Business Intelligence with
Primavera P6 Analytics
Shawn Lafferty, Oracle Primavera Development
Doug Larkin, Oracle Primavera Product Strategy
3 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
4 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
The following is intended to outline our general product
direction. It is intended for information purposes only, and
may not be incorporated into any contract. It is not a
commitment to deliver any material, code, or
functionality, and should not be relied upon in making
purchasing decisions.
The development, release, and timing of any features or
functionality described for Oracle’s products remains at
the sole discretion of Oracle.
5 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
San Francisco
September 30–October 4, 2012
What is Business Intelligence?
“Business intelligence aims to support
better business decision-making”
- Wikipedia
8 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Challenges to making better business &
project related decisions?
9 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Too Much or Too Little Information?
10 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Inaccurate, Inconsistent or Dated Information?
11 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Multiple or Disconnected Silos of Information?
12 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Time Lost Gathering and Reconciling?
13 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Lack of Visibility and Insight?
14 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Knowledge Only Available to a Few?
15 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Poor Alignment Between Decisions and Actions?
16 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Frustration?
17 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
What Would You
Rather Know?
What is the project’s
scheduled completion
date?
How likely will this project
complete on time?
What can I do to ensure
successful completion?
The Solution
22 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
P6 Analytics
23 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Plan in
P6 EPPM
24 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
25 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Uncover in
P6 Analytics
26 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
27 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
90+ Prebuilt
Analytics
and Dashboard
Pages
28 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Three Areas
P6 Analytics
Delivers
29 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Analysis
Enterprise
Mobility
30 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Clear Understanding of Project Performance
31 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Use Past Performance to Predict the Future
32 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Relevant, Complete and Consistent Information
33 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Get a Handle on Project Costs
34 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
View Resource Allocation and Limit Over Time
35 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Focus on What Matters Most
36 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Call Attention to Problem Areas
37 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
View Earned Value Metrics Over Time
38 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Visualize Project Scoring and Prioritization
39 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Make Decisions based on Project Alignment
New Analyses
with R2.0!
41 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Deeper
Trending
Analysis
42 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
New Activity and WBS Trends
43 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
New Activity and WBS Trends
• Track Activity and WBS-level history
• Compare Dates and Durations as well as Costs and
Units
• Collect Historical Data Down to Weekly Intervals
• Analyze Cumulative or Periodic Trends
44 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
New Period-Based Metrics
• Analyze key data based on defined periods (e.g., What
happened last week? What’s supposed to happen this
week?)
• See activity counts including Not Started, In Progress,
and Completed
45 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
History Control in P6
46 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.46 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
UDFs
47 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Project UDFs
48 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
PROJECT
WBS
ACTIVITY
COST
NUMBER
INTEGER
49 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Geospatial
50 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Geographical Analysis of Key Project Data
51 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Risk
52 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
What is the Risk?
53 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
And Where is It?
54 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Resource Utilization
55 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Capacity Planning
56 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Gantt Chart
57 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Analysis
Enterprise
Mobility
58 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Built on Best-In-Class BI Platform
Primavera P6 Analytics
Oracle Business Intelligence
59 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Automated ETL Process
P6
Primavera P6 Analytics
Oracle Business Intelligence
ETL
60 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Consolidate Data from Multiple P6 Databases
Primavera P6 Analytics
Oracle Business Intelligence
ETLP6P6P6
61 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Combine With Other Data Sources & Applications
Primavera P6
Analytics
Oracle Business Intelligence
ETLP6
P6
P6
Other
Data
Sources
Other
Applications
62 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Business User Friendly P6 Metadata
63 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Geospatial
Oracle Locator
Free
Supported
65 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Using Oracle Locator…..
• Specify location in P6 EPPM
– Projects
– Resources
– Activities
• Consume in P6 Analytics
– Visualization
– Navigation/drill down via multiple
views
– Master-detail link to charts and
scorecards
66 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
And How Do I Get the Maps?
• Customer provided
• License from NAVTEQ (Oracle partner)
• Leverage Google Maps or Bing Maps, etc.
• Choice depends on particular uses cases, types of maps
needed, area of coverage, etc.
67 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Is Oracle Locator Same as Oracle Spatial?
• Oracle Locator provides a subset of features
found in Oracle Spatial.
• Oracle Spatial is not required for P6 Analytics
mapping features.
• Additional option to Oracle Database Enterprise
Edition.
OBI 11g!
