BRIDGEWAY GROUP
BRIDGEWAY GROUP - FACTS
22 offices in GCC
countries & India.
Employee strength
over 10000 – highly
trained & skilled.
Multi-modal
capability.
Contributing to the
progress of multiple
nations with our
own schools.
Warehouses – over
100,000 sq. ft. (
strategically located
inside & outside the
free zone in U.A.E.,
Jebel Ali).
ORGANISATION CHART - BRIDGEWAY GROUP
CHAIRMAN
P.V. ABDUL WAHAB
MANAGING
DIRECTOR
JABER A.W
COO
P.V HAMEED
BEST(Bridgeway
Education &
Systems Training)
E.M ASHRAF
Bridgeway Medical
Systems
ASHRAF THAYYIL
BRIDGEWAY
WATCHES(CITY
MOMENTS)
DHANDAPANI
BRIDGEWAY REAL
ESTATE
NIYASI
CAR DEALERSHIP
(INDUS MOTORS)
KURUVILA
MALL
MANAGEMENT
BALU
BRIDGEWAY
SHIPPING
JAVED
CUSTOMER BENEFITS – BRIDGEWAY GROUP
One - stop solution for logistics services from a single
source.
Full range of international & domestic products &
services.
High level of customer services, reliability & speed.
Global network of 2000 offices in 130 countries.
Combined experience of more than 160 years amongst
personnel’s.
Perfect understanding of local conditions.
BRIDGEWAY SHIPPING - DIVISIONS
GLOBAL FORWARDING
PROJECT FORWARDING
EXHIBITION & EVENT LOGISTICS
RELOCATIONS
ART LOGISTICS
GCC TRUCKING
WAREHOUSING & DISTRIBUTION
Continue…….
Bridgeway Shipping & Clearing Services L.L.C. comprises of divisions
with wide-ranging operations in Freight Forwarding, Project Forwarding,
Exhibition Logistics, Art Logistics, Industrial & Household Relocations
& GCC Trucking. Bridgeway Shipping & Clearing Services L.L.C. is
100% owned by the Bridgeway Group of Companies. The Bridgeway
Group’s revenues in 2011 amounted to over AED 750 million.
ORGANISATION CHART - BRIDGEWAY SHIPPING
DIRECTOR
JAVED A.W
GLOBAL FORWARDING
SAKEER
SALES
4 Nos
CUSTOMER SERVICE
2 Nos.
OPERATIONS
14 Nos.
PROJECT FORWARDING
THOMAS
SALES
2 Nos
CUSTOMER SERVICE
2 Nos.
OPERATIONS
8 Nos.
RELOCATIONS
JOB
SALES
8 Nos.
CUSTOMER SERVICE
6 Nos.
OPERATIONS
26 Nos.
EXHIBITIONS
MANOJ
SALES
5 Nos.
CUSTOMER SERVICE
4 Nos.
OPERATIONS
21 Nos.
GCC TRUCKING
FIDA
SALES
3 Nos
OPERATIONS
7
ART LOGISTICS
ZAHID
SALES
1 No
OPERATIONS
2 Nos.
WAREHOUSING &
DISTRIBUTION
UJEN
SALES
2 Nos.
OPERATIONS
7 Nos.
FINANCE/
ADMINISTRATION/ HR
JAMSHEER
FINANCE
4 Nos.
ADMINISTRATION
3 Nos.
HR
1 No.
EMPLOYEE STRENGTH - 142
1. GLOBAL FORWARDING
 Leading Airfreight & Ocean freight forwarding company
in U.A.E., covering the entire gamut of door-to-door logistics
including customs clearance, warehousing, distribution and
transportation.
 Has a Global network of 2000 offices in 130 countries.
 IATA & FIATA approved.
 Operational offices & warehouses within the free zone in
Jebel Ali & in Dubai area.
Origin Services
 Sale leads / Enquiry.
 On time Quotations.
 Proper Follow up.
 Planning of pick up, storage and stuffing of cargo.
 Proper planning of Sea/Air Freight for arrival deadlines at
destination.
 Export Documentation.
Destination Services
 Fast Action of Pre Alert.
