10/02/2012 Slide 1
CT Testing:
Ratio, Burden, and Admittance
Prepared by Rob Reese,TESCO
for NREA MS 2017 – February 7, 2017
2
Agenda
1. What we will not cover!
-The Very Basics: meter forms and
self-contained vs. transformer rated
2. CT Functionality Basics
3. The Faceplate:
-Terminology and Specifications
4. Ratio Testing
5. Burden Testing
6. Admittance Testing
7. Demag Functions
8. Roundtable: What you do and why?
3
What is a CT?
“A current transformer (CT) is used for measurement of
alternating electric currents. Current transformers, together
with voltage (or potential) transformers (VT or PT), are
known as instrument transformers. When current in a
circuit is too high to apply directly to measuring
instruments, a current transformer produces a reduced
current accurately proportional to the current in the circuit,
which can be conveniently connected to measuring and
recording instruments. A current transformer isolates the
measuring instruments from what may be very high
voltage in the monitored circuit. Current transformers are
commonly used in metering and protective relays in the
electrical power industry.” - Wikipedia
4
What is a CT?
Equivalent Circuit w/ losses
Conceptual Picture of a CT
As current is applied in the primary, it produces a
magnetic flux in the core. This flux flows through
the core and induces a current in the secondary
windings and circuit that is proportional to the
number of turns.
5
Example Application
9S Meter Installation
5A
PHASE A
SOURCE
PHASE C
PHASE B
LOAD
400A
400A
400A
5A5A
6
Faceplate Specifications
7
Faceplate Specifications
Ratio
8
CT’s Ratio
For instance, a CT with a 400:5 ratio will produce
5A on the secondary, when 400A are applied to
the primary.
9
Faceplate Specifications
Thermal
factor
10
CT’s – Functions and Terminology
Thermal Rating factor
A value representing the amount by which the
primary current can be increased without
exceeding the allowable temperature rise.
For instance, a RF of 4.0 at 30° ambient on a
400:5 ratio CT would allow for a primary current
up to 1600A.
11
Faceplate Specifications
Accuracy Classifications
All CT’s fall within an accuracy class.
IEEE Standards have defined accuracy classes.
12
Faceplate Specifications
Burden
Rating
13
Burden Rating
The burden range, present in the secondary
circuit, that the manufacturer will guarantee their
CT’s will still accurately function, in regards to the
ratio specification.
14
Ratio Testing
Ratio of Primary Current to Secondary Current
5A
PHASE A
SOURCE LOAD
400A
400A
400A
5A5A
Calculate
Ratio
15
Burden Testing
Functionality with Burden Present on the
Secondary Loop
PHASE A
Some burden will always be
present – junctions, meter coils,
test switches, cables, etc.
CT’s must be able to maintain
an accurate ratio with burden on
the secondary.
16
Burden Testing
Functionality with Burden Present on the
Secondary Loop
PHASE A
Some burden will always be
present – junctions, meter coils,
test switches, cables, etc.
CT’s must be able to maintain
an accurate ratio with burden on
the secondary.
17
Burden Testing
Functionality with Burden Present on the
Secondary Loop
Example Burden Spec:
0.3% @ B0.1, B0.2, B0.5
or
There should be less than the 0.3%
change in secondary current from initial
(“0” burden) reading, when up to
0.5Ohms of burden is applied
18
Burden Testing
Functionality with Burden Present on the
Secondary Loop
ANSI Burden Values
0.1 Ohms
0.2 Ohms
0.5 Ohms
1 Ohms
2 Ohms
4 Ohms
8 Ohms
19
Burden Testing
0.0000
1.0000
2.0000
3.0000
4.0000
5.0000
6.0000
0 2 4 6 8
0.3% @ B0.1, B0.2, B0.5
Initial Reading = 5Amps
0.3% x 5A = 0.015A
5A – 0.015 = 4.985A
Burden Reading
0 5.0000
0.1 4.9999
0.2 4.9950
0.5 4.9900
1 4.9800
2 4.9500
4 4.0000
8 0.8000
20
Burden Testing
4.9500
4.9600
4.9700
4.9800
4.9900
5.0000
5.0100
5.0200
5.0300
5.0400
5.0500
0 0.2 0.4 0.6 0.8 1
0.3% @ B0.1, B0.2, B0.5
Initial Reading = 5Amps
0.3% x 5A = 0.015A
5A – 0.015 = 4.985A
At 0.5Ohms of Burden
the secondary current is
still at 4.990A – Less
than 0.3% change –
Good CT!
Burden Reading
0 5.0000
0.1 4.9999
0.2 4.9950
0.5 4.9900
1 4.9800
2 4.9500
4 4.0000
8 0.8000
21
Admittance Testing
What is Admittance?
Admittance testing measures the overall “health” of the
secondary loop of the CT.
Measured in units of MiliSiemens (mS)
Admittance is the inverse of impedance.
Impedance is the opposition to current.
Therefore, admittance testing measures the overall
“health” of the secondary loop of the CT.
22
Admittance Testing
Admittance testing devices inject an audio sine wave
signal into the secondary loop of the CT.
The resulting current is measured.
The voltage of the initial signal is known.
From these two parameters, the impedance, and thus
the admittance can be calculated.
23
Admittance Testing
Admittance test results are not immediately intuative.
Some analysis and interpretation is need.
What do all these mS values mean?
24
Admittance Testing
Three phase process is recommended.
1.Test each CT individually
2.Test the matched sets
3.Test over time
25
De-magnitization
CT’s can become magnitized, due to a number of reasons,
including leaving the shorting clip open, near lightning
strikes, and harmonic content.
CT’s can be demagnitized by slowly and smoothly increasing
the secondary resistance until saturation occurs, and then
slowly and smoothly decreasing the secondary resistance.
A resistance that will cause a secondary current reduction of
65% to 75% will typically put the CT into saturation.
*Some information has been taken from Radian Research’s Application Note 1109A: Admittance Testing Verifies CT Testing
Integrity
26
Roundtable
What CT testing is executed at your utility?
Do you test CT’s?
Do you choose not to?
What method(s) do you use?
Why?
27
Questions?
Please feel free to call or e-mail any questions
Rob Reese
Rob.Reese@TescoMeterManager.com 215-310-8809 (cell)
The Eastern Specialty Company

