SlideShare a Scribd company logo
1 of 1
Download to read offline
60694 © IEC:1996+A1:2000+A2:2001 – 173 –
d) tightness test in accordance with 7.4;
e) design and visual checks in accordance with 7.5.
Additional routine tests may be necessary and will be specified in the relevant IEC standards.
When switchgear and controlgear are not completely assembled before transport, separate
tests shall be made on all transport units. In this event, the manufacturer shall demonstrate
the validity of his test (example: leakage rate, test voltage, resistance of part of the main
circuit).
Test reports of the routine tests are normally not necessary unless otherwise agreed upon
between manufacturer and user.
7.1 Dielectric test on the main circuit
A dry, short-duration power-frequency voltage test shall be applied. The test shall be made
according to IEC 60060-1, and to 6.2 on complete apparatus or on separate poles, or on
transport units in new, clean and dry conditions.
The test voltage shall be that specified in column 2 of tables 1 or 2, according to the relevant
IEC standards, or the applicable part of it.
When the insulation of switchgear and controlgear is provided only by solid-core insulators
and air at ambient pressure, the power-frequency voltage withstand test may be omitted if the
dimensions between the conductive parts – between phases, across open switching device
and between conductive parts and the frame – are checked by dimensional measurements.
Bases for the checking of dimensions are the dimensional (outline) drawings, which are part
of the type test report (or are referred to in it) of the particular switchgear and controlgear.
Therefore, in these drawings all information necessary for dimensional checking including the
permissible tolerances shall be given.
7.2 Tests on auxiliary and control circuits
7.2.1 Inspection of auxiliary and control circuits, and verification of conformity
to the circuit diagrams and wiring diagrams
The nature of the materials, the quality of assembly, the finish and, if necessary, the
protective coatings against corrosion shall be checked. A visual inspection is also necessary
to check the satisfactory installation of the thermal insulation.
A visual inspection of actuators, interlocks, locks, etc., shall be made.
Components for auxiliary and control circuits inside enclosures shall be checked for proper
mounting. The location of the means provided for connecting external wiring shall be checked
to ensure that there is sufficient wiring space for spreading of the cores of multi-core cables
and for the proper connection of the conductors.
The conductors and cables shall be checked for proper routing. Special attention shall be
given to ensure that no mechanical damage can occur to conductors and cables due to the
proximity of sharp edges or heating elements, or to the movement of moving parts.

More Related Content

What's hot

Fault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibrationFault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibrationYousof Elkhouly
 
Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging Power System Operation
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsmichaeljmack
 
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...IJMERJOURNAL
 
electrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoringelectrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition MonitoringMarcep Inc.
 
Condition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric materialCondition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric materialeSAT Publishing House
 
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewFulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewMark Platten
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoringAnkit Narain
 
Challenges of Rebar Testing
Challenges of Rebar TestingChallenges of Rebar Testing
Challenges of Rebar TestingInstron
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management ServicesIsmail Yusof
 
Condition Monitoring Basics
Condition Monitoring BasicsCondition Monitoring Basics
Condition Monitoring BasicsUzair Ahmad
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoringKurien George
 
Challenges of Pipe & Tube Testing
Challenges of Pipe & Tube TestingChallenges of Pipe & Tube Testing
Challenges of Pipe & Tube TestingInstron
 
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsSensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsEvigia
 
Aceeptance testing and commisioning data measurement for photon beam
Aceeptance testing and commisioning data measurement for photon beam Aceeptance testing and commisioning data measurement for photon beam
Aceeptance testing and commisioning data measurement for photon beam din muhammad hridoy
 

What's hot (20)

Condition monitoring part 2
Condition monitoring part 2Condition monitoring part 2
Condition monitoring part 2
 
Fault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibrationFault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibration
 
Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
 
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 
Power System Earthing Guide
Power System Earthing GuidePower System Earthing Guide
Power System Earthing Guide
 
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
 
electrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoringelectrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoring
 
Inspection and testing
Inspection and testingInspection and testing
Inspection and testing
 
Condition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric materialCondition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric material
 
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewFulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For review
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
Challenges of Rebar Testing
Challenges of Rebar TestingChallenges of Rebar Testing
Challenges of Rebar Testing
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
 
Condition Monitoring Basics
Condition Monitoring BasicsCondition Monitoring Basics
Condition Monitoring Basics
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
Challenges of Pipe & Tube Testing
Challenges of Pipe & Tube TestingChallenges of Pipe & Tube Testing
Challenges of Pipe & Tube Testing
 
