Case Study
How we solved an Earth-fault
(mal)Tripping that was causing complete
plant tripped
Routine Maintenance and Testing of the
various equipment's in the plant is one of
the most important jobs, which is usually
entrusted to experts. We are presenting
herewith a case which makes such activities
meaningful and can save the assets.
During these activities, one day, the
Engineer-in-Charge informed us that there
is a long-pending problem in LT PCC
Incomer Feeder, and whether we can solve
it. The Earth Fault element operated every
time the load increased beyond a certain
limit (but within TR limit). As it was a
continuous process plant, they had turned
off the Earth Fault protection and were
running the feeder without the Earth Fault
protection. They wanted to take this
protection in line.
In Derived type Earth Fault protection,
current to the relay is fed from the Phase
CTs only. From the available Phase currents,
relay calculates the residual current which
is represented as the Earth Fault current.
Hence, inside the relay, vector summation
of Phase currents (Ia, Ib & Ic) is carried out
and Earth Fault current (In) is derived.
Unbalancing in the three phase currents
can be due to unbalance loading condition
also.
www.systemprotection.in +91-265-2225137
We were appointed to carry out the routine
maintenance and testing of the
Switchgears, Relays, CTs & PTs in one of the
Continuous Process Plants in India.
Findings :
As per the EIC, the plant operated on low
loads and there was no evident fault (i.e.,
short circuit or considerable leakage).
Upon checking, Earth Fault protection was
found to be of Derived type.
Above vector sum is always zero in normal
condition. Hence, if the Earth Fault element
operates, it is understood that this
summation is non-zero, there is some
unbalancing in three phase currents, which
is higher than the adopted settings.
As the entire loading was 3-Ø and balanced,
there was no question of unbalancing.
As, it can be seen (Image 1) on the relay,
Current in the Neutral is around 610 A. Earth
Fault Pick-up was set at 400 A in the relay.
Hence, relay kept operating when it sensed
higher current. Phase CTs were having a
ratio of 4000/1 A and the Earth Fault
element was set at 400 A, i.e., 10 %.
Root Cause Analysis
The programming of the relay was found in
order. Tripping relays were assigned and
operated as per drawings.
The Relay was tested by secondary injection
method and found healthy.
The wiring to relay from CT and the CT links
were found alright. It was decided then to
check the CTs for its various characteristics.
Usually, for higher rating CTs, Primary
Injection at Site is done at comparatively
lower currents, due to size and weight
limitations posed by higher current -
injection kits. Besides, even if we somehow
manage to inject such heavy currents, it
does not usually lead to conclusive Ratio
Measurement. High currents generate
considerable heat in the injection cables
(due to I2t), which in turn results in
fluctuation of currents, as the cable
resistance keep on changing due to
heating. Moreover, measurement of such
large primary currents with Clamp-on Meter
is also a challenge.
So, we employed a state-of-the-art CT
Testing Instrument, CT Analyzer of Omicron
Make, which uses IEC 61869-2 standard and
performs model-based testing which is far
more accurate and conclusive.
www.systemprotection.in +91-265-2225137
The following are the results of Y Phase
CT :
CT Analyzer Test
Results for Y Phase
CT
We found that R and B Phase CTs were
having minor errors, but Y phase CT had a
ratio error of 50 % at rated burden. It
means, CT will act as it is having a ratio of
4000/0.5 A instead of 4000/1 A. Phase angle
error was also found to be -1574.06 min.
Due to high errors (Magnitude and Phase
angle) of Y Phase CT, relay mal-operated in
Earth Fault element.
The faulty CT was replaced with a new CT
after proper testing and wiring, the
Transformer was switched on and re-
commissioned with loading.
Conclusion – how
advanced technology
can help solve such
issues more
accurately
At times, routine test equipments, such as
Primary Injection Kit, do not provide the
conclusive results. It is likely that the fault in
the equipment may go unnoticed /
unchecked despite carrying out Routine
Testing.
Upgrading ourselves constantly with
advanced technology has always been at
the forefront for us, and we invest heavily in
such technology so that our Customers can
keep their protection systems safer and
more reliable.
Transformer is a very important asset, and
the loss of production due to mal-operation
of its protection system, can run into crores.
All our efforts are viewing the problems
from customers’ point and resolving them
in totality.
The above was in fact the major problem
found, we also observed some minor
abnormalities and corrected them too.
There could be many reasons for mal-
operation of Transformer Protection System
and can be addressed on case-to-case basis.
To know more, you may call/write to us.
And if you are looking for a dedicated
agency that understands the direct link
between your assets and your revenue,
call/write to us, we will be happy to assist
you.
www.systemprotection.in +91-265-2225137
CONTACT INFORMATION
301/2/306, Silverline Complex,Opposite BBC
Tower,Sayajigunj,Vadodara - 390 005,
Gujarat, India.
bdm@systemprotection.in
www.systemprotection.in
+91-265-2225137

