Case Study - How we solved an Earth-fault (mal)Tripping that was causing
tripping of complete plant
Background
outine Maintenance and Testing of the various equipments in the plant is one of the most
important jobs, which is usually entrusted to experts. We are presenting herewith a case which
makes such activities meaningful and can save the assets.
We were appointed to carry out the routine maintenance and testing of the Switchgears,
Relays, CTs & PTs in one of the Continuous Process Plants in India.
During these activities, one day, the Engineer-in-Charge informed us that there is a long-
pending problem in LT PCC Incomer Feeder, and whether we can solve it. The Earth Fault
element operated every time the load increased beyond a certain limit (but within TR limit). As
it was a continuous process plant, they had turned off the Earth Fault protection and were
running the feeder without the Earth Fault protection. They wanted to take this protection in
line.
Findings
As per the EIC, the plant operated on low loads and there was no evident fault (i.e., short circuit
or considerable leakage).
Upon checking, Earth Fault protection was found to be of Derived type.
- In Derived type Earth Fault protection, current to the relay is fed from the Phase CTs
only. From the available Phase currents, relay calculates the residual current which is
represented as the Earth Fault current. Hence, inside the relay, vector summation of
Phase currents (Ia, Ib & Ic) is carried out and Earth Fault current (In) is derived.
+ + =
- Above vector sum is always zero in normal condition. Hence, if the Earth Fault element
operates, it is understood that this summation is non-zero, there is some unbalancing in
three phase currents, which is higher than the adopted settings.
Unbalancing in the three phase currents can be due to unbalance loading condition also.
As the entire loading was 3-Ø and balanced, there was no question of unbalancing.
R
Page | 2
Authorised Channel Partners
As, it can be seen (Image 1) on the relay, Current in the Neutral is around 610 A. Earth Fault
Pick-up was set at 400 A in the relay. Hence, relay kept operating when it sensed higher current.
Phase CTs were having a ratio of 4000/1 A and the Earth Fault element was set at 400 A, i.e., 10
%.
Root Cause Analysis
- The programming of the relay was found in order. Tripping relays were assigned and
operated as per drawings.
- The Relay was tested by secondary injection method and found healthy.
- The wiring to relay from CT and the CT links were found alright. It was decided then to
check the CTs for its various characteristics.
Image 1 : Actual Relay Measurement
Page | 3
Authorised Channel Partners
Usually, for higher rating CTs, Primary Injection at Site is done at comparatively lower
currents, due to size and weight limitations posed by higher current -injection kits.
Besides, even if we somehow manage to inject such heavy currents, it does not usually
lead to conclusive Ratio Measurement. High currents generate considerable heat in the
injection cables (due to I2
t), which in turn results in fluctuation of currents, as the cable
resistance keep on changing due to heating. Moreover, measurement of such large
primary currents with Clamp-on Meter is also a challenge.
- So, we employed a state-of-the-art CT Testing Instrument, CT Analyzer of Omicron Make,
which uses IEC 61869-2 standard and performs model-based testing which is far more
accurate and conclusive.
The following are the results of Y Phase CT :
Image 2 : Omicron CT Analyzer Test Results for Y Phase CT
- We found that R and B Phase CTs were having minor errors, but Y phase CT had a ratio
error of 50 % at rated burden. It means, CT will act as it is having a ratio of 4000/0.5 A
instead of 4000/1 A. Phase angle error was also found to be -1574.06 min.
- Due to high errors (Magnitude and Phase angle) of Y Phase CT, relay mal-operated in
Earth Fault element.
- The faulty CT was replaced with a new CT after proper testing and wiring, the
Transformer was switched on and re-commissioned with loading.
Page | 4
Authorised Channel Partners
Conclusion – how advanced technology can help solve such issues more accurately
- At times, routine test equipments, such as Primary Injection Kit, do not provide the
conclusive results. It is likely that the fault in the equipment may go unnoticed /
unchecked despite carrying out Routine Testing.
- Upgrading ourselves constantly with advanced technology has always been at the
forefront for us, and we invest heavily in such technology so that our Customers can keep
their protection systems safer and more reliable.
- Transformer is a very important asset, and the loss of production due to mal-operation of
its protection system, can run into crores. All our efforts are viewing the problems from
customers’ point and resolving them in totality.
- The above was in fact the major problem found, we also observed some minor
abnormalities and corrected them too. There could be many reasons for mal-operation
of Transformer Protection System and can be addressed on case-to-case basis. To know
more, you may call/write to us.
And if you are looking for a dedicated agency that understands the direct link between
your assets and your revenue, call/write to us, we will be happy to assist you.
SYSTEM PROTECTION
E-Mail : bdm@systemprotection.in
Web : www.systemprotection.in
Tele : +91-265-2225137
(Servicing & Testing of Circuit Breaker,
Relay, CT, PT, Transformer, Other
Switchyard Equipment’s, Relay Co-
ordination Studies, Cable, etc.)

