SlideShare a Scribd company logo
GM WWP
Base Material
Presented by: Shital Deshmukh
Date: 08/06/2003
GM & IBM Confidential
GM & IBM Confidential
Agenda:
• Base Material Exchange Contract Updates Batch
Process
• Steps involved in updating Contract Line Items
• Performance Requirements
GM & IBM Confidential
Base Material Exchange Contract Updates
Batch Process
• The process describes how the Base Material Exchange
information that is approved on the Base Material Exchange
Approval screen is automatically posted to existing standard
blanket contracts.
• It generates the necessary data that will be needed to create
the Base Material Amendment forms.
• It will create Contract Line Item Amendments and the special
Base Material Amendment Contract forms.
• It should be understood that the edits performed by the Output
Contract process will NOT be applied in this process.
GM & IBM Confidential
Base Material Exchange Contract Updates
Batch Process …
• The process will find all of the Standard Blanket contracts with
parts that are made up of the Base Material being adjusted
and have also been flagged as “Auto Update”. The batch
process will then output new amendments for the contract line
items that are affected by the change in base material.
• The Report Status Screen will be updated and the Buyers for
the affected parts will be notified when the base material
updates are complete. The base material forms will be
specific to Buyer/Supplier/Legal Business Entity.
GM & IBM Confidential
Steps involved in updating Contract Line
Items
Step #1 - Identify Base Material Exchanges needing to update
Contracts
Retrieve all Base Material Exchange records at an ‘APPROVED’
Exchange Status from the Base Material Exchange Transaction
table, meaning that these updates have been approved but have
not yet been applied.
Step #2 - Identify Output Contracts Impacted by Base Material
Exchange
Retrieve all Standard Blanket Output Contract Line Item Periods’
Base Material records that fall on or after the Base Material
Exchange Effective Date that have the specific Base
Material/Exchange combination.
GM & IBM Confidential
Steps involved in updating Contract Line
Items…
Step #3 - Create NEW Contract Period where necessary
For each period identified, a check is made to see if that period is
effective at the time of the Base Material Exchange Effective
Date
Step #4 - Update Existing Contract Periods
For each Period Effective Date AFTER the Base Material
Exchange Effective Date with a Price Change Effective Date
before the Base Material Exchange update, the Base Material
Exchange information will be updated. Additionally, any period
with a period Effective Date equal to the Base Material Exchange
Effective Date will also be updated (no new period created). Any
period/Base Material with a Price Change Effective Date AFTER
the Base Material Exchange Effective Date is not updated.
GM & IBM Confidential
Steps involved in updating Contract Line
Items…
Step #5 - Update Contract Line Item Amendment
Once all periods are processed for a Contract Line Item, the
Contract Line Item Amendment Number will be increased.
Additionally, the Output Contract Line Item Amendment Reason
will be set to ‘Base Material Update’.
Step #6 – Creation of Contract Forms
This batch process groups all contract line items that have been
amended by the Base Material Exchange rate changes by
Buyer/Supplier/LBE. A Base Material Amendment Summary
Form and a Base Material Amendment Detail Form are created
for each Buyer/Supplier/LBE combination.
GM & IBM Confidential
Steps involved in updating Contract Line
Items…
Step #7 - Notify Interface(s) of Contract Line Item Amendment
An interface transaction will be generated to outbound the
Amendment information to the appropriate Legacy Systems.
Step #8 - Identify Pending Contract Line Item Amendment
Once all periods are processed for a Contract Line Item, a check
is performed on the Pending Contract tables to see if this same
Contract Line Item exists in pending. If it does, then the same
type of processing performed on the Output Contract (steps 3
through 5 above) is done on the Pending Contract Line Item. The
exception is that the retroactive change and retroactive price
change indicators do not need to be set as these do not exist in
pending.
GM & IBM Confidential
Steps involved in updating Contract Line
Items…
Step #9 - Identify Other Affected Pending Contract Line Items
Once all output line items and the corresponding pending
amendments are updated, any other affected pending contract
line items also need to be processed. This would include new
contract line items that are in pending only (not output) and
contract line items in pending where the pending contract line item
is affected but the corresponding output line item was not.
Step #10 - Update Approved Base Material Exchanges
After completing all updates for a given Base Material Exchange,
the System will move the Approved Base Material Exchange
update from the Base Material Exchange Transaction table to the
Base Material Exchange Cost table, where all Approved
information that has been posted to contracts exists.
GM & IBM Confidential
Performance Requirements
The updating of Contract data with Approved Base Material
Exchange(s) will be scheduled on a quarterly basis. The
scheduling of this job must ensure that it will not be running at the
same time that the Output Contract Batch process is running.