 Proper advice to assist agents for documentation.
 Coordination with shipping line / airline.
 Arrangement of multimodal transportation.
 Excellent relation with Ports and Customs Authority for
clearance of cargo.
 Own bank Guarantees with UAE Customs Authority (up to AED 5
million).
 Project planning, coordination & execution in a time
bound manner, along with technical support.
 Heavy lifts, Offshore oil rig supplies, Industrial turbines,
Transformers, Oversized equipments, voluminous heavy
structures (iron & steel sheets, bars, beams, coils), bulk cargo.
 Full & part charter capabilities.
 Multi modal transport capabilities.
 Marine & Route surveys.
 Special equipment transportation & handling.

PROJECT FORWARDING
Project Forwarding
 Energy (Oil & Gas)
 Power (Hydro, Thermal & Nuclear)
 Infrastructure (Road, Airport, Port, Bridges & Sea link)
 Industrial plants
 Iron & Steel
 Direct & Excellent relationship with vessel owners, air carriers,
ODC transporters & equipment providers.
GALLERY Page 1/11
GALLERY Page 2/11
GALLERY Page 3/11
GALLERY Page 4/11
GALLERY Page 5/11
GALLERY Page 6/11
GALLERY Page 7/11
GALLERY Page 8/11
GALLERY Page 9/11
GALLERY Page 10/11
GALLERY Page 11/11
EXHIBITION LOGISTICS
 Exhibitions, Events, Concerts & Road shows Freight
management.
 EXIM freight management for above mentioned activities.
 Official exhibition freight management company for
various shows in the Middle East region.
 Own fleet of Transport, Equipments & Warehouses for
above mentioned activities.
 Skilled & Trained personnel for above mentioned
activities.
SERVICES
 Official forwarder for exhibition organizers.
 Official cargo handlers for exhibitions venues.
 Official forwarder on behalf of private venues.
 Logistics service provider for stand builders.
 Total logistics service provider for exhibitors.
 Total logistics provider for international organizers.
 Logistics partners for international agents.
ON-SITE SERVICES
 Experienced on-site staff having a cumulative experience of
60+years
 Own equipment and manpower according to the exhibition
 Proper Coordination and communication with agents and
exhibitors
 Timely response/solutions for all their queries
 Timely delivery of cargo/empties at the booth on priority
 Packing/Unpacking and placement of items done quickly
 Storage of empties
 Gathering of disposal instructions
WAREHOUSING/TEMPORARY STORAGE
 Own warehouse of 12,000 sqft
 Proper insulated warehouse suitable for any exhibition cargo
 Conveniently attached open yard used for Stuffing/Destuffing
 15 days free storage time till buildup
 Own equipments handled by Professional Staffs
RELOCATIONS
 Mission: Through Professional Management of Tailored Relocation
Services Bridgeway strives to deliver focused, productive employees,
who immediately add value to their organization.
 Industrial moves, including dismantling, packing & relocating
factories.
 Office relocations.
 Vehicle relocations.
 Pet relocations.
Continue…
 International & Domestic Personal effects Relocations on Door to
Door Basis.
 Settling in Services in terms of Housing, Schooling, Immigration
advisory, City Orientation, and Property Management.
 Long & short term storages in our state of the art warehouses
(temperature controlled & ambient).
 Comprehensive Transit Insurance for Peace of mind.
ART LOGISTICS
 Gallery services
 Museum services
 Artists services
 Sculpture positioning
 Art Exhibitions (Official freight management company for Art
Dubai, the most premium art exhibition in the middle east).
 Installation & De-installation services.
GCC TRUCKING
 Own & outsourced fleet of trucking in a time defined manner.
 Weekly consolidations from multiple points to multiple destinations
within GCC countries.
 Excellent knowledge on road customs clearances requirements
across GCC countries.
 Dedicated & knowledgeable staff.
 Track & Trace capabilities.
SECURITY
• As one of the prime forwarders, we have robust security
policies and procedures in place which meet all
international security requirements and regulation and has
had these for many years. We are complying fully with all
relevant directives and regulations issued globally and by
single countries and authorities regarding shipments, which
are subject to special security protocol and treated in
accordance with the necessary requirements.
