Benefits from
implementing BPM solution
at a leading private insurance player
At a Glance
                                                                          Max New York Life Insurance, one of India's top private
                                                                          players, implemented Newgen's Business Process
                                                                          Management (BPM) solution to improve their critical
                                                                          business processes, increase employee productivity and
                                                                          efficiency, and achieve operational excellence. The quick
                                                                          implementation of the solution by Newgen ensured that the
                                                                          insurer started reaping benefits within the first year of
                                                                          deployment.



Key Challenges
•      Processing delays and low productivity

•      Dependency on physical movement of documents
         between departments and locations

•      Difficulty in measuring and monitoring of performance

•      High operational costs

•      Major challenges in handling the burgeoning volume
         of transactions

•      Difficulty in meeting regulatory requirements and
         customer servicing timelines




Key Benefits
     Area                                        Benefits

Increase in Employee                             More than 70%
Productivity and efficiency

Reduction in TATs, processing                    More than 75%
time and servicing time                                                       Return on Investment of
Reduction in Operational Costs                   Around 50%                   135%1
Increase in Customer Service                     For both existing
Quality and Satisfaction                         & new customers

Increase in Volumes of                           Almost 300%
transactions handled per day

Reduction in Dependency on                       100%
physical documents

1
    Refer “Methodology” section for details on how Return on Investments (ROI) has been calculated

1 of 8
Background
Like other players in the life insurance industry, this insurer
was in the growth phase and wanted to provide cutting
edge service to their customers. With a strong quality
                                                                     “The continual increase
orientation, the focus was on developing their servicing             in the effort required for
quality, turnaround time and other customer service
parameters as key differentiators. Max New York Life looked
                                                                     servicing customer
at its emerging business requirements: a new range of                requests, was a major
products, a new set of distribution channels, new processes
and full automation of its operational processes. To keep            concern for the Policy
pace with its growing business requirements and aggressive
growth strategy these, they decided to strengthen their
                                                                     Owner servicing
back-office solutions and processes. This initiated the              department”
insurer to implement a BPM solution. Their aim was to have
a solution that would not only handle existing business
processes but also meet future operational demands.



Key Challenges
  Area                                                               Key Challenges

 Productivity                     •   Physical transportation of documents between departments and locations increased
                                      the waiting time before which processing could start
                                  •   Delay in indentifying discrepancies as verification could only be done at the Head
                                      Office, where all the physical records were maintained
                                  •   Duplication of data entry due to lack of integration with legacy applications
                                  •   Low employee productivity and operational efficiency

 Operational Costs                •   Increase in cost of operations with the incremental increase in operations
                                  •   High shipping and document handling cost recurring costs of couriering documents
                                      between locations/photocopying costs/printing costs
                                  •   Time cost due to a long processing cycle and delays caused by unavailability of
                                      documents
                                  •   High overheads on support staff and other related activities

 Customer Service                 •   High turn around time to process customer requests due to complexity of requests
                                      and difficulty in retrieving relevant customer information from different sources
                                  •   Difficulty in adhering to regulatory requirements in terms of servicing customer requests

 Document Handling                •   High risk of documents getting misplaced and lost inability to track documents,
                                      documents getting worn through multiple handling and couriering
                                  •   Major expenses incurred in terms of infrastructure, support staff and time delays for
                                      document management

 Productivity Measuring           •   Manual process with high physical document dependency gave rise to factors
                                      beyond the control of users, which affected performance and productivity
                                  •   Dependency on spreadsheets for capturing user performance data made
                                      performance tracking a cumbersome job for supervisors and managers

