EM 385 -1-1 (30 NOV 2014) & UFGS 103526 11/15
Activity Hazard Analysis (AHA)
Activity/Work Task:
AHA Signature Log Number Overall Risk Assessment Code (RAC) (Use highest code)
Project Location:
Risk Assessment Code (RAC) Matrix
Contract Number:
Severity
Probability
Frequent Likely Occasional Seldom Likely
Date Prepared: Catastrophic E E H H M
Critical E H H M L
SSHO:
Signature:
Marginal H M M L L
Superintendent:
Signature:
Negligible M L L L L
QC Manager:
Signature
Subcontractor Forman:
Name:
Signature:
QA Reviewed by (Name/Title): Step 1; Review each “Hazard” with identified safety “Controls” Determine RAC (See above)
Notes: (Field Notes,
Review Comments, etc.)
Probability: likelihood the activity will cause a Mishap (near
miss, incident or accident). Identify as Frequent, Likely,
Occasional, Seldom or Unlikely
RAC Chart
Severity: the outcome if a mishap occurred. Identify as
Catastrophic, Critical, Marginal, or Negligible
E = Extremely High Risk
H = High Risk
Step 2: Identify the RAC (probability vs. severity) as E, H,
M, or L for each “Hazard” on AHA. Annotate the overall
highest RAC at the top of the AHA
M = Moderate Risk
L = Low Risk
Job Steps (Work Sequences) Specific Anticipated Hazards Controls RAC
1.
2.
1.
2.
1.
2.
1.
2.
UFGS 013526 11/15 1.9 Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work
sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
UFGS 013526 1.9.1 Review the AHA list periodically (at least monthly) at supervisory safety meetings, update when procedures, scheduling or hazards change
UFGS 013526 1.9.2 Each employee performing work … must review the AHA and sign a signature log for that AHA prior to starting work. The SSHO must
maintain a signature log on site for every AHA.
Job Steps (Work Sequences) Continued Specific Anticipated Hazards (Continued) Controls (Continued) RAC
Equipment to be Used Training Requirements & Competent or Qualified
Personnel Names
Inspection Requirements
UFGS 013526 11/15 1.9 Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work
sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
UFGS 013526 1.9.1 Review the AHA list periodically (at least monthly) at supervisory safety meetings, update when procedures, scheduling or hazards change
UFGS 013526 1.9.2 Each employee performing work … must review the AHA and sign a signature log for that AHA prior to starting work. The SSHO must
maintain a signature log on site for every AHA.

More Related Content

Similar to AHA Template for a Job Hazard Analysis Form

Sfty Handle Hazardous Materials
Sfty Handle Hazardous MaterialsSfty Handle Hazardous Materials
Sfty Handle Hazardous Materials
Scott Jarrold
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
zeidali3
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
zeidali3
 
Mangold essential elements of risk assessment
Mangold essential elements of risk assessmentMangold essential elements of risk assessment
Mangold essential elements of risk assessment
LTDH2013
 
Risk Assessment documentation templates are located within this se.docx
Risk Assessment documentation templates are located within this se.docxRisk Assessment documentation templates are located within this se.docx
Risk Assessment documentation templates are located within this se.docx
SUBHI7
 
Design failure modes and effects analysis (dfmea) of an all terrain vehicle
Design failure modes and effects analysis (dfmea) of an all terrain vehicleDesign failure modes and effects analysis (dfmea) of an all terrain vehicle
Design failure modes and effects analysis (dfmea) of an all terrain vehicle
eSAT Journals
 

Similar to AHA Template for a Job Hazard Analysis Form (20)

Sfty Handle Hazardous Materials
Sfty Handle Hazardous MaterialsSfty Handle Hazardous Materials
Sfty Handle Hazardous Materials
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Fmea v1
Fmea v1Fmea v1
Fmea v1
 
Functional safety certification guide
Functional safety certification guideFunctional safety certification guide
Functional safety certification guide
 
Media Object File Flt Ops Hum Per Seq01
Media Object File Flt Ops Hum Per Seq01Media Object File Flt Ops Hum Per Seq01
Media Object File Flt Ops Hum Per Seq01
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
 
Safety Management Systems (SMS) Fundmentals: Safety Risk Management Component
Safety Management Systems (SMS) Fundmentals: Safety Risk Management ComponentSafety Management Systems (SMS) Fundmentals: Safety Risk Management Component
Safety Management Systems (SMS) Fundmentals: Safety Risk Management Component
 
