• Competent and result oriented professional offering over 3+ years of rich GULF & INDIA
experience across HVAC Designing & Drafting, Currently spearheading as HVAC Design
Engineer In COMFOTECH, DUBAI
• Adequate experience in HVAC overall project activities including project scheduling, Co-
ordinations of all project and resource allocation. Proven capability in setting up perfect
coordination with all involved agencies to remove bottlenecks and accelerate pace of project
implementation.
• To plan and manage work programme and to lead, motivate and provide effective guidance to a
team of professional and support staff.
• Language proficiency in English, Hindi and Telugu.
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
 COMFOTECH, DUBAI OCT 2015- WORKING
AAs as a HVACHVAC Design Engineer
 APEX KNOWLEDGE TECHNOLOGY PVT LTD APR 2014 – SEPT 2015
AAs as a HVACHVAC Design Engineer
 CG CLIMAIR MEP CONSULTANTCY JUNE 2009- FEB 2011
AAs as a HVAC DHVAC Draftsmanraftsman
Projects Undertaken (MAJOR PROJECTS)
 Project : BLUE WATERS WHARF RETAIL, DUBAI.
Scope of Work : Air cooled chiller plant.
Client : Miraas.
 Project : QATAR STADIUM.
Scope of Work : Air cooled chiller plant.
Client : Qatar Stadium.
 Project : PROPOSED STUDIOS, ILUPEJU, NIGERIA.
Scope of Work : Air cooled chiller plant.
Client : Multichoice super sport NIG..
 Project TATA STEEL PLANT, Odissa.
Scope of Work : Air cooled Chillers and Water Cooled Chillers
Client : M/s TATA STEEL PLANT.
 Project VICAT SAGAR CEMENT FACTORY.
Scope of Work : 1,00,000 Sft VRF SYSTEM.
Client : M/s SAGAR CEMENTS.
 Project : MADHUCON HEIGHTS – KPHB.
Scope of Work : 4,00,000 Sft, Air cooled Chillers
Client : M/s NAMA NAGESWARA RAO
 Project : GOLKONDA RESORTS, Hyderabad
Scope of Work : 1,00,000 Sft. Water Cooled Chiller
Client : M/s GOLKONDA HOTELS.
 Project : BIO GENEX, Hyderabad.
Scope of Work : 1,50,000 Sft , VRV System,
Client : M/s BIO GENEX.
Etc…
.Responsibilities:
 Preparation of Heat loads with using E20, HAP. Capacity statement, DBR. BOQ’S Estimations.
Approved makes. Etc.
 Preparation of SLD Drawings using ASHRAE standards, distribution of cfm, equipment details.
co ordinate with MEP Services.
 Detailed drawing of diffusers, grills, and dampers sizes with sections.
 Performing the calculations for Duct Sizing By using McQuay Duct sizer, Routing layout,
Diffuser Sizes and Location Identification.
 Performing the selection of Split Units, DX Units and VAVs.
 Air cooled/ water cooled Chillers plant location, pump locations, pipe connections, pipe routings.
 Chilled water piping detailed Designing by using McQuay pipe sizer
 Detailed drawing with Detailed sections with valves.
 Knowledge of Ducting Sheet Gauges, Material and size ratios.
 Knowledge of Piping, size calculations, Gpm Calculation
 Schematic drawings with all the equipments.
 Analyzed and reviewed the total designing of the overall project like Ducting, chilled water
piping with sections.
 Designing of Basement ventilation. Type of fans like Jet fans, axial fans or centrifugal fans etc.
with location of the fans.
 Designing of Toilet ventilation. Staircase pressurization.
 Prepared and attended weekly project status updates with general contractors and management
team
 Closely monitoring for the execution of HVAC works, Chilled water piping, Ducting
Square/Spiral/ oval Ducting.
 Preparation Detailed Drawing for VRV with entire Copper pipe with indoor and out door
equipments.
 Managed multiple projects closely.
 Analyzed project results to discover more efficient ways of operating with increased productivity
 Preparation of Detailed Chilled water, Condensing water Schematic diagrams based on tentative
drawings.
 Ensured successful project execution by means of progress meetings, managing and motivating
team members, and continued communication with project stakeholders
 Co-coordinating with Electrical, Fire fighting, BMS (Building Management System), plumbing
services in daily activities for HVAC site execution.
 co-ordination with all other agencies to complete the Job as per targets set by client.
 Managing day to day operations in ways consistent with the strategic goals and performance
targets, including Client/ customer relations.
EDUCATIONEDUCATION
 B Tech in Mechanical Engineering in Ellenki college of engineering & Technology, JNTUH
 Diploma In Mechanical engineering in Vijayawada Govt. Polytechnic College , SBTET
Vijayawada.
COMPUTER KNOWLEDGECOMPUTER KNOWLEDGE
Languages : MS office, C, C++
Packages : REVIT 2014, AUTO CADD 2006-2012 Versions. CAM, UG.
Date of Birth: 2nd
November 1990
References: Available on request.
DECLARATIONDECLARATION
I do hereby confirm that the information given in this form is true to the best of my knowledge and
belief.
DATE:DATE: (P.CHANDRA MOULI)(P.CHANDRA MOULI)
PLACE: HYDERABADPLACE: HYDERABAD

CHANDRA MOULI_CV

  • 1.
