4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com
Nuclear Decontamination
EnviroCare of Utah
Salt Lake City, Utah
Clive Facility
July 2001
Application:
Customer has 150 gondola type rails cars used to transport contaminated soil/debris to it’s
facility in the Tooele Hazardous Industry District.
Customer requested CIB demonstrate/test the ice blast process effectiveness in removing
contaminated soil/dirt/debris from interior steel surfaces of transport rails car.
Customer requires the cleaning process to remove surface contamination to meet or exceed the
levels specified for “Return to Service” (RTS) purposes.
Customer requires CIB to provide a completely portable/mobile equipment/set-up so that the
system can be operated outside the “restricted area” and inside the “buffer zone”. The actual test
cleaning is performed by the customers prime maintenance contractor inside the “New Rail
Wash Station” facility, a controlled and restricted access area.
Site Conditions/Set-up Parameters:
Site conditions are on the outside range of CIB operating specifications for optimal performance
of the ice blast process.
 Ambient operating temperatures expected to exceed 100 F.
 Extended length of ice/air delivery hose needed to reach test site from buffer zone.
 Elevated water supply source, 85-90 F.
 Water supply is excessively “hard” with a high TDS level.
 Elevated supply air temperature, 150 F +.
Test Summary:
Customer performed several tests to determine the effectiveness of the ice blast process.
The first test was to clean a square meter area and check for surface contamination residue. The
customer spent approximately 10 minutes cleaning the 1 square meter area. A meter was used to
check for background contamination and then a smear sample was taken to the customer’s lab
for analysis. Results showed the ice blast process was effective.
A second test was performed to see if a reduction in time spent would yield the same cleanliness
level. A second square meter area was cleaned in approximately 5 minutes. Testing showed the
level of surface contamination diminished but not to the level as the first test.
COULSON ICE BLAST
REDEFINING CLEAN
4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com
Subsequent test cleaning revealed the entire surfaces of the rail car could be cleaned in
approximately 6 hours elapsed time or 18 man-hours (customer employed 1 man to operate the
blast nozzle, 1 man to tend the ice/air delivery hose and 1 man to supervise the operation).
Previous efforts using high-pressure water blast could not achieve the same level of
decontamination as ice blast. Grit blasting was also used prior to the ice blast process. Grit
blasting exceeded the requirements for RTS but encumbered the cleaning process by requiring
access holes to be cut in the sides of the rail cars for waste removal. Grit blasting also required
the use of extensive personnel protective equipment (PPE) such as supplied air and two layers of
covering garments for the work personnel. The first rail car cleaned using grit blasting exceeded
90 man-hours.
The subsequent testing assessed the volume of waste generated during the ice blast process. Due
to the elevated ambient temperature and the high evaporation point (low humidity) the water
volume generated from the ice particle phase-change was nearly zero gallons. Recovery of
residue from the cleaning process would be accomplished with HEPA filtered vacuum units.
Addition benefits of the ice blast process directed the customer to reduce the level of PPE
required for the blasting personnel. In lieu of multi-layered “rain gear”, a single “Tyvek” suit
was used by the blasting personnel. This aided in reducing personnel fatigue due to excessive
ambient heat. Supplied air blasting hoods were used at the time of the testing, which were
available from the grit blasting operation, however it was determined that full face respirators
could be used instead due to the low airborne readings obtained.
Conclusion:
CIB supplied and set-up a complete mobile ice blast system on the desert floor for the customer
to perform test-cleaning/decontamination evaluation. The ice blast system ran for approximately
5 hours during the testing phases. The system was stopped and started several times so the
customer could perform sample testing. The ice blast system performed within normal operating
parameters even though the operating environment exceeded optimal operating conditions.
The customer performed all test cleaning, test sampling and evaluations. A full report illustrating
the test parameters and results is forthcoming from the customers Risk Manager.
Customer is currently evaluating a proposal from CIB to implement two ice blast units for this
cleaning/decontamination application. Upon acceptance of proposal CIB expects to deliver and
install the ice blast systems by the end of August 2001.
4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com
Picture 1: EnviroCare of Utah-Clive Facility.
Picture 2: 150 Gondola type rail cars ready for decon and RTS.
4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com
Picture 3: Entrance to decon facility.
Picture 4: Mobile ice blast system inside buffer zone.
4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com
Picture 5: Rail car prior to ice blast.
Picture 6: Rail car after ice blast..