More Related Content

What's hot

Parallel settlement clinic 6.4.2017
Parallel settlement clinic 6.4.2017Parallel settlement clinic 6.4.2017
Parallel settlement clinic 6.4.2017
eSett
 
CK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost EstimateCK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost Estimate
Jeff Lu
 
civil enigneering
civil enigneeringcivil enigneering
civil enigneering
AHMED NADIM JILANI
 
SA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdfSA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdf
darshansksk
 
Subcontracting
SubcontractingSubcontracting
Subcontracting
SRITHARAN V
 

What's hot (7)

Parallel settlement clinic 6.4.2017
Parallel settlement clinic 6.4.2017Parallel settlement clinic 6.4.2017
Parallel settlement clinic 6.4.2017
 
Inventory
InventoryInventory
Inventory
 
CK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost EstimateCK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost Estimate
 
Contract savings
Contract savingsContract savings
Contract savings
 
civil enigneering
civil enigneeringcivil enigneering
civil enigneering
 
SA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdfSA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdf
 
Subcontracting
SubcontractingSubcontracting
Subcontracting
 

Viewers also liked

Hist 4 pract
Hist 4 practHist 4 pract
Hist 4 pract
Ahmed S.Ibrahim
 
Dentinogenesis
DentinogenesisDentinogenesis
Dentinogenesis
Ahmed Al-Dawoodi
 
DENTINOGENESIS
DENTINOGENESISDENTINOGENESIS
DENTINOGENESIS
Jhon Bryant Toro Ponce
 
Pulpitis OD
Pulpitis ODPulpitis OD
Pulpitis OD
IAU Dent
 
Dentinogenesis
DentinogenesisDentinogenesis
Dentinogenesis
syedsadatullah
 
Root canal treatment
Root canal treatmentRoot canal treatment
Root canal treatmentVenkat Nag
 
Apexogenesis
ApexogenesisApexogenesis
Apexogenesis
Ali Othman
 
Apexogenesis y apexificacion
Apexogenesis y apexificacionApexogenesis y apexificacion
Apexogenesis y apexificacion
4paulo74
 
Dentinogenesis Imperfecta
Dentinogenesis ImperfectaDentinogenesis Imperfecta
Dentinogenesis Imperfectashabeel pn
 
Root Canal Treatment
Root Canal TreatmentRoot Canal Treatment
Root Canal Treatment
Sumudu Himesha Meawela
 
5 root canal filling materials
5 root canal filling materials5 root canal filling materials
5 root canal filling materials
Waleed K. O. Jaber
 
Denture base materials
Denture base materialsDenture base materials
Denture base materials
Ahmed Al-obaidi
 
Root Canal Treatment
Root Canal TreatmentRoot Canal Treatment
Root Canal Treatment
endodontics
 
Pulpotomy
Pulpotomy Pulpotomy
Dentinogenesis
DentinogenesisDentinogenesis
Dentinogenesisshabeel pn
 

Viewers also liked (15)

Hist 4 pract
Hist 4 practHist 4 pract
Hist 4 pract
 
Dentinogenesis
DentinogenesisDentinogenesis
Dentinogenesis
 
DENTINOGENESIS
DENTINOGENESISDENTINOGENESIS
DENTINOGENESIS
 
Pulpitis OD
Pulpitis ODPulpitis OD
Pulpitis OD
 
Dentinogenesis
DentinogenesisDentinogenesis
Dentinogenesis
 
Root canal treatment
Root canal treatmentRoot canal treatment
Root canal treatment
 
