SlideShare a Scribd company logo
RESUME
VIRGILIO CORONEL SAMPANG
Experience Positions:
Technical Inspector (Oil and Gas Infrastructure Projects), Project Coordinator (Government
Infrastructure Projects), Quantity Surveyor, (Road Projects), Construction Supervisor (Bridge and
Highway Structures) and Structural Engineer (Concrete and Steel Structures).
Summary:
Extensive experience with reputable Consulting firms, Contracting companies and Government
Corporations in the PHILIPPINES and QATAR for more than 35 years in different fields of Civil
Engineering. Involved in Project development, Construction and Supervision and Technical
inspection of Infrastructure Projects which includes: Wharves, Jetties, Roads, Bridges, Culverts &
Building projects and can perform the following tasks: Review Structural and Road Design
Drawings; Analyze and calculate Structural Designs of Concrete and Steel Structures, Prepare
Quantity take-off, Prepare Tender Bid documents, Prepare and evaluate Project Execution
Plans, Prepare and review Method statements and Scope of works; Monitor and evaluate
progress of works
Registration and Professional Affiliation: Registered Civil Engineer - Professional Regulation
Commission, Manila Philippines (1979)
Profession and Specialization: Road and Bridge Supervision, Project Coordination, and Road
and Bridge Inspection
Degree, Institution and Graduation: Bachelor of Science in Civil Engineering - Manila,
Philippines (1977)
Computer Knowledge: ARC GIS; Auto CAD; SAP; Primavera; MS Project; Microsoft Office
Other Information:
Nationality: Filipino
Date of Birth: 30 Sept. 1955
Marital Status: Married
Languages Known: English and Filipino
Contact Tel.: +974-55623301
E mail: vil215421@hotmail.com
Training/Course:
Basic Supervisory Training Seminar (1981)
Performance Training Program (1981)
ArcGIS I & II (Arc View 8, Arc Editor 8, Arc Info 8) –(2004)
Introduction to OH & Safety Management Systems and OHSA18001(2006)
Effective Project & Programme Management Development (2008)
Time and Stress Management (2009)
Construction Management of Oil & Gas EPC Projects (2009)
Primavera 5.0 Project Planner (2009)
Land CADD Software Training (2009)
1
IOSH Working Safely (2010)
Basic Fire Extinguisher (2010)
Project Planning ,Scheduling and Cost Control (2011)
Basic Life support (2011)
SAP PM Notification Training (2011)
SAP PM Work Order (2011)
IOSH Managing Safely in Construction (2011)
SAP ES Contracting Procedures for Sponsor Dept. (2012)
Maintenance Planning & Scheduling (2012)
Floor Marshall (Fire Warden) –(2012)
Contract Administration & Management (2012)
Leadership Skills (2012)
Professional Experience:
1. Qatar Petroleum – Doha, Qatar (2002 to present)
TECHNICAL INSPECTOR: Roads, Bridges, Berths, Jetties, Culverts, Surface Water Drainage,
Traffic signs and Road Markings, Road Furniture and Underground Utility Services
2. Sowaidco Contracting Co. – Doha, Qatar (1986 – 2002)
PROJECT COORDINATOR, for Government Infrastructure Projects: Roads; Helipads; Military
Parade Grounds; Drainage and Water Networks
3. Construction and Development Corporation of the Philippines – Manila, Philippines (1978
– 1986)
CONSTRUCTION SUPERVISOR: Concrete Post-tensioned Bridges; Reinforced Concrete Box
Culverts; Concrete Piling and Under–water Structures
4. Gilbert Yu Architects and Associates – Manila, Philippines (1977 – 1978)
STRUCTURAL ENGINEER: Design of Steel and Concrete Structures: Fifteen (15) Storey Concrete
Buildings; Steel Trusses and Frames
Representative Projects:
A. QATAR PETROLEUM – DOHA, QATAR
(from 20 January 2002 to present)
1. Contract No. GTC 179/ED/01 EPIC of Crushed Stone Import Facilities at Mesaieed
Project involves the Design & Construction of 200 m Concrete Berth, 7 km 2 lane Dual
Carriageway Asphalt Concrete Roads and Gabbro Storage Area, which includes: Loading
Equipments; Pre-cast Concrete Bridges; Water Reservoirs; Street Lightings; Security Gate House
and Utility Services
2. Contract No. GTC 196/ED/01 EPIC Roads & Bridges for Crushed Stone Import Facilities
at Mesaieed
Project involves the Design and Construction of 8 KM. 2- Lane Dual Carriageway Asphalt Road
connecting the Gabbro Storage Area to Route 55, which includes: Cloverleaf Interchange;
Concrete Post-tensioned Bridges; Concrete Culverts; Street Lightings; Street Furniture and Utility
Services.
3. Contract No. GTC 135/MIC/02 Road Refurbishment Works in Mesaieed Community
Area
Project involves the refurbishment of 2 KM. 2-lane Dual Carriageway Asphalt Road, which
includes: Roundabouts; Street Furniture and Utility Services
4. Contract No. GTC 160/MIC/03 Construction of Community Park – Mesaieed
Project involves the construction of a Public Park, which includes: Soft and Hard Landscaping;
Irrigation System; Administration Building; Playground; Water Features
2
and Lightings
5. Contract No.LTC 131/MIC/03 Renovation Works to Building, High Mast Foundations &
Shore Power Connections-Mesaieed
The project involves the renovation of Office buildings, high mast and shore power connections
at Mesaieed Port
6. Contract No. GTC 04/214/ED Construction of Roads, Utility Crossings and Street
Lighting in the Industrial Area, Mesaieed (Package-1)
The Project involves the construction of 25 KM. 2-lane Dual Carriageway Asphalt Road, which
includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and
Utility Services
7. Contract No. GTC 04/205/MIC Restoration of Al Afjah Heritage Village at Mesaieed
The project involves the restoration of old heritage villages including the beautification of
surrounding area located west of Mesaieed Community Area
8. Contract No. LTC 05/336 Engineering Consultancy Services For Truck Weigh Station in
Mesaieed
The Consultancy Service involves the Design of Weigh Bridges in Mesaieed to control the Heavy
Trucks Transporting goods to-and-fro Measieed Industrial City, which includes: Access roads,
Truck parking Service areas and Control building
9. Contract No. LTC 05/217 Engineering Consultancy Services for Beautification of
Cloverleaf Interchange in Mesaieed – Doha, Qatar
The Consultancy Service involves the Design of Soft and Hard Landscaping of a one-Square