More Related Content

What's hot

Presentation on Full Depth Rehabilitation
Presentation on Full Depth RehabilitationPresentation on Full Depth Rehabilitation
Presentation on Full Depth Rehabilitation
hsiengineering
 
TIGG Municipal Drinking Water Purification Equipment
TIGG Municipal Drinking Water Purification EquipmentTIGG Municipal Drinking Water Purification Equipment
TIGG Municipal Drinking Water Purification Equipment
Distributor Service Incorporated
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
Larry W. Vincent - (832) 326-9056
 
Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]
Vishal Modi
 
Asphalt Rubber Blending
Asphalt Rubber BlendingAsphalt Rubber Blending
The GBHE Project Experience
The GBHE Project ExperienceThe GBHE Project Experience
The GBHE Project Experience
Gerard B. Hawkins
 
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
Jj HanXue
 
Resume
ResumeResume
Chem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwanChem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwan
Shun-Hsing Cheng
 
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
ziiishan
 
Quality
QualityQuality
Smartr Presentation Jan 19
Smartr Presentation Jan 19Smartr Presentation Jan 19
Smartr Presentation Jan 19
patrickokeefe
 
28 voelzke sorenson issues of ageing sand2016 8277 c
28 voelzke sorenson issues of ageing sand2016 8277 c28 voelzke sorenson issues of ageing sand2016 8277 c
28 voelzke sorenson issues of ageing sand2016 8277 c
leann_mays
 
Itp
ItpItp
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Baker Hughes
 
Superpave - Low Volume
Superpave - Low VolumeSuperpave - Low Volume
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
Pratap Biswas
 
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
Sandia National Laboratories: Energy & Climate: Renewables
 
Rubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix DesignRubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix Design
California Asphalt Pavement Association
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
Sandia National Laboratories: Energy & Climate: Renewables
 

What's hot (20)

Presentation on Full Depth Rehabilitation
Presentation on Full Depth RehabilitationPresentation on Full Depth Rehabilitation
Presentation on Full Depth Rehabilitation
 
TIGG Municipal Drinking Water Purification Equipment
TIGG Municipal Drinking Water Purification EquipmentTIGG Municipal Drinking Water Purification Equipment
TIGG Municipal Drinking Water Purification Equipment
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
 
Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]
 
Asphalt Rubber Blending
Asphalt Rubber BlendingAsphalt Rubber Blending
Asphalt Rubber Blending
 
The GBHE Project Experience
The GBHE Project ExperienceThe GBHE Project Experience
The GBHE Project Experience
 
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
 
Resume
ResumeResume
Resume
 
Chem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwanChem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwan
 
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
Comparative Analysis of Performance of Horizontal and Hydraulically Fractured...
 
Quality
QualityQuality
Quality
 
Smartr Presentation Jan 19
Smartr Presentation Jan 19Smartr Presentation Jan 19
Smartr Presentation Jan 19
 
28 voelzke sorenson issues of ageing sand2016 8277 c
28 voelzke sorenson issues of ageing sand2016 8277 c28 voelzke sorenson issues of ageing sand2016 8277 c
28 voelzke sorenson issues of ageing sand2016 8277 c
 
Itp
ItpItp
Itp
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
 
Superpave - Low Volume
Superpave - Low VolumeSuperpave - Low Volume
Superpave - Low Volume
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
06b PFLOTRAN-RepoTREND Code Inter-comparison: Inter-comparison Plan & First P...
 
Rubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix DesignRubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix Design
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
 

Viewers also liked

14 04-01 mae-informe-diario
14 04-01 mae-informe-diario14 04-01 mae-informe-diario
14 04-01 mae-informe-diario
Marcelo Pablo Mercs
 
Measuring the Economy
Measuring the EconomyMeasuring the Economy
Measuring the Economy
Emmanuel Joseph Ariza
 
julio 1945
 julio 1945 julio 1945
julio 1945
Ciudad de Riobamba
 
Are pirates causing global warming
Are pirates causing global warmingAre pirates causing global warming
Are pirates causing global warming
SHU Learning & Teaching
 
83. Diferències entre reproducció i sexualitat
83. Diferències entre reproducció i sexualitat83. Diferències entre reproducció i sexualitat
83. Diferències entre reproducció i sexualitat
Dani Ribo
 
Biologia 2n Batxillerat. U08.Citosol i estructures no membranoses
Biologia 2n Batxillerat. U08.Citosol i estructures no membranosesBiologia 2n Batxillerat. U08.Citosol i estructures no membranoses
Biologia 2n Batxillerat. U08.Citosol i estructures no membranoses
Oriol Baradad
 
02. Els nivells d’organització de la matèria
02. Els nivells d’organització de la matèria02. Els nivells d’organització de la matèria
02. Els nivells d’organització de la matèria
Dani Ribo
 
Biologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genètica
Biologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genèticaBiologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genètica
Biologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genètica
Oriol Baradad
 
Biologia 2n Batxillerat. U11. Anabolisme
Biologia 2n Batxillerat. U11. AnabolismeBiologia 2n Batxillerat. U11. Anabolisme
Biologia 2n Batxillerat. U11. Anabolisme
Oriol Baradad
 

Viewers also liked (9)

14 04-01 mae-informe-diario
14 04-01 mae-informe-diario14 04-01 mae-informe-diario
14 04-01 mae-informe-diario
 
Measuring the Economy
Measuring the EconomyMeasuring the Economy
Measuring the Economy
 
julio 1945
 julio 1945 julio 1945
julio 1945
 
Are pirates causing global warming
Are pirates causing global warmingAre pirates causing global warming
Are pirates causing global warming
 
83. Diferències entre reproducció i sexualitat
83. Diferències entre reproducció i sexualitat83. Diferències entre reproducció i sexualitat
83. Diferències entre reproducció i sexualitat
 
Biologia 2n Batxillerat. U08.Citosol i estructures no membranoses
Biologia 2n Batxillerat. U08.Citosol i estructures no membranosesBiologia 2n Batxillerat. U08.Citosol i estructures no membranoses
Biologia 2n Batxillerat. U08.Citosol i estructures no membranoses
 
02. Els nivells d’organització de la matèria
02. Els nivells d’organització de la matèria02. Els nivells d’organització de la matèria
02. Els nivells d’organització de la matèria
 
Biologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genètica
Biologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genèticaBiologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genètica
Biologia 2n Batxillerat. UD20. Biotecnologia i enginyeria genètica
 
Biologia 2n Batxillerat. U11. Anabolisme
Biologia 2n Batxillerat. U11. AnabolismeBiologia 2n Batxillerat. U11. Anabolisme
Biologia 2n Batxillerat. U11. Anabolisme
 

Similar to Case study wet ice blast technology for nuclear decontamination of surfaces 2001

Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
Jeffrey Pickett
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian Showcase
Comit Projects Ltd
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
Jose Verghese Bijoy
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
MichaelUberti
 
Tank Cleaning Case Study Transportation
Tank Cleaning Case Study TransportationTank Cleaning Case Study Transportation
Tank Cleaning Case Study Transportation
Randy Brawn
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
IJET - International Journal of Engineering and Techniques
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
Mujahid Ali Akhtar
 
ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin
NSW Environment and Planning
 
CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_
CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_
CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_
Victor Momoh
 
BW-WhentoCleanAirCondensers-WhitePaper
BW-WhentoCleanAirCondensers-WhitePaperBW-WhentoCleanAirCondensers-WhitePaper
BW-WhentoCleanAirCondensers-WhitePaper
Dennis Miller
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR
Andrew de Villiers
 