More Related Content

What's hot

Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
Ashish Patel
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
SARAVANAN A
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
Power System Operation
 
311l testing procedure
311l testing procedure311l testing procedure
311l testing procedure
NASSAR KALLIKETTIYAPURAKAL
 
At&c losses and remedies
At&c losses and remediesAt&c losses and remedies
At&c losses and remedies
Sushant Kumar Sinha
 
UNSYMMETRICAL FAULTS IN POWER SYSTEM
UNSYMMETRICAL FAULTS IN POWER SYSTEMUNSYMMETRICAL FAULTS IN POWER SYSTEM
UNSYMMETRICAL FAULTS IN POWER SYSTEM
erramansaini1947
 
Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrent
michaeljmack
 
Hvdc system.pptx
Hvdc system.pptxHvdc system.pptx
Hvdc system.pptx
Ashfaque Yoosuf
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.
Geetesh Verma
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
Parth Patel
 
Ee 1351 power system analysis
Ee 1351 power system analysisEe 1351 power system analysis
Ee 1351 power system analysis
Hari Kumar
 
HVDC TRANSMISSION LINE PPT
HVDC TRANSMISSION LINE  PPTHVDC TRANSMISSION LINE  PPT
HVDC TRANSMISSION LINE PPT
Ashutosh kumar
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
Power System Operation
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
On load tap changer
On load tap changerOn load tap changer
On load tap changer
Sourabh sharma
 
Tap changer
Tap changerTap changer
Tap changer
vivek1292
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
michaeljmack
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
RajuMondal18
 

What's hot (20)

Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
311l testing procedure
311l testing procedure311l testing procedure
311l testing procedure
 
At&c losses and remedies
At&c losses and remediesAt&c losses and remedies
At&c losses and remedies
 
Duality concept
Duality conceptDuality concept
Duality concept
 
UNSYMMETRICAL FAULTS IN POWER SYSTEM
UNSYMMETRICAL FAULTS IN POWER SYSTEMUNSYMMETRICAL FAULTS IN POWER SYSTEM
UNSYMMETRICAL FAULTS IN POWER SYSTEM
 
Transformer overcurrent
Transformer overcurrentTransformer overcurrent
Transformer overcurrent
 
Hvdc system.pptx
Hvdc system.pptxHvdc system.pptx
Hvdc system.pptx
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
Ee 1351 power system analysis
Ee 1351 power system analysisEe 1351 power system analysis
Ee 1351 power system analysis
 
HVDC TRANSMISSION LINE PPT
HVDC TRANSMISSION LINE  PPTHVDC TRANSMISSION LINE  PPT
HVDC TRANSMISSION LINE PPT
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
On load tap changer
On load tap changerOn load tap changer
On load tap changer
 
Tap changer
Tap changerTap changer
Tap changer
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 

Similar to Case Study - How we solved an Earth-fault (mal)Tripping that was causing complete plant tripped

Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
System Protection
 
How we saved a Process Plant from break-down
How we saved a Process Plant from break-downHow we saved a Process Plant from break-down
How we saved a Process Plant from break-down
System Protection
 
Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance
Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and AdmittanceNebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance
Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance
TESCO - The Eastern Specialty Company
 
TESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the FieldTESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the Field
TESCO - The Eastern Specialty Company
 
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
TESCO - The Eastern Specialty Company
 
Ratio, Burden, Admittance Testing
Ratio, Burden, Admittance TestingRatio, Burden, Admittance Testing
Ratio, Burden, Admittance Testing
TESCO - The Eastern Specialty Company
 
Burden Testing, Theory, and Practice
Burden Testing, Theory, and PracticeBurden Testing, Theory, and Practice
Burden Testing, Theory, and Practice
TESCO - The Eastern Specialty Company
 