Continue…
• We will at all times continue to work diligently and
proactively with authorities, representations from country
legislative as well as industry bodies to ensure full
compliance and to support and collaborate on improving
security aspects further. For security reasons, please
understand that we do not divulge details of our security
standards, policies or procedures.
OUR CUSTOMS CLEARANCE PROFICIENCY
 Licensed by customs at all major ports & airports in U.A.E.
 Licenses by customs in other GCC countries through our
partners.
 Staff strength of over 50 people directly dealing with customs
clearance (Imports & Exports, Air & Ocean).
 All personnel dealing with customs are Qualified & suitably
Certified by customs to handle customs operations respectively.
OUR WAREHOUSING & DISTRIBUTION CAPABILITIES
 Finished goods warehouse – Mother W/H.
 Networks.
 Spare parts warehouse.
 Bonded warehouse.
 Part test & repair center.
 Inspection center.
 Battery charging facility.
 Examination & Palletisation of cargo.
 Shrink wrapping, Lashing/Choking & Re-taping.
 Handling of Transshipment cargo.
OUR EXPERTISE IN W & D
 Finished Goods.
 Hubbing
 Inventory/Location
Management
 FIFO/FEFO/Sr. No.
Tracking
 Merging & Kitting, Light
assembly
 Promo Bundling
 Labeling / Packing
 Invoicing &
Documentation
 Spares.
 Inventory
 Renaming of parts/MRP
 Labeling / Reboxing
 Reverse Logistics
 Vendor Management
 Repair & Testing
 Warranty
 Tracking/Replacement
 Scrapping
 Re-export
ACCREDITIONS
 Most valuable member of the MTG global network of freight forwarders.
 Member of WCAPN, the project network arm of WCA.
 Certified by National Association of Freight Logistics (U.A.E.).
 Member of IELA - Internationally experienced professional exhibition
freight forwarders association.
 Member of IAM (International Association of Movers) – One of the most
valued networks for International Relocations.
 Approved by IATA & FIATA.
CONTACT
Bridgeway shipping & Clearing Services L.L.C.
South Zone, JAFZA
P. O. Box: 8109, Dubai, U.A.E.
Tel.: +971 4 8861170
Fax: +971 4 8861192
http://www.bridgewayshipping.com
THANK YOU

BRIDGEWAY PROFILE.ppsx

  • 1.
  • 2.
    BRIDGEWAY GROUP -FACTS 22 offices in GCC countries & India. Employee strength over 10000 – highly trained & skilled. Multi-modal capability. Contributing to the progress of multiple nations with our own schools. Warehouses – over 100,000 sq. ft. ( strategically located inside & outside the free zone in U.A.E., Jebel Ali).
  • 3.
    ORGANISATION CHART -BRIDGEWAY GROUP CHAIRMAN P.V. ABDUL WAHAB MANAGING DIRECTOR JABER A.W COO P.V HAMEED BEST(Bridgeway Education & Systems Training) E.M ASHRAF Bridgeway Medical Systems ASHRAF THAYYIL BRIDGEWAY WATCHES(CITY MOMENTS) DHANDAPANI BRIDGEWAY REAL ESTATE NIYASI CAR DEALERSHIP (INDUS MOTORS) KURUVILA MALL MANAGEMENT BALU BRIDGEWAY SHIPPING JAVED
  • 4.
    CUSTOMER BENEFITS –BRIDGEWAY GROUP One - stop solution for logistics services from a single source. Full range of international & domestic products & services. High level of customer services, reliability & speed. Global network of 2000 offices in 130 countries. Combined experience of more than 160 years amongst personnel’s. Perfect understanding of local conditions.
  • 5.
    BRIDGEWAY SHIPPING -DIVISIONS GLOBAL FORWARDING PROJECT FORWARDING EXHIBITION & EVENT LOGISTICS RELOCATIONS ART LOGISTICS GCC TRUCKING WAREHOUSING & DISTRIBUTION
  • 6.