C. Belfield Detailed Work History
C. Belfield Detailed Work HistoryC. Belfield Detailed Work History
C. Belfield Detailed Work History
Caroline Belfield
 
C. Belfield Detailed Work History
C. Belfield Detailed Work HistoryC. Belfield Detailed Work History
C. Belfield Detailed Work History
Caroline Belfield
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
CARLOS RUIZ CARDENAS
 
CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_
Victor Momoh
 
WP_Extreme_2016 (2)
WP_Extreme_2016 (2)WP_Extreme_2016 (2)
WP_Extreme_2016 (2)
Stephen Streich
 
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docxCON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
donnajames55
 
Case study - Pharmaceutical Pressure Vessels
Case study - Pharmaceutical Pressure VesselsCase study - Pharmaceutical Pressure Vessels
Case study - Pharmaceutical Pressure Vessels
Greater Shepparton Childrens Lighthouse Project
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
Kamran Saeed
 
rhe-use_haynesville_1
rhe-use_haynesville_1rhe-use_haynesville_1
rhe-use_haynesville_1
Manu Tayal
 

Similar to Case study wet ice blast technology for nuclear decontamination of surfaces 2001 (20)

Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian Showcase
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Tank Cleaning Case Study Transportation
Tank Cleaning Case Study TransportationTank Cleaning Case Study Transportation
Tank Cleaning Case Study Transportation
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin
 
CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_
CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_
CASING_SOLUTIONS_SAMABIRI_BISENI_FIELD_
 
BW-WhentoCleanAirCondensers-WhitePaper
BW-WhentoCleanAirCondensers-WhitePaperBW-WhentoCleanAirCondensers-WhitePaper
BW-WhentoCleanAirCondensers-WhitePaper
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR
 
C. Belfield Detailed Work History
C. Belfield Detailed Work HistoryC. Belfield Detailed Work History
C. Belfield Detailed Work History
 
C. Belfield Detailed Work History
C. Belfield Detailed Work HistoryC. Belfield Detailed Work History
C. Belfield Detailed Work History
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_CASING_SOLUTIONS_OGBAINBIRI_FIELD_
CASING_SOLUTIONS_OGBAINBIRI_FIELD_
 
WP_Extreme_2016 (2)
WP_Extreme_2016 (2)WP_Extreme_2016 (2)
WP_Extreme_2016 (2)
 
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docxCON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
 
Case study - Pharmaceutical Pressure Vessels
Case study - Pharmaceutical Pressure VesselsCase study - Pharmaceutical Pressure Vessels
Case study - Pharmaceutical Pressure Vessels
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
rhe-use_haynesville_1
rhe-use_haynesville_1rhe-use_haynesville_1
rhe-use_haynesville_1
 

More from Dave Davidson

MFI Mass Finishing Equipment and Media
MFI Mass Finishing Equipment and MediaMFI Mass Finishing Equipment and Media
MFI Mass Finishing Equipment and Media
Dave Davidson
 
Centrifugal Iso-Finishing
Centrifugal Iso-FinishingCentrifugal Iso-Finishing
Centrifugal Iso-Finishing
Dave Davidson
 
Modern machine-shop-apr-18 centrifugal isofinishing crnakshafts
Modern machine-shop-apr-18 centrifugal isofinishing crnakshaftsModern machine-shop-apr-18 centrifugal isofinishing crnakshafts
Modern machine-shop-apr-18 centrifugal isofinishing crnakshafts
Dave Davidson
 
Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...
Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...
Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...
Dave Davidson
 
Iso-Finishing sample part finishing application form
Iso-Finishing sample part finishing application formIso-Finishing sample part finishing application form
Iso-Finishing sample part finishing application form
Dave Davidson
 
MFI full finishing product catalog with technical assistance info
MFI full finishing product catalog with technical assistance infoMFI full finishing product catalog with technical assistance info
MFI full finishing product catalog with technical assistance info
Dave Davidson
 