IRJET- Study Over Current Relay (MCGG53) Response using Matlab Model
IRJET- Study Over Current Relay (MCGG53) Response using Matlab ModelIRJET- Study Over Current Relay (MCGG53) Response using Matlab Model
IRJET- Study Over Current Relay (MCGG53) Response using Matlab Model
IRJET Journal
 
3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf
LiewChiaPing
 
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
ssuserb444c3
 
Apparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering StudentsApparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering Students
kannan348865
 
Ratio, Burden, and Admittance Testing
Ratio, Burden, and Admittance TestingRatio, Burden, and Admittance Testing
Ratio, Burden, and Admittance Testing
TESCO - The Eastern Specialty Company
 
CT Testing - Theory and Practice
CT Testing - Theory and PracticeCT Testing - Theory and Practice
CT Testing - Theory and Practice
TESCO - The Eastern Specialty Company
 
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
IRJET Journal
 
ECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and PracticeECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and Practice
TESCO - The Eastern Specialty Company
 
STATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYSSTATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYS
Dr. Rohit Babu
 
Get 8402
Get 8402Get 8402
Get 8402
rubendtp
 
Major faults in an alternator and their protection.
Major faults in an alternator and their protection.Major faults in an alternator and their protection.
Major faults in an alternator and their protection.
javid iqbal sodagar
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
MAHMOUDMOHAMED431205
 

Similar to Case Study - How we solved an Earth-fault (mal)Tripping that was causing complete plant tripped (20)

Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
 
How we saved a Process Plant from break-down
How we saved a Process Plant from break-downHow we saved a Process Plant from break-down
How we saved a Process Plant from break-down
 
Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance
Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and AdmittanceNebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance
Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance
 
TESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the FieldTESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the Field
 
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
 
Ratio, Burden, Admittance Testing
Ratio, Burden, Admittance TestingRatio, Burden, Admittance Testing
Ratio, Burden, Admittance Testing
 
Burden Testing, Theory, and Practice
Burden Testing, Theory, and PracticeBurden Testing, Theory, and Practice
Burden Testing, Theory, and Practice
 
IRJET- Study Over Current Relay (MCGG53) Response using Matlab Model
IRJET- Study Over Current Relay (MCGG53) Response using Matlab ModelIRJET- Study Over Current Relay (MCGG53) Response using Matlab Model
IRJET- Study Over Current Relay (MCGG53) Response using Matlab Model
 
3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf
 
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
4b. INSTRUMENT TRANSFORMER SELECTION GUIDES.ppt
 
Apparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering StudentsApparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering Students
 
Ratio, Burden, and Admittance Testing
Ratio, Burden, and Admittance TestingRatio, Burden, and Admittance Testing
Ratio, Burden, and Admittance Testing
 
CT Testing - Theory and Practice
CT Testing - Theory and PracticeCT Testing - Theory and Practice
CT Testing - Theory and Practice
 
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
 
ECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and PracticeECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and Practice
 
STATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYSSTATIC AND DIGITAL RELAYS
STATIC AND DIGITAL RELAYS
 
Get 8402
Get 8402Get 8402
Get 8402
 
Major faults in an alternator and their protection.
Major faults in an alternator and their protection.Major faults in an alternator and their protection.
Major faults in an alternator and their protection.
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 

More from System Protection

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54
System Protection
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
System Protection
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System Protection
System Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
System Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System Protection
System Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711
System Protection
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
System Protection
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016
System Protection
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)
System Protection
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
System Protection
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
System Protection
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
System Protection
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System Protection
System Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
System Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System Protection
System Protection
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...
System Protection
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!
System Protection
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
System Protection
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | Kyoritsu
System Protection
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | Kyoritsu
System Protection
 

More from System Protection (20)

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System Protection
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | Kyoritsu
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | Kyoritsu
 

Recently uploaded

Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
Allensmith572606
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 

Recently uploaded (20)

Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 

Case Study - How we solved an Earth-fault (mal)Tripping that was causing complete plant tripped

