Submit Search
Upload
Dialectirc tests
•
0 likes
•
104 views
N
Nimer Cahuas Medina
Follow
DIELECTRIC TEST
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 1
Download now
Download to read offline
Recommended
SVC device optimal location for voltage stability enhancement based on a comb...
SVC device optimal location for voltage stability enhancement based on a comb...
TELKOMNIKA JOURNAL
HTA - WIRE WOUND RESISTORS SILICONE COATED TYPE
HTA - WIRE WOUND RESISTORS SILICONE COATED TYPE
htrindia
Always Switched on
Always Switched on
Wakkas Mirza
Jose_resume 1
Jose_resume 1
ROYAPPAN JOSEPH JESU RAJA
Thermography test of electrical panels
Thermography test of electrical panels
Power System Operation
Htr india-products-wire-wound-resistors-silicone-coated-resistors-hta-english...
Htr india-products-wire-wound-resistors-silicone-coated-resistors-hta-english...
htrindia
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
Rohit Kaushik
Brosur Gossen Metrawatt Earth Ground Tester : GEOHM5
Brosur Gossen Metrawatt Earth Ground Tester : GEOHM5
PT. Siwali Swantika
Recommended
SVC device optimal location for voltage stability enhancement based on a comb...
SVC device optimal location for voltage stability enhancement based on a comb...
TELKOMNIKA JOURNAL
HTA - WIRE WOUND RESISTORS SILICONE COATED TYPE
HTA - WIRE WOUND RESISTORS SILICONE COATED TYPE
htrindia
Always Switched on
Always Switched on
Wakkas Mirza
Jose_resume 1
Jose_resume 1
ROYAPPAN JOSEPH JESU RAJA
Thermography test of electrical panels
Thermography test of electrical panels
Power System Operation
Htr india-products-wire-wound-resistors-silicone-coated-resistors-hta-english...
Htr india-products-wire-wound-resistors-silicone-coated-resistors-hta-english...
htrindia
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
Rohit Kaushik
Brosur Gossen Metrawatt Earth Ground Tester : GEOHM5
Brosur Gossen Metrawatt Earth Ground Tester : GEOHM5
PT. Siwali Swantika
Condition monitoring part 2
Condition monitoring part 2
Hendry Hasbiallah
Fault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibration
Yousof Elkhouly
Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging
Power System Operation
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
michaeljmack
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
Windpower Engineering & Development
Power System Earthing Guide
Power System Earthing Guide
Power System Operation
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
IJMERJOURNAL
electrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoring
Marcep Inc.
Inspection and testing
Inspection and testing
electrician2hire
Condition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric material
eSAT Publishing House
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For review
Mark Platten
Condition monitoring
Condition monitoring
Ankit Narain
Challenges of Rebar Testing
Challenges of Rebar Testing
Instron
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
Ismail Yusof
Condition Monitoring Basics
Condition Monitoring Basics
Uzair Ahmad
Condition monitoring
Condition monitoring
Kurien George
Challenges of Pipe & Tube Testing
Challenges of Pipe & Tube Testing
Instron
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Evigia
Condition monitoring
Condition monitoring
Kshitija Hinge
Aceeptance testing and commisioning data measurement for photon beam
Aceeptance testing and commisioning data measurement for photon beam
din muhammad hridoy
Armonicos Conceptos Basicos
Armonicos Conceptos Basicos
F Blanco
Fallas transformadores
Fallas transformadores
Jose Manuel Aller
More Related Content
What's hot
Condition monitoring part 2
Condition monitoring part 2
Hendry Hasbiallah
Fault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibration
Yousof Elkhouly
Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging
Power System Operation
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
michaeljmack
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
Windpower Engineering & Development
Power System Earthing Guide
Power System Earthing Guide
Power System Operation
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
IJMERJOURNAL
electrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoring
Marcep Inc.
Inspection and testing
Inspection and testing
electrician2hire
Condition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric material
eSAT Publishing House
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For review
Mark Platten
Condition monitoring
Condition monitoring
Ankit Narain
Challenges of Rebar Testing
Challenges of Rebar Testing
Instron
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
Ismail Yusof
Condition Monitoring Basics
Condition Monitoring Basics
Uzair Ahmad
Condition monitoring
Condition monitoring
Kurien George
Challenges of Pipe & Tube Testing
Challenges of Pipe & Tube Testing
Instron
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Evigia
Condition monitoring
Condition monitoring
Kshitija Hinge
Aceeptance testing and commisioning data measurement for photon beam
Aceeptance testing and commisioning data measurement for photon beam
din muhammad hridoy
What's hot
(20)
Condition monitoring part 2
Condition monitoring part 2
Fault diagnosis of rotating machines using vibration
Fault diagnosis of rotating machines using vibration
Automated Substation Monitoring with Thermal Imaging
Automated Substation Monitoring with Thermal Imaging
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
Power System Earthing Guide
Power System Earthing Guide
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
Condition Monitoring of Rotating Equipment Considering the Cause and Effects ...