It's the Finish that Counts. Technical Magazine article reprint.
It's the Finish that Counts. Technical Magazine article reprint.It's the Finish that Counts. Technical Magazine article reprint.
It's the Finish that Counts. Technical Magazine article reprint.
Dave Davidson
 
Gear Finishing Technical Intewrview
Gear Finishing Technical IntewrviewGear Finishing Technical Intewrview
Gear Finishing Technical Intewrview
Dave Davidson
 
BV PRODUCTS - Bowl and Tub Vibratory Finishing Systems
BV PRODUCTS - Bowl and Tub Vibratory Finishing SystemsBV PRODUCTS - Bowl and Tub Vibratory Finishing Systems
BV PRODUCTS - Bowl and Tub Vibratory Finishing Systems
Dave Davidson
 
BV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHING
BV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHINGBV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHING
BV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHING
Dave Davidson
 
BV Products - Vibratory Finishing machinery for deburring and polishing
BV Products - Vibratory Finishing machinery for deburring and polishingBV Products - Vibratory Finishing machinery for deburring and polishing
BV Products - Vibratory Finishing machinery for deburring and polishing
Dave Davidson
 
BV Products TECHNOVIBE Series
BV Products TECHNOVIBE Series BV Products TECHNOVIBE Series
BV Products TECHNOVIBE Series
Dave Davidson
 
Centrifugal Iso-Finishing for Additive Manufactured Parts
Centrifugal Iso-Finishing for Additive Manufactured PartsCentrifugal Iso-Finishing for Additive Manufactured Parts
Centrifugal Iso-Finishing for Additive Manufactured Parts
Dave Davidson
 
Centrifugal iso finishing sample processing
Centrifugal iso finishing sample processingCentrifugal iso finishing sample processing
Centrifugal iso finishing sample processing
Dave Davidson
 
Centrifugal iso finishing contract services
Centrifugal iso finishing contract services Centrifugal iso finishing contract services
Centrifugal iso finishing contract services
Dave Davidson
 
Centrifugal iso-Finishing 3D parts
Centrifugal iso-Finishing 3D partsCentrifugal iso-Finishing 3D parts
Centrifugal iso-Finishing 3D parts
Dave Davidson
 
Centrifugal iso finishing - part dividers
Centrifugal iso finishing - part dividersCentrifugal iso finishing - part dividers
Centrifugal iso finishing - part dividers
Dave Davidson
 
Final vibratory iso-finishing processes
Final   vibratory iso-finishing processesFinal   vibratory iso-finishing processes
Final vibratory iso-finishing processes
Dave Davidson
 
Centrifugal Iso-Finishing Equipment
Centrifugal Iso-Finishing EquipmentCentrifugal Iso-Finishing Equipment
Centrifugal Iso-Finishing Equipment
Dave Davidson
 
Centrifugal iso finishing - Equipment description
Centrifugal iso finishing - Equipment descriptionCentrifugal iso finishing - Equipment description
Centrifugal iso finishing - Equipment description
Dave Davidson
 

More from Dave Davidson (20)

MFI Mass Finishing Equipment and Media
MFI Mass Finishing Equipment and MediaMFI Mass Finishing Equipment and Media
MFI Mass Finishing Equipment and Media
 
Centrifugal Iso-Finishing
Centrifugal Iso-FinishingCentrifugal Iso-Finishing
Centrifugal Iso-Finishing
 
Modern machine-shop-apr-18 centrifugal isofinishing crnakshafts
Modern machine-shop-apr-18 centrifugal isofinishing crnakshaftsModern machine-shop-apr-18 centrifugal isofinishing crnakshafts
Modern machine-shop-apr-18 centrifugal isofinishing crnakshafts
 
Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...
Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...
Centrifugal Iso-Finishing Technical article as seen in Products Finishing mag...
 