69 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Easily Create New Analytics on the Fly
70 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Gain Insight with Guided Paths of Discovery
71 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Turn Insight into Action – Drill Down into P6
72 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Stay in the Know – Proactive Detection & Alerts
73 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Dynamically Filter, Group, Sort and Pivot
Including Project, Activity and Resource Codes & User Defined Fields
74 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Create KPIs to Track & Measure Performance
75 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Enhanced Action Links Back to P6
76 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
New ETL Configuration Wizard
77 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
P6 EPPM
Security
P6 Analytics
Security
78 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Fully Customizable
 Combine P6 analytics with analytics from other data
sources/applications on the same dashboard
 Tweak the metadata to include commonly used metrics
 Specify which projects from P6 are “published” to Analytics
 Create individual and role specific dashboards, analytics
and navigation paths
 Configure the ETL process to run as often as necessary
79 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Analysis
Enterprise
Mobility
80 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Access P6 Analytics with OBI Mobile
81 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Delivered Dashboard Optimized for Mobile
82 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
OBI 11g Mobile Application Info
• Currently supports iPad/iPhone
• Add-on to OBI as an additional purchase
83 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Distribute P6 Analytics Directly within Email
84 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Export P6 Analytics to PDF and MS Office
85 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Securely Embed P6 Analytics in MS Office
86 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Snapshot Analytics and Access Offline / Later
87 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Analysis
Enterprise
Mobility
88 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
What if I already have a different
BI platform?
89 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Build from Scratch P6 Analytics
Weeks or MonthsQuarters or Years
DW Design
Back-end ETL & Mapping
Define Metrics & Dashboards
Training & Roll-out
Pre-built ETL Tailoring
DW Design Modification
Specific Metrics & Dashboards
Training & Rollout
 Faster deployment
 Lower TCO
 Assured business value
90 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Make Better Decisions with P6 Analytics
 Built on top of best-in-class BI Platform
 Easily create new ad-hoc analytics
 Filter, slice, dice and pivot on the fly
 Guided navigation and proactive discovery
 Turn insight into action with P6 drilldown capabilities Tailor to suite the needs of your organization
 Tailor to suite the needs of individual users
 Access via mobile devices
 Share analytic content by email, MS Office or offline
 One place to look
 Relevant, complete and consistent information
 Focus on what matters most
 Large library of analytics and dashboards provided OOTB
 Understand where you’ve been and where you’re going
Analysis
Enterprise
Mobility
91 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Q&A
92 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
93 Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

Business intelligence with primavera p6 analytics ppt

  • 1.
    1 Copyright ©2012, Oracle and/or its affiliates. All rights reserved.
  • 2.
    2 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. TITLE HERE All of your information would go in this area. For all fonts, just select and replace with the content. Business Intelligence with Primavera P6 Analytics Shawn Lafferty, Oracle Primavera Development Doug Larkin, Oracle Primavera Product Strategy
  • 3.
    3 Copyright ©2012, Oracle and/or its affiliates. All rights reserved.
  • 4.
    4 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.
  • 5.
    5 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. San Francisco September 30–October 4, 2012
  • 6.
    What is BusinessIntelligence?
  • 7.
    “Business intelligence aimsto support better business decision-making” - Wikipedia
  • 8.
    8 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Challenges to making better business & project related decisions?
  • 9.
    9 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Too Much or Too Little Information?
  • 10.
    10 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Inaccurate, Inconsistent or Dated Information?
  • 11.
    11 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Multiple or Disconnected Silos of Information?
  • 12.
    12 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Time Lost Gathering and Reconciling?
  • 13.
    13 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Lack of Visibility and Insight?
  • 14.
    14 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Knowledge Only Available to a Few?
  • 15.
    15 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Poor Alignment Between Decisions and Actions?
  • 16.
    16 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Frustration?
  • 17.
    17 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. What Would You Rather Know?
  • 18.
    What is theproject’s scheduled completion date?
  • 19.
    How likely willthis project complete on time?
  • 20.
    What can Ido to ensure successful completion?
  • 21.
  • 22.
    22 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. P6 Analytics
  • 23.
    23 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Plan in P6 EPPM
  • 24.
    24 Copyright ©2012, Oracle and/or its affiliates. All rights reserved.
  • 25.
    25 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Uncover in P6 Analytics
  • 26.
    26 Copyright ©2012, Oracle and/or its affiliates. All rights reserved.
  • 27.
    27 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. 90+ Prebuilt Analytics and Dashboard Pages
  • 28.
    28 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Three Areas P6 Analytics Delivers
  • 29.
    29 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Analysis Enterprise Mobility
  • 30.
    30 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Clear Understanding of Project Performance
  • 31.
    31 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Use Past Performance to Predict the Future
  • 32.
    32 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Relevant, Complete and Consistent Information
  • 33.
    33 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Get a Handle on Project Costs
  • 34.
    34 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. View Resource Allocation and Limit Over Time
  • 35.
    35 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Focus on What Matters Most
  • 36.
    36 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Call Attention to Problem Areas
  • 37.
    37 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. View Earned Value Metrics Over Time
  • 38.
    38 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Visualize Project Scoring and Prioritization
  • 39.
    39 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Make Decisions based on Project Alignment
  • 40.
  • 41.
    41 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Deeper Trending Analysis
  • 42.
    42 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. New Activity and WBS Trends
  • 43.
    43 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. New Activity and WBS Trends • Track Activity and WBS-level history • Compare Dates and Durations as well as Costs and Units • Collect Historical Data Down to Weekly Intervals • Analyze Cumulative or Periodic Trends
  • 44.
    44 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. New Period-Based Metrics • Analyze key data based on defined periods (e.g., What happened last week? What’s supposed to happen this week?) • See activity counts including Not Started, In Progress, and Completed
  • 45.