                                                                                                                          2 of 8
The Solution
Based on Max New York Life Insurance's requirements,           department is responsible for generating revenue for the
Newgen developed a customized solution, consisting of the      company. New Business is responsible for correct
following products:                                            assessment of each case for any additional requirement
                                                               (underwriting/medical/premium amount) and ultimately
• OmniFlowTM - workflow solution
                                                               closure of the case through issuance of the policy.
               TM
• OmniDocs - document management solution
                                                               • New Business : The solution directly impacted issuance
• OmniScan     TM
                    (OmniCapture) - image capture and             time, user productivity and volumes of transactions
    indexing solution                                             handled. The centralized solution has all the process
                                                                  rules and business logic built into its design, enabling it
• Record Management SystemTM - record management                  to handle all kinds of complexities associated with policy
    solution                                                      issuance for different kinds of product categories.
                                                                  Processing time has reduced significantly with users
The centralized solution was implemented in record time at
                                                                  across locations having instant access to scanned images
the Head Office and in offices spread across 37 locations in
                                                                  of the application form and supporting documents. Role
India. These locations were given web access to
                                                                  defined access rights ensured complete security and
OmniFlow™. Additionally, certain locations specified as
                                                                  confidentiality. The solution attaches all the documents
“Service Centres” were installed with Remote Image servers
                                                                  generated by the core application (counter offers,
for managing locally scanned images.
                                                                  response letters, etc.) to the relevant work item and
Max New York Life implemented Newgen's BPM solution               forwards it to the next step. The users are also provided
for two of its most critical processes – New Business and         with additional facilities, which help in efficient load
Policy Owner Servicing. POS department is responsible             balancing, reduction in both document retrieval time
for servicing all kinds of diverse and complex service            and cost, quicker resolution of discrepancies and instant
requests from existing policy owners. A customer may have         tracking of case status. For managers and supervisors,
one or multiple different policies. Therefore, the customer       the solution helps in efficient load balancing and easier
requests can vary across various permutations and                 productivity assessment. The solution provides complete
combinations. The centralized New Business department             visibility of both the process (for each transaction) and
processes all new proposals at the Head Office (HO). The          user performance across the organization.




3 of 8
• Policy Owner Servicing (POS): Other than being one                                         • Display of relevant information from the core application
                                of the critical customer facing departments, POS also           reducing, information searching and retrieving time
                                has the responsibility of ensuring compliance with
                                                                                             • Automatic generation of relevant documents at
                                stringent regulatory requirements in terms of delivery
                                                                                                different worksteps of the process
                                timelines and verification processes. The solution's rule-
                                based workflow design has incorporated all the process       • Built-in feature to help supervisors /managers allocate
                                rules and business logic for various types of service           work and ensure workload balancing
                                requests. The solution has a user friendly interface and
                                                                                             • Monitoring and performance measurement features
                                various system services, which extracts and displays
                                                                                                used for better visibility of business and user
                                relevant customer information from the core system.
                                                                                                performance
                                The solution also addresses the challenges, users were
                                facing while handling complex customer requests.
                                Critical activities like “signature verification” of
                                customers are now enforceable using the workflow. The
                                flexibility of Newgen's solution ensured that any process
                                modifications/requirements are easily incorporated in
                                the workflow. Over 50% increase in productivity was              “A highly scalable
                                achieved as an outcome of the time saved through easy
                                access to relevant customer information. The team's
                                                                                                 solution, allowing the
                                performance, in terms of volumes of transaction                  insurer to keep
                                handled per day, increased by more than 100%.*
                                                                                                 operations in pace with
• Scanned proposals can be introduced into the workflow
                                from any location providing instant access for processing        business growth*”
                                and eliminating document arrival waiting time




                                                Yearly Growth in Business & Number of Users (Supported by the Solution)
                                   1,800                                                                                              2500
No. of Transactions (in '000)




                                   1,600
                                   1,400                                                                                              2000
                                   1,200
                                                                                                                                                Nos. of Users




                                                                                                                                      1500
                                   1,000
                                     800
                                                                                                                                      1000
                                     600
                                     400                                                                                              500
                                     200
                                                                                                                                      0
                                                 2004               2005              2006             2007              2008
                                                      No of closed Transactions               No concurrent of users

