Mounting Systems is a leading provider of mounting structures for utility-scale solar projects worldwide with over 20 years of experience. They offer a complete portfolio of aluminum and steel mounting solutions for rooftop, flat roof and ground-mounted applications. Key factors for successful utility-scale projects in emerging markets include optimal design to balance costs and performance, smooth implementation within budget and schedule, and commercial/financial conditions that maximize revenue. Mounting Systems can help with their experience designing projects to site conditions and optimizing balance of system costs through efficient installation.
www.lngsummit.com/pdf/Enrique_Alonso.pdf
3RD GEN MODULAR EXECUTION. SM DESIGN AND .... Steel / Pipe / E&I Work. COST ACCOUNT. Hours ...
Modular Designs Which Maximize Movement of Hours Offsite
• “Modularization Drives Layout” not “Layout Drives
Modularization”
• “Standardized” not “Customized” Designs
• Maximum Collaboration Between Owner, Engineer,
Procurement, Construction, Project Management and
Fabricato
www.lngsummit.com/pdf/Enrique_Alonso.pdf
3RD GEN MODULAR EXECUTION. SM DESIGN AND .... Steel / Pipe / E&I Work. COST ACCOUNT. Hours ...
Modular Designs Which Maximize Movement of Hours Offsite
• “Modularization Drives Layout” not “Layout Drives
Modularization”
• “Standardized” not “Customized” Designs
• Maximum Collaboration Between Owner, Engineer,
Procurement, Construction, Project Management and
Fabricato
Project Spotlight - UT System Replacement Office BuildingZEROSIX Consulting
Zero/Six conducted an extensive document review to identify deficiencies in systems integration and establish performance criteria for envelope assemblies; laboratory and field testing requirements were then developed to verify installation and functionality for an airtight and watertight enclosure upon completion.
G and R Custom Elevator Cabs is a highly reputable go-to elevator manufacturing company providing elevator cabs and design engineering services that enable building owners, elevator managers and contractors to get elevator cabs and components built to non-standard specification (in other words, to fit inside their building/elevator).
Our Sales Director, John Omorean, presented this slideshow to Elevator U attendees during the 2015 Elevator U Conference in Columbus, Ohio. This presentation covers what information is required for new elevator construction and elevator modernization proposals, major concerns that we look for when preparing a proposal, related elevator codes/restrictions and how we decipher if new cab shells should be utilized as well as the pro's and con's of new and existing conditions. Visit our website for more info: www.GandRCustomCabs.com
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Armani Ferdaous
This presentation illustrates the various aspects of decision-making in engineering design in the stages prior to the construction bidding process for the renovation of DEP’s South Brooklyn headquarters on Remsen Avenue. It reveals components of the value engineering method through a comparative analysis of two different glass systems in consideration for the future renovation. The analysis initially demonstrates the cost estimation of both materials that will allow BWSO to construct a budget for the project, and it proceeds to reflect the performance of both systems through a comparison of wind loads to derive strength. Lastly, the presentation factors in architectural theory to examine the aesthetic value and social impact of construction materials in visual culture.
Pipe spool fabrication is major component of construction operations on large industrial projects. The nature of spooling is relatively short term involving complex construction process and riddled with uncertainty due to the intrinsic unique nature of its outputs and the numerous factors affecting its activities.
With this in mind, it is important for all stakeholders to have a good grasp of the performance of pipe fabrication shops and their ability to meet the site pipe installation schedules.
Procurement of bulk materials handling machinesrmorgan1209
Materials handling machines such as in pit crushers, spreaders, shiploaders, stackers and reclaimers are major investment items for the ports and mines involved in the supply chain for export of commodities. Australia is one of the few countries to have its own standard for such equipment, AS4324 which was introduced in response to a number of machine failures in the early to mid-1990’s. When procuring new bulk materials handling machines, the following stages need to be considered:
• Identifying specification requirements
• Assessing which type of contract is most suitable
• Tackling challenges with overseas procurement
• Ensuring effective quality control and supervision
• Handling shipment, site erection and commissioning
24 partner provenienti da tutta Europa, a rappresentare le più innovative aziende operanti nel settore Automotive, fra le quali Pininfarina nella veste di coordinatore tecnico, oltre a molte prestigiose università, come il capofila Aalborg Universitet, hanno lavorato insieme per 48 mesi con l’obiettivo di vincere una sfida ambiziosa: dimostrare la sostenibilità della fattibilità di una city car elettrica di soli 600kg di peso, strutturalmente prestazionale e ad alto grado di riciclabilità, per medi volumi di produzione (30,000 unità/anno).