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsSensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
Aceeptance testing and commisioning data measurement for photon beam
Aceeptance testing and commisioning data measurement for photon beam Aceeptance testing and commisioning data measurement for photon beam
Aceeptance testing and commisioning data measurement for photon beam
 

Viewers also liked

Armonicos Conceptos Basicos
Armonicos   Conceptos BasicosArmonicos   Conceptos Basicos
Armonicos Conceptos BasicosF Blanco
 
Transitorios al energizar un transformador
Transitorios al energizar un transformadorTransitorios al energizar un transformador
Transitorios al energizar un transformadorAlex López
 
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
FenóMenos Transitorios Asociados A La EnergizacióN De TransformadoresFenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
FenóMenos Transitorios Asociados A La EnergizacióN De TransformadoresEsteban
 
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-SocabayaEstudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-SocabayaRed de Energía del Perú
 
Operación de sistemas de transmisión en 500k
Operación de sistemas de transmisión en 500k Operación de sistemas de transmisión en 500k
Operación de sistemas de transmisión en 500k Red de Energía del Perú
 
Analisis de sistemas_electricos_de_potencia
Analisis de sistemas_electricos_de_potenciaAnalisis de sistemas_electricos_de_potencia
Analisis de sistemas_electricos_de_potenciaSergio Amado
 
Apunte de protección de transformadores
Apunte de protección de transformadoresApunte de protección de transformadores
Apunte de protección de transformadoresMarcelo Fabián Neuah
 
Lineas de transmision
Lineas de transmisionLineas de transmision
Lineas de transmisionalejraque
 
E book sistemas electricos de potencia (grainger)
E book sistemas electricos de potencia (grainger)E book sistemas electricos de potencia (grainger)
E book sistemas electricos de potencia (grainger)federicoblanco
 
Calculo de Corriente de cortocircuito
Calculo de Corriente de cortocircuitoCalculo de Corriente de cortocircuito
Calculo de Corriente de cortocircuitoJesús Castrillón
 
Electricidad tecnicas de_alta_tension
Electricidad tecnicas de_alta_tensionElectricidad tecnicas de_alta_tension
Electricidad tecnicas de_alta_tensionLeito JB
 
Introduccion a las Protecciones Electricas
Introduccion a las Protecciones ElectricasIntroduccion a las Protecciones Electricas
Introduccion a las Protecciones ElectricasGerman Neira Vargas
 
Calculo de proteciones de transformadores
Calculo de proteciones de transformadoresCalculo de proteciones de transformadores
Calculo de proteciones de transformadoresNakary Rodriguez
 

Viewers also liked (18)

Armonicos Conceptos Basicos
Armonicos   Conceptos BasicosArmonicos   Conceptos Basicos
Armonicos Conceptos Basicos
 
Fallas transformadores
Fallas transformadoresFallas transformadores
Fallas transformadores
 
Transitorios al energizar un transformador
Transitorios al energizar un transformadorTransitorios al energizar un transformador
Transitorios al energizar un transformador
 
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
FenóMenos Transitorios Asociados A La EnergizacióN De TransformadoresFenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
 
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-SocabayaEstudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
 
Armonicos en sistemas electricos
Armonicos en sistemas electricosArmonicos en sistemas electricos
Armonicos en sistemas electricos
 
Operación de sistemas de transmisión en 500k
Operación de sistemas de transmisión en 500k Operación de sistemas de transmisión en 500k
Operación de sistemas de transmisión en 500k
 
Analisis de sistemas_electricos_de_potencia
Analisis de sistemas_electricos_de_potenciaAnalisis de sistemas_electricos_de_potencia
Analisis de sistemas_electricos_de_potencia
 
253690381 alta-tension-libro
253690381 alta-tension-libro253690381 alta-tension-libro
253690381 alta-tension-libro
 
Apunte de protección de transformadores
Apunte de protección de transformadoresApunte de protección de transformadores
Apunte de protección de transformadores
 
Lineas de transmision
Lineas de transmisionLineas de transmision
Lineas de transmision
 
Lineas tecsup
Lineas tecsupLineas tecsup
Lineas tecsup
 
E book sistemas electricos de potencia (grainger)
E book sistemas electricos de potencia (grainger)E book sistemas electricos de potencia (grainger)
E book sistemas electricos de potencia (grainger)
 
Informe tecnico
Informe tecnicoInforme tecnico
Informe tecnico
 
Calculo de Corriente de cortocircuito
Calculo de Corriente de cortocircuitoCalculo de Corriente de cortocircuito
Calculo de Corriente de cortocircuito
 
Electricidad tecnicas de_alta_tension
Electricidad tecnicas de_alta_tensionElectricidad tecnicas de_alta_tension
Electricidad tecnicas de_alta_tension
 