* As per data provided by Newgen’s client


                                                                                                                                                                4 of 8
Automated policy Issuance process, using Workflow




5 of 8
Key Benefits and ROI
Reduction in operating costs, travel and communication
expenses, office stationary, infrastructure usage, printing                                                    “More than 100% increase
and postage costs were some of the common direct
benefits of BPM which the insurer also achieved through the
                                                                                                               in productivity level in the
Newgen solution. The insurer also achieved other benefits                                                      first year of deployment,
like productivity gains, reduction in IT infrastructure costs
through better utilisation and reduction in timelines.                                                         exceeding 250% over the
•                                        Reduced cycle time in processing customer requests                    next three years.*”
                                           and issuance of new policies

•                                        Better visibility by providing critical inputs for
                                           Dashboards and MIS

•                                        Efficient resource utilization through optimized load
                                           balancing via built-in system services

•                                        Scalable solution that enables faster rollout of initiatives

•                                        More than 100% increase in productivity level in the
                                           first year of deployment, exceeding 250% over the
                                           next three years.*

•                                        Return on Investment of 180%1




                                                            YoY Productivity movement in comparison to Preimplementation Scenario
of transactions closed per day per employee)
  Per Employee Productivity (in terms of no




                                                  40
                                                                                                                                            17
                                                  35
                                                  30
                                                                                                                           14
                                                                                                         15                        14
                                                  25
                                                                                                                                            20
                                                  20
                                                                                     7
                                                  15
                                                                                                                            13     15
                                                  10                                                    14
                                                                    4                    9
                                                  5
                                                                    3
                                                  0
                                                                    2003             2004               2005            2006      2007   2008

                                                                                    POS Productivity            NB Productivity

1
          Refer “Methodology” section for details on how Return on Investments (ROI) has been calculated
*
          As per data provided by Newgen’s client


                                                                                                                                                 6 of 8
Other Benefits
•    Meet compliance and regulatory guidelines and
         requirements in terms of TATs and verification
         processes
                                                               “Enhanced customer
•    Identification of discrepancies at an earlier stage and
                                                               service, better leveraging
         their faster resolution                               of team knowledge,
•    Improved customer satisfaction through quicker and        improved employee
         better servicing, and reduced customer response
         timelines                                             productivity Max New
•    End-to-end audit trails facilitating faster query         York achieved it all
     resolution and tracking of transactions
                                                               through the workflow
•    Enabling the deployment of dashboards and
     monitoring reports for senior management, needing
                                                               solution”
     quicker access to key metrics

•    Reduction in administrative and infrastructure usage
     cost




7 of 8
Methodology
The ROI calculation represents the relative value of a        Benefits were calculated by quantifying the returns
project's cumulative net benefits over the analysis period,   achieved through TAT improvements, higher employee
divided by the project's cumulative costs, expressed as a     productivity and reduction in various cost heads. In case of
percentage. In a formula, this can be represented as: ROI =   Max New York Life, some of the benefit areas evaluated
cumulative net benefit / total investments. For Max New       were:
York Life, the ROI it achieved from the implementation of
                                                              • Resource savings – from reduced hirings
Newgen's BPM solution was derived on the basis of total
benefits achieved and investments made by the company         • Time savings – reduction in processing time
over a period of three years.
                                                              • Capital expense reductions – savings in expenses such
Investments includes both one time and annual recurring          as facilities, workstations, rentals
costs incurred by Max New York Life, for components like
                                                              • Productivity benefits – increase in volumes of
• Implementation, software and initial license cost,             transactions processed per day

• Hardware                                                    The above mentioned data and information was sourced
                                                              through the following:
• Maintenance and production support
                                                              • Primary Research (customized questionnaire)
• User training
                                                              • Secondary Research (Third Party Industry Reports and
                                                                 Deloitte Global Benchmarks and Survey Reports)