Apexogenesis
ApexogenesisApexogenesis
Apexogenesis
 
Apexogenesis y apexificacion
Apexogenesis y apexificacionApexogenesis y apexificacion
Apexogenesis y apexificacion
 
Dentinogenesis Imperfecta
Dentinogenesis ImperfectaDentinogenesis Imperfecta
Dentinogenesis Imperfecta
 
Root Canal Treatment
Root Canal TreatmentRoot Canal Treatment
Root Canal Treatment
 
5 root canal filling materials
5 root canal filling materials5 root canal filling materials
5 root canal filling materials
 
Denture base materials
Denture base materialsDenture base materials
Denture base materials
 
Root Canal Treatment
Root Canal TreatmentRoot Canal Treatment
Root Canal Treatment
 
Pulpotomy
Pulpotomy Pulpotomy
Pulpotomy
 
Dentinogenesis
DentinogenesisDentinogenesis
Dentinogenesis
 

Similar to Base material presentation

Contract management for c&i customers
Contract management for c&i customersContract management for c&i customers
Contract management for c&i customers
Ripunjay Rathaur
 
Vendor consignment configuration doc
Vendor consignment configuration docVendor consignment configuration doc
Vendor consignment configuration doc
Lokesh Modem
 
Бюджетирвние в разрезе договоров
Бюджетирвние в разрезе договоровБюджетирвние в разрезе договоров
Бюджетирвние в разрезе договоровAnatoly Ryabukha
 
Sap scm ewm na muk 11 02
Sap scm ewm na muk 11  02 Sap scm ewm na muk 11  02
Sap scm ewm na muk 11 02
Gaddam Gaddam
 
Routing Jobsite Field Data for Approval and Billing in 4castplus
Routing Jobsite Field Data for Approval and Billing in 4castplusRouting Jobsite Field Data for Approval and Billing in 4castplus
Routing Jobsite Field Data for Approval and Billing in 4castplus
4castplus
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Bhavin Shah
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Bhavin Shah
 
SAP MM Standard Business Processes
SAP MM Standard Business ProcessesSAP MM Standard Business Processes
SAP MM Standard Business Processes
Subhrajyoti (Subhra) Bhattacharjee
 
Purchase contract
Purchase contractPurchase contract
Purchase contract
boydaemon
 
capitaltraining
capitaltrainingcapitaltraining
capitaltrainingRick Pand
 
Bearing Point REV RECOGNITION Project
Bearing Point REV RECOGNITION ProjectBearing Point REV RECOGNITION Project
Bearing Point REV RECOGNITION ProjectJim Gremillion Jr
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
R.R.G.S Bandara
 
Stock transfer using stock transport order
Stock transfer using stock transport orderStock transfer using stock transport order
Stock transfer using stock transport order
Santhana Kishore
 
Contract Mgmt
Contract MgmtContract Mgmt
Contract Mgmt
Vishal Srivastava
 
Projects cost adjustments functional_specs - openbravo
Projects cost adjustments functional_specs - openbravo Projects cost adjustments functional_specs - openbravo
Projects cost adjustments functional_specs - openbravo
Abul Khayer
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
Vj NiroSh
 
sap-variant-configurationpdf
 sap-variant-configurationpdf sap-variant-configurationpdf
sap-variant-configurationpdf
Shantanu Deshpande
 

Similar to Base material presentation (20)

Contract management for c&i customers
Contract management for c&i customersContract management for c&i customers
Contract management for c&i customers
 
Vendor consignment configuration doc
Vendor consignment configuration docVendor consignment configuration doc
Vendor consignment configuration doc
 
Contract savings new
Contract savings newContract savings new
Contract savings new
 
Contract savings new
Contract savings newContract savings new
Contract savings new
 
Бюджетирвние в разрезе договоров
Бюджетирвние в разрезе договоровБюджетирвние в разрезе договоров
Бюджетирвние в разрезе договоров
 