More Related Content

What's hot

Continuity of Supply means Continuity of Production
Continuity of Supply means Continuity of ProductionContinuity of Supply means Continuity of Production
Continuity of Supply means Continuity of ProductionRusty Roar Enterprises
 
Basics of protective relaying in power system
Basics of protective relaying in power systemBasics of protective relaying in power system
Basics of protective relaying in power systemSystem Protection
 
Store.selectbreakers.com - Siemens circuit breaker mounting hardware
Store.selectbreakers.com - Siemens circuit breaker mounting hardwareStore.selectbreakers.com - Siemens circuit breaker mounting hardware
Store.selectbreakers.com - Siemens circuit breaker mounting hardwareselectbreakers
 
Store.selectbreakers.com - Siemens circuit breaker mounting hardware
Store.selectbreakers.com  - Siemens circuit breaker mounting hardwareStore.selectbreakers.com  - Siemens circuit breaker mounting hardware
Store.selectbreakers.com - Siemens circuit breaker mounting hardwareselectbreakers
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyNSW Environment and Planning
 
CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 Ahmed Jaffar
 
Agilent E3611A
Agilent  E3611AAgilent  E3611A
Agilent E3611Asavomir
 
A high gain input parallel output-series dcdc converter with dual coupled ind...
A high gain input parallel output-series dcdc converter with dual coupled ind...A high gain input parallel output-series dcdc converter with dual coupled ind...
A high gain input parallel output-series dcdc converter with dual coupled ind...LeMeniz Infotech
 
peter cv october 2016 CV
peter cv october 2016 CVpeter cv october 2016 CV
peter cv october 2016 CVpeter thomson
 
A high gain input parallel output-series dc dc converter with dual coupled in...
A high gain input parallel output-series dc dc converter with dual coupled in...A high gain input parallel output-series dc dc converter with dual coupled in...
A high gain input parallel output-series dc dc converter with dual coupled in...I3E Technologies
 
Intro to Switchgear and its working
Intro to Switchgear and its workingIntro to Switchgear and its working
Intro to Switchgear and its workingGhafoorEngineering
 
Vinesh A - Power System
Vinesh A - Power SystemVinesh A - Power System
Vinesh A - Power Systemvingrt
 

What's hot (18)

Continuity of Supply means Continuity of Production
Continuity of Supply means Continuity of ProductionContinuity of Supply means Continuity of Production
Continuity of Supply means Continuity of Production
 
Basics of protective relaying in power system
Basics of protective relaying in power systemBasics of protective relaying in power system
Basics of protective relaying in power system
 
Store.selectbreakers.com - Siemens circuit breaker mounting hardware
Store.selectbreakers.com - Siemens circuit breaker mounting hardwareStore.selectbreakers.com - Siemens circuit breaker mounting hardware
Store.selectbreakers.com - Siemens circuit breaker mounting hardware
 