More Related Content

What's hot

Ac meters-part-1
Ac meters-part-1Ac meters-part-1
Ac meters-part-1
Auroral Flame
 
Voltmeter - Measurement and Instruments
Voltmeter - Measurement and InstrumentsVoltmeter - Measurement and Instruments
Voltmeter - Measurement and Instruments
Gowtham Cr
 
TESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and AdmittanceTESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and Admittance
TESCO - The Eastern Specialty Company
 
THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4
THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4
THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4
Karimi LordRamza
 
Voltmeter
VoltmeterVoltmeter
Voltmeter
vishal gupta
 
Communicating to Your Meters
Communicating to Your MetersCommunicating to Your Meters
Communicating to Your Meters
TESCO - The Eastern Specialty Company
 
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering FundamentalsTESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO - The Eastern Specialty Company
 
4. Test instruments and their connections
4. Test instruments and their connections4. Test instruments and their connections
4. Test instruments and their connections
sanewton
 
Analog & digital measuring instruments
Analog & digital measuring instrumentsAnalog & digital measuring instruments
Analog & digital measuring instruments
Ekalavya Group of Technologies
 
Outcome 2.3 identify appropriate electrical instruments for the measurement...
Outcome 2.3   identify appropriate electrical instruments for the measurement...Outcome 2.3   identify appropriate electrical instruments for the measurement...
Outcome 2.3 identify appropriate electrical instruments for the measurement...
sanewton
 
TESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & AccessoriesTESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & Accessories
TESCO - The Eastern Specialty Company
 
CSEC Physics Lab - IV Relationship of a filament lamp
CSEC Physics Lab - IV Relationship of a filament lampCSEC Physics Lab - IV Relationship of a filament lamp
CSEC Physics Lab - IV Relationship of a filament lamp
Ronaldo Degazon
 