                                                                                                                     8 of 8
Disclaimer
The ROI analysis was commissioned by Newgen and has been done by Deloitte for the client provided by Newgen. The analysis was done based on
data provided by Newgen and its client and Deloitte makes no assertions on the potential ROI that other organizations might receive by using
Newgen's solutions. Deloitte has verified the data but due to nature of the study and solution implementation timelines involved certain
assumptions have been made to derive the potential ROI therefore it can impact the accuracy of the data and analysis. This case study is a validation
of the benefits that the client derived from implementing Newgen solutions in its operational and business scenario and is not meant to be used for
competitive product analysis. The study was commissioned only for calculation of the ROI derived from implementing Newgen's solutions and not
to endorse its solutions by Deloitte.

This document contains general information only and Deloitte Touché Tohmatsu India Pvt. Ltd is not, by means of this publication, rendering
accounting, business, financial, investment, legal, tax or other professional advice or services. This publication is not a substitute for such
professional advice or services, nor should it be used as a basis for any decision or action that may affect your business. Before making any decision or
taking any action that may affect your business, you are advised to consult a qualified professional advisor. Deloitte, its affiliates and related entities
shall not be responsible for any loss sustained by any person who makes decisions based solely on the information present in this publication.
Deloitte, its affiliates and related entities shall not be responsible for any future changes or modifications done to the signed off published
document.

About Deloitte

Deloitte refers to one or more of Deloitte Touche Tohmatsu, a Swiss Verein, and its network of member firms, each of which is a legally separate and
independent entity. Please see www.deloitte.com/about for a detailed description of the legal structure of Deloitte Touche Tohmatsu and its
member firms.

About Newgen

Newgen Software Technologies Limited is the market leader in Business Process Management (BPM) and Enterprise Content Management (ECM),
with a global footprint of about 750 installations in over 35 countries. More than 100 of these implementations are large, mission-critical solutions
deployed at world's leading BFSI, BPO and Fortune Global 500 companies.

Newgen is recognized by distinguished analyst firms like Frost and Sullivan as A 'Hot Company to Watch for' in their global ECM Market report,
2009 and by IDC in its exclusive report “Newgen Software: Global Leader in Business Process Management and Document Management
Solutions”. Newgen is a winner of prestigious award, such as CNBC-TV18, “Emerging India Award 2008”.

With HSBC and SAP investment, Newgen is one of the rare product companies to have backing of both leading financial and technology companies
of the world. Newgen’s Quality Systems are certified against ISO 9001:2008 and Information Security Standard, ISO 27001:2005. Newgen has been
assessed at CMMI Level3.




Corporate Office
Newgen Software Technologies Ltd.                                               Newgen Software Inc.
A-6, Satsang Vihar Marg,                                                        1364 Beverly Road, Suite 300
Qutab Institutional Area,                                                       McLean, VA 22101
New Delhi - 110 067 INDIA                                                       Tel: +1-703-439-0703
Tel: +91-11-4077 0100, 2696 3571, 2696 4733                                     Email: usa@newgensoft.com
Fax: +91-11-2685 6936
Email: corpmktg@newgensoft.com