Iso-Finishing sample part finishing application form
Iso-Finishing sample part finishing application formIso-Finishing sample part finishing application form
Iso-Finishing sample part finishing application form
 
MFI full finishing product catalog with technical assistance info
MFI full finishing product catalog with technical assistance infoMFI full finishing product catalog with technical assistance info
MFI full finishing product catalog with technical assistance info
 
It's the Finish that Counts. Technical Magazine article reprint.
It's the Finish that Counts. Technical Magazine article reprint.It's the Finish that Counts. Technical Magazine article reprint.
It's the Finish that Counts. Technical Magazine article reprint.
 
Gear Finishing Technical Intewrview
Gear Finishing Technical IntewrviewGear Finishing Technical Intewrview
Gear Finishing Technical Intewrview
 
BV PRODUCTS - Bowl and Tub Vibratory Finishing Systems
BV PRODUCTS - Bowl and Tub Vibratory Finishing SystemsBV PRODUCTS - Bowl and Tub Vibratory Finishing Systems
BV PRODUCTS - Bowl and Tub Vibratory Finishing Systems
 
BV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHING
BV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHINGBV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHING
BV PRODUCTS VIBRATORY FINISHING SYSTEMS FOR DEBURRING AND FINISHING
 
BV Products - Vibratory Finishing machinery for deburring and polishing
BV Products - Vibratory Finishing machinery for deburring and polishingBV Products - Vibratory Finishing machinery for deburring and polishing
BV Products - Vibratory Finishing machinery for deburring and polishing
 
BV Products TECHNOVIBE Series
BV Products TECHNOVIBE Series BV Products TECHNOVIBE Series
BV Products TECHNOVIBE Series
 
Centrifugal Iso-Finishing for Additive Manufactured Parts
Centrifugal Iso-Finishing for Additive Manufactured PartsCentrifugal Iso-Finishing for Additive Manufactured Parts
Centrifugal Iso-Finishing for Additive Manufactured Parts
 
Centrifugal iso finishing sample processing
Centrifugal iso finishing sample processingCentrifugal iso finishing sample processing
Centrifugal iso finishing sample processing
 
Centrifugal iso finishing contract services
Centrifugal iso finishing contract services Centrifugal iso finishing contract services
Centrifugal iso finishing contract services
 
Centrifugal iso-Finishing 3D parts
Centrifugal iso-Finishing 3D partsCentrifugal iso-Finishing 3D parts
Centrifugal iso-Finishing 3D parts
 
Centrifugal iso finishing - part dividers
Centrifugal iso finishing - part dividersCentrifugal iso finishing - part dividers
Centrifugal iso finishing - part dividers
 
Final vibratory iso-finishing processes
Final   vibratory iso-finishing processesFinal   vibratory iso-finishing processes
Final vibratory iso-finishing processes
 
Centrifugal Iso-Finishing Equipment
Centrifugal Iso-Finishing EquipmentCentrifugal Iso-Finishing Equipment
Centrifugal Iso-Finishing Equipment
 
Centrifugal iso finishing - Equipment description
Centrifugal iso finishing - Equipment descriptionCentrifugal iso finishing - Equipment description
Centrifugal iso finishing - Equipment description
 

Recently uploaded

Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
Global Landscapes Forum (GLF)
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
Global Landscapes Forum (GLF)
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
CIFOR-ICRAF
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
Open Access Research Paper
 
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
vijaykumar292010
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
neilsencassidy
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
Global Landscapes Forum (GLF)
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
EpconLP
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
mvrpcz6
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
Global Landscapes Forum (GLF)
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Global Landscapes Forum (GLF)
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
Global Landscapes Forum (GLF)
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Global Landscapes Forum (GLF)
 

Recently uploaded (20)

Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
 
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
 

Case study wet ice blast technology for nuclear decontamination of surfaces 2001

  • 1. 4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com Nuclear Decontamination EnviroCare of Utah Salt Lake City, Utah Clive Facility July 2001 Application: Customer has 150 gondola type rails cars used to transport contaminated soil/debris to it’s facility in the Tooele Hazardous Industry District. Customer requested CIB demonstrate/test the ice blast process effectiveness in removing contaminated soil/dirt/debris from interior steel surfaces of transport rails car. Customer requires the cleaning process to remove surface contamination to meet or exceed the levels specified for “Return to Service” (RTS) purposes. Customer requires CIB to provide a completely portable/mobile equipment/set-up so that the system can be operated outside the “restricted area” and inside the “buffer zone”. The actual test cleaning is performed by the customers prime maintenance contractor inside the “New Rail Wash Station” facility, a controlled and restricted access area. Site Conditions/Set-up Parameters: Site conditions are on the outside range of CIB operating specifications for optimal performance of the ice blast process.  Ambient operating temperatures expected to exceed 100 F.  Extended length of ice/air delivery hose needed to reach test site from buffer zone.  Elevated water supply source, 85-90 F.  Water supply is excessively “hard” with a high TDS level.  Elevated supply air temperature, 150 F +. Test Summary: Customer performed several tests to determine the effectiveness of the ice blast process. The first test was to clean a square meter area and check for surface contamination residue. The customer spent approximately 10 minutes cleaning the 1 square meter area. A meter was used to check for background contamination and then a smear sample was taken to the customer’s lab for analysis. Results showed the ice blast process was effective. A second test was performed to see if a reduction in time spent would yield the same cleanliness level. A second square meter area was cleaned in approximately 5 minutes. Testing showed the level of surface contamination diminished but not to the level as the first test. COULSON ICE BLAST REDEFINING CLEAN
  • 2. 4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com Subsequent test cleaning revealed the entire surfaces of the rail car could be cleaned in approximately 6 hours elapsed time or 18 man-hours (customer employed 1 man to operate the blast nozzle, 1 man to tend the ice/air delivery hose and 1 man to supervise the operation). Previous efforts using high-pressure water blast could not achieve the same level of decontamination as ice blast. Grit blasting was also used prior to the ice blast process. Grit blasting exceeded the requirements for RTS but encumbered the cleaning process by requiring access holes to be cut in the sides of the rail cars for waste removal. Grit blasting also required the use of extensive personnel protective equipment (PPE) such as supplied air and two layers of covering garments for the work personnel. The first rail car cleaned using grit blasting exceeded 90 man-hours. The subsequent testing assessed the volume of waste generated during the ice blast process. Due to the elevated ambient temperature and the high evaporation point (low humidity) the water volume generated from the ice particle phase-change was nearly zero gallons. Recovery of residue from the cleaning process would be accomplished with HEPA filtered vacuum units. Addition benefits of the ice blast process directed the customer to reduce the level of PPE required for the blasting personnel. In lieu of multi-layered “rain gear”, a single “Tyvek” suit was used by the blasting personnel. This aided in reducing personnel fatigue due to excessive ambient heat. Supplied air blasting hoods were used at the time of the testing, which were available from the grit blasting operation, however it was determined that full face respirators could be used instead due to the low airborne readings obtained. Conclusion: CIB supplied and set-up a complete mobile ice blast system on the desert floor for the customer to perform test-cleaning/decontamination evaluation. The ice blast system ran for approximately 5 hours during the testing phases. The system was stopped and started several times so the customer could perform sample testing. The ice blast system performed within normal operating parameters even though the operating environment exceeded optimal operating conditions. The customer performed all test cleaning, test sampling and evaluations. A full report illustrating the test parameters and results is forthcoming from the customers Risk Manager. Customer is currently evaluating a proposal from CIB to implement two ice blast units for this cleaning/decontamination application. Upon acceptance of proposal CIB expects to deliver and install the ice blast systems by the end of August 2001.
  • 3. 4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com Picture 1: EnviroCare of Utah-Clive Facility. Picture 2: 150 Gondola type rail cars ready for decon and RTS.
  • 4. 4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com Picture 3: Entrance to decon facility. Picture 4: Mobile ice blast system inside buffer zone.
  • 5. 4890 Cherry Creek Road, Port Alberni, BC, Canada, Phn- (250)-724-7600 www.coulsoniceblast.com Picture 5: Rail car prior to ice blast. Picture 6: Rail car after ice blast..