now and future
1
2
Augmented reality (AR) is a live direct or indirect view of a physical, real-world environment
whose elements are augmented (or supplemented) by computer-generated sensory input
such as sound, video, graphics or GPS data. http://en.wikipedia.org/wiki/Augmented_reality
What is Augmented Reality?
3
And this..
AR being used in a Real Estate
Expo in Mumbai. https://www.youtube.com/watch?v=4gwxGGLcQzY
4
..this too !!
AR used to enhance gaming
experience.
5
Still Wondering what is it ? Watch this..
An amazing
video by Total
Immersion
displaying the
current and
future trends in
the
Augmented
Reality.
https://www.youtube.com/watch?v=--vAH656y9E
6
How to experience Augmented Reality?
One of the many ways for
implementing Augmented
Reality.
This technique is used
in several web based
AR apps.
It requires 3 simple steps:
• Recognition: Recognition of an
image, an object, a face or a
body.
• Tracking: Real-time localization in
space of the image, object, face,
or body.
• Mix: Superposition of a media
(video, 3D, 2D, text, etc…) on top
of this image, object, face or body.
http://www.t-immersion.com/As implemented by:
7
How does AR work?
The process of those three steps takes less
than 40ms to match the human eye fluidity
of 25 images per second.
Powerful algorithms need to be applied
and research is continuously progressing
to further develop each of these three
processes boosted by the growing
performances of equipment and devices.
ComputerVision is in itself a high
consumer of CPU but higher is the
available power, better is the
sophistication of the algorithm for a
truly enhanced user experience.
Furthermore, with the rapidly
progressing utilization of captors,
such as GPS, Compass, gyroscope,
thermometers, speedometer, the sum
of information collected can be
used to further enrich and boost
users experience in a current context.
8
What are Augmented Reality Usages?
9
People
10
Polar Rose a powerful AR app for facial
recognition which has been acquired
by Apple.
11
Places
12
The TripAdvisor app which merges real-time location data
with Google Maps to provide useful information about the
area.
13
Google Latitude -the AR based location
sharing app which allows users to share
their real-time location with their friends.
14
People & Places
15
Google Goggles is a downloadable image recognition
application created by Google. It is used for searches
based on pictures taken by handheld devices.
16
Google Sky Map: the AR app which allows users to view a collaboration of images from NASA satellites, the
Sloan Digital Sky Survey, and the Hubble Telescope.
17
Wikitude- one of the leading AR
platform developers in the world.
http://www.wikitude.com/app/
18
Wikitude displays information about the users' surroundings in a mobile camera view, including image
recognition and 3d modelling.
Wikitude was the first publicly available application that used a location-based approach to augmented reality.
19
Browse the world around you and discover
information about places, famous landmarks, and
other points of interest with Wikitude World Browser.
The Physical World as a platform.
20
Google Glass: the most anticipated and high-profile
AR & OHMD technology which is set to revolutionize
how we interact to our surroundings.
OHMD
21
AR-as a tool to
enhance
Retail
22
IN-Store Engagement
As customers increasingly demand a more interactive shopping environment, marketers and retailers are
beginning to leverage AR technology to help boost in-store sales.
23
Improves conversion
rates and reduces
returns for clothing
stores – Virtual fitting
room (J.C.Penney).
Increased online
conversion rate
and reduced
returns lead to an
improved
company’s
profitability.
https://www.youtube.com/watch?v=qB
uMCPYyRmQ#t=37
24
https://www.youtube.com/watch?v=qBuMCPYyRmQ#t=37
Gamification
added to the
physical products
helps to engage
customers with a
product and
works as an
incentive to a
quicker purchase.
Enhances brand recognition (Augmented Pixels & Tavria-V)
25https://www.youtube.com/watch?v=EAVtHjzQnqY#t=13
Empowers advertising campaigns (VW)
Brands can incorporate
AR experience into an
advert which directs the
user to the additional
web content, product
video, coupons etc.
26
https://www.youtube.com/watch?v=EAVtHjzQnqY#t=13
Displays additional information about products shown,
enriches shopping experience (IBM Research).
Anything from nutritional information to a virtual
coupon that customers can redeem at check
out can be incorporated with augmented reality.
27
https://www.youtube.com/watch?v=vDNzTasuYEw#t=26
Visualizes product catalogues (IKEA)
The “projected”
catalog items
give a customer
a real-time,
scale view of
what the
product would
look like in their
space.
