The Petromax transportation case study details a project at a major Los Angeles refinery where 3,500 bbls of crude oil tank bottom sludge needed to be disposed of with minimal environmental impact. Using the Petromax process, the sludge was effectively conditioned and transported 400 miles to a sister refinery, resulting in significant cost savings of at least $362,000 and enhanced safety through improved waste handling. The project allowed for a quicker turnaround for tank reuse, showcasing the efficiency of the Petromax method in sludge management.