General:
The high potential test (applied voltage test) is used to detect weak spots in the insulation of stator
windings, or rotor windings (wound rotor windings, field windings) and of some machine components
(e.g. bearing insulation).
Introduction
During the service-life-time of machines a degradation of the dielectric strength of the insulation
cannot be excluded. To minimize unexpected forced outages, the high-potential test is used: weak
spots in the insulation will lead to a voltage-break-down during this test; now the insulation at these
spots of failure can be reinforced and can be tested again. Doing this gives some certainty that the
insulation under test will withstand the normal operation voltage during the following operation period
till the next scheduled inspection.
The High-Potential Test
The high-potential test preferable is done by applying an AC voltage of normal frequency to the
winding under test; the advantage of AC is given by the fact that all dielectric stresses in the
insulation correspond to the stresses under normal operating conditions (exception: field winding;
use a DC voltage in this case).
Although AC voltage is preferable, sometimes the application of AC is inconvenient (particularly in
cases where an appropriate regulator step-up-transformer is not available) and thus a DC source is
used. To ensure equivalent stresses, the AC and DC test voltages correlate as follows:
VDC = 1.6 x VAC r.m.s
(Note: Sometimes an equivalence factor of 1.7 is used, according to national specifications)
The AC test voltage used normally for newly fabricated armature windings (stator windings) is given
by
VAC r.m.s = 2 VL + 1 kV
Where VL = nominal line-to-line operating voltage. The test voltage has to be reduced for the
application to old windings; the reduction factor normally is
0.75
For old and/or partially refreshed windings (in such cases the test voltage often simplified is laid
down to be 1.5 VL ) and is
0.80
for renewed windings or in case of a repeated high-potential test on a new winding.
The application of the test voltage has to be done according to the relevant standards; Starting with
maximally 50%of the test level, the voltage has to be increased from 50% up to 100% within more
Page 1
than 10 seconds and the insulation must withstand the voltage for 1 minute without any break-down
or flash-over.
General Requirements
The main requirements for the high potential test is that the insulation to be tested must be dry and
clean.
For the generation of the AC test voltage, an appropriate regulator-transformer (step-up transformer)
is necessary. Only in cases where a regulator-transformer is not available and/or if the capacitive
power cannot be achieved, the use of an appropriate DC source is recommended, substituting the
AC test by a DC test.
Measuring the test voltage should be done by a precision voltage-transformer and a DC-voltage
divider respectively. When measuring AC voltage it is recommended to use a voltmeter whose
system picks up the crest value Ú of the voltage and whose read-out is Ú/√2 (which corresponds to
the r.m.s – value if the voltage is sine-shaped)
For the test set-up and for the operation of the rest equipment, one high-voltage engineer is
necessary, assisted by at least one experienced technician. If necessary, additional personnel
and/or barricades are required in order to prevent persons from touching energized components
and/or leads. As high voltage is used for the test, appropriate safety precautions are necessary; all
relevant safety instructions and standards have to be observed.
© This QM-Instruction remains the property of PNG Power and must neither be copied nor used in
any other way without the written consent of PNG Power Neither is it to be transferred or in other
way communicated to a third party. Infringement will lead to prosecution.
Page 2

More Related Content

What's hot

Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset managementMuthar Hussain
 
Over current Relays
Over current RelaysOver current Relays
Over current RelaysASWANTH6270
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...Jobin Abraham
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformerPraveenKumar5880
 
Hybrid HVDC Circuit Breaker Definitions
Hybrid HVDC Circuit Breaker  DefinitionsHybrid HVDC Circuit Breaker  Definitions
Hybrid HVDC Circuit Breaker DefinitionsAli Sepehri
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerRaveendranath Macherla
 
Measurement of the resistance of switchgear main circuit
Measurement of the resistance of switchgear main circuitMeasurement of the resistance of switchgear main circuit
Measurement of the resistance of switchgear main circuitRaveendranath Macherla
 
Selection Of Circuit Breaker
Selection Of Circuit BreakerSelection Of Circuit Breaker
Selection Of Circuit BreakerRaviraj solanki
 
Distribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent FaultsDistribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent FaultsToshaliMohapatra
 
Generator protection LEC 2
Generator protection  LEC 2Generator protection  LEC 2
Generator protection LEC 2Rahaf Waheep
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)Rohini Haridas
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
Surge protection with shah jaydeep
Surge protection with shah jaydeepSurge protection with shah jaydeep
Surge protection with shah jaydeepJAYDEEP SHAH
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjarMukesh gurjar
 
Circuit Breaker and its types
Circuit Breaker and its typesCircuit Breaker and its types
Circuit Breaker and its typesRakesh Gothwal
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenancedwessin
 