Benefits from Implementing BPM Solution at a Leading Private Insurance Player

  • 1.
    Benefits from implementing BPMsolution at a leading private insurance player
  • 2.
    At a Glance Max New York Life Insurance, one of India's top private players, implemented Newgen's Business Process Management (BPM) solution to improve their critical business processes, increase employee productivity and efficiency, and achieve operational excellence. The quick implementation of the solution by Newgen ensured that the insurer started reaping benefits within the first year of deployment. Key Challenges • Processing delays and low productivity • Dependency on physical movement of documents between departments and locations • Difficulty in measuring and monitoring of performance • High operational costs • Major challenges in handling the burgeoning volume of transactions • Difficulty in meeting regulatory requirements and customer servicing timelines Key Benefits Area Benefits Increase in Employee More than 70% Productivity and efficiency Reduction in TATs, processing More than 75% time and servicing time Return on Investment of Reduction in Operational Costs Around 50% 135%1 Increase in Customer Service For both existing Quality and Satisfaction & new customers Increase in Volumes of Almost 300% transactions handled per day Reduction in Dependency on 100% physical documents 1 Refer “Methodology” section for details on how Return on Investments (ROI) has been calculated 1 of 8
  • 3.
    Background Like other playersin the life insurance industry, this insurer was in the growth phase and wanted to provide cutting edge service to their customers. With a strong quality “The continual increase orientation, the focus was on developing their servicing in the effort required for quality, turnaround time and other customer service parameters as key differentiators. Max New York Life looked servicing customer at its emerging business requirements: a new range of requests, was a major products, a new set of distribution channels, new processes and full automation of its operational processes. To keep concern for the Policy pace with its growing business requirements and aggressive growth strategy these, they decided to strengthen their Owner servicing back-office solutions and processes. This initiated the department” insurer to implement a BPM solution. Their aim was to have a solution that would not only handle existing business processes but also meet future operational demands. Key Challenges Area Key Challenges Productivity • Physical transportation of documents between departments and locations increased the waiting time before which processing could start • Delay in indentifying discrepancies as verification could only be done at the Head Office, where all the physical records were maintained • Duplication of data entry due to lack of integration with legacy applications • Low employee productivity and operational efficiency Operational Costs • Increase in cost of operations with the incremental increase in operations • High shipping and document handling cost recurring costs of couriering documents between locations/photocopying costs/printing costs • Time cost due to a long processing cycle and delays caused by unavailability of documents • High overheads on support staff and other related activities Customer Service • High turn around time to process customer requests due to complexity of requests and difficulty in retrieving relevant customer information from different sources • Difficulty in adhering to regulatory requirements in terms of servicing customer requests Document Handling • High risk of documents getting misplaced and lost inability to track documents, documents getting worn through multiple handling and couriering • Major expenses incurred in terms of infrastructure, support staff and time delays for document management Productivity Measuring • Manual process with high physical document dependency gave rise to factors beyond the control of users, which affected performance and productivity • Dependency on spreadsheets for capturing user performance data made performance tracking a cumbersome job for supervisors and managers 2 of 8
  • 4.
    The Solution Based onMax New York Life Insurance's requirements, department is responsible for generating revenue for the Newgen developed a customized solution, consisting of the company. New Business is responsible for correct following products: assessment of each case for any additional requirement (underwriting/medical/premium amount) and ultimately • OmniFlowTM - workflow solution closure of the case through issuance of the policy. TM • OmniDocs - document management solution • New Business : The solution directly impacted issuance • OmniScan TM (OmniCapture) - image capture and time, user productivity and volumes of transactions indexing solution handled. The centralized solution has all the process rules and business logic built into its design, enabling it • Record Management SystemTM - record management to handle all kinds of complexities associated with policy solution issuance for different kinds of product categories. Processing time has reduced significantly with users The centralized solution was implemented in record time at across locations having instant access to scanned images the Head Office and in offices spread across 37 locations in of