Measurement of resistance
Measurement of resistanceMeasurement of resistance
Measurement of resistance
ANKUR GHEEWALA
 
Ohm's law
Ohm's lawOhm's law
Ac and dc meters and kirchoff's laws
Ac and dc meters and kirchoff's lawsAc and dc meters and kirchoff's laws
Ac and dc meters and kirchoff's laws
Nishkam Dhiman
 
Digital multimeter
Digital multimeterDigital multimeter
Digital multimeter
Vivek Pathak
 
Resistance measurement; DC bridges
Resistance measurement; DC bridgesResistance measurement; DC bridges
Resistance measurement; DC bridges
Dr Naim R Kidwai
 
Transducer and instrumentation lab manual
Transducer and instrumentation lab manual Transducer and instrumentation lab manual
Transducer and instrumentation lab manual
awais ahmad
 

What's hot (20)

Ac meters-part-1
Ac meters-part-1Ac meters-part-1
Ac meters-part-1
 
Voltmeter - Measurement and Instruments
Voltmeter - Measurement and InstrumentsVoltmeter - Measurement and Instruments
Voltmeter - Measurement and Instruments
 
TESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and AdmittanceTESCO Tuesday: Ratio, Burden and Admittance
TESCO Tuesday: Ratio, Burden and Admittance
 
THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4
THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4
THEVENIN’S THEOREM AND WHEATSTONE BRIDGE experiment 4
 
Voltmeter
VoltmeterVoltmeter
Voltmeter
 
Communicating to Your Meters
Communicating to Your MetersCommunicating to Your Meters
Communicating to Your Meters
 
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering FundamentalsTESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
TESCO Tuesday: Transformer-Rated & Self-Contained Metering Fundamentals
 
4. Test instruments and their connections
4. Test instruments and their connections4. Test instruments and their connections
4. Test instruments and their connections
 
Analog & digital measuring instruments
Analog & digital measuring instrumentsAnalog & digital measuring instruments
Analog & digital measuring instruments
 
Outcome 2.3 identify appropriate electrical instruments for the measurement...
Outcome 2.3   identify appropriate electrical instruments for the measurement...Outcome 2.3   identify appropriate electrical instruments for the measurement...
Outcome 2.3 identify appropriate electrical instruments for the measurement...
 
TESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & AccessoriesTESCO Tuesday: Test Switch Operation & Accessories
TESCO Tuesday: Test Switch Operation & Accessories
 
Lab report 2
Lab report 2Lab report 2
Lab report 2
 
Lab 4
Lab 4Lab 4
Lab 4
 
CSEC Physics Lab - IV Relationship of a filament lamp
CSEC Physics Lab - IV Relationship of a filament lampCSEC Physics Lab - IV Relationship of a filament lamp
CSEC Physics Lab - IV Relationship of a filament lamp
 
Measurement of resistance
Measurement of resistanceMeasurement of resistance
Measurement of resistance
 
Ohm's law
Ohm's lawOhm's law
Ohm's law
 
Ac and dc meters and kirchoff's laws
Ac and dc meters and kirchoff's lawsAc and dc meters and kirchoff's laws
Ac and dc meters and kirchoff's laws
 
Digital multimeter
Digital multimeterDigital multimeter
Digital multimeter
 
Resistance measurement; DC bridges
Resistance measurement; DC bridgesResistance measurement; DC bridges
Resistance measurement; DC bridges
 
Transducer and instrumentation lab manual
Transducer and instrumentation lab manual Transducer and instrumentation lab manual
Transducer and instrumentation lab manual
 

Viewers also liked

TechAdvantage 2017 Hot Socket Issues - Causes and Best Practices
TechAdvantage 2017 Hot Socket Issues - Causes and Best PracticesTechAdvantage 2017 Hot Socket Issues - Causes and Best Practices
TechAdvantage 2017 Hot Socket Issues - Causes and Best Practices
TESCO - The Eastern Specialty Company
 