Introduccion a las Protecciones Electricas
Introduccion a las Protecciones ElectricasIntroduccion a las Protecciones Electricas
Introduccion a las Protecciones Electricas
 
Calculo de proteciones de transformadores
Calculo de proteciones de transformadoresCalculo de proteciones de transformadores
Calculo de proteciones de transformadores
 

Similar to Dialectirc tests

High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...Ali Sepehri
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...Ali Sepehri
 
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Emeka Ojeah
 
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARDINSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARDhussein ibrahim
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-studyhomeworkping4
 
conf-type-test-2007-03.ppt
conf-type-test-2007-03.pptconf-type-test-2007-03.ppt
conf-type-test-2007-03.pptssuser1f60f6
 
5 is 1554_2_pvc cables hd
5 is 1554_2_pvc cables hd5 is 1554_2_pvc cables hd
5 is 1554_2_pvc cables hdSamsher Singh
 
A study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendmentsA study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendmentsricha diptisikha
 
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Emeka Ojeah
 
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation  02Specification for electrical automation and instrumentation  02
Specification for electrical automation and instrumentation 02Sajeewa Lakmal
 
Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)Ibrahim Ali
 
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e06612 iec zerti_rz11_e
06612 iec zerti_rz11_eCesar Chilet
 
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric CablesENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric CablesThorne & Derrick International
 
Benefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systemsBenefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systemsMessung Electrical Engineering
 

Similar to Dialectirc tests (20)

High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
 
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
 
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARDINSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
 
EESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim WebsterEESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim Webster
 
conf-type-test-2007-03.ppt
conf-type-test-2007-03.pptconf-type-test-2007-03.ppt
conf-type-test-2007-03.ppt
 
5 is 1554_2_pvc cables hd
5 is 1554_2_pvc cables hd5 is 1554_2_pvc cables hd
5 is 1554_2_pvc cables hd
 
A study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendmentsA study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendments
 
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
 
66 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may1266 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12
 
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation  02Specification for electrical automation and instrumentation  02
Specification for electrical automation and instrumentation 02
 
Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)
 
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e06612 iec zerti_rz11_e
06612 iec zerti_rz11_e
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric CablesENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
 
Benefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systemsBenefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systems
 

Recently uploaded

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 

Recently uploaded (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 

Dialectirc tests

  • 1. 60694 © IEC:1996+A1:2000+A2:2001 – 173 – d) tightness test in accordance with 7.4; e) design and visual checks in accordance with 7.5. Additional routine tests may be necessary and will be specified in the relevant IEC standards. When switchgear and controlgear are not completely assembled before transport, separate tests shall be made on all transport units. In this event, the manufacturer shall demonstrate the validity of his test (example: leakage rate, test voltage, resistance of part of the main circuit). Test reports of the routine tests are normally not necessary unless otherwise agreed upon between manufacturer and user. 7.1 Dielectric test on the main circuit A dry, short-duration power-frequency voltage test shall be applied. The test shall be made according to IEC 60060-1, and to 6.2 on complete apparatus or on separate poles, or on transport units in new, clean and dry conditions. The test voltage shall be that specified in column 2 of tables 1 or 2, according to the relevant IEC standards, or the applicable part of it. When the insulation of switchgear and controlgear is provided only by solid-core insulators and air at ambient pressure, the power-frequency voltage withstand test may be omitted if the dimensions between the conductive parts – between phases, across open switching device and between conductive parts and the frame – are checked by dimensional measurements. Bases for the checking of dimensions are the dimensional (outline) drawings, which are part of the type test report (or are referred to in it) of the particular switchgear and controlgear. Therefore, in these drawings all information necessary for dimensional checking including the permissible tolerances shall be given. 7.2 Tests on auxiliary and control circuits 7.2.1 Inspection of auxiliary and control circuits, and verification of conformity to the circuit diagrams and wiring diagrams The nature of the materials, the quality of assembly, the finish and, if necessary, the protective coatings against corrosion shall be checked. A visual inspection is also necessary to check the satisfactory installation of the thermal insulation. A visual inspection of actuators, interlocks, locks, etc., shall be made. Components for auxiliary and control circuits inside enclosures shall be checked for proper mounting. The location of the means provided for connecting external wiring shall be checked to ensure that there is sufficient wiring space for spreading of the cores of multi-core cables and for the proper connection of the conductors. The conductors and cables shall be checked for proper routing. Special attention shall be given to ensure that no mechanical damage can occur to conductors and cables due to the proximity of sharp edges or heating elements, or to the movement of moving parts.