Kilometer of land at the Cloverleaf Interchange, which includes: Surface Water Drainage
System; Irrigation System
10. Contract No. GTC 05/281 Engineering Procurement Installation and Commissioning for
Road Beautification of Industrial Road at Community- Mesaieed
The project involves the Design and Construction of Hard and Soft Landscaping of a 4 KM. 2-
Lane Dual Carriageway and 2 Roundabouts at the Community area, which includes: Surface
Water Drainage; Irrigation System and Parking Bays
11. Contract No. GTC 05/275/ED Construction of Roads, Utility Crossings and Street
Lighting in the Industrial Area at Mesaieed – (Package-2)
The Project involves the construction of 7 KM. 2 –lane Dual Carriageway Asphalt Road, which
includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and
Utility Services
12. Contract No. GTC 06/123/ED Construction of Roads, Utility Crossings and Street
Lighting in the Industrial Area at Mesaieed – (Package-3)
The Project involves the construction of 7 KM. 3 –lane Dual Carriageway Asphalt Road, which
includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and
Utility Services
13. Contract No.GTC 06/195/ED Construction of Remaining Works for Crushed Stone
Facilities, Roads and Bridges – Mesaieed
The Project involves the construction of 6 KM. 3 –lane Dual Carriageway Asphalt Road, which
includes: Cloverleaf Interchange; Concrete Bridges; Concrete Culverts; Traffic Signals; Street
Lightings; Soft and Hard Landscaping and Utility Services
14. Contract No.GTC 05/237/ED - ECS for Mesaieed Community Roads and Infrastructure
The Project involves the design of 30 KM. 2 –lane Dual Carriageway Asphalt Road, which
includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and
Utility Services
15. Contract No.GT 08104100 – EPIC for Earthworks, Roads and Infrastructure in Mesaieed
Community Area
3
Project involves the design and construction of 5 Million m3 of embankment fill, 31 KM. 2–lane
Dual Carriageway Asphalt Road, which includes: Concrete Culverts; Traffic Signals; Street
Lightings; Soft and Hard Landscaping and Utility Services
16. Contract No.LC 0810300 – ECS for Upgrading of Sealine Beach Road – Mesaieed
The Project involves the design of 17 KM with 3 –lane Dual Carriageway Asphalt Road, which
includes: 2 Level intersections Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard
Landscaping and Utility Services
17. Contract No.GT 09100600- Construction of Roads, Utility Crossings and Street Lighting
in the Industrial Area at Mesaieed – (Package-6)
The Project involves the construction of 7 KM. 2 –lane Dual Carriageway Asphalt Road, which
includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and
Utility Services
18. Contract No.GT 10111900- Maintenance of Roads and Fences at Various Locations in
MIC
The Project involves the maintenance of 60 KM of roads within MIC which includes: Roads,
Surface water drainage, Security fence, Traffic Signals; Hard Landscaping and Utility Service
19. Contract No. GC12109100 Repair of Wharves and Jetties at Mesaieed Port
Project involves the repair of Wharves and Jetties for all the Ports in Mesaieed from Berth 1 to
19 with a total of 2400 m. Repairs includes: concrete cope beams, wooden and rubber fenders,
deck slabs, trench walls and trench covers.
Duties and Responsibilities:
(Project Development)
1. Prepares Scope of Works, Specifications and Concept Design Layout Drawings for
proposed Roads and Infrastructures
2. Review Tender Documents.
3. Review Technical Evaluation and qualifications of Contractors during Tendering Stages.
Review key personnel CV’s and qualifications, Project program of works, Project Method
of Statements and Manpower Histogram and S-Curve.
4. Review Topographical Survey, Geotechnical Investigation Reports.
5. Review Consultants Design proposals. Analyze and Review Structural Design Drawings
6. Review Design Drawings for Road works: Horizontal and Vertical alignments; Elevation
profiles; Geometry and Structural Pavement layers; Surface water Drainage; Traffic Signs
and Road Markings; Utilities, such as Telephone, Water, Electricity, Sewage; and
Irrigation Systems
7. Review Designs Drawings for Landscaping and Beautification projects: Surface Water
Drainage System; Hard Landscaping; and other utility Services.
8. Attend Progress and Technical Meetings
(Technical Inspection)
9. Responsible for maintaining the Quality of Works. Review Method of Statements.
Inspection of Contractor's works according to plans and Specifications. Witness the
testing of Soils, Concrete, Steel, Sub-base and Asphalt materials.
10. Determine the extent of repair works at Mesaieed Port by visual and physical inspection.
Review RFI and conduct inspection of pre-pour concrete works and post concrete works.
Monitor concrete casting. Prepare inspection reports and update RFI status
11. Review BOQ and upload RO on SAP the items of works executed by the Maintenance
Contractor
12. Measure the final quantity of works executed by the maintenance Contractor on site
and upload SES on SAP
4
13. Review As-Built drawings and assist Land surveyors in verifying the executed works
onsite.
B. SOWAIDCO CONTRACTING CO. – DOHA, QATAR
(from 28 August 1986 to 20 January 2002)
1. Contract No. ERC 0176 Access Roads to Sub Stations- Doha
The project involves the Construction of Access roads to 15 Electrical Sub- Stations in Qatar,
which includes: 25 Km of single Carriageway Asphalt Roads: T- Junctions and utility Crossings;
i.e., Telephone, Electric and Water networks
2. Contract No. ERA 0129 Road Improvements Works At Izgawa
The project involves road improvements at several roads at this particular zone which involves
the complete construction of roads including utility services
3. Contract No. ERA 0317 Road Improvement Works at South of Salwa
The project involves road improvements at several roads at a this particular area which involves
the complete construction of roads including under-ground utility services
4. Contract No. ERA 0130 Road Improvement Works At Bani Hajar
The project involves road improvements at several roads at this particular area which involves
the complete construction of roads including under- ground utility services
5. Contract No. ERA 1100 Road Improvement Works at Gharafah