Sap scm ewm na muk 11 02
Sap scm ewm na muk 11  02 Sap scm ewm na muk 11  02
Sap scm ewm na muk 11 02
 
Routing Jobsite Field Data for Approval and Billing in 4castplus
Routing Jobsite Field Data for Approval and Billing in 4castplusRouting Jobsite Field Data for Approval and Billing in 4castplus
Routing Jobsite Field Data for Approval and Billing in 4castplus
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Contract savings
Contract savingsContract savings
Contract savings
 
SAP MM Standard Business Processes
SAP MM Standard Business ProcessesSAP MM Standard Business Processes
SAP MM Standard Business Processes
 
Purchase contract
Purchase contractPurchase contract
Purchase contract
 
capitaltraining
capitaltrainingcapitaltraining
capitaltraining
 
Bearing Point REV RECOGNITION Project
Bearing Point REV RECOGNITION ProjectBearing Point REV RECOGNITION Project
Bearing Point REV RECOGNITION Project
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
Stock transfer using stock transport order
Stock transfer using stock transport orderStock transfer using stock transport order
Stock transfer using stock transport order
 
Contract Mgmt
Contract MgmtContract Mgmt
Contract Mgmt
 
Projects cost adjustments functional_specs - openbravo
Projects cost adjustments functional_specs - openbravo Projects cost adjustments functional_specs - openbravo
Projects cost adjustments functional_specs - openbravo
 
General notes to building schedule of rates
General notes to building schedule of ratesGeneral notes to building schedule of rates
General notes to building schedule of rates
 
sap-variant-configurationpdf
 sap-variant-configurationpdf sap-variant-configurationpdf
sap-variant-configurationpdf
 

More from SivaprasanthRentala1975 (20)

Testing using load runner performance testing
Testing using load runner  performance testingTesting using load runner  performance testing
Testing using load runner performance testing
 
Why contract savings are missing
Why contract savings are missingWhy contract savings are missing
Why contract savings are missing
 
Voyager scm
Voyager scmVoyager scm
Voyager scm
 
Volumes
VolumesVolumes
Volumes
 
The new mainframe
The new mainframeThe new mainframe
The new mainframe
 
Test execution may_04_2006
Test execution may_04_2006Test execution may_04_2006
Test execution may_04_2006
 
Telecom testing
Telecom testingTelecom testing
Telecom testing
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Sdlc models
Sdlc modelsSdlc models
Sdlc models
 
Sdlc
SdlcSdlc
Sdlc
 
Scm
ScmScm
Scm
 
Pt presentation1
Pt presentation1Pt presentation1
Pt presentation1
 
Pp employee learnnig initiative-iss-220-g tle 2007
Pp employee learnnig initiative-iss-220-g tle 2007Pp employee learnnig initiative-iss-220-g tle 2007
Pp employee learnnig initiative-iss-220-g tle 2007
 
Performance testing and rpt
Performance testing and rptPerformance testing and rpt
Performance testing and rpt
 
Patents
PatentsPatents
Patents
 
Xpediter kanbay
Xpediter kanbayXpediter kanbay
Xpediter kanbay
 
Copy of good quotes.ppt
Copy of good quotes.pptCopy of good quotes.ppt
Copy of good quotes.ppt
 
Contract savings schema
Contract savings schemaContract savings schema
Contract savings schema
 
Contract savings may 10th 2004 by gm euro
Contract savings may 10th 2004 by gm euroContract savings may 10th 2004 by gm euro
Contract savings may 10th 2004 by gm euro
 
Contract savings job overview
Contract savings job overviewContract savings job overview
Contract savings job overview
 

Recently uploaded

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 

Recently uploaded (20)