28
Augmented Reality
Games
29
http://play.google.com/store/apps/details?id=com.fuerteint.toyota86
Toyota 86 AR Game
Go to toyota86ar.com and
print your “Made to Thrill”
marker. Place your marker on
the floor in front of your
camera and start Toyota 86 AR
and place camera on the
marker to get the stunning
Toyota 86. It makes you test
your skills turning around
cones, corners.
30http://play.google.com/store/apps/details?id=com.thoughtshastra.templetreasure
Temple Treasure Hunt Game
Temple Treasure Hunt game is an adventurous thrilling game in augmented reality. It gives you an exciting trail to
an ancient treasure buried in a Shiva temple. Use camera for real surroundings and inbuilt location based
tracking technologies in the app along with many interesting clues during the great journey to reach to the Hunt.
31
Augmented Tomorrow
With the availability of this technology, sky is the limit, when it comes to thinking of
possibilities of its uses. The current world of AR uses live video feed which is digitally
enhanced with CGI.
Augmented reality apps are changing the way we see the world, literally. As long
as the generated augmented content remains appealing and pioneering,
consumers will certainly approve them as a novel and fun twist to conventional
marketing technique.
32
the way forward..
We can expect further
advances in AR technology
at the various live events
and trade shows taking
place across the globe, not
least the Augmented World
Expo (world's largest AR
event) in California. Chief
Executives come together
to discuss the future of AR
and how it will being to
effect retail, health,
education, media,
entertainment, travel and
more in 2014.
At CES 2014we can expect many
more forward-thinking designs to
be presented, pushing forward AR
developments and realities
33
References:
https://www.youtube.com/watch?v=qBuMCPYyRmQ#t=37
https://www.youtube.com/watch?v=vDNzTasuYEw#t=26
http://www.wikitude.com/app/
Augmented
Reality Retail
Experiences
http://www.trendhunter.com/slideshow/augmented-reality-retail
Augmented
Reality Trends for
2014
http://www.hhglobal.com/blog/5-augmented-reality-trends-for-2014
34
Presented to:
MR. Harinandan Tunga
HOD , Computer Science & Engineering Dept.
RCC Institute Of Information Technology.
For the Seminar (CS-681)
Session: 2011-2015
Presented by:
Anand

Augmented Reality-now and future

  • 1.
  • 2.
    2 Augmented reality (AR)is a live direct or indirect view of a physical, real-world environment whose elements are augmented (or supplemented) by computer-generated sensory input such as sound, video, graphics or GPS data. http://en.wikipedia.org/wiki/Augmented_reality What is Augmented Reality?
  • 3.
    3 And this.. AR beingused in a Real Estate Expo in Mumbai. https://www.youtube.com/watch?v=4gwxGGLcQzY
  • 4.
    4 ..this too !! ARused to enhance gaming experience.
  • 5.
    5 Still Wondering whatis it ? Watch this.. An amazing video by Total Immersion displaying the current and future trends in the Augmented Reality. https://www.youtube.com/watch?v=--vAH656y9E
  • 6.
    6 How to experienceAugmented Reality? One of the many ways for implementing Augmented Reality. This technique is used in several web based AR apps. It requires 3 simple steps: • Recognition: Recognition of an image, an object, a face or a body. • Tracking: Real-time localization in space of the image, object, face, or body. • Mix: Superposition of a media (video, 3D, 2D, text, etc…) on top of this image, object, face or body. http://www.t-immersion.com/As implemented by:
  • 7.
    7 How does ARwork? The process of those three steps takes less than 40ms to match the human eye fluidity of 25 images per second. Powerful algorithms need to be applied and research is continuously progressing to further develop each of these three processes boosted by the growing performances of equipment and devices. ComputerVision is in itself a high consumer of CPU but higher is the available power, better is the sophistication of the algorithm for a truly enhanced user experience. Furthermore, with the rapidly progressing utilization of captors, such as GPS, Compass, gyroscope, thermometers, speedometer, the sum of information collected can be used to further enrich and boost users experience in a current context.
  • 8.
    8 What are AugmentedReality Usages?
  • 9.
  • 10.
    10 Polar Rose apowerful AR app for facial recognition which has been acquired by Apple.
  • 11.
  • 12.
    12 The TripAdvisor appwhich merges real-time location data with Google Maps to provide useful information about the area.