The project involves road improvements at several roads at this particular area which involves
the complete construction of roads including under- ground utility services
6. Contract No. ERC 0364 Construction of Roads in Zone 45
The project involves road construction at several roads at this particular zone which involves
the complete construction of roads including underground utility services
7. Sailiyah Camp Central Stores Project (Road works Sub -Contractor)
Project involves the construction internal roads inside military camp including Parking Areas and
Parade Ground located at Sailiyah Military Camp south of Doha
8. Duhail Camp Artillery Camp Project (Road works Sub-Contractor)
Project involves the construction internal roads inside military camp including Parking Areas
and Parade Ground located at Duhail Military Camp north of Doha
9. VIP Lounge Doha International Airport (Road works Sub-Contractor
Project involves the construction internal roads and parking areas at the VIP lounge at the Doha
International Airport
Duties and Responsibilities
(Tender Preparation)
1. Responsible for Tender Bidding; Prepare and analyze price for items of work.
2. Prepare Tender Technical Submission; Prepare Manpower Schedule; Prepare Method of
Statements.
3. Attend Kick-off Meetings.
(Project Supervision and Coordination)
4. Responsible for Project Site Supervision. Prepare Program of Works, Material
Submittals, Method of Works, Monthly Progress Reports, Monthly invoice, Hand-over
Documentation; Monitor Progress of Works
5. Responsible for Project Coordination. Liaise with different Government Departments:
CED-Roads and Drainage, Q-tel, Kharamaa (Water and Electric); Ministry of Interior
(Traffic Department) and Government Municipalities.
5
6. Execute Surveying works for Road work Projects which includes setting out road
centerline coordinates and levels using Total Station survey instruments
7. Conduct Joint survey with project Consultant survey team in checking and verifying
survey points and setting outs
C. CONSTRUCTION AND DEVELOPMENT CORPORATION OF THE PHILIPPINES - MANILA,
PHILIPPINES
(from April 1978 to August 1986)
1. Manila - North Luzon Expressway III - Manila, Philippines
The project includes the construction of 83 KM 2-lane Dual Carriageway Expressway with
Cloverleaf Interchanges, Precast Concrete Bridges, Over-passes and Reinforced Concrete Box
Culverts and a 5 KM precast Concrete Viaduct over a swamp area. The substructure of the
bridges, viaducts and overpasses are supported by precast concrete plies and cast-in situ pile
caps and columns on land and on river beds. The bridge super structures are constructed by a
conventional construction method using precast girders and cast- in-situ Deck slab.
2. Arayat Bridge Project - Pampanga, Philippines
The project includes the construction of a 300m concrete post tension Bridge across the
Pampanga River. The bridge Sub-structures are supported by pre-cast concrete piles and cast-in-
situ pile caps and columns on the river beds constructed by means of Coffer-Dams. The Bridge
Super Structure, Box Girders and Deck Slab are constructed by means of post tensioning system.
3. Atugan Bridge Project Bukidnon, Philippines
The project includes the construction of a 400m concrete post-tensioned Bridge across Atugan
River. The Bridge Sub-structures are supported on Pre-cast concrete piles and cast-in-situ piles
caps and pier shaft on river beds. The Pier Shaft is constructed by using Slip Forming Methods.
The Super-Structure, Box Girder and Deck Slab, are constructed by means of Segment-by-
Segment Slip Forming methods and Post-Tensioning System.
4. Mabalacat- Bamban Road Project-Pampanga, Philippines
The project includes the Tendering of a 30 KM. 2- lane Dual Carriageway Expressway with
Cloverleaf Interchanges, Pre-cast Concrete Bridges, Over-Passes and Reinforced Concrete Box
Culverts. The Bridge Sub-structures are supported on concrete driven piles, concrete cast-in-situ
pile caps and columns on land and on river beds. The Bridge Super-structure constructed by
means of conventional construction methods using pre-cast girders and cast-in-situ Deck Slab
Duties and Responsibilities
(Project supervision)
1. Responsible for the Construction of Concrete Bridges and other highway structures.
2. Prepares detailed Program of Woks and Daily Activity Reports
3. Supervise construction activities such as: Sheet piling for Coffer Dams, Driving concrete
piles, Erection of formworks and slip form system, Cutting and installation of re-bars,
Launching of pre-cast girders, Casting of concrete, post tensioning and grouting
4. Assist in surveying works for Bridge foundation centerlines and alignments by means of
triangulation methods using Theodolite survey instruments
(Quantity Survey)
5. Assist in preparing Cost Estimates for Project Budget purposes. Prepares Price Analysis
for Civil and Structural items of Works, Quantity Take-off and material estimates
6
D. GILBERT YU ARCHITECTS AND ASSOCIATES – MANILA, PHILIPPINES
(from April 1977 to April 1978)
1. Isetan Commercial Complex - Manila, Philippines
The project includes the Design of a 15 Storey Commercial Building in Metro Manila:
Foundations on pre-cast Concrete Piles and Pile Caps; Cast-in-situ Columns and Beams; Post-
tensioned Concrete Floor Slabs.
2. Gotesco Twin Cinema – Manila, Philippines
The project includes the Design of a Cinema in Metro Manila: Foundations on Pre-cast Concrete
Piles and Pile Caps; Cast-in-situ Concrete Columns and Beams; Post-tensioned Concrete Floor
Slabs and Steel Truss Roofing.
Duties and Responsibilities
(Structural Design)
1. Prepares Structural Design Calculations for Concrete and Steel Structures using Working
Stress Design (WSD)
2. Review Structural Design Drawings.
(Technical inspection)
3. Site Inspections for Structural works such as: Pre-cast Concrete Piling; Formworks; Re-
bars Installations; Concrete Casting; Post-tensioning; Steel Frame Fabrication & Erection
I certify that the above information are true and correct to the best of my knowledge and belief.
Respectfully yours,
Virgilio Coronel Sampang
Technical Inspector
Qatar Petroleum
7