Obiettivo raggiunto e sfida vinta: il punto di partenza per il progetto Evolution è stato il concept Pininfarina Nido, prevalentemente realizzato in profili commerciali e pezzi stampati in alluminio, del peso di circa 850 kg; il punto di arrivo è stato un archetipo innovativo di veicolo, fortemente ottimizzato in termini di peso vs performance pienamente in linea con il target di peso ed estremamente interessante dal punto di vista della fattibilità tecnico-economica, focalizzata su cinque sottosistemi innovativi, i dimostratori (pianale, puntone anteriore, traversa paraurti anteriore, porta, traversa sospensione anteriore).
L’approccio progettuale seguito ha considerato come variabili di progetto i materiali, le scelte ingegneristiche e le tecnologie di processo: il risultato è stato una nuova struttura, rinforzata solo dove necessario, nella quale i materiali sono stati studiati ad hoc per la specifica applicazione e per le tecnologie di produzione proposte/sviluppate contestualmente.
L’intero sviluppo è stato guidato dalle analisi numeriche (CAE) e verificato sperimentalmente.
Oltre ai dimostratori, importanti risultati sono stati ottenuti anche nell’ambito delle tecnologie di giunzione multi-materiale (adesivi strutturali) e per quanto riguarda gli aspetti di smontaggio/riuso/riciclo dei nuovi materiali.
Il progetto si è concluso con successo lo scorso ottobre con la presentazione del dimostratore tecnologico alla Commissione Europea.
Modular fired heaters - A presentation by Esteem Projects at Refining India ...Tanveer Singh
Modular construction of Fired Heaters can help in saving both time and cost. This presentation touches the topic from the Indian perspective and how it can also be helpful in revamps.
For any details, please visit us at https://www.esteemprojects.com.
Thanks,
Esteem Projects Pvt. Ltd.
Project Spotlight - UT System Replacement Office BuildingZEROSIX Consulting
Zero/Six conducted an extensive document review to identify deficiencies in systems integration and establish performance criteria for envelope assemblies; laboratory and field testing requirements were then developed to verify installation and functionality for an airtight and watertight enclosure upon completion.
G and R Custom Elevator Cabs is a highly reputable go-to elevator manufacturing company providing elevator cabs and design engineering services that enable building owners, elevator managers and contractors to get elevator cabs and components built to non-standard specification (in other words, to fit inside their building/elevator).
Our Sales Director, John Omorean, presented this slideshow to Elevator U attendees during the 2015 Elevator U Conference in Columbus, Ohio. This presentation covers what information is required for new elevator construction and elevator modernization proposals, major concerns that we look for when preparing a proposal, related elevator codes/restrictions and how we decipher if new cab shells should be utilized as well as the pro's and con's of new and existing conditions. Visit our website for more info: www.GandRCustomCabs.com
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Armani Ferdaous
This presentation illustrates the various aspects of decision-making in engineering design in the stages prior to the construction bidding process for the renovation of DEP’s South Brooklyn headquarters on Remsen Avenue. It reveals components of the value engineering method through a comparative analysis of two different glass systems in consideration for the future renovation. The analysis initially demonstrates the cost estimation of both materials that will allow BWSO to construct a budget for the project, and it proceeds to reflect the performance of both systems through a comparison of wind loads to derive strength. Lastly, the presentation factors in architectural theory to examine the aesthetic value and social impact of construction materials in visual culture.
Pipe spool fabrication is major component of construction operations on large industrial projects. The nature of spooling is relatively short term involving complex construction process and riddled with uncertainty due to the intrinsic unique nature of its outputs and the numerous factors affecting its activities.
With this in mind, it is important for all stakeholders to have a good grasp of the performance of pipe fabrication shops and their ability to meet the site pipe installation schedules.
