Primavera Gateway 15.2 is Oracle's standard integration platform that provides out-of-the-box integration connections between Primavera applications and third party applications. New features in 15.2 include enhancements to support loose-coupled integrations, P6 event support, and usability improvements. The document outlines the integration strategies and capabilities of Primavera Gateway and its pre-built connectors to applications such as Oracle E-Business Suite, Unifier, and Primavera P6.