Electric Vehicle Service Equipment (EVSE)
Electric Vehicle Service Equipment (EVSE)Electric Vehicle Service Equipment (EVSE)
Electric Vehicle Service Equipment (EVSE)
TESCO - The Eastern Specialty Company
 
ECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the FutureECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the Future
TESCO - The Eastern Specialty Company
 
Field Testing
Field TestingField Testing
Meter Asset Management at Coop's, IOU's, & Muni's
Meter Asset Management at Coop's, IOU's, & Muni'sMeter Asset Management at Coop's, IOU's, & Muni's
Meter Asset Management at Coop's, IOU's, & Muni's
TESCO - The Eastern Specialty Company
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
TESCO - The Eastern Specialty Company
 
Sema 2016- Managing Vendor Issues on AMI Design
Sema 2016- Managing Vendor Issues on AMI DesignSema 2016- Managing Vendor Issues on AMI Design
Sema 2016- Managing Vendor Issues on AMI Design
TESCO - The Eastern Specialty Company
 
Asset Tracking Systems for Meter Services
Asset Tracking Systems for Meter ServicesAsset Tracking Systems for Meter Services
Asset Tracking Systems for Meter Services
TESCO - The Eastern Specialty Company
 
SEMA 2016 - Managing Meter Shops of the Future
SEMA 2016 - Managing Meter Shops of the FutureSEMA 2016 - Managing Meter Shops of the Future
SEMA 2016 - Managing Meter Shops of the Future
TESCO - The Eastern Specialty Company
 
SEMA - 2016 Meter Farms, New Tools for AMR and AMI Meters
SEMA - 2016 Meter Farms, New Tools for AMR and AMI MetersSEMA - 2016 Meter Farms, New Tools for AMR and AMI Meters
SEMA - 2016 Meter Farms, New Tools for AMR and AMI Meters
TESCO - The Eastern Specialty Company
 
SEMA 2016 - AMI Certification Before, During and After Deployment
SEMA 2016 - AMI Certification Before, During and After DeploymentSEMA 2016 - AMI Certification Before, During and After Deployment
SEMA 2016 - AMI Certification Before, During and After Deployment
TESCO - The Eastern Specialty Company
 
SEMA 2016 - Introduction to Transformer Rated Metering
SEMA 2016 -  Introduction to Transformer Rated MeteringSEMA 2016 -  Introduction to Transformer Rated Metering
SEMA 2016 - Introduction to Transformer Rated Metering
TESCO - The Eastern Specialty Company
 
Il vero "problema" del web - Matteo Flora
Il vero "problema" del web - Matteo FloraIl vero "problema" del web - Matteo Flora
Il vero "problema" del web - Matteo Flora
Matteo Flora
 
History of Electric Metering
History of Electric MeteringHistory of Electric Metering
History of Electric Metering
TESCO - The Eastern Specialty Company
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving Cars
LinkedIn
 
UX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and ArchivesUX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and Archives
Ned Potter
 
Designing Teams for Emerging Challenges
Designing Teams for Emerging ChallengesDesigning Teams for Emerging Challenges
Designing Teams for Emerging Challenges
Aaron Irizarry
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
Seth Familian
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
Drift
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
Leslie Samuel
 

Viewers also liked (20)

TechAdvantage 2017 Hot Socket Issues - Causes and Best Practices
TechAdvantage 2017 Hot Socket Issues - Causes and Best PracticesTechAdvantage 2017 Hot Socket Issues - Causes and Best Practices
TechAdvantage 2017 Hot Socket Issues - Causes and Best Practices
 
Electric Vehicle Service Equipment (EVSE)
Electric Vehicle Service Equipment (EVSE)Electric Vehicle Service Equipment (EVSE)
Electric Vehicle Service Equipment (EVSE)
 
ECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the FutureECNC 2016 - Managing Meter Shops of the Future
ECNC 2016 - Managing Meter Shops of the Future
 