More Related Content

What's hot

Sergio Carratala Profile
Sergio Carratala ProfileSergio Carratala Profile
Sergio Carratala Profile
Sergio Carratalá
 
cv1
cv1cv1
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
Alpees Nattyhithylu
 
McKenney resume March 2015
McKenney resume March 2015McKenney resume March 2015
McKenney resume March 2015
Tom McKenney
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)
Bashir Chakar
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116
Majeed Hashim
 
Leandro CV
Leandro CVLeandro CV
Leandro CV
Leandro Enriquez
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
Jamilatul Adawiah Mohd Aminudin
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
Sabah JEREIGE
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
Ibrahim Al-Hudhaif
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
Rizeq Hijjawi
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
TARIG MARHOUM
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
John Adams
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
Richard Rask
 
003_work profile_3
003_work profile_3003_work profile_3
003_work profile_3
raja shahid raza
 
KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016
Konstantinos Seferoglou
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
Mahmoud Fareed alsheick Hussain
 
David's CV, 2017
David's CV, 2017David's CV, 2017
David's CV, 2017
David Bicknell
 
WILSON SAPIEN CV
WILSON SAPIEN CVWILSON SAPIEN CV
WILSON SAPIEN CV
Wilson Sapien
 

What's hot (20)

Sergio Carratala Profile
Sergio Carratala ProfileSergio Carratala Profile
Sergio Carratala Profile
 
cv1
cv1cv1
cv1
 
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
 
McKenney resume March 2015
McKenney resume March 2015McKenney resume March 2015
McKenney resume March 2015
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116
 
Leandro CV
Leandro CVLeandro CV
Leandro CV
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
003_work profile_3
003_work profile_3003_work profile_3
003_work profile_3
 
KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
David's CV, 2017
David's CV, 2017David's CV, 2017
David's CV, 2017
 
WILSON SAPIEN CV
WILSON SAPIEN CVWILSON SAPIEN CV
WILSON SAPIEN CV
 

Viewers also liked

Plus Sized Wars-Documentary Analysis
Plus Sized Wars-Documentary AnalysisPlus Sized Wars-Documentary Analysis
Plus Sized Wars-Documentary Analysis
Adam Wareing
 
Documentary Theory
Documentary TheoryDocumentary Theory
Documentary Theory
Adam Wareing
 
Jalal Resume
Jalal ResumeJalal Resume
Jalal Resume
Ahmed Jalaluddin
 
Too Posh To Parent
Too Posh To ParentToo Posh To Parent
Too Posh To Parent
Adam Wareing
 
Too Posh To Parent
Too Posh To ParentToo Posh To Parent
Too Posh To Parent
Adam Wareing
 
Best service apartments in Bangalore | TrustedStay
Best service apartments in Bangalore | TrustedStayBest service apartments in Bangalore | TrustedStay
Best service apartments in Bangalore | TrustedStay
Ajay Dewan
 
