriber, you should credit SlideEgg by keeping the “Thank You” slide. Kindly refer to the following slide for the Terms of Use for premium users. You can: • Customize or edit this template • Use this template for both business and personal endeavors. You can not: • Sell, rent, or second-license SlideEgg content or its altered version. Promulgate, unless explicitly permitted, SlideEgg content, by SlideEgg. • Incorporate SlideEgg content in any database or file online or offline. • Obtain SlideEgg content’s copyright. Kindly refer to our Tutorial page or FAQ for advanced slide modification guidelines.
  • 40. Terms Of Use (Premium Users) Being a premium subscriber, you have the privilege of using this PPT template without giving attribution to SlideEgg or keeping the “Thank You” slide. You can: • Customize or edit this template. • Use this template for both business and personal endeavors. • Circulate or share the editable format of this template with anyone you want. You can not: • Sell, rent or second-license SlideEgg content or the altered version of it. Promulgate or include the templates in any other services database • that performs as distribution or resale platform, unless explicitly permitted, by SlideEgg. • Incorporate the elements used in SlideEgg templates separately. • Obtain SlideEgg copyright for the elements used in this template as a logo or trademark. Kindly refer to our Tutorial page or FAQ for advanced slide modification guidelines.
  • 41. www.slideegg.com Thank You! We respect your valuable time with SlideEgg! If you have any questions, please reach us CREDIT: SlideEgg created this PowerPoint template. Let this slide be kept for attribution. Do you have a design request, please visit our redesign page.