  • 1. www.systemprotection.in +91-265-2225137 ISO 9001:2015 ISO 45001:2015 (OH & S) Certified Company Case Study How we solved an Earth-fault (mal)Tripping that was causing complete plant tripped
  • 2. Routine Maintenance and Testing of the various equipment's in the plant is one of the most important jobs, which is usually entrusted to experts. We are presenting herewith a case which makes such activities meaningful and can save the assets. During these activities, one day, the Engineer-in-Charge informed us that there is a long-pending problem in LT PCC Incomer Feeder, and whether we can solve it. The Earth Fault element operated every time the load increased beyond a certain limit (but within TR limit). As it was a continuous process plant, they had turned off the Earth Fault protection and were running the feeder without the Earth Fault protection. They wanted to take this protection in line. In Derived type Earth Fault protection, current to the relay is fed from the Phase CTs only. From the available Phase currents, relay calculates the residual current which is represented as the Earth Fault current. Hence, inside the relay, vector summation of Phase currents (Ia, Ib & Ic) is carried out and Earth Fault current (In) is derived. Unbalancing in the three phase currents can be due to unbalance loading condition also. www.systemprotection.in +91-265-2225137 We were appointed to carry out the routine maintenance and testing of the Switchgears, Relays, CTs & PTs in one of the Continuous Process Plants in India. Findings : As per the EIC, the plant operated on low loads and there was no evident fault (i.e., short circuit or considerable leakage). Upon checking, Earth Fault protection was found to be of Derived type. Above vector sum is always zero in normal condition. Hence, if the Earth Fault element operates, it is understood that this summation is non-zero, there is some unbalancing in three phase currents, which is higher than the adopted settings. As the entire loading was 3-Ø and balanced, there was no question of unbalancing. As, it can be seen (Image 1) on the relay, Current in the Neutral is around 610 A. Earth Fault Pick-up was set at 400 A in the relay. Hence, relay kept operating when it sensed higher current. Phase CTs were having a ratio of 4000/1 A and the Earth Fault element was set at 400 A, i.e., 10 %. Root Cause Analysis The programming of the relay was found in order. Tripping relays were assigned and operated as per drawings. The Relay was tested by secondary injection method and found healthy. The wiring to relay from CT and the CT links were found alright. It was decided then to check the CTs for its various characteristics.
  • 3. Usually, for higher rating CTs, Primary Injection at Site is done at comparatively lower currents, due to size and weight limitations posed by higher current - injection kits. Besides, even if we somehow manage to inject such heavy currents, it does not usually lead to conclusive Ratio Measurement. High currents generate considerable heat in the injection cables (due to I2t), which in turn results in fluctuation of currents, as the cable resistance keep on changing due to heating. Moreover, measurement of such large primary currents with Clamp-on Meter is also a challenge. So, we employed a state-of-the-art CT Testing Instrument, CT Analyzer of Omicron Make, which uses IEC 61869-2 standard and performs model-based testing which is far more accurate and conclusive. www.systemprotection.in +91-265-2225137 The following are the results of Y Phase CT : CT Analyzer Test Results for Y Phase CT We found that R and B Phase CTs were having minor errors, but Y phase CT had a ratio error of 50 % at rated burden. It means, CT will act as it is having a ratio of 4000/0.5 A instead of 4000/1 A. Phase angle error was also found to be -1574.06 min. Due to high errors (Magnitude and Phase angle) of Y Phase CT, relay mal-operated in Earth Fault element. The faulty CT was replaced with a new CT after proper testing and wiring, the Transformer was switched on and re- commissioned with loading. Conclusion – how advanced technology can help solve such issues more accurately At times, routine test equipments, such as Primary Injection Kit, do not provide the conclusive results. It is likely that the fault in the equipment may go unnoticed / unchecked despite carrying out Routine Testing. Upgrading ourselves constantly with advanced technology has always been at the forefront for us, and we invest heavily in such technology so that our Customers can keep their protection systems safer and more reliable. Transformer is a very important asset, and the loss of production due to mal-operation of its protection system, can run into crores. All our efforts are viewing the problems from customers’ point and resolving them in totality.
  • 4. The above was in fact the major problem found, we also observed some minor abnormalities and corrected them too. There could be many reasons for mal- operation of Transformer Protection System and can be addressed on case-to-case basis. To know more, you may call/write to us. And if you are looking for a dedicated agency that understands the direct link between your assets and your revenue, call/write to us, we will be happy to assist you. www.systemprotection.in +91-265-2225137