the application form and supporting documents. Role India. These locations were given web access to defined access rights ensured complete security and OmniFlow™. Additionally, certain locations specified as confidentiality. The solution attaches all the documents “Service Centres” were installed with Remote Image servers generated by the core application (counter offers, for managing locally scanned images. response letters, etc.) to the relevant work item and Max New York Life implemented Newgen's BPM solution forwards it to the next step. The users are also provided for two of its most critical processes – New Business and with additional facilities, which help in efficient load Policy Owner Servicing. POS department is responsible balancing, reduction in both document retrieval time for servicing all kinds of diverse and complex service and cost, quicker resolution of discrepancies and instant requests from existing policy owners. A customer may have tracking of case status. For managers and supervisors, one or multiple different policies. Therefore, the customer the solution helps in efficient load balancing and easier requests can vary across various permutations and productivity assessment. The solution provides complete combinations. The centralized New Business department visibility of both the process (for each transaction) and processes all new proposals at the Head Office (HO). The user performance across the organization. 3 of 8
  • 5.
    • Policy OwnerServicing (POS): Other than being one • Display of relevant information from the core application of the critical customer facing departments, POS also reducing, information searching and retrieving time has the responsibility of ensuring compliance with • Automatic generation of relevant documents at stringent regulatory requirements in terms of delivery different worksteps of the process timelines and verification processes. The solution's rule- based workflow design has incorporated all the process • Built-in feature to help supervisors /managers allocate rules and business logic for various types of service work and ensure workload balancing requests. The solution has a user friendly interface and • Monitoring and performance measurement features various system services, which extracts and displays used for better visibility of business and user relevant customer information from the core system. performance The solution also addresses the challenges, users were facing while handling complex customer requests. Critical activities like “signature verification” of customers are now enforceable using the workflow. The flexibility of Newgen's solution ensured that any process modifications/requirements are easily incorporated in the workflow. Over 50% increase in productivity was “A highly scalable achieved as an outcome of the time saved through easy access to relevant customer information. The team's solution, allowing the performance, in terms of volumes of transaction insurer to keep handled per day, increased by more than 100%.* operations in pace with • Scanned proposals can be introduced into the workflow from any location providing instant access for processing business growth*” and eliminating document arrival waiting time Yearly Growth in Business & Number of Users (Supported by the Solution) 1,800 2500 No. of Transactions (in '000) 1,600 1,400 2000 1,200 Nos. of Users 1500 1,000 800 1000 600 400 500 200 0 2004 2005 2006 2007 2008 No of closed Transactions No concurrent of users * As per data provided by Newgen’s client 4 of 8
  • 6.
    Automated policy Issuanceprocess, using Workflow 5 of 8
  • 7.
    Key Benefits andROI Reduction in operating costs, travel and communication expenses, office stationary, infrastructure usage, printing “More than 100% increase and postage costs were some of the common direct benefits of BPM which the insurer also achieved through the in productivity level in the Newgen solution. The insurer also achieved other benefits first year of deployment, like productivity gains, reduction in IT infrastructure costs through better utilisation and reduction in timelines. exceeding 250% over the • Reduced cycle time in processing customer requests next three years.*” and issuance of new policies • Better visibility by providing critical inputs for Dashboards and MIS • Efficient resource utilization through optimized load balancing via built-in system services • Scalable solution that enables faster rollout of initiatives • More than 100% increase in productivity level in the first year of deployment, exceeding 250% over the next three years.* • Return on Investment of 180%1 YoY Productivity movement in comparison to Preimplementation Scenario of transactions closed per day per employee) Per Employee Productivity (in terms of no 40 17 35 30 14 15 14 25 20 20 7 15 13 15 10 14 4 9 5 3 0 2003 2004 2005 2006 2007 2008 POS Productivity NB Productivity 1 Refer “Methodology” section for details on how Return on Investments (ROI) has been calculated * As per data provided by Newgen’s client 6 of 8
  • 8.