Procurement of bulk materials handling machinesrmorgan1209
Materials handling machines such as in pit crushers, spreaders, shiploaders, stackers and reclaimers are major investment items for the ports and mines involved in the supply chain for export of commodities. Australia is one of the few countries to have its own standard for such equipment, AS4324 which was introduced in response to a number of machine failures in the early to mid-1990’s. When procuring new bulk materials handling machines, the following stages need to be considered:
• Identifying specification requirements
• Assessing which type of contract is most suitable
• Tackling challenges with overseas procurement
• Ensuring effective quality control and supervision
• Handling shipment, site erection and commissioning
24 partner provenienti da tutta Europa, a rappresentare le più innovative aziende operanti nel settore Automotive, fra le quali Pininfarina nella veste di coordinatore tecnico, oltre a molte prestigiose università, come il capofila Aalborg Universitet, hanno lavorato insieme per 48 mesi con l’obiettivo di vincere una sfida ambiziosa: dimostrare la sostenibilità della fattibilità di una city car elettrica di soli 600kg di peso, strutturalmente prestazionale e ad alto grado di riciclabilità, per medi volumi di produzione (30,000 unità/anno).
Obiettivo raggiunto e sfida vinta: il punto di partenza per il progetto Evolution è stato il concept Pininfarina Nido, prevalentemente realizzato in profili commerciali e pezzi stampati in alluminio, del peso di circa 850 kg; il punto di arrivo è stato un archetipo innovativo di veicolo, fortemente ottimizzato in termini di peso vs performance pienamente in linea con il target di peso ed estremamente interessante dal punto di vista della fattibilità tecnico-economica, focalizzata su cinque sottosistemi innovativi, i dimostratori (pianale, puntone anteriore, traversa paraurti anteriore, porta, traversa sospensione anteriore).
L’approccio progettuale seguito ha considerato come variabili di progetto i materiali, le scelte ingegneristiche e le tecnologie di processo: il risultato è stato una nuova struttura, rinforzata solo dove necessario, nella quale i materiali sono stati studiati ad hoc per la specifica applicazione e per le tecnologie di produzione proposte/sviluppate contestualmente.
L’intero sviluppo è stato guidato dalle analisi numeriche (CAE) e verificato sperimentalmente.
Oltre ai dimostratori, importanti risultati sono stati ottenuti anche nell’ambito delle tecnologie di giunzione multi-materiale (adesivi strutturali) e per quanto riguarda gli aspetti di smontaggio/riuso/riciclo dei nuovi materiali.
Il progetto si è concluso con successo lo scorso ottobre con la presentazione del dimostratore tecnologico alla Commissione Europea.
Modular fired heaters - A presentation by Esteem Projects at Refining India ...Tanveer Singh
Modular construction of Fired Heaters can help in saving both time and cost. This presentation touches the topic from the Indian perspective and how it can also be helpful in revamps.
For any details, please visit us at https://www.esteemprojects.com.
Thanks,
Esteem Projects Pvt. Ltd.
Jsp roofing & trussless roofing solutions pvt. ltd in puneMaxpromotion
COMPANY PROFILE:
JSP ROOFING GROUP is an organisation set up by a group of young professional with focus of developing Industrial World Class Product Manufacturer of Self Supported Roofing System/Trussless roofing System,Trapezoidal profile, Clay tile sheets & Turbo Ventilators.
BUSINESS PROFILE:
JSP Roofing & Trussless Roofing Solutions Pvt. Ltd. Over the year JSP Roofing Group blossemed in to the front ranking manufacturer of top self supported roofing/Trussless roofing System, Galvalume, Galvanized profile & Clay Title roofing sheet in India. Through our contineous performance evalution And upgradation we are determine to stay ahead in the competitve world with pioneering spirit, clear vision of future and commitment to excel JSP ROOFING GROUP a long sheet product arm of JSP ROOFING GROUP , was set up at pune.
The company JSP ROOFING, has earned respect and fame in the business of roofing industry making during short span of only two and half years on the back of visionery director and highly skilled and dedicated team. JSP ROOFING plant is fully integrated plant having various manufavturing facilities of Trapozoidal, clay tile and decking sheets.we Also deal in pencil profile,"Z" & "C" purlins, PEB structures, SDSS crews,Poly -carbonate Sheet,FRP sheets, insulation products, turbine ventilators & all type of roofing accessories.
VISION & MISSION
Mission :
"Provide Quality Steel Products to customers by ensuring Customer Satisfaction & through Continuous Improvement in Products."JSP ROOFING GROUPrecognized that while honesty and integrity are the essential ingredients of a strong and stable enterprise, profitability provides the main spark of economic activity. Overall, the company seeks to scale the heights of excellence in all that it does in an atmosphere free from fear, and thereby reaffirms in democratic values.