Systems Hazards Analysis.pptx
Systems Hazards Analysis.pptxSystems Hazards Analysis.pptx
Systems Hazards Analysis.pptx
 
Session 04_Risk Assessment Program for YSP_Risk Analysis I
Session 04_Risk Assessment Program for YSP_Risk Analysis ISession 04_Risk Assessment Program for YSP_Risk Analysis I
Session 04_Risk Assessment Program for YSP_Risk Analysis I
 
Topic5
Topic5Topic5
Topic5
 
Mangold essential elements of risk assessment
Mangold essential elements of risk assessmentMangold essential elements of risk assessment
Mangold essential elements of risk assessment
 
Quality Risk Management - FMEA
Quality Risk Management - FMEAQuality Risk Management - FMEA
Quality Risk Management - FMEA
 
HIRA TATA Projects construction of solar plant
HIRA TATA Projects construction of solar plantHIRA TATA Projects construction of solar plant
HIRA TATA Projects construction of solar plant
 
Risk Assessment documentation templates are located within this se.docx
Risk Assessment documentation templates are located within this se.docxRisk Assessment documentation templates are located within this se.docx
Risk Assessment documentation templates are located within this se.docx
 
Military + Civilian Best Practices: Risk Management ver 1.1
Military + Civilian Best Practices: Risk Management ver 1.1Military + Civilian Best Practices: Risk Management ver 1.1
Military + Civilian Best Practices: Risk Management ver 1.1
 
Design failure modes and effects analysis (dfmea) of an all terrain vehicle
Design failure modes and effects analysis (dfmea) of an all terrain vehicleDesign failure modes and effects analysis (dfmea) of an all terrain vehicle
Design failure modes and effects analysis (dfmea) of an all terrain vehicle
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput
 
Risk Analysis and.pdf
Risk Analysis and.pdfRisk Analysis and.pdf
Risk Analysis and.pdf
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

AHA Template for a Job Hazard Analysis Form

  • 1. EM 385 -1-1 (30 NOV 2014) & UFGS 103526 11/15 Activity Hazard Analysis (AHA) Activity/Work Task: AHA Signature Log Number Overall Risk Assessment Code (RAC) (Use highest code) Project Location: Risk Assessment Code (RAC) Matrix Contract Number: Severity Probability Frequent Likely Occasional Seldom Likely Date Prepared: Catastrophic E E H H M Critical E H H M L SSHO: Signature: Marginal H M M L L Superintendent: Signature: Negligible M L L L L QC Manager: Signature Subcontractor Forman: Name: Signature: QA Reviewed by (Name/Title): Step 1; Review each “Hazard” with identified safety “Controls” Determine RAC (See above) Notes: (Field Notes, Review Comments, etc.) Probability: likelihood the activity will cause a Mishap (near miss, incident or accident). Identify as Frequent, Likely, Occasional, Seldom or Unlikely RAC Chart Severity: the outcome if a mishap occurred. Identify as Catastrophic, Critical, Marginal, or Negligible E = Extremely High Risk H = High Risk Step 2: Identify the RAC (probability vs. severity) as E, H, M, or L for each “Hazard” on AHA. Annotate the overall highest RAC at the top of the AHA M = Moderate Risk L = Low Risk Job Steps (Work Sequences) Specific Anticipated Hazards Controls RAC 1. 2. 1. 2. 1. 2. 1. 2.
  • 2. UFGS 013526 11/15 1.9 Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented. UFGS 013526 1.9.1 Review the AHA list periodically (at least monthly) at supervisory safety meetings, update when procedures, scheduling or hazards change UFGS 013526 1.9.2 Each employee performing work … must review the AHA and sign a signature log for that AHA prior to starting work. The SSHO must maintain a signature log on site for every AHA. Job Steps (Work Sequences) Continued Specific Anticipated Hazards (Continued) Controls (Continued) RAC Equipment to be Used Training Requirements & Competent or Qualified Personnel Names Inspection Requirements
  • 3. UFGS 013526 11/15 1.9 Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented. UFGS 013526 1.9.1 Review the AHA list periodically (at least monthly) at supervisory safety meetings, update when procedures, scheduling or hazards change UFGS 013526 1.9.2 Each employee performing work … must review the AHA and sign a signature log for that AHA prior to starting work. The SSHO must maintain a signature log on site for every AHA.