Group theory
Group theoryGroup theory
Group theory
Anirban Bhattacharjee
 
How to do delegate & ditch with confidence webinar
How to do delegate & ditch with confidence webinarHow to do delegate & ditch with confidence webinar
How to do delegate & ditch with confidence webinar
Sheryl Andrews
 
ヒプノセラピーについて
ヒプノセラピーについてヒプノセラピーについて
ヒプノセラピーについて
Kyoko Okada
 
Types of Documentaries
Types of DocumentariesTypes of Documentaries
Types of Documentaries
Adam Wareing
 
Meat eating effects
Meat eating effectsMeat eating effects
Meat eating effects
NovakSophie
 
Narrative Structures Of Documentary
Narrative Structures Of DocumentaryNarrative Structures Of Documentary
Narrative Structures Of Documentary
Adam Wareing
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
Mark Crivac
 

Viewers also liked (15)

Plus Sized Wars-Documentary Analysis
Plus Sized Wars-Documentary AnalysisPlus Sized Wars-Documentary Analysis
Plus Sized Wars-Documentary Analysis
 
Documentary Theory
Documentary TheoryDocumentary Theory
Documentary Theory
 
Jalal Resume
Jalal ResumeJalal Resume
Jalal Resume
 
Too Posh To Parent
Too Posh To ParentToo Posh To Parent
Too Posh To Parent
 
Too Posh To Parent
Too Posh To ParentToo Posh To Parent
Too Posh To Parent
 
Best service apartments in Bangalore | TrustedStay
Best service apartments in Bangalore | TrustedStayBest service apartments in Bangalore | TrustedStay
Best service apartments in Bangalore | TrustedStay
 
Group theory
Group theoryGroup theory
Group theory
 
How to do delegate & ditch with confidence webinar
How to do delegate & ditch with confidence webinarHow to do delegate & ditch with confidence webinar
How to do delegate & ditch with confidence webinar
 
Nadis hypno
Nadis hypnoNadis hypno
Nadis hypno
 
ヒプノセラピーについて
ヒプノセラピーについてヒプノセラピーについて
ヒプノセラピーについて
 
Types of Documentaries
Types of DocumentariesTypes of Documentaries
Types of Documentaries
 
Meat eating effects
Meat eating effectsMeat eating effects
Meat eating effects
 
Nadis hypno
Nadis hypnoNadis hypno
Nadis hypno
 
Narrative Structures Of Documentary
Narrative Structures Of DocumentaryNarrative Structures Of Documentary
Narrative Structures Of Documentary
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 

Similar to VCS Resume_May 2015

Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
Markfel Lamban
 
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe DriveChain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Fairfax County
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
Student
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
Osama Abdulrahman
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
City Brandon
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
Ali Fakhir
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
RONIEE Sparks
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
Lasantha Perera
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
Mateti Srinivas
 
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Sajjad Gilal
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
iain_cameron
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
jamsheer p
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
amr mahrous
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
Sajeev Pandaraparambil
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
Rolando Garcia
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016
Raed Ramahi
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
Fairfax County
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
oyepuneeta
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County
 
ProjectReport.pdf
ProjectReport.pdfProjectReport.pdf
ProjectReport.pdf
ParveenMalik26
 

Similar to VCS Resume_May 2015 (20)

Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe DriveChain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
Chain Bridge Road Walkway from Niblick Drive to Horse Shoe Drive
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
Resume of R.E Engr. M. SAJJAD HUSSAIN GILAL 2016 (PPPU)
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
ProjectReport.pdf
ProjectReport.pdfProjectReport.pdf
ProjectReport.pdf
 