Vision :
"Want to Colour whole world by steel products."we aspire to the global steel industry benchmark for value Creation And Corporate citizenship we aspire to the most trusted quality of products and services.
More Details,
www.proflexroofing.com
Koch Modular helps large client realize significant savings in lost revenue by building modular while permit receipt was in progress.
We completed timely delivery of a 15 module system, including columns, vessels, heat exchangers, pumps, vacuum systems, piping, instruments, and a control system.
Our involvement was a late addition to the main, larger project, which was already in progress, and had a very aggressive and business critical schedule. Air permit timelines were resulting in an unacceptable schedule overrun, if traditional stick-build construction was utilized. Therefore, the client elected to utilize Koch Modular’s modular construction capabilities and realized significant savings in lost revenue.
This system consisted of a reaction step, multiple distillation steps, neutralization, and scrubbing steps. Our initial design phase included a process optimization study to increase product yield and capacity, and to decrease energy usage. Koch Modular completed timely delivery of a 15 module system, including columns, vessels, heat exchangers, pumps, vacuum systems, piping, instruments, and a control system. Today the modular system is running well beyond capacity.
Case Study - Creation Of A Cutting Edge AM Built Injector For The Aerospace ...ObjectifyTechnologie
Injectors are widely used in the Aerospace industry for fluid transportation. The varying use cases — depending on their needs — require a significant level of customization. Because of this, they are produced in large numbers and kept in storage as backups. This avoids long lead times of up to 20 weeks in case of failure and guarantees uptime for a part crucial to the company’s capital.
Pre Engineered Steel buildings are the fastest systems of modern day construction, an amalgamation of Speed, functionality and durability. These are known for their unique designs, self adhesive nature, and thermal insulation properties. Delta steel provide end-to-end PEB solutions from structural design to installation
WRI’s brand new “Food Service Playbook for Promoting Sustainable Food Choices” gives food service operators the very latest strategies for creating dining environments that empower consumers to choose sustainable, plant-rich dishes. This research builds off our first guide for food service, now with industry experience and insights from nearly 350 academic trials.
Characterization and the Kinetics of drying at the drying oven and with micro...Open Access Research Paper
The objective of this work is to contribute to valorization de Nephelium lappaceum by the characterization of kinetics of drying of seeds of Nephelium lappaceum. The seeds were dehydrated until a constant mass respectively in a drying oven and a microwawe oven. The temperatures and the powers of drying are respectively: 50, 60 and 70°C and 140, 280 and 420 W. The results show that the curves of drying of seeds of Nephelium lappaceum do not present a phase of constant kinetics. The coefficients of diffusion vary between 2.09.10-8 to 2.98. 10-8m-2/s in the interval of 50°C at 70°C and between 4.83×10-07 at 9.04×10-07 m-8/s for the powers going of 140 W with 420 W the relation between Arrhenius and a value of energy of activation of 16.49 kJ. mol-1 expressed the effect of the temperature on effective diffusivity.
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Venturesgreendigital
Willie Nelson is a name that resonates within the world of music and entertainment. Known for his unique voice, and masterful guitar skills. and an extraordinary career spanning several decades. Nelson has become a legend in the country music scene. But, his influence extends far beyond the realm of music. with ventures in acting, writing, activism, and business. This comprehensive article delves into Willie Nelson net worth. exploring the various facets of his career that have contributed to his large fortune.
Follow us on: Pinterest
Introduction
Willie Nelson net worth is a testament to his enduring influence and success in many fields. Born on April 29, 1933, in Abbott, Texas. Nelson's journey from a humble beginning to becoming one of the most iconic figures in American music is nothing short of inspirational. His net worth, which estimated to be around $25 million as of 2024. reflects a career that is as diverse as it is prolific.
Early Life and Musical Beginnings
Humble Origins
Willie Hugh Nelson was born during the Great Depression. a time of significant economic hardship in the United States. Raised by his grandparents. Nelson found solace and inspiration in music from an early age. His grandmother taught him to play the guitar. setting the stage for what would become an illustrious career.
First Steps in Music
Nelson's initial foray into the music industry was fraught with challenges. He moved to Nashville, Tennessee, to pursue his dreams, but success did not come . Working as a songwriter, Nelson penned hits for other artists. which helped him gain a foothold in the competitive music scene. His songwriting skills contributed to his early earnings. laying the foundation for his net worth.