Field Testing
Field TestingField Testing
Field Testing
 
Meter Asset Management at Coop's, IOU's, & Muni's
Meter Asset Management at Coop's, IOU's, & Muni'sMeter Asset Management at Coop's, IOU's, & Muni's
Meter Asset Management at Coop's, IOU's, & Muni's
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Sema 2016- Managing Vendor Issues on AMI Design
Sema 2016- Managing Vendor Issues on AMI DesignSema 2016- Managing Vendor Issues on AMI Design
Sema 2016- Managing Vendor Issues on AMI Design
 
Asset Tracking Systems for Meter Services
Asset Tracking Systems for Meter ServicesAsset Tracking Systems for Meter Services
Asset Tracking Systems for Meter Services
 
SEMA 2016 - Managing Meter Shops of the Future
SEMA 2016 - Managing Meter Shops of the FutureSEMA 2016 - Managing Meter Shops of the Future
SEMA 2016 - Managing Meter Shops of the Future
 
SEMA - 2016 Meter Farms, New Tools for AMR and AMI Meters
SEMA - 2016 Meter Farms, New Tools for AMR and AMI MetersSEMA - 2016 Meter Farms, New Tools for AMR and AMI Meters
SEMA - 2016 Meter Farms, New Tools for AMR and AMI Meters
 
SEMA 2016 - AMI Certification Before, During and After Deployment
SEMA 2016 - AMI Certification Before, During and After DeploymentSEMA 2016 - AMI Certification Before, During and After Deployment
SEMA 2016 - AMI Certification Before, During and After Deployment
 
SEMA 2016 - Introduction to Transformer Rated Metering
SEMA 2016 -  Introduction to Transformer Rated MeteringSEMA 2016 -  Introduction to Transformer Rated Metering
SEMA 2016 - Introduction to Transformer Rated Metering
 
Il vero "problema" del web - Matteo Flora
Il vero "problema" del web - Matteo FloraIl vero "problema" del web - Matteo Flora
Il vero "problema" del web - Matteo Flora
 
History of Electric Metering
History of Electric MeteringHistory of Electric Metering
History of Electric Metering
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving Cars
 
UX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and ArchivesUX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and Archives
 
Designing Teams for Emerging Challenges
Designing Teams for Emerging ChallengesDesigning Teams for Emerging Challenges
Designing Teams for Emerging Challenges
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Similar to Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance

Ratio Burden Admittance Testing
Ratio Burden Admittance TestingRatio Burden Admittance Testing
Ratio Burden Admittance Testing
TESCO - The Eastern Specialty Company
 
CT Testing - Theory and Practice.pptx
CT Testing - Theory and Practice.pptxCT Testing - Theory and Practice.pptx
CT Testing - Theory and Practice.pptx
TESCO - The Eastern Specialty Company
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
TESCO - The Eastern Specialty Company
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
TESCO - The Eastern Specialty Company
 
ECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and PracticeECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and Practice
TESCO - The Eastern Specialty Company
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
Parth Patel
 
Introduction to Instrument Transformers
Introduction to Instrument TransformersIntroduction to Instrument Transformers
Introduction to Instrument Transformers
TESCO - The Eastern Specialty Company
 
Current transformer (ct)
Current transformer (ct)Current transformer (ct)
Current transformer (ct)
Jay Ranvir
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
MAHMOUDMOHAMED431205
 
CT Burden Testing
CT Burden TestingCT Burden Testing
CT Testing - Theory and Practice
CT Testing - Theory and PracticeCT Testing - Theory and Practice
CT Testing - Theory and Practice
TESCO - The Eastern Specialty Company
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
TESCO - The Eastern Specialty Company
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
TESCO - The Eastern Specialty Company
 
Complete Site Testing
Complete Site TestingComplete Site Testing
Apparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering StudentsApparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering Students
kannan348865
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
TESCO - The Eastern Specialty Company
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-enSuresh Patil
 
Complete Site Testing
Complete Site TestingComplete Site Testing
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Md Irshad Ahmad
 
Lecture (11.11.22).pptx
Lecture (11.11.22).pptxLecture (11.11.22).pptx
Lecture (11.11.22).pptx
SahdevChandraSwarnak
 

Similar to Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance (20)

Ratio Burden Admittance Testing
Ratio Burden Admittance TestingRatio Burden Admittance Testing
Ratio Burden Admittance Testing
 