    Continue……. Bridgeway Shipping &Clearing Services L.L.C. comprises of divisions with wide-ranging operations in Freight Forwarding, Project Forwarding, Exhibition Logistics, Art Logistics, Industrial & Household Relocations & GCC Trucking. Bridgeway Shipping & Clearing Services L.L.C. is 100% owned by the Bridgeway Group of Companies. The Bridgeway Group’s revenues in 2011 amounted to over AED 750 million.
  • 7.
    ORGANISATION CHART -BRIDGEWAY SHIPPING DIRECTOR JAVED A.W GLOBAL FORWARDING SAKEER SALES 4 Nos CUSTOMER SERVICE 2 Nos. OPERATIONS 14 Nos. PROJECT FORWARDING THOMAS SALES 2 Nos CUSTOMER SERVICE 2 Nos. OPERATIONS 8 Nos. RELOCATIONS JOB SALES 8 Nos. CUSTOMER SERVICE 6 Nos. OPERATIONS 26 Nos. EXHIBITIONS MANOJ SALES 5 Nos. CUSTOMER SERVICE 4 Nos. OPERATIONS 21 Nos. GCC TRUCKING FIDA SALES 3 Nos OPERATIONS 7 ART LOGISTICS ZAHID SALES 1 No OPERATIONS 2 Nos. WAREHOUSING & DISTRIBUTION UJEN SALES 2 Nos. OPERATIONS 7 Nos. FINANCE/ ADMINISTRATION/ HR JAMSHEER FINANCE 4 Nos. ADMINISTRATION 3 Nos. HR 1 No. EMPLOYEE STRENGTH - 142
  • 8.
    1. GLOBAL FORWARDING Leading Airfreight & Ocean freight forwarding company in U.A.E., covering the entire gamut of door-to-door logistics including customs clearance, warehousing, distribution and transportation.  Has a Global network of 2000 offices in 130 countries.  IATA & FIATA approved.  Operational offices & warehouses within the free zone in Jebel Ali & in Dubai area.
  • 9.
    Origin Services  Saleleads / Enquiry.  On time Quotations.  Proper Follow up.  Planning of pick up, storage and stuffing of cargo.  Proper planning of Sea/Air Freight for arrival deadlines at destination.  Export Documentation.
  • 10.
    Destination Services  FastAction of Pre Alert.  Proper advice to assist agents for documentation.  Coordination with shipping line / airline.  Arrangement of multimodal transportation.  Excellent relation with Ports and Customs Authority for clearance of cargo.  Own bank Guarantees with UAE Customs Authority (up to AED 5 million).
  • 11.
     Project planning,coordination & execution in a time bound manner, along with technical support.  Heavy lifts, Offshore oil rig supplies, Industrial turbines, Transformers, Oversized equipments, voluminous heavy structures (iron & steel sheets, bars, beams, coils), bulk cargo.  Full & part charter capabilities.  Multi modal transport capabilities.  Marine & Route surveys.  Special equipment transportation & handling.  PROJECT FORWARDING
  • 12.
    Project Forwarding  Energy(Oil & Gas)  Power (Hydro, Thermal & Nuclear)  Infrastructure (Road, Airport, Port, Bridges & Sea link)  Industrial plants  Iron & Steel  Direct & Excellent relationship with vessel owners, air carriers, ODC transporters & equipment providers.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
    EXHIBITION LOGISTICS  Exhibitions,Events, Concerts & Road shows Freight management.  EXIM freight management for above mentioned activities.  Official exhibition freight management company for various shows in the Middle East region.  Own fleet of Transport, Equipments & Warehouses for above mentioned activities.  Skilled & Trained personnel for above mentioned activities.
  • 25.
    SERVICES  Official forwarderfor exhibition organizers.  Official cargo handlers for exhibitions venues.  Official forwarder on behalf of private venues.  Logistics service provider for stand builders.  Total logistics service provider for exhibitors.  Total logistics provider for international organizers.  Logistics partners for international agents.
  • 26.
    ON-SITE SERVICES  Experiencedon-site staff having a cumulative experience of 60+years  Own equipment and manpower according to the exhibition  Proper Coordination and communication with agents and exhibitors  Timely response/solutions for all their queries  Timely delivery of cargo/empties at the booth on priority  Packing/Unpacking and placement of items done quickly  Storage of empties  Gathering of disposal instructions
  • 27.