    CURRICULUM VITAE P.CHANDRA MOULIP.CHANDRAMOULI Phone : 0565658820 Email :chandramouli443@gmail.com Passport no: K8590008 PROFESSIONAL SYNOPSISPROFESSIONAL SYNOPSIS • Competent and result oriented professional offering over 3+ years of rich GULF & INDIA experience across HVAC Designing & Drafting, Currently spearheading as HVAC Design Engineer In COMFOTECH, DUBAI • Adequate experience in HVAC overall project activities including project scheduling, Co- ordinations of all project and resource allocation. Proven capability in setting up perfect coordination with all involved agencies to remove bottlenecks and accelerate pace of project implementation. • To plan and manage work programme and to lead, motivate and provide effective guidance to a team of professional and support staff. • Language proficiency in English, Hindi and Telugu. PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE  COMFOTECH, DUBAI OCT 2015- WORKING AAs as a HVACHVAC Design Engineer  APEX KNOWLEDGE TECHNOLOGY PVT LTD APR 2014 – SEPT 2015 AAs as a HVACHVAC Design Engineer  CG CLIMAIR MEP CONSULTANTCY JUNE 2009- FEB 2011 AAs as a HVAC DHVAC Draftsmanraftsman Projects Undertaken (MAJOR PROJECTS)  Project : BLUE WATERS WHARF RETAIL, DUBAI. Scope of Work : Air cooled chiller plant. Client : Miraas.  Project : QATAR STADIUM. Scope of Work : Air cooled chiller plant. Client : Qatar Stadium.  Project : PROPOSED STUDIOS, ILUPEJU, NIGERIA. Scope of Work : Air cooled chiller plant. Client : Multichoice super sport NIG..
  • 2.
     Project TATASTEEL PLANT, Odissa. Scope of Work : Air cooled Chillers and Water Cooled Chillers Client : M/s TATA STEEL PLANT.  Project VICAT SAGAR CEMENT FACTORY. Scope of Work : 1,00,000 Sft VRF SYSTEM. Client : M/s SAGAR CEMENTS.  Project : MADHUCON HEIGHTS – KPHB. Scope of Work : 4,00,000 Sft, Air cooled Chillers Client : M/s NAMA NAGESWARA RAO  Project : GOLKONDA RESORTS, Hyderabad Scope of Work : 1,00,000 Sft. Water Cooled Chiller Client : M/s GOLKONDA HOTELS.  Project : BIO GENEX, Hyderabad. Scope of Work : 1,50,000 Sft , VRV System, Client : M/s BIO GENEX. Etc… .Responsibilities:  Preparation of Heat loads with using E20, HAP. Capacity statement, DBR. BOQ’S Estimations. Approved makes. Etc.  Preparation of SLD Drawings using ASHRAE standards, distribution of cfm, equipment details. co ordinate with MEP Services.  Detailed drawing of diffusers, grills, and dampers sizes with sections.  Performing the calculations for Duct Sizing By using McQuay Duct sizer, Routing layout, Diffuser Sizes and Location Identification.  Performing the selection of Split Units, DX Units and VAVs.  Air cooled/ water cooled Chillers plant location, pump locations, pipe connections, pipe routings.  Chilled water piping detailed Designing by using McQuay pipe sizer  Detailed drawing with Detailed sections with valves.  Knowledge of Ducting Sheet Gauges, Material and size ratios.  Knowledge of Piping, size calculations, Gpm Calculation  Schematic drawings with all the equipments.  Analyzed and reviewed the total designing of the overall project like Ducting, chilled water piping with sections.  Designing of Basement ventilation. Type of fans like Jet fans, axial fans or centrifugal fans etc. with location of the fans.
  • 3.
     Designing ofToilet ventilation. Staircase pressurization.  Prepared and attended weekly project status updates with general contractors and management team  Closely monitoring for the execution of HVAC works, Chilled water piping, Ducting Square/Spiral/ oval Ducting.  Preparation Detailed Drawing for VRV with entire Copper pipe with indoor and out door equipments.  Managed multiple projects closely.  Analyzed project results to discover more efficient ways of operating with increased productivity  Preparation of Detailed Chilled water, Condensing water Schematic diagrams based on tentative drawings.  Ensured successful project execution by means of progress meetings, managing and motivating team members, and continued communication with project stakeholders  Co-coordinating with Electrical, Fire fighting, BMS (Building Management System), plumbing services in daily activities for HVAC site execution.  co-ordination with all other agencies to complete the Job as per targets set by client.  Managing day to day operations in ways consistent with the strategic goals and performance targets, including Client/ customer relations. EDUCATIONEDUCATION  B Tech in Mechanical Engineering in Ellenki college of engineering & Technology, JNTUH  Diploma In Mechanical engineering in Vijayawada Govt. Polytechnic College , SBTET Vijayawada. COMPUTER KNOWLEDGECOMPUTER KNOWLEDGE Languages : MS office, C, C++ Packages : REVIT 2014, AUTO CADD 2006-2012 Versions. CAM, UG. Date of Birth: 2nd November 1990 References: Available on request. DECLARATIONDECLARATION I do hereby confirm that the information given in this form is true to the best of my knowledge and belief. DATE:DATE: (P.CHANDRA MOULI)(P.CHANDRA MOULI) PLACE: HYDERABADPLACE: HYDERABAD