  • 13.
    13 Google Latitude -theAR based location sharing app which allows users to share their real-time location with their friends.
  • 14.
  • 15.
    15 Google Goggles isa downloadable image recognition application created by Google. It is used for searches based on pictures taken by handheld devices.
  • 16.
    16 Google Sky Map:the AR app which allows users to view a collaboration of images from NASA satellites, the Sloan Digital Sky Survey, and the Hubble Telescope.
  • 17.
    17 Wikitude- one ofthe leading AR platform developers in the world. http://www.wikitude.com/app/
  • 18.
    18 Wikitude displays informationabout the users' surroundings in a mobile camera view, including image recognition and 3d modelling. Wikitude was the first publicly available application that used a location-based approach to augmented reality.
  • 19.
    19 Browse the worldaround you and discover information about places, famous landmarks, and other points of interest with Wikitude World Browser. The Physical World as a platform.
  • 20.
    20 Google Glass: themost anticipated and high-profile AR & OHMD technology which is set to revolutionize how we interact to our surroundings. OHMD
  • 21.
    21 AR-as a toolto enhance Retail
  • 22.
    22 IN-Store Engagement As customersincreasingly demand a more interactive shopping environment, marketers and retailers are beginning to leverage AR technology to help boost in-store sales.
  • 23.
    23 Improves conversion rates andreduces returns for clothing stores – Virtual fitting room (J.C.Penney). Increased online conversion rate and reduced returns lead to an improved company’s profitability. https://www.youtube.com/watch?v=qB uMCPYyRmQ#t=37
  • 24.
    24 https://www.youtube.com/watch?v=qBuMCPYyRmQ#t=37 Gamification added to the physicalproducts helps to engage customers with a product and works as an incentive to a quicker purchase. Enhances brand recognition (Augmented Pixels & Tavria-V)
  • 25.
    25https://www.youtube.com/watch?v=EAVtHjzQnqY#t=13 Empowers advertising campaigns(VW) Brands can incorporate AR experience into an advert which directs the user to the additional web content, product video, coupons etc.
  • 26.
    26 https://www.youtube.com/watch?v=EAVtHjzQnqY#t=13 Displays additional informationabout products shown, enriches shopping experience (IBM Research). Anything from nutritional information to a virtual coupon that customers can redeem at check out can be incorporated with augmented reality.
  • 27.
    27 https://www.youtube.com/watch?v=vDNzTasuYEw#t=26 Visualizes product catalogues(IKEA) The “projected” catalog items give a customer a real-time, scale view of what the product would look like in their space.
  • 28.
  • 29.
    29 http://play.google.com/store/apps/details?id=com.fuerteint.toyota86 Toyota 86 ARGame Go to toyota86ar.com and print your “Made to Thrill” marker. Place your marker on the floor in front of your camera and start Toyota 86 AR and place camera on the marker to get the stunning Toyota 86. It makes you test your skills turning around cones, corners.
  • 30.
    30http://play.google.com/store/apps/details?id=com.thoughtshastra.templetreasure Temple Treasure HuntGame Temple Treasure Hunt game is an adventurous thrilling game in augmented reality. It gives you an exciting trail to an ancient treasure buried in a Shiva temple. Use camera for real surroundings and inbuilt location based tracking technologies in the app along with many interesting clues during the great journey to reach to the Hunt.
  • 31.
    31 Augmented Tomorrow With theavailability of this technology, sky is the limit, when it comes to thinking of possibilities of its uses. The current world of AR uses live video feed which is digitally enhanced with CGI. Augmented reality apps are changing the way we see the world, literally. As long as the generated augmented content remains appealing and pioneering, consumers will certainly approve them as a novel and fun twist to conventional marketing technique.
  • 32.
    32 the way forward.. Wecan expect further advances in AR technology at the various live events and trade shows taking place across the globe, not least the Augmented World Expo (world's largest AR event) in California. Chief Executives come together to discuss the future of AR and how it will being to effect retail, health, education, media, entertainment, travel and more in 2014. At CES 2014we can expect many more forward-thinking designs to be presented, pushing forward AR developments and realities
  • 33.
  • 34.
    34 Presented to: MR. HarinandanTunga HOD , Computer Science & Engineering Dept. RCC Institute Of Information Technology. For the Seminar (CS-681) Session: 2011-2015 Presented by: Anand