Store.selectbreakers.com - Siemens circuit breaker mounting hardware
Store.selectbreakers.com  - Siemens circuit breaker mounting hardwareStore.selectbreakers.com  - Siemens circuit breaker mounting hardware
Store.selectbreakers.com - Siemens circuit breaker mounting hardware
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17
 
SENTHIL.k RESUME
SENTHIL.k RESUMESENTHIL.k RESUME
SENTHIL.k RESUME
 
Before and After Power Conditioner
Before and After Power ConditionerBefore and After Power Conditioner
Before and After Power Conditioner
 
Agilent E3611A
Agilent  E3611AAgilent  E3611A
Agilent E3611A
 
CV_Parulkar
CV_ParulkarCV_Parulkar
CV_Parulkar
 
A high gain input parallel output-series dcdc converter with dual coupled ind...
A high gain input parallel output-series dcdc converter with dual coupled ind...A high gain input parallel output-series dcdc converter with dual coupled ind...
A high gain input parallel output-series dcdc converter with dual coupled ind...
 
Resume
ResumeResume
Resume
 
Rotatingelectrics
RotatingelectricsRotatingelectrics
Rotatingelectrics
 
peter cv october 2016 CV
peter cv october 2016 CVpeter cv october 2016 CV
peter cv october 2016 CV
 
A high gain input parallel output-series dc dc converter with dual coupled in...
A high gain input parallel output-series dc dc converter with dual coupled in...A high gain input parallel output-series dc dc converter with dual coupled in...
A high gain input parallel output-series dc dc converter with dual coupled in...
 
Intro to Switchgear and its working
Intro to Switchgear and its workingIntro to Switchgear and its working
Intro to Switchgear and its working
 
Vinesh A - Power System
Vinesh A - Power SystemVinesh A - Power System
Vinesh A - Power System
 
muhammad Usman CV
muhammad Usman CVmuhammad Usman CV
muhammad Usman CV
 

Similar to How Advanced CT Testing Solved Earth Fault Tripping

Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueSystem Protection
 
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...TESCO - The Eastern Specialty Company
 
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...IRJET Journal
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"Teja venkat
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...TESCO - The Eastern Specialty Company
 
Remediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazardRemediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazardIJAPEJOURNAL
 
IRJET- Enhancement of Power Quality using DPFC
IRJET-  	  Enhancement of Power Quality using DPFCIRJET-  	  Enhancement of Power Quality using DPFC
IRJET- Enhancement of Power Quality using DPFCIRJET Journal
 
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET Journal
 
Nuisance tripping of circuit breakers
Nuisance tripping of circuit breakersNuisance tripping of circuit breakers
Nuisance tripping of circuit breakersLeonardo ENERGY
 
Nuisance Tripping - True RMS Measurements
Nuisance Tripping - True RMS MeasurementsNuisance Tripping - True RMS Measurements
Nuisance Tripping - True RMS MeasurementsLeonardo ENERGY
 
Simulation of DVR for power Quality Improvement by using Ultra Capacitor
Simulation of DVR for power Quality Improvement by using Ultra CapacitorSimulation of DVR for power Quality Improvement by using Ultra Capacitor
Simulation of DVR for power Quality Improvement by using Ultra CapacitorIRJET Journal
 
Monitoring of Distribution Transformer Parameters Using Plc
Monitoring of Distribution Transformer Parameters Using PlcMonitoring of Distribution Transformer Parameters Using Plc
Monitoring of Distribution Transformer Parameters Using PlcIRJET Journal
 
ETAP Training.pptx
ETAP Training.pptxETAP Training.pptx
ETAP Training.pptxHoshangs
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...IRJET Journal
 
Basics Of Energy Matering And Fraud Detection
Basics Of Energy Matering And Fraud DetectionBasics Of Energy Matering And Fraud Detection
Basics Of Energy Matering And Fraud DetectionAbhisek Swain
 

Similar to How Advanced CT Testing Solved Earth Fault Tripping (20)

Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenue
 
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
Instrument Transformers - Following the Money: Best Practices in a Post AMI W...
 
TESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the FieldTESCO Tuesday: Meter Testing in the Field
TESCO Tuesday: Meter Testing in the Field
 
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
Mitigation of Voltage Sags & Swells in LV Distribution System Using Dynamic V...
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
Field Test Kits and Hot Socket Repair Kits
Field Test Kits and Hot Socket Repair KitsField Test Kits and Hot Socket Repair Kits
Field Test Kits and Hot Socket Repair Kits
 
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
 
Remediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazardRemediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazard
 
IRJET- Enhancement of Power Quality using DPFC
IRJET-  	  Enhancement of Power Quality using DPFCIRJET-  	  Enhancement of Power Quality using DPFC
IRJET- Enhancement of Power Quality using DPFC
 
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
 
Nuisance tripping of circuit breakers
Nuisance tripping of circuit breakersNuisance tripping of circuit breakers
Nuisance tripping of circuit breakers
 
Nuisance Tripping - True RMS Measurements
Nuisance Tripping - True RMS MeasurementsNuisance Tripping - True RMS Measurements
Nuisance Tripping - True RMS Measurements
 
Simulation of DVR for power Quality Improvement by using Ultra Capacitor
Simulation of DVR for power Quality Improvement by using Ultra CapacitorSimulation of DVR for power Quality Improvement by using Ultra Capacitor
Simulation of DVR for power Quality Improvement by using Ultra Capacitor
 
Monitoring of Distribution Transformer Parameters Using Plc
Monitoring of Distribution Transformer Parameters Using PlcMonitoring of Distribution Transformer Parameters Using Plc
Monitoring of Distribution Transformer Parameters Using Plc
 
ETAP Training.pptx
ETAP Training.pptxETAP Training.pptx
ETAP Training.pptx
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...IRJET-  	  A Unique Methodology for Transmission Line Breakage Detection and ...
IRJET- A Unique Methodology for Transmission Line Breakage Detection and ...
 
Basics Of Energy Matering And Fraud Detection
Basics Of Energy Matering And Fraud DetectionBasics Of Energy Matering And Fraud Detection
Basics Of Energy Matering And Fraud Detection
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenance
 

More from System Protection

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54System Protection
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsSystem Protection
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionSystem Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionSystem Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionSystem Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711System Protection
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingSystem Protection
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016System Protection
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)System Protection
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatSystem Protection
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSystem Protection
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSystem Protection
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionSystem Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionSystem Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionSystem Protection
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!System Protection
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuDigital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuSystem Protection
 

More from System Protection (20)

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System Protection
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | Kyoritsu
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | Kyoritsu
 
Digital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuDigital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | Kyoritsu
 

Recently uploaded

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCRsoniya singh
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 

Recently uploaded (20)