    45 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. History Control in P6
  • 46.
    46 Copyright ©2012, Oracle and/or its affiliates. All rights reserved.46 Copyright © 2012, Oracle and/or its affiliates. All rights reserved. UDFs
  • 47.
    47 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Project UDFs
  • 48.
    48 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. PROJECT WBS ACTIVITY COST NUMBER INTEGER
  • 49.
    49 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Geospatial
  • 50.
    50 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Geographical Analysis of Key Project Data
  • 51.
    51 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Risk
  • 52.
    52 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. What is the Risk?
  • 53.
    53 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. And Where is It?
  • 54.
    54 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Resource Utilization
  • 55.
    55 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Capacity Planning
  • 56.
    56 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Gantt Chart
  • 57.
    57 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Analysis Enterprise Mobility
  • 58.
    58 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Built on Best-In-Class BI Platform Primavera P6 Analytics Oracle Business Intelligence
  • 59.
    59 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Automated ETL Process P6 Primavera P6 Analytics Oracle Business Intelligence ETL
  • 60.
    60 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Consolidate Data from Multiple P6 Databases Primavera P6 Analytics Oracle Business Intelligence ETLP6P6P6
  • 61.
    61 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Combine With Other Data Sources & Applications Primavera P6 Analytics Oracle Business Intelligence ETLP6 P6 P6 Other Data Sources Other Applications
  • 62.
    62 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Business User Friendly P6 Metadata
  • 63.
    63 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Geospatial
  • 64.
  • 65.
    65 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Using Oracle Locator….. • Specify location in P6 EPPM – Projects – Resources – Activities • Consume in P6 Analytics – Visualization – Navigation/drill down via multiple views – Master-detail link to charts and scorecards
  • 66.
    66 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. And How Do I Get the Maps? • Customer provided • License from NAVTEQ (Oracle partner) • Leverage Google Maps or Bing Maps, etc. • Choice depends on particular uses cases, types of maps needed, area of coverage, etc.
  • 67.
    67 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Is Oracle Locator Same as Oracle Spatial? • Oracle Locator provides a subset of features found in Oracle Spatial. • Oracle Spatial is not required for P6 Analytics mapping features. • Additional option to Oracle Database Enterprise Edition.
  • 68.
  • 69.
    69 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Easily Create New Analytics on the Fly
  • 70.
    70 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Gain Insight with Guided Paths of Discovery
  • 71.
    71 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Turn Insight into Action – Drill Down into P6
  • 72.
    72 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Stay in the Know – Proactive Detection & Alerts
  • 73.
    73 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Dynamically Filter, Group, Sort and Pivot Including Project, Activity and Resource Codes & User Defined Fields
  • 74.
    74 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Create KPIs to Track & Measure Performance
  • 75.
    75 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Enhanced Action Links Back to P6
  • 76.
    76 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. New ETL Configuration Wizard
  • 77.
    77 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. P6 EPPM Security P6 Analytics Security
  • 78.
    78 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Fully Customizable  Combine P6 analytics with analytics from other data sources/applications on the same dashboard  Tweak the metadata to include commonly used metrics  Specify which projects from P6 are “published” to Analytics  Create individual and role specific dashboards, analytics and navigation paths  Configure the ETL process to run as often as necessary
  • 79.
    79 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Analysis Enterprise Mobility
  • 80.
    80 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Access P6 Analytics with OBI Mobile
  • 81.
    81 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Delivered Dashboard Optimized for Mobile
  • 82.
    82 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. OBI 11g Mobile Application Info • Currently supports iPad/iPhone • Add-on to OBI as an additional purchase
  • 83.
    83 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Distribute P6 Analytics Directly within Email
  • 84.
    84 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Export P6 Analytics to PDF and MS Office
  • 85.
    85 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Securely Embed P6 Analytics in MS Office
  • 86.
    86 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Snapshot Analytics and Access Offline / Later
  • 87.
    87 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Analysis Enterprise Mobility
  • 88.
    88 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. What if I already have a different BI platform?
  • 89.
    89 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Build from Scratch P6 Analytics Weeks or MonthsQuarters or Years DW Design Back-end ETL & Mapping Define Metrics & Dashboards Training & Roll-out Pre-built ETL Tailoring DW Design Modification Specific Metrics & Dashboards Training & Rollout  Faster deployment  Lower TCO  Assured business value
  • 90.
    90 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Make Better Decisions with P6 Analytics  Built on top of best-in-class BI Platform  Easily create new ad-hoc analytics  Filter, slice, dice and pivot on the fly  Guided navigation and proactive discovery  Turn insight into action with P6 drilldown capabilities Tailor to suite the needs of your organization  Tailor to suite the needs of individual users  Access via mobile devices  Share analytic content by email, MS Office or offline  One place to look  Relevant, complete and consistent information  Focus on what matters most  Large library of analytics and dashboards provided OOTB  Understand where you’ve been and where you’re going Analysis Enterprise Mobility
  • 91.
    91 Copyright ©2012, Oracle and/or its affiliates. All rights reserved. Q&A