7UT612 Transformer Differential Protection relay
7UT612 Transformer Differential Protection relay7UT612 Transformer Differential Protection relay
7UT612 Transformer Differential Protection relayashwini reliserv
 
Fuse and its types
Fuse and its typesFuse and its types
Fuse and its typesSlides Hub
 

What's hot (20)

Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset management
 
Over current Relays
Over current RelaysOver current Relays
Over current Relays
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 
Hybrid HVDC Circuit Breaker Definitions
Hybrid HVDC Circuit Breaker  DefinitionsHybrid HVDC Circuit Breaker  Definitions
Hybrid HVDC Circuit Breaker Definitions
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
 
Measurement of the resistance of switchgear main circuit
Measurement of the resistance of switchgear main circuitMeasurement of the resistance of switchgear main circuit
Measurement of the resistance of switchgear main circuit
 
Selection Of Circuit Breaker
Selection Of Circuit BreakerSelection Of Circuit Breaker
Selection Of Circuit Breaker
 
Distribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent FaultsDistribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent Faults
 
Transformer Site test
Transformer Site testTransformer Site test
Transformer Site test
 
Generator protection LEC 2
Generator protection  LEC 2Generator protection  LEC 2
Generator protection LEC 2
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Surge protection with shah jaydeep
Surge protection with shah jaydeepSurge protection with shah jaydeep
Surge protection with shah jaydeep
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjar
 
Circuit Breaker and its types
Circuit Breaker and its typesCircuit Breaker and its types
Circuit Breaker and its types
 
Pd Maintenance
Pd MaintenancePd Maintenance
Pd Maintenance
 
7UT612 Transformer Differential Protection relay
7UT612 Transformer Differential Protection relay7UT612 Transformer Differential Protection relay
7UT612 Transformer Differential Protection relay
 
Fuse and its types
Fuse and its typesFuse and its types
Fuse and its types
 

Viewers also liked

Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodDonald Stephen
 
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testSustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testDonald Stephen
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constantDonald Stephen
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setupDonald Stephen
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistancesDonald Stephen
 
Participants 2009 bilderberg meetings
Participants 2009   bilderberg meetingsParticipants 2009   bilderberg meetings
Participants 2009 bilderberg meetingsDonald Stephen
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setupDonald Stephen
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testingDonald Stephen
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsDonald Stephen
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windingsDonald Stephen
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta testDonald Stephen
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit testDonald Stephen
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit testDonald Stephen
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance testDonald Stephen
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction testDonald Stephen
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr testDonald Stephen
 

Viewers also liked (20)

Core deffect detector
Core deffect detectorCore deffect detector
Core deffect detector
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
 
Load test
Load testLoad test
Load test
 
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testSustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent test
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistances
 
Participants 2009 bilderberg meetings
Participants 2009   bilderberg meetingsParticipants 2009   bilderberg meetings
Participants 2009 bilderberg meetings
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setup
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
 
Check pole connector
Check pole connectorCheck pole connector
Check pole connector
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
 
Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit test
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit test
 
Crack monitor
Crack monitorCrack monitor
Crack monitor
 
Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction test
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
 

Similar to High potential test

AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformerPreet_patel
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 
13 l m100-150,cl13m10-15,14ml10
13 l m100-150,cl13m10-15,14ml1013 l m100-150,cl13m10-15,14ml10
13 l m100-150,cl13m10-15,14ml10Cesar1alex
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................hiiarindam
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Power System Protection and Testing of Electrical Equipment.pptx
Power System Protection and Testing of Electrical Equipment.pptxPower System Protection and Testing of Electrical Equipment.pptx
Power System Protection and Testing of Electrical Equipment.pptxAbhishekRanjan17318
 
Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...Mohammad Raza
 
Hall-Effect-Experiment-Manual-SE-7260.pdf
Hall-Effect-Experiment-Manual-SE-7260.pdfHall-Effect-Experiment-Manual-SE-7260.pdf
Hall-Effect-Experiment-Manual-SE-7260.pdfVINEYCHHILLAR
 

Similar to High potential test (20)

AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
Impulse testing of transformer
Impulse testing of transformerImpulse testing of transformer
Impulse testing of transformer
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
13 l m100-150,cl13m10-15,14ml10
13 l m100-150,cl13m10-15,14ml1013 l m100-150,cl13m10-15,14ml10
13 l m100-150,cl13m10-15,14ml10
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................
 