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 

How Advanced CT Testing Solved Earth Fault Tripping

  • 1. Page | 1 Authorised Channel Partners Case Study - How we solved an Earth-fault (mal)Tripping that was causing tripping of complete plant Background outine Maintenance and Testing of the various equipments in the plant is one of the most important jobs, which is usually entrusted to experts. We are presenting herewith a case which makes such activities meaningful and can save the assets. We were appointed to carry out the routine maintenance and testing of the Switchgears, Relays, CTs & PTs in one of the Continuous Process Plants in India. During these activities, one day, the Engineer-in-Charge informed us that there is a long- pending problem in LT PCC Incomer Feeder, and whether we can solve it. The Earth Fault element operated every time the load increased beyond a certain limit (but within TR limit). As it was a continuous process plant, they had turned off the Earth Fault protection and were running the feeder without the Earth Fault protection. They wanted to take this protection in line. Findings As per the EIC, the plant operated on low loads and there was no evident fault (i.e., short circuit or considerable leakage). Upon checking, Earth Fault protection was found to be of Derived type. - In Derived type Earth Fault protection, current to the relay is fed from the Phase CTs only. From the available Phase currents, relay calculates the residual current which is represented as the Earth Fault current. Hence, inside the relay, vector summation of Phase currents (Ia, Ib & Ic) is carried out and Earth Fault current (In) is derived. + + = - Above vector sum is always zero in normal condition. Hence, if the Earth Fault element operates, it is understood that this summation is non-zero, there is some unbalancing in three phase currents, which is higher than the adopted settings. Unbalancing in the three phase currents can be due to unbalance loading condition also. As the entire loading was 3-Ø and balanced, there was no question of unbalancing. R
  • 2. Page | 2 Authorised Channel Partners As, it can be seen (Image 1) on the relay, Current in the Neutral is around 610 A. Earth Fault Pick-up was set at 400 A in the relay. Hence, relay kept operating when it sensed higher current. Phase CTs were having a ratio of 4000/1 A and the Earth Fault element was set at 400 A, i.e., 10 %. Root Cause Analysis - The programming of the relay was found in order. Tripping relays were assigned and operated as per drawings. - The Relay was tested by secondary injection method and found healthy. - The wiring to relay from CT and the CT links were found alright. It was decided then to check the CTs for its various characteristics. Image 1 : Actual Relay Measurement
  • 3. Page | 3 Authorised Channel Partners Usually, for higher rating CTs, Primary Injection at Site is done at comparatively lower currents, due to size and weight limitations posed by higher current -injection kits. Besides, even if we somehow manage to inject such heavy currents, it does not usually lead to conclusive Ratio Measurement. High currents generate considerable heat in the injection cables (due to I2 t), which in turn results in fluctuation of currents, as the cable resistance keep on changing due to heating. Moreover, measurement of such large primary currents with Clamp-on Meter is also a challenge. - So, we employed a state-of-the-art CT Testing Instrument, CT Analyzer of Omicron Make, which uses IEC 61869-2 standard and performs model-based testing which is far more accurate and conclusive. The following are the results of Y Phase CT : Image 2 : Omicron CT Analyzer Test Results for Y Phase CT - We found that R and B Phase CTs were having minor errors, but Y phase CT had a ratio error of 50 % at rated burden. It means, CT will act as it is having a ratio of 4000/0.5 A instead of 4000/1 A. Phase angle error was also found to be -1574.06 min. - Due to high errors (Magnitude and Phase angle) of Y Phase CT, relay mal-operated in Earth Fault element. - The faulty CT was replaced with a new CT after proper testing and wiring, the Transformer was switched on and re-commissioned with loading.
  • 4. Page | 4 Authorised Channel Partners Conclusion – how advanced technology can help solve such issues more accurately - At times, routine test equipments, such as Primary Injection Kit, do not provide the conclusive results. It is likely that the fault in the equipment may go unnoticed / unchecked despite carrying out Routine Testing. - Upgrading ourselves constantly with advanced technology has always been at the forefront for us, and we invest heavily in such technology so that our Customers can keep their protection systems safer and more reliable. - Transformer is a very important asset, and the loss of production due to mal-operation of its protection system, can run into crores. All our efforts are viewing the problems from customers’ point and resolving them in totality. - The above was in fact the major problem found, we also observed some minor abnormalities and corrected them too. There could be many reasons for mal-operation of Transformer Protection System and can be addressed on case-to-case basis. To know more, you may call/write to us. And if you are looking for a dedicated agency that understands the direct link between your assets and your revenue, call/write to us, we will be happy to assist you. SYSTEM PROTECTION E-Mail : bdm@systemprotection.in Web : www.systemprotection.in Tele : +91-265-2225137 (Servicing & Testing of Circuit Breaker, Relay, CT, PT, Transformer, Other Switchyard Equipment’s, Relay Co- ordination Studies, Cable, etc.)