Arunan R
BLIPL-Chennai
 Project Logistics Overview
 Cargo
 Classification
 Inspection
 Vehicle Selection
 Cargo Documentation
 Vehicle Documentation
 Loading & Lashing
 Dispatch &Tracking
 Site Inspection & Coordination
 Logistics of materials destined for projects in
various industries/sectors
 e.g.,
 Power (Generation &Transmission ofThermal, Hydel,
Wind, Solar)
 Oil (Refineries and Other Petrochemical Industries)
 Others (Paper, Steel, Mining, Infra etc)
 Materials are classified as General & Over
Dimensional/Over Weight for logistical purpose
 General Cargo
 Dimensions: 12 x 2.4 x 2.4 meters
 Weight: Up to 32 MT
 Over Dimensional and/or OverWeight
 All cargo not falling under above
 Shipper/Manufacturer Location
 Port of Discharge
 In-Transit
 CFS
 Cargo Dimension up to 12 x 2.4 x 2.4 meters
andWeight up to 22 MT – High BedTrailer
 Cargo Height up to 3 meters andWeight up to
30 MT – Semi Low BedTrailer
 Cargo HeightAbove 3 meters but less than 6
meters and weight up to 32 MT – Low Bed
Trailer
 Beyond above classification: Multi-Axle
Trailers or HydraulicTrailers
 Route Survey is mandatory for ODC/OWCs
 Commercial Invoice
 CST/TIN Nos
 Packing List
 Way Bill or Declaration
 Consignment Note or Lorry Receipt (LR)
 Driver License
 Registration Copy
 Insurance
 Fitness
 Tax Paid Certificate
 National Permit
 Pollution Under Control Certificate (PUC)
Equipment No RC Tax FC Insurance NP PUC
GJ 12 Z 4076 Yes 31-Mar-16 19-Jun-15 06-May-16 21-Mar-18 NA
GJ 12 Z 0140 Yes 31-Mar-16 08-May-15 17-May-15 19-Jun-18 NA
GJ 12 Z 3453 Yes 31-Mar-16 04-Feb-15 04-Nov-15 19-Feb-18 NA
GJ 12 Z 0137 Yes 31-Mar-16 08-May-15 17-May-15 19-Jun-18 NA
MH 06 AC 8289 Yes 31-Aug-15 29-Jan-16 25-Jul-15 17-Apr-18 23-Jan-16
 Loading
 Crane
 Fork Lift
 Lashing
 Nylon Belt with Ratchet (capacity 3-20 MT)
 Steel Chain with D-Shackle /Turn-Buckle (10 – 25
MT)
 Lock (in the case of containers)
 Ensure Cargo is covered (depending on
weather conditions or client requirement)
 ConfirmVehicle Documentation
 Confirm Cargo Documentation
 Confirm Lashing/Lock
 ConfirmTransitTime
 Track vehicle
 Update Status
 Site Survey
 Coordination with site representative
(Consignee/EPC Contractor etc)
 Receive materials &Tally with Packing List
 Take acknowledgement on Lorry Receipt
 Send complete documentation to HO/Billing
Office
Basics of Project Cargo Operations
Basics of Project Cargo Operations

Basics of Project Cargo Operations

  • 1.
  • 2.
     Project LogisticsOverview  Cargo  Classification  Inspection  Vehicle Selection  Cargo Documentation  Vehicle Documentation  Loading & Lashing  Dispatch &Tracking  Site Inspection & Coordination
  • 3.
     Logistics ofmaterials destined for projects in various industries/sectors  e.g.,  Power (Generation &Transmission ofThermal, Hydel, Wind, Solar)  Oil (Refineries and Other Petrochemical Industries)  Others (Paper, Steel, Mining, Infra etc)  Materials are classified as General & Over Dimensional/Over Weight for logistical purpose
  • 4.
     General Cargo Dimensions: 12 x 2.4 x 2.4 meters  Weight: Up to 32 MT  Over Dimensional and/or OverWeight  All cargo not falling under above
  • 5.
     Shipper/Manufacturer Location Port of Discharge  In-Transit  CFS
  • 6.
     Cargo Dimensionup to 12 x 2.4 x 2.4 meters andWeight up to 22 MT – High BedTrailer  Cargo Height up to 3 meters andWeight up to 30 MT – Semi Low BedTrailer  Cargo HeightAbove 3 meters but less than 6 meters and weight up to 32 MT – Low Bed Trailer  Beyond above classification: Multi-Axle Trailers or HydraulicTrailers  Route Survey is mandatory for ODC/OWCs
  • 12.
     Commercial Invoice CST/TIN Nos  Packing List  Way Bill or Declaration  Consignment Note or Lorry Receipt (LR)
  • 13.
     Driver License Registration Copy  Insurance  Fitness  Tax Paid Certificate  National Permit  Pollution Under Control Certificate (PUC)
  • 14.
    Equipment No RCTax FC Insurance NP PUC GJ 12 Z 4076 Yes 31-Mar-16 19-Jun-15 06-May-16 21-Mar-18 NA GJ 12 Z 0140 Yes 31-Mar-16 08-May-15 17-May-15 19-Jun-18 NA GJ 12 Z 3453 Yes 31-Mar-16 04-Feb-15 04-Nov-15 19-Feb-18 NA GJ 12 Z 0137 Yes 31-Mar-16 08-May-15 17-May-15 19-Jun-18 NA MH 06 AC 8289 Yes 31-Aug-15 29-Jan-16 25-Jul-15 17-Apr-18 23-Jan-16
  • 15.
     Loading  Crane Fork Lift  Lashing  Nylon Belt with Ratchet (capacity 3-20 MT)  Steel Chain with D-Shackle /Turn-Buckle (10 – 25 MT)  Lock (in the case of containers)  Ensure Cargo is covered (depending on weather conditions or client requirement)
  • 20.
     ConfirmVehicle Documentation Confirm Cargo Documentation  Confirm Lashing/Lock  ConfirmTransitTime  Track vehicle  Update Status
  • 21.
     Site Survey Coordination with site representative (Consignee/EPC Contractor etc)  Receive materials &Tally with Packing List  Take acknowledgement on Lorry Receipt  Send complete documentation to HO/Billing Office