VCS Resume_May 2015

  • 1. RESUME VIRGILIO CORONEL SAMPANG Experience Positions: Technical Inspector (Oil and Gas Infrastructure Projects), Project Coordinator (Government Infrastructure Projects), Quantity Surveyor, (Road Projects), Construction Supervisor (Bridge and Highway Structures) and Structural Engineer (Concrete and Steel Structures). Summary: Extensive experience with reputable Consulting firms, Contracting companies and Government Corporations in the PHILIPPINES and QATAR for more than 35 years in different fields of Civil Engineering. Involved in Project development, Construction and Supervision and Technical inspection of Infrastructure Projects which includes: Wharves, Jetties, Roads, Bridges, Culverts & Building projects and can perform the following tasks: Review Structural and Road Design Drawings; Analyze and calculate Structural Designs of Concrete and Steel Structures, Prepare Quantity take-off, Prepare Tender Bid documents, Prepare and evaluate Project Execution Plans, Prepare and review Method statements and Scope of works; Monitor and evaluate progress of works Registration and Professional Affiliation: Registered Civil Engineer - Professional Regulation Commission, Manila Philippines (1979) Profession and Specialization: Road and Bridge Supervision, Project Coordination, and Road and Bridge Inspection Degree, Institution and Graduation: Bachelor of Science in Civil Engineering - Manila, Philippines (1977) Computer Knowledge: ARC GIS; Auto CAD; SAP; Primavera; MS Project; Microsoft Office Other Information: Nationality: Filipino Date of Birth: 30 Sept. 1955 Marital Status: Married Languages Known: English and Filipino Contact Tel.: +974-55623301 E mail: vil215421@hotmail.com Training/Course: Basic Supervisory Training Seminar (1981) Performance Training Program (1981) ArcGIS I & II (Arc View 8, Arc Editor 8, Arc Info 8) –(2004) Introduction to OH & Safety Management Systems and OHSA18001(2006) Effective Project & Programme Management Development (2008) Time and Stress Management (2009) Construction Management of Oil & Gas EPC Projects (2009) Primavera 5.0 Project Planner (2009) Land CADD Software Training (2009) 1
  • 2. IOSH Working Safely (2010) Basic Fire Extinguisher (2010) Project Planning ,Scheduling and Cost Control (2011) Basic Life support (2011) SAP PM Notification Training (2011) SAP PM Work Order (2011) IOSH Managing Safely in Construction (2011) SAP ES Contracting Procedures for Sponsor Dept. (2012) Maintenance Planning & Scheduling (2012) Floor Marshall (Fire Warden) –(2012) Contract Administration & Management (2012) Leadership Skills (2012) Professional Experience: 1. Qatar Petroleum – Doha, Qatar (2002 to present) TECHNICAL INSPECTOR: Roads, Bridges, Berths, Jetties, Culverts, Surface Water Drainage, Traffic signs and Road Markings, Road Furniture and Underground Utility Services 2. Sowaidco Contracting Co. – Doha, Qatar (1986 – 2002) PROJECT COORDINATOR, for Government Infrastructure Projects: Roads; Helipads; Military Parade Grounds; Drainage and Water Networks 3. Construction and Development Corporation of the Philippines – Manila, Philippines (1978 – 1986) CONSTRUCTION SUPERVISOR: Concrete Post-tensioned Bridges; Reinforced Concrete Box Culverts; Concrete Piling and Under–water Structures 4. Gilbert Yu Architects and Associates – Manila, Philippines (1977 – 1978) STRUCTURAL ENGINEER: Design of Steel and Concrete Structures: Fifteen (15) Storey Concrete Buildings; Steel Trusses and Frames Representative Projects: A. QATAR PETROLEUM – DOHA, QATAR (from 20 January 2002 to present) 1. Contract No. GTC 179/ED/01 EPIC of Crushed Stone Import Facilities at Mesaieed Project involves the Design & Construction of 200 m Concrete Berth, 7 km 2 lane Dual Carriageway Asphalt Concrete Roads and Gabbro Storage Area, which includes: Loading Equipments; Pre-cast Concrete Bridges; Water Reservoirs; Street Lightings; Security Gate House and Utility Services 2. Contract No. GTC 196/ED/01 EPIC Roads & Bridges for Crushed Stone Import Facilities at Mesaieed Project involves the Design and Construction of 8 KM. 2- Lane Dual Carriageway Asphalt Road connecting the Gabbro Storage Area to Route 55, which includes: Cloverleaf Interchange; Concrete Post-tensioned Bridges; Concrete Culverts; Street Lightings; Street Furniture and Utility Services. 3. Contract No. GTC 135/MIC/02 Road Refurbishment Works in Mesaieed Community Area Project involves the refurbishment of 2 KM. 2-lane Dual Carriageway Asphalt Road, which includes: Roundabouts; Street Furniture and Utility Services 4. Contract No. GTC 160/MIC/03 Construction of Community Park – Mesaieed Project involves the construction of a Public Park, which includes: Soft and Hard Landscaping; Irrigation System; Administration Building; Playground; Water Features 2
  • 3. and Lightings 5. Contract No.LTC 131/MIC/03 Renovation Works to Building, High Mast Foundations & Shore Power Connections-Mesaieed The project involves the renovation of Office buildings, high mast and shore power connections at Mesaieed Port 6. Contract No. GTC 04/214/ED Construction of Roads, Utility Crossings and Street Lighting in the Industrial Area, Mesaieed (Package-1) The Project involves the construction of 25 KM. 2-lane Dual Carriageway Asphalt Road, which includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 7. Contract No. GTC 04/205/MIC Restoration of Al Afjah Heritage Village at Mesaieed The project involves the restoration of old heritage villages including the beautification of surrounding area located west of Mesaieed Community Area 8. Contract No. LTC 05/336 Engineering Consultancy Services For Truck Weigh Station in Mesaieed The Consultancy Service involves the Design of Weigh Bridges in Mesaieed to control the Heavy Trucks Transporting goods to-and-fro Measieed Industrial City, which includes: Access roads, Truck parking Service areas and Control building 9. Contract No. LTC 05/217 Engineering Consultancy Services for Beautification of Cloverleaf Interchange in Mesaieed – Doha, Qatar The Consultancy Service involves the Design of Soft and Hard Landscaping of a one-Square