CT Testing - Theory and Practice.pptx
CT Testing - Theory and Practice.pptxCT Testing - Theory and Practice.pptx
CT Testing - Theory and Practice.pptx
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
 
Current Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden TestingCurrent Transformers: Ratio & Burden Testing
Current Transformers: Ratio & Burden Testing
 
ECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and PracticeECNE - Spring 2017 CT Theory and Practice
ECNE - Spring 2017 CT Theory and Practice
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
Introduction to Instrument Transformers
Introduction to Instrument TransformersIntroduction to Instrument Transformers
Introduction to Instrument Transformers
 
Current transformer (ct)
Current transformer (ct)Current transformer (ct)
Current transformer (ct)
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
CT Burden Testing
CT Burden TestingCT Burden Testing
CT Burden Testing
 
CT Testing - Theory and Practice
CT Testing - Theory and PracticeCT Testing - Theory and Practice
CT Testing - Theory and Practice
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
Complete Site Testing
Complete Site TestingComplete Site Testing
Complete Site Testing
 
Apparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering StudentsApparatus Protection Using Relays for Engineering Students
Apparatus Protection Using Relays for Engineering Students
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 
Complete Site Testing
Complete Site TestingComplete Site Testing
Complete Site Testing
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
 
Lecture (11.11.22).pptx
Lecture (11.11.22).pptxLecture (11.11.22).pptx
Lecture (11.11.22).pptx
 

Recently uploaded

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
aozcue
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
peuce
 
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Peter Gallagher
 
web-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jerweb-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jer
freshgammer09
 
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
aozcue
 
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
PinkySharma900491
 
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
andreassenrolf537
 

Recently uploaded (7)

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
 
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
 
web-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jerweb-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jer
 