    WAREHOUSING/TEMPORARY STORAGE  Ownwarehouse of 12,000 sqft  Proper insulated warehouse suitable for any exhibition cargo  Conveniently attached open yard used for Stuffing/Destuffing  15 days free storage time till buildup  Own equipments handled by Professional Staffs
  • 28.
    RELOCATIONS  Mission: ThroughProfessional Management of Tailored Relocation Services Bridgeway strives to deliver focused, productive employees, who immediately add value to their organization.  Industrial moves, including dismantling, packing & relocating factories.  Office relocations.  Vehicle relocations.  Pet relocations.
  • 29.
    Continue…  International &Domestic Personal effects Relocations on Door to Door Basis.  Settling in Services in terms of Housing, Schooling, Immigration advisory, City Orientation, and Property Management.  Long & short term storages in our state of the art warehouses (temperature controlled & ambient).  Comprehensive Transit Insurance for Peace of mind.
  • 30.
    ART LOGISTICS  Galleryservices  Museum services  Artists services  Sculpture positioning  Art Exhibitions (Official freight management company for Art Dubai, the most premium art exhibition in the middle east).  Installation & De-installation services.
  • 31.
    GCC TRUCKING  Own& outsourced fleet of trucking in a time defined manner.  Weekly consolidations from multiple points to multiple destinations within GCC countries.  Excellent knowledge on road customs clearances requirements across GCC countries.  Dedicated & knowledgeable staff.  Track & Trace capabilities.
  • 32.
    SECURITY • As oneof the prime forwarders, we have robust security policies and procedures in place which meet all international security requirements and regulation and has had these for many years. We are complying fully with all relevant directives and regulations issued globally and by single countries and authorities regarding shipments, which are subject to special security protocol and treated in accordance with the necessary requirements.
  • 33.
    Continue… • We willat all times continue to work diligently and proactively with authorities, representations from country legislative as well as industry bodies to ensure full compliance and to support and collaborate on improving security aspects further. For security reasons, please understand that we do not divulge details of our security standards, policies or procedures.
  • 34.
    OUR CUSTOMS CLEARANCEPROFICIENCY  Licensed by customs at all major ports & airports in U.A.E.  Licenses by customs in other GCC countries through our partners.  Staff strength of over 50 people directly dealing with customs clearance (Imports & Exports, Air & Ocean).  All personnel dealing with customs are Qualified & suitably Certified by customs to handle customs operations respectively.
  • 35.
    OUR WAREHOUSING &DISTRIBUTION CAPABILITIES  Finished goods warehouse – Mother W/H.  Networks.  Spare parts warehouse.  Bonded warehouse.  Part test & repair center.  Inspection center.  Battery charging facility.  Examination & Palletisation of cargo.  Shrink wrapping, Lashing/Choking & Re-taping.  Handling of Transshipment cargo.
  • 36.
    OUR EXPERTISE INW & D  Finished Goods.  Hubbing  Inventory/Location Management  FIFO/FEFO/Sr. No. Tracking  Merging & Kitting, Light assembly  Promo Bundling  Labeling / Packing  Invoicing & Documentation  Spares.  Inventory  Renaming of parts/MRP  Labeling / Reboxing  Reverse Logistics  Vendor Management  Repair & Testing  Warranty  Tracking/Replacement  Scrapping  Re-export
  • 37.
    ACCREDITIONS  Most valuablemember of the MTG global network of freight forwarders.  Member of WCAPN, the project network arm of WCA.  Certified by National Association of Freight Logistics (U.A.E.).  Member of IELA - Internationally experienced professional exhibition freight forwarders association.  Member of IAM (International Association of Movers) – One of the most valued networks for International Relocations.  Approved by IATA & FIATA.
  • 38.
    CONTACT Bridgeway shipping &Clearing Services L.L.C. South Zone, JAFZA P. O. Box: 8109, Dubai, U.A.E. Tel.: +971 4 8861170 Fax: +971 4 8861192 http://www.bridgewayshipping.com
  • 39.