Kilometer of land at the Cloverleaf Interchange, which includes: Surface Water Drainage System; Irrigation System 10. Contract No. GTC 05/281 Engineering Procurement Installation and Commissioning for Road Beautification of Industrial Road at Community- Mesaieed The project involves the Design and Construction of Hard and Soft Landscaping of a 4 KM. 2- Lane Dual Carriageway and 2 Roundabouts at the Community area, which includes: Surface Water Drainage; Irrigation System and Parking Bays 11. Contract No. GTC 05/275/ED Construction of Roads, Utility Crossings and Street Lighting in the Industrial Area at Mesaieed – (Package-2) The Project involves the construction of 7 KM. 2 –lane Dual Carriageway Asphalt Road, which includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 12. Contract No. GTC 06/123/ED Construction of Roads, Utility Crossings and Street Lighting in the Industrial Area at Mesaieed – (Package-3) The Project involves the construction of 7 KM. 3 –lane Dual Carriageway Asphalt Road, which includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 13. Contract No.GTC 06/195/ED Construction of Remaining Works for Crushed Stone Facilities, Roads and Bridges – Mesaieed The Project involves the construction of 6 KM. 3 –lane Dual Carriageway Asphalt Road, which includes: Cloverleaf Interchange; Concrete Bridges; Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 14. Contract No.GTC 05/237/ED - ECS for Mesaieed Community Roads and Infrastructure The Project involves the design of 30 KM. 2 –lane Dual Carriageway Asphalt Road, which includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 15. Contract No.GT 08104100 – EPIC for Earthworks, Roads and Infrastructure in Mesaieed Community Area 3
  • 4. Project involves the design and construction of 5 Million m3 of embankment fill, 31 KM. 2–lane Dual Carriageway Asphalt Road, which includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 16. Contract No.LC 0810300 – ECS for Upgrading of Sealine Beach Road – Mesaieed The Project involves the design of 17 KM with 3 –lane Dual Carriageway Asphalt Road, which includes: 2 Level intersections Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 17. Contract No.GT 09100600- Construction of Roads, Utility Crossings and Street Lighting in the Industrial Area at Mesaieed – (Package-6) The Project involves the construction of 7 KM. 2 –lane Dual Carriageway Asphalt Road, which includes: Concrete Culverts; Traffic Signals; Street Lightings; Soft and Hard Landscaping and Utility Services 18. Contract No.GT 10111900- Maintenance of Roads and Fences at Various Locations in MIC The Project involves the maintenance of 60 KM of roads within MIC which includes: Roads, Surface water drainage, Security fence, Traffic Signals; Hard Landscaping and Utility Service 19. Contract No. GC12109100 Repair of Wharves and Jetties at Mesaieed Port Project involves the repair of Wharves and Jetties for all the Ports in Mesaieed from Berth 1 to 19 with a total of 2400 m. Repairs includes: concrete cope beams, wooden and rubber fenders, deck slabs, trench walls and trench covers. Duties and Responsibilities: (Project Development) 1. Prepares Scope of Works, Specifications and Concept Design Layout Drawings for proposed Roads and Infrastructures 2. Review Tender Documents. 3. Review Technical Evaluation and qualifications of Contractors during Tendering Stages. Review key personnel CV’s and qualifications, Project program of works, Project Method of Statements and Manpower Histogram and S-Curve. 4. Review Topographical Survey, Geotechnical Investigation Reports. 5. Review Consultants Design proposals. Analyze and Review Structural Design Drawings 6. Review Design Drawings for Road works: Horizontal and Vertical alignments; Elevation profiles; Geometry and Structural Pavement layers; Surface water Drainage; Traffic Signs and Road Markings; Utilities, such as Telephone, Water, Electricity, Sewage; and Irrigation Systems 7. Review Designs Drawings for Landscaping and Beautification projects: Surface Water Drainage System; Hard Landscaping; and other utility Services. 8. Attend Progress and Technical Meetings (Technical Inspection) 9. Responsible for maintaining the Quality of Works. Review Method of Statements. Inspection of Contractor's works according to plans and Specifications. Witness the testing of Soils, Concrete, Steel, Sub-base and Asphalt materials. 10. Determine the extent of repair works at Mesaieed Port by visual and physical inspection. Review RFI and conduct inspection of pre-pour concrete works and post concrete works. Monitor concrete casting. Prepare inspection reports and update RFI status 11. Review BOQ and upload RO on SAP the items of works executed by the Maintenance Contractor 12. Measure the final quantity of works executed by the maintenance Contractor on site and upload SES on SAP 4
  • 5. 13. Review As-Built drawings and assist Land surveyors in verifying the executed works onsite. B. SOWAIDCO CONTRACTING CO. – DOHA, QATAR (from 28 August 1986 to 20 January 2002) 1. Contract No. ERC 0176 Access Roads to Sub Stations- Doha The project involves the Construction of Access roads to 15 Electrical Sub- Stations in Qatar, which includes: 25 Km of single Carriageway Asphalt Roads: T- Junctions and utility Crossings; i.e., Telephone, Electric and Water networks 2. Contract No. ERA 0129 Road Improvements Works At Izgawa The project involves road improvements at several roads at this particular zone which involves the complete construction of roads including utility services 3. Contract No. ERA 0317 Road Improvement Works at South of Salwa The project involves road improvements at several roads at a this particular area which involves the complete construction of roads including under-ground utility services 4. Contract No. ERA 0130 Road Improvement Works At Bani Hajar The project involves road improvements at several roads at this particular area which involves the complete construction of roads including under- ground utility services 5. Contract No. ERA 1100 Road Improvement Works at Gharafah The project involves road improvements