Rise to Stardom
Breakthrough Albums
The 1970s marked a turning point in Willie Nelson's career. His albums "Shotgun Willie" (1973), "Red Headed Stranger" (1975). and "Stardust" (1978) received critical acclaim and commercial success. These albums not only solidified his position in the country music genre. but also introduced his music to a broader audience. The success of these albums played a crucial role in boosting Willie Nelson net worth.
Iconic Songs
Willie Nelson net worth is also attributed to his extensive catalog of hit songs. Tracks like "Blue Eyes Crying in the Rain," "On the Road Again," and "Always on My Mind" have become timeless classics. These songs have not only earned Nelson large royalties but have also ensured his continued relevance in the music industry.
Acting and Film Career
Hollywood Ventures
In addition to his music career, Willie Nelson has also made a mark in Hollywood. His distinctive personality and on-screen presence have landed him roles in several films and television shows. Notable appearances include roles in "The Electric Horseman" (1979), "Honeysuckle Rose" (1980), and "Barbarosa" (1982). These acting gigs have added a significant amount to Willie Nelson net worth.
Television Appearances
Nelson's char
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...MMariSelvam4
The carbon cycle is a critical component of Earth's environmental system, governing the movement and transformation of carbon through various reservoirs, including the atmosphere, oceans, soil, and living organisms. This complex cycle involves several key processes such as photosynthesis, respiration, decomposition, and carbon sequestration, each contributing to the regulation of carbon levels on the planet.
Human activities, particularly fossil fuel combustion and deforestation, have significantly altered the natural carbon cycle, leading to increased atmospheric carbon dioxide concentrations and driving climate change. Understanding the intricacies of the carbon cycle is essential for assessing the impacts of these changes and developing effective mitigation strategies.
By studying the carbon cycle, scientists can identify carbon sources and sinks, measure carbon fluxes, and predict future trends. This knowledge is crucial for crafting policies aimed at reducing carbon emissions, enhancing carbon storage, and promoting sustainable practices. The carbon cycle's interplay with climate systems, ecosystems, and human activities underscores its importance in maintaining a stable and healthy planet.
In-depth exploration of the carbon cycle reveals the delicate balance required to sustain life and the urgent need to address anthropogenic influences. Through research, education, and policy, we can work towards restoring equilibrium in the carbon cycle and ensuring a sustainable future for generations to come.
Natural farming @ Dr. Siddhartha S. Jena.pptxsidjena70
A brief about organic farming/ Natural farming/ Zero budget natural farming/ Subash Palekar Natural farming which keeps us and environment safe and healthy. Next gen Agricultural practices of chemical free farming.
UNDERSTANDING WHAT GREEN WASHING IS!.pdfJulietMogola
Many companies today use green washing to lure the public into thinking they are conserving the environment but in real sense they are doing more harm. There have been such several cases from very big companies here in Kenya and also globally. This ranges from various sectors from manufacturing and goes to consumer products. Educating people on greenwashing will enable people to make better choices based on their analysis and not on what they see on marketing sites.
Building utility scale projects in MENA. The mounting systems perspective.
1. Building Utility Scale Projects in MENA
BOS Optimization from the Perspective of Mounting Structures
Yiorgos Eftychiou
Abu Dhabi, 21.01.2016
2. Mounting Systems at a glance
Over 8GW of mounting structures shipped worldwide
More than 20 years of experience in the PV-racking market
Complete product portfolio comprising of in-roof, on-roof, flat-roof and
ground-mounted solutions
Aluminum and steel solutions to cover various projects needs
Installation services offered in growing markets, MENA included
Strong financial stability as part of a large German industrial group
3. Company milestones
20 years of
Mounting
Systems
Opening
Office Tokyo, Japan
Recertification
ISO 9001
Award as
accredited
training company
180 employees
Certified
according to
EN 1090
(CE marking)
Founding of
Mounting
Systems Inc.