SEMA 2016 - Introduction to Transformer Rated Metering
SEMA 2016 -  Introduction to Transformer Rated MeteringSEMA 2016 -  Introduction to Transformer Rated Metering
SEMA 2016 - Introduction to Transformer Rated Metering
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
 
Bam Nuttall Hv Test Report
Bam Nuttall   Hv Test ReportBam Nuttall   Hv Test Report
Bam Nuttall Hv Test Report
 
Test Switch Operation and Accessories
Test Switch Operation and AccessoriesTest Switch Operation and Accessories
Test Switch Operation and Accessories
 
Power System Protection and Testing of Electrical Equipment.pptx
Power System Protection and Testing of Electrical Equipment.pptxPower System Protection and Testing of Electrical Equipment.pptx
Power System Protection and Testing of Electrical Equipment.pptx
 
Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...
 
Hall-Effect-Experiment-Manual-SE-7260.pdf
Hall-Effect-Experiment-Manual-SE-7260.pdfHall-Effect-Experiment-Manual-SE-7260.pdf
Hall-Effect-Experiment-Manual-SE-7260.pdf
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
1 7
1 71 7
1 7
 

More from Donald Stephen

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report formDonald Stephen
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation testDonald Stephen
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial dischargesDonald Stephen
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejectionDonald Stephen
 
Future strategic-issues-and-warfare
Future strategic-issues-and-warfareFuture strategic-issues-and-warfare
Future strategic-issues-and-warfareDonald Stephen
 

More from Donald Stephen (8)

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report form
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation test
 
Noise measurement
Noise measurementNoise measurement
Noise measurement
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
 
Temperature rise test
Temperature rise testTemperature rise test
Temperature rise test
 
Future strategic-issues-and-warfare
Future strategic-issues-and-warfareFuture strategic-issues-and-warfare
Future strategic-issues-and-warfare
 
The Watcher
The WatcherThe Watcher
The Watcher
 

Recently uploaded

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

High potential test

  • 1. HIGH POTENTIAL TEST General: The high potential test (applied voltage test) is used to detect weak spots in the insulation of stator windings, or rotor windings (wound rotor windings, field windings) and of some machine components (e.g. bearing insulation). Introduction During the service-life-time of machines a degradation of the dielectric strength of the insulation cannot be excluded. To minimize unexpected forced outages, the high-potential test is used: weak spots in the insulation will lead to a voltage-break-down during this test; now the insulation at these spots of failure can be reinforced and can be tested again. Doing this gives some certainty that the insulation under test will withstand the normal operation voltage during the following operation period till the next scheduled inspection. The High-Potential Test The high-potential test preferable is done by applying an AC voltage of normal frequency to the winding under test; the advantage of AC is given by the fact that all dielectric stresses in the insulation correspond to the stresses under normal operating conditions (exception: field winding; use a DC voltage in this case). Although AC voltage is preferable, sometimes the application of AC is inconvenient (particularly in cases where an appropriate regulator step-up-transformer is not available) and thus a DC source is used. To ensure equivalent stresses, the AC and DC test voltages correlate as follows: VDC = 1.6 x VAC r.m.s (Note: Sometimes an equivalence factor of 1.7 is used, according to national specifications) The AC test voltage used normally for newly fabricated armature windings (stator windings) is given by VAC r.m.s = 2 VL + 1 kV Where VL = nominal line-to-line operating voltage. The test voltage has to be reduced for the application to old windings; the reduction factor normally is 0.75 For old and/or partially refreshed windings (in such cases the test voltage often simplified is laid down to be 1.5 VL ) and is 0.80 for renewed windings or in case of a repeated high-potential test on a new winding. The application of the test voltage has to be done according to the relevant standards; Starting with maximally 50%of the test level, the voltage has to be increased from 50% up to 100% within more Page 1
  • 2. than 10 seconds and the insulation must withstand the voltage for 1 minute without any break-down or flash-over. General Requirements The main requirements for the high potential test is that the insulation to be tested must be dry and clean. For the generation of the AC test voltage, an appropriate regulator-transformer (step-up transformer) is necessary. Only in cases where a regulator-transformer is not available and/or if the capacitive power cannot be achieved, the use of an appropriate DC source is recommended, substituting the AC test by a DC test. Measuring the test voltage should be done by a precision voltage-transformer and a DC-voltage divider respectively. When measuring AC voltage it is recommended to use a voltmeter whose system picks up the crest value Ú of the voltage and whose read-out is Ú/√2 (which corresponds to the r.m.s – value if the voltage is sine-shaped) For the test set-up and for the operation of the rest equipment, one high-voltage engineer is necessary, assisted by at least one experienced technician. If necessary, additional personnel and/or barricades are required in order to prevent persons from touching energized components and/or leads. As high voltage is used for the test, appropriate safety precautions are necessary; all relevant safety instructions and standards have to be observed. © This QM-Instruction remains the property of PNG Power and must neither be copied nor used in any other way without the written consent of PNG Power Neither is it to be transferred or in other way communicated to a third party. Infringement will lead to prosecution. Page 2