at several roads at this particular area which involves the complete construction of roads including under- ground utility services 6. Contract No. ERC 0364 Construction of Roads in Zone 45 The project involves road construction at several roads at this particular zone which involves the complete construction of roads including underground utility services 7. Sailiyah Camp Central Stores Project (Road works Sub -Contractor) Project involves the construction internal roads inside military camp including Parking Areas and Parade Ground located at Sailiyah Military Camp south of Doha 8. Duhail Camp Artillery Camp Project (Road works Sub-Contractor) Project involves the construction internal roads inside military camp including Parking Areas and Parade Ground located at Duhail Military Camp north of Doha 9. VIP Lounge Doha International Airport (Road works Sub-Contractor Project involves the construction internal roads and parking areas at the VIP lounge at the Doha International Airport Duties and Responsibilities (Tender Preparation) 1. Responsible for Tender Bidding; Prepare and analyze price for items of work. 2. Prepare Tender Technical Submission; Prepare Manpower Schedule; Prepare Method of Statements. 3. Attend Kick-off Meetings. (Project Supervision and Coordination) 4. Responsible for Project Site Supervision. Prepare Program of Works, Material Submittals, Method of Works, Monthly Progress Reports, Monthly invoice, Hand-over Documentation; Monitor Progress of Works 5. Responsible for Project Coordination. Liaise with different Government Departments: CED-Roads and Drainage, Q-tel, Kharamaa (Water and Electric); Ministry of Interior (Traffic Department) and Government Municipalities. 5
  • 6. 6. Execute Surveying works for Road work Projects which includes setting out road centerline coordinates and levels using Total Station survey instruments 7. Conduct Joint survey with project Consultant survey team in checking and verifying survey points and setting outs C. CONSTRUCTION AND DEVELOPMENT CORPORATION OF THE PHILIPPINES - MANILA, PHILIPPINES (from April 1978 to August 1986) 1. Manila - North Luzon Expressway III - Manila, Philippines The project includes the construction of 83 KM 2-lane Dual Carriageway Expressway with Cloverleaf Interchanges, Precast Concrete Bridges, Over-passes and Reinforced Concrete Box Culverts and a 5 KM precast Concrete Viaduct over a swamp area. The substructure of the bridges, viaducts and overpasses are supported by precast concrete plies and cast-in situ pile caps and columns on land and on river beds. The bridge super structures are constructed by a conventional construction method using precast girders and cast- in-situ Deck slab. 2. Arayat Bridge Project - Pampanga, Philippines The project includes the construction of a 300m concrete post tension Bridge across the Pampanga River. The bridge Sub-structures are supported by pre-cast concrete piles and cast-in- situ pile caps and columns on the river beds constructed by means of Coffer-Dams. The Bridge Super Structure, Box Girders and Deck Slab are constructed by means of post tensioning system. 3. Atugan Bridge Project Bukidnon, Philippines The project includes the construction of a 400m concrete post-tensioned Bridge across Atugan River. The Bridge Sub-structures are supported on Pre-cast concrete piles and cast-in-situ piles caps and pier shaft on river beds. The Pier Shaft is constructed by using Slip Forming Methods. The Super-Structure, Box Girder and Deck Slab, are constructed by means of Segment-by- Segment Slip Forming methods and Post-Tensioning System. 4. Mabalacat- Bamban Road Project-Pampanga, Philippines The project includes the Tendering of a 30 KM. 2- lane Dual Carriageway Expressway with Cloverleaf Interchanges, Pre-cast Concrete Bridges, Over-Passes and Reinforced Concrete Box Culverts. The Bridge Sub-structures are supported on concrete driven piles, concrete cast-in-situ pile caps and columns on land and on river beds. The Bridge Super-structure constructed by means of conventional construction methods using pre-cast girders and cast-in-situ Deck Slab Duties and Responsibilities (Project supervision) 1. Responsible for the Construction of Concrete Bridges and other highway structures. 2. Prepares detailed Program of Woks and Daily Activity Reports 3. Supervise construction activities such as: Sheet piling for Coffer Dams, Driving concrete piles, Erection of formworks and slip form system, Cutting and installation of re-bars, Launching of pre-cast girders, Casting of concrete, post tensioning and grouting 4. Assist in surveying works for Bridge foundation centerlines and alignments by means of triangulation methods using Theodolite survey instruments (Quantity Survey) 5. Assist in preparing Cost Estimates for Project Budget purposes. Prepares Price Analysis for Civil and Structural items of Works, Quantity Take-off and material estimates 6
  • 7. D. GILBERT YU ARCHITECTS AND ASSOCIATES – MANILA, PHILIPPINES (from April 1977 to April 1978) 1. Isetan Commercial Complex - Manila, Philippines The project includes the Design of a 15 Storey Commercial Building in Metro Manila: Foundations on pre-cast Concrete Piles and Pile Caps; Cast-in-situ Columns and Beams; Post- tensioned Concrete Floor Slabs. 2. Gotesco Twin Cinema – Manila, Philippines The project includes the Design of a Cinema in Metro Manila: Foundations on Pre-cast Concrete Piles and Pile Caps; Cast-in-situ Concrete Columns and Beams; Post-tensioned Concrete Floor Slabs and Steel Truss Roofing. Duties and Responsibilities (Structural Design) 1. Prepares Structural Design Calculations for Concrete and Steel Structures using Working Stress Design (WSD) 2. Review Structural Design Drawings. (Technical inspection) 3. Site Inspections for Structural works such as: Pre-cast Concrete Piling; Formworks; Re- bars Installations; Concrete Casting; Post-tensioning; Steel Frame Fabrication & Erection I certify that the above information are true and correct to the best of my knowledge and belief. Respectfully yours, Virgilio Coronel Sampang Technical Inspector Qatar Petroleum 7