with
production in
West
Sacramento,
USA
Opening of
the new site in
Rangsdorf with
1.000 m²
Company
foundation
in Dahlewitz
near Berlin
as RegEnBau
Founding of
Mounting Systems
GmbH
Site expansion
to 17.000 m²
ISO 9001
Certification
Acquisition
from
Conergy
Acquisition
from NWI
1993 20132004 2008 2010 /2011 20122007
2014 2015
Mounting
Systems
aquires
HatiCon
Germany
GmbH
and HatiCon
Solar, LLC
2016
4. Key Success Factors for utility-scale
projects in emerging markets
Optimal project design:
Technical design of the system
The efficient balance between cost / performance
Smooth project implementation:
On-time and within budget
Commercial and financial conditions:
Regulatory frameworks, type of incentives/support
mechanisms that maximize the revenue streams
5. Optimal Project Design
Feasibility Phase
a. Site measurements, location and topography
as well as environmental factors
b. Key design features: type of modules,
inclination angle, azimuth, module
arrangement
c. Optimization considerations: shading,
performance degradation, trade-off between
increased investment and energy yield
6. Optimal Project Design
Preliminary project design
Site Selection: preliminary ground surveys include valuable information
for the available foundation options
PV system layout: even at a conceptual stage and given the
approximate investment requirements, the right fit between the mounting
structure and the desired lay-out is critical for a preliminary cost-benefit
assessment
7. Optimal Project Design
Development of detailed project design:
a. Detailed lay-out
b. Detailed civil design
c. Detailed electrical design
d. Revised energy yield
e. Construction plans
f. Project schedule
g. Commissioning plans
8. Optimal Project Design
Critical factors
• Extensive testing to ensure load conditions requirements are met
• Corrosion protection system (below ground and atmospheric)
• Site specific structural design calculations
• Flexibility tolerances to compensate inaccuracies during placement of
foundations
• Minimize use of tools and level of expertise for installation
• Adherence to module manufacturer installation manual
• Allow for thermal expansion to avoid mechanical stress of modules
10. Smooth project implementation
Construction phase – mechanical completion
• Achieving contractual obligations, also known as “milestones”, depends on
the timely construction-phase execution
• The time needed to mount the system impacts substantially the labor
costs associated with construction and thus the total project cost
• A time-consuming and complicated to install racking system could
jeopardize the effective task sequencing of the construction phase
11. BoS Optimisation
The choice of the mounting structure
impacts the on BoS and therefore the ROI
a. optimizing inter-row spacing and thus
reducing cable runs, avoid shading and
therefore enhancing production
b. minimizing total costs associated with
installation
c. Shorten supply times through effective
usage of local/regional/supply chain
12. BoS Optimization - Considerations on emerging markets
Limited options for obtaining-importing the equipment required
Long transport times and customs delays
New suppliers could have quality issues i.e. additional time- monitoring is
generally required to ensure deliveries meet quality standards
Packaging and transportation
Inexperienced employees of project installation companies
Strict quality management is required
13. Mounting Systems, your reliable EPC partner
Successful track record build upon experience and project optimization
know-how acquired in
…. more than 50 countries
…. with various topographies, ground and environmental conditions
…. using all available foundation methods
…. under extreme tight installation schedules and budgets
14. Global presence
International sites
GER · Headquarters and
production
Rangsdorf near Berlin
JP · Company subsidiary
Tokyo
USA · Company subsidiary and
production
West Sacramento
USA · Sales office
Michigan
● Local representation / production sites
16. Sigma I XL Ground-mount
• Ramming posts without ground sealing for all
types of modules
• Reduced number of foundations required
• Time and cost saving thanks the
use of ramming posts and a high
degree of pre-assembly
• Easy dismantling
Company Development Production Quality Logistics Service Products References
Less posts same performance
17. Sigma I XL Steel Ground-mount
• Cheaper than aluminum
• Ground slope up to 10° east/ west direction
• More flexibility thanks Clickstone technology
• Different variants for portrait and landscape
installation
• Height adjustable upper adapter
• Different ramming and concrete foundations
Company Development Production Quality Logistics Service Products References
Same performance – reduced costs
18. Sigma II Ground-mount
• Available with ramming posts, screw
foundations or base plates
• Optimal performance by maximum utilization
of space
• Time and cost saving thanks the use
of ramming posts and material optimization
• Easy dismantling
• Also available in the Steel-Hybrid variant
Company Development Production Quality Logistics Service Products References
The space saving open terrain professional
19. Sigma II Stahl Ground-mount
Easy installation, flexibility and optimal use of material
• Simple and functional design
• Higher load-bearing and stability thanks
cap profile posts
• Maximum service life due to special
coating
• Slope up to 10° East/ West
• Installation efforts are reduced by using Clickstone
technology
• Connection to the ground by using ramming posts,
screw foundations or foot plates
Company Development Production Quality Logistics Service Products References