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 

Base material presentation

  • 1. GM WWP Base Material Presented by: Shital Deshmukh Date: 08/06/2003 GM & IBM Confidential
  • 2. GM & IBM Confidential Agenda: • Base Material Exchange Contract Updates Batch Process • Steps involved in updating Contract Line Items • Performance Requirements
  • 3. GM & IBM Confidential Base Material Exchange Contract Updates Batch Process • The process describes how the Base Material Exchange information that is approved on the Base Material Exchange Approval screen is automatically posted to existing standard blanket contracts. • It generates the necessary data that will be needed to create the Base Material Amendment forms. • It will create Contract Line Item Amendments and the special Base Material Amendment Contract forms. • It should be understood that the edits performed by the Output Contract process will NOT be applied in this process.
  • 4. GM & IBM Confidential Base Material Exchange Contract Updates Batch Process … • The process will find all of the Standard Blanket contracts with parts that are made up of the Base Material being adjusted and have also been flagged as “Auto Update”. The batch process will then output new amendments for the contract line items that are affected by the change in base material. • The Report Status Screen will be updated and the Buyers for the affected parts will be notified when the base material updates are complete. The base material forms will be specific to Buyer/Supplier/Legal Business Entity.
  • 5. GM & IBM Confidential Steps involved in updating Contract Line Items Step #1 - Identify Base Material Exchanges needing to update Contracts Retrieve all Base Material Exchange records at an ‘APPROVED’ Exchange Status from the Base Material Exchange Transaction table, meaning that these updates have been approved but have not yet been applied. Step #2 - Identify Output Contracts Impacted by Base Material Exchange Retrieve all Standard Blanket Output Contract Line Item Periods’ Base Material records that fall on or after the Base Material Exchange Effective Date that have the specific Base Material/Exchange combination.
  • 6. GM & IBM Confidential Steps involved in updating Contract Line Items… Step #3 - Create NEW Contract Period where necessary For each period identified, a check is made to see if that period is effective at the time of the Base Material Exchange Effective Date Step #4 - Update Existing Contract Periods For each Period Effective Date AFTER the Base Material Exchange Effective Date with a Price Change Effective Date before the Base Material Exchange update, the Base Material Exchange information will be updated. Additionally, any period with a period Effective Date equal to the Base Material Exchange Effective Date will also be updated (no new period created). Any period/Base Material with a Price Change Effective Date AFTER the Base Material Exchange Effective Date is not updated.
  • 7. GM & IBM Confidential Steps involved in updating Contract Line Items… Step #5 - Update Contract Line Item Amendment Once all periods are processed for a Contract Line Item, the Contract Line Item Amendment Number will be increased. Additionally, the Output Contract Line Item Amendment Reason will be set to ‘Base Material Update’. Step #6 – Creation of Contract Forms This batch process groups all contract line items that have been amended by the Base Material Exchange rate changes by Buyer/Supplier/LBE. A Base Material Amendment Summary Form and a Base Material Amendment Detail Form are created for each Buyer/Supplier/LBE combination.
  • 8. GM & IBM Confidential Steps involved in updating Contract Line Items… Step #7 - Notify Interface(s) of Contract Line Item Amendment An interface transaction will be generated to outbound the Amendment information to the appropriate Legacy Systems. Step #8 - Identify Pending Contract Line Item Amendment Once all periods are processed for a Contract Line Item, a check is performed on the Pending Contract tables to see if this same Contract Line Item exists in pending. If it does, then the same type of processing performed on the Output Contract (steps 3 through 5 above) is done on the Pending Contract Line Item. The exception is that the retroactive change and retroactive price change indicators do not need to be set as these do not exist in pending.
  • 9. GM & IBM Confidential Steps involved in updating Contract Line Items… Step #9 - Identify Other Affected Pending Contract Line Items Once all output line items and the corresponding pending amendments are updated, any other affected pending contract line items also need to be processed. This would include new contract line items that are in pending only (not output) and contract line items in pending where the pending contract line item is affected but the corresponding output line item was not. Step #10 - Update Approved Base Material Exchanges After completing all updates for a given Base Material Exchange, the System will move the Approved Base Material Exchange update from the Base Material Exchange Transaction table to the Base Material Exchange Cost table, where all Approved information that has been posted to contracts exists.
  • 10. GM & IBM Confidential Performance Requirements The updating of Contract data with Approved Base Material Exchange(s) will be scheduled on a quarterly basis. The scheduling of this job must ensure that it will not be running at the same time that the Output Contract Batch process is running.