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
 
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
 
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
 

Nebraska Meter Conference 2017 - CT Testing - Ratio, Burden, and Admittance

  • 1. 1 10/02/2012 Slide 1 CT Testing: Ratio, Burden, and Admittance Prepared by Rob Reese,TESCO for NREA MS 2017 – February 7, 2017
  • 2. 2 Agenda 1. What we will not cover! -The Very Basics: meter forms and self-contained vs. transformer rated 2. CT Functionality Basics 3. The Faceplate: -Terminology and Specifications 4. Ratio Testing 5. Burden Testing 6. Admittance Testing 7. Demag Functions 8. Roundtable: What you do and why?
  • 3. 3 What is a CT? “A current transformer (CT) is used for measurement of alternating electric currents. Current transformers, together with voltage (or potential) transformers (VT or PT), are known as instrument transformers. When current in a circuit is too high to apply directly to measuring instruments, a current transformer produces a reduced current accurately proportional to the current in the circuit, which can be conveniently connected to measuring and recording instruments. A current transformer isolates the measuring instruments from what may be very high voltage in the monitored circuit. Current transformers are commonly used in metering and protective relays in the electrical power industry.” - Wikipedia
  • 4. 4 What is a CT? Equivalent Circuit w/ losses Conceptual Picture of a CT As current is applied in the primary, it produces a magnetic flux in the core. This flux flows through the core and induces a current in the secondary windings and circuit that is proportional to the number of turns.
  • 5. 5 Example Application 9S Meter Installation 5A PHASE A SOURCE PHASE C PHASE B LOAD 400A 400A 400A 5A5A
  • 8. 8 CT’s Ratio For instance, a CT with a 400:5 ratio will produce 5A on the secondary, when 400A are applied to the primary.
  • 10. 10 CT’s – Functions and Terminology Thermal Rating factor A value representing the amount by which the primary current can be increased without exceeding the allowable temperature rise. For instance, a RF of 4.0 at 30° ambient on a 400:5 ratio CT would allow for a primary current up to 1600A.
  • 11. 11 Faceplate Specifications Accuracy Classifications All CT’s fall within an accuracy class. IEEE Standards have defined accuracy classes.
  • 13. 13 Burden Rating The burden range, present in the secondary circuit, that the manufacturer will guarantee their CT’s will still accurately function, in regards to the ratio specification.
  • 14. 14 Ratio Testing Ratio of Primary Current to Secondary Current 5A PHASE A SOURCE LOAD 400A 400A 400A 5A5A Calculate Ratio
  • 15. 15 Burden Testing Functionality with Burden Present on the Secondary Loop PHASE A Some burden will always be present – junctions, meter coils, test switches, cables, etc. CT’s must be able to maintain an accurate ratio with burden on the secondary.
  • 16. 16 Burden Testing Functionality with Burden Present on the Secondary Loop PHASE A Some burden will always be present – junctions, meter coils, test switches, cables, etc. CT’s must be able to maintain an accurate ratio with burden on the secondary.
  • 17. 17 Burden Testing Functionality with Burden Present on the Secondary Loop Example Burden Spec: 0.3% @ B0.1, B0.2, B0.5 or There should be less than the 0.3% change in secondary current from initial (“0” burden) reading, when up to 0.5Ohms of burden is applied
  • 18. 18 Burden Testing Functionality with Burden Present on the Secondary Loop ANSI Burden Values 0.1 Ohms 0.2 Ohms 0.5 Ohms 1 Ohms 2 Ohms 4 Ohms 8 Ohms
  • 19. 19 Burden Testing 0.0000 1.0000 2.0000 3.0000 4.0000 5.0000 6.0000 0 2 4 6 8 0.3% @ B0.1, B0.2, B0.5 Initial Reading = 5Amps 0.3% x 5A = 0.015A 5A – 0.015 = 4.985A Burden Reading 0 5.0000 0.1 4.9999 0.2 4.9950 0.5 4.9900 1 4.9800 2 4.9500 4 4.0000 8 0.8000
  • 20. 20 Burden Testing 4.9500 4.9600 4.9700 4.9800 4.9900 5.0000 5.0100 5.0200 5.0300 5.0400 5.0500 0 0.2 0.4 0.6 0.8 1 0.3% @ B0.1, B0.2, B0.5 Initial Reading = 5Amps 0.3% x 5A = 0.015A 5A – 0.015 = 4.985A At 0.5Ohms of Burden the secondary current is still at 4.990A – Less than 0.3% change – Good CT! Burden Reading 0 5.0000 0.1 4.9999 0.2 4.9950 0.5 4.9900 1 4.9800 2 4.9500 4 4.0000 8 0.8000
  • 21. 21 Admittance Testing What is Admittance? Admittance testing measures the overall “health” of the secondary loop of the CT. Measured in units of MiliSiemens (mS) Admittance is the inverse of impedance. Impedance is the opposition to current. Therefore, admittance testing measures the overall “health” of the secondary loop of the CT.
  • 22. 22 Admittance Testing Admittance testing devices inject an audio sine wave signal into the secondary loop of the CT. The resulting current is measured. The voltage of the initial signal is known. From these two parameters, the impedance, and thus the admittance can be calculated.
  • 23. 23 Admittance Testing Admittance test results are not immediately intuative. Some analysis and interpretation is need. What do all these mS values mean?
  • 24. 24 Admittance Testing Three phase process is recommended. 1.Test each CT individually 2.Test the matched sets 3.Test over time
  • 25. 25 De-magnitization CT’s can become magnitized, due to a number of reasons, including leaving the shorting clip open, near lightning strikes, and harmonic content. CT’s can be demagnitized by slowly and smoothly increasing the secondary resistance until saturation occurs, and then slowly and smoothly decreasing the secondary resistance. A resistance that will cause a secondary current reduction of 65% to 75% will typically put the CT into saturation. *Some information has been taken from Radian Research’s Application Note 1109A: Admittance Testing Verifies CT Testing Integrity
  • 26. 26 Roundtable What CT testing is executed at your utility? Do you test CT’s? Do you choose not to? What method(s) do you use? Why?
  • 27. 27 Questions? Please feel free to call or e-mail any questions Rob Reese Rob.Reese@TescoMeterManager.com 215-310-8809 (cell) The Eastern Specialty Company