Rub-Nawaz Bhatti
REG # 2015-UET-CCET-CIVIL-02
CHENAB COLLEGE OF ENGINEERING &
TECHNOLOGY GUJRANWALA
AL BRAJ AL BAIT
MAKKAH ROYAL CLOCK TOWER
THE WORLD 3RD TALLEST BUILDING
INTRODUCTION
 It is government owned mega tall complex of seven skyscraper hotel in MAKKAH.
 Located in Makkah adjacent to MASJID-AL-HARAM
 also called Makkah Royal Clock Tower
 Part of king Abdul Aziz Endowment program
 World 3rd tallest building
 4th tallest free standing structure in the world
 Tallest in Saudi Arabia
CONSTRUCTION DETAIL
 The building was planned in 2002.
 It is also designed in same year 2002 by a Lebanon company Dar Al Handasah
 The construction of the tower starts in year 2004
 Main contractor of the building is Kingdom’s largest construction company Saudi
Bin Ladin Group
 Its construction completed in 2012
ACCCIDENTS DURING CONSTRUCTION
 Two major accidents occurred during the construction of Al Braj Al Bait both of
the accidents were of fire
 1st accident occurred on 28 October 2008 at Hajar Tower
 Fire started shortly after midnight and spread all over the building due to the
wood used in construction.
 It took 400 fire fighters to put out the fire.
 The building was cleared by fire fighters in 10 hours consuming 9 floors of the
tower.
 Fortunately no injuries were reported in the accident.
Accidents (cont.)
 Second fire accident was held on 1 may 2009 at Safa tower.
 Fire broke out at 14th floor and reached 20th floor of the building.
 Fire broke out just after ASR prayer when some worker in building were welding
iron rods on wooden scaffolding.
 Fire damage a large part of building under construction.
 No injuries were reported in the accident.
MAIN FEATURES OF MAKKAH ROYAL CLOCK
TOWER
 Ranking in world
 Total height of the building is 1972ft
 Floors count
 Total seven buildings
 5 floors shopping mall
 A large parking place
 Large prayer room
FEATURES OF THE CLOCK
 Clock face is visible from 25 km
 Clock faces dimension are 43m*43m largest in the World
 Roof of clock is 1740ft above ground
 Each Clock face is 151ft in diameter
 Illuminated by 2 million LEDs of green and white as the color of the Saudi’s flag
 Minute hand is 22m (72ft)
 Hour hand is 17m (56ft)
Significant features of Spire
 The main building is topped by a 93m spire with a crescent
 The spire has a lunar gallery
 The crescent was constructed in Dubai and weighs 35 tons
 Crescent was divided into 10 parts to transport it to MAKKAH
Controversies
 Not to construct your house higher than the minaret of the building
 Location of the building was not appropriate as Ajyad Fortress has to be
demolished
Conclusion
 First tallest building in the Muslim central state
 Beneficial for Saudi Arabs economic structure
 Pilgrims from all over the world came and stay there and worship ALLAH
ALMIGHTY
 This hotel provides them world class accommodation and dining facilities.

Al bairaj al bait

  • 1.
    Rub-Nawaz Bhatti REG #2015-UET-CCET-CIVIL-02 CHENAB COLLEGE OF ENGINEERING & TECHNOLOGY GUJRANWALA
  • 2.
    AL BRAJ ALBAIT MAKKAH ROYAL CLOCK TOWER THE WORLD 3RD TALLEST BUILDING
  • 4.
    INTRODUCTION  It isgovernment owned mega tall complex of seven skyscraper hotel in MAKKAH.  Located in Makkah adjacent to MASJID-AL-HARAM  also called Makkah Royal Clock Tower  Part of king Abdul Aziz Endowment program  World 3rd tallest building  4th tallest free standing structure in the world  Tallest in Saudi Arabia
  • 5.
    CONSTRUCTION DETAIL  Thebuilding was planned in 2002.  It is also designed in same year 2002 by a Lebanon company Dar Al Handasah  The construction of the tower starts in year 2004  Main contractor of the building is Kingdom’s largest construction company Saudi Bin Ladin Group  Its construction completed in 2012
  • 6.
    ACCCIDENTS DURING CONSTRUCTION Two major accidents occurred during the construction of Al Braj Al Bait both of the accidents were of fire  1st accident occurred on 28 October 2008 at Hajar Tower  Fire started shortly after midnight and spread all over the building due to the wood used in construction.  It took 400 fire fighters to put out the fire.  The building was cleared by fire fighters in 10 hours consuming 9 floors of the tower.  Fortunately no injuries were reported in the accident.
  • 7.
    Accidents (cont.)  Secondfire accident was held on 1 may 2009 at Safa tower.  Fire broke out at 14th floor and reached 20th floor of the building.  Fire broke out just after ASR prayer when some worker in building were welding iron rods on wooden scaffolding.  Fire damage a large part of building under construction.  No injuries were reported in the accident.
  • 8.
    MAIN FEATURES OFMAKKAH ROYAL CLOCK TOWER  Ranking in world  Total height of the building is 1972ft  Floors count  Total seven buildings  5 floors shopping mall  A large parking place  Large prayer room
  • 10.
    FEATURES OF THECLOCK  Clock face is visible from 25 km  Clock faces dimension are 43m*43m largest in the World  Roof of clock is 1740ft above ground  Each Clock face is 151ft in diameter  Illuminated by 2 million LEDs of green and white as the color of the Saudi’s flag  Minute hand is 22m (72ft)  Hour hand is 17m (56ft)
  • 12.
    Significant features ofSpire  The main building is topped by a 93m spire with a crescent  The spire has a lunar gallery  The crescent was constructed in Dubai and weighs 35 tons  Crescent was divided into 10 parts to transport it to MAKKAH
  • 14.
    Controversies  Not toconstruct your house higher than the minaret of the building  Location of the building was not appropriate as Ajyad Fortress has to be demolished
  • 15.
    Conclusion  First tallestbuilding in the Muslim central state  Beneficial for Saudi Arabs economic structure  Pilgrims from all over the world came and stay there and worship ALLAH ALMIGHTY  This hotel provides them world class accommodation and dining facilities.