    Other Benefits • Meet compliance and regulatory guidelines and requirements in terms of TATs and verification processes “Enhanced customer • Identification of discrepancies at an earlier stage and service, better leveraging their faster resolution of team knowledge, • Improved customer satisfaction through quicker and improved employee better servicing, and reduced customer response timelines productivity Max New • End-to-end audit trails facilitating faster query York achieved it all resolution and tracking of transactions through the workflow • Enabling the deployment of dashboards and monitoring reports for senior management, needing solution” quicker access to key metrics • Reduction in administrative and infrastructure usage cost 7 of 8
  • 9.
    Methodology The ROI calculationrepresents the relative value of a Benefits were calculated by quantifying the returns project's cumulative net benefits over the analysis period, achieved through TAT improvements, higher employee divided by the project's cumulative costs, expressed as a productivity and reduction in various cost heads. In case of percentage. In a formula, this can be represented as: ROI = Max New York Life, some of the benefit areas evaluated cumulative net benefit / total investments. For Max New were: York Life, the ROI it achieved from the implementation of • Resource savings – from reduced hirings Newgen's BPM solution was derived on the basis of total benefits achieved and investments made by the company • Time savings – reduction in processing time over a period of three years. • Capital expense reductions – savings in expenses such Investments includes both one time and annual recurring as facilities, workstations, rentals costs incurred by Max New York Life, for components like • Productivity benefits – increase in volumes of • Implementation, software and initial license cost, transactions processed per day • Hardware The above mentioned data and information was sourced through the following: • Maintenance and production support • Primary Research (customized questionnaire) • User training • Secondary Research (Third Party Industry Reports and Deloitte Global Benchmarks and Survey Reports) 8 of 8
  • 10.
    Disclaimer The ROI analysiswas commissioned by Newgen and has been done by Deloitte for the client provided by Newgen. The analysis was done based on data provided by Newgen and its client and Deloitte makes no assertions on the potential ROI that other organizations might receive by using Newgen's solutions. Deloitte has verified the data but due to nature of the study and solution implementation timelines involved certain assumptions have been made to derive the potential ROI therefore it can impact the accuracy of the data and analysis. This case study is a validation of the benefits that the client derived from implementing Newgen solutions in its operational and business scenario and is not meant to be used for competitive product analysis. The study was commissioned only for calculation of the ROI derived from implementing Newgen's solutions and not to endorse its solutions by Deloitte. This document contains general information only and Deloitte Touché Tohmatsu India Pvt. Ltd is not, by means of this publication, rendering accounting, business, financial, investment, legal, tax or other professional advice or services. This publication is not a substitute for such professional advice or services, nor should it be used as a basis for any decision or action that may affect your business. Before making any decision or taking any action that may affect your business, you are advised to consult a qualified professional advisor. Deloitte, its affiliates and related entities shall not be responsible for any loss sustained by any person who makes decisions based solely on the information present in this publication. Deloitte, its affiliates and related entities shall not be responsible for any future changes or modifications done to the signed off published document. About Deloitte Deloitte refers to one or more of Deloitte Touche Tohmatsu, a Swiss Verein, and its network of member firms, each of which is a legally separate and independent entity. Please see www.deloitte.com/about for a detailed description of the legal structure of Deloitte Touche Tohmatsu and its member firms. About Newgen Newgen Software Technologies Limited is the market leader in Business Process Management (BPM) and Enterprise Content Management (ECM), with a global footprint of about 750 installations in over 35 countries. More than 100 of these implementations are large, mission-critical solutions deployed at world's leading BFSI, BPO and Fortune Global 500 companies. Newgen is recognized by distinguished analyst firms like Frost and Sullivan as A 'Hot Company to Watch for' in their global ECM Market report, 2009 and by IDC in its exclusive report “Newgen Software: Global Leader in Business Process Management and Document Management Solutions”. Newgen is a winner of prestigious award, such as CNBC-TV18, “Emerging India Award 2008”. With HSBC and SAP investment, Newgen is one of the rare product companies to have backing of both leading financial and technology companies of the world. Newgen’s Quality Systems are certified against ISO 9001:2008 and Information Security Standard, ISO 27001:2005. Newgen has been assessed at CMMI Level3. Corporate Office Newgen Software Technologies Ltd. Newgen Software Inc. A-6, Satsang Vihar Marg, 1364 Beverly Road, Suite 300 Qutab Institutional Area, McLean, VA 22101 New Delhi - 110 067 INDIA Tel: +1-703-439-0703 Tel: +91-11-4077 0100, 2696 3571, 2696 4733 Email: usa@newgensoft.com Fax: +91-11-2685 6936 Email: corpmktg@newgensoft.com