electrical plants & equipment's Condition Monitoring
electrical plants & equipment's Condition Monitoring
Inspection and testing
Inspection and testing
Condition based monitoring of rotating machines using piezoelectric material
Condition based monitoring of rotating machines using piezoelectric material
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For review
Condition monitoring
Condition monitoring
Challenges of Rebar Testing
Challenges of Rebar Testing
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
Condition Monitoring Basics
Condition Monitoring Basics
Condition monitoring
Condition monitoring
Challenges of Pipe & Tube Testing
Challenges of Pipe & Tube Testing
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Condition monitoring
Condition monitoring
Aceeptance testing and commisioning data measurement for photon beam
Aceeptance testing and commisioning data measurement for photon beam
Viewers also liked
Armonicos Conceptos Basicos
Armonicos Conceptos Basicos
F Blanco
Fallas transformadores
Fallas transformadores
Jose Manuel Aller
Transitorios al energizar un transformador
Transitorios al energizar un transformador
Alex López
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
Esteban
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Red de Energía del Perú
Armonicos en sistemas electricos
Armonicos en sistemas electricos
Waldo Eber Melendez Garro
Operación de sistemas de transmisión en 500k
Operación de sistemas de transmisión en 500k
Red de Energía del Perú
Analisis de sistemas_electricos_de_potencia
Analisis de sistemas_electricos_de_potencia
Sergio Amado
253690381 alta-tension-libro
253690381 alta-tension-libro
benjamin riveros riveros
Apunte de protección de transformadores
Apunte de protección de transformadores
Marcelo Fabián Neuah
Lineas de transmision
Lineas de transmision
alejraque
Lineas tecsup
Lineas tecsup
Elviz Julver Arce
E book sistemas electricos de potencia (grainger)
E book sistemas electricos de potencia (grainger)
federicoblanco
Informe tecnico
Informe tecnico
Diego Albán
Calculo de Corriente de cortocircuito
Calculo de Corriente de cortocircuito
Jesús Castrillón
Electricidad tecnicas de_alta_tension
Electricidad tecnicas de_alta_tension
Leito JB
Introduccion a las Protecciones Electricas
Introduccion a las Protecciones Electricas
German Neira Vargas
Calculo de proteciones de transformadores
Calculo de proteciones de transformadores
Nakary Rodriguez
Viewers also liked
(18)
Armonicos Conceptos Basicos
Armonicos Conceptos Basicos
Fallas transformadores
Fallas transformadores
Transitorios al energizar un transformador
Transitorios al energizar un transformador
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
FenóMenos Transitorios Asociados A La EnergizacióN De Transformadores
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Estudios para el Refuerzo de la Capacidad de la Línea 220 kV Mantaro-Socabaya
Armonicos en sistemas electricos
Armonicos en sistemas electricos
Operación de sistemas de transmisión en 500k
Operación de sistemas de transmisión en 500k
Analisis de sistemas_electricos_de_potencia
Analisis de sistemas_electricos_de_potencia
253690381 alta-tension-libro
253690381 alta-tension-libro
Apunte de protección de transformadores
Apunte de protección de transformadores
Lineas de transmision
Lineas de transmision
Lineas tecsup
Lineas tecsup
E book sistemas electricos de potencia (grainger)
E book sistemas electricos de potencia (grainger)
Informe tecnico
Informe tecnico
Calculo de Corriente de cortocircuito
Calculo de Corriente de cortocircuito
Electricidad tecnicas de_alta_tension
Electricidad tecnicas de_alta_tension
Introduccion a las Protecciones Electricas
Introduccion a las Protecciones Electricas
Calculo de proteciones de transformadores
Calculo de proteciones de transformadores
Similar to Dialectirc tests
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
Ali Sepehri
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
Ali Sepehri
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
Ali Sepehri
Relay testing procedure
Relay testing procedure
sambit mohapatra
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
Ali Sepehri
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Emeka Ojeah
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
hussein ibrahim
61131730 transmission-line-case-study
61131730 transmission-line-case-study
homeworkping4
EESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim Webster
NSW Environment and Planning
conf-type-test-2007-03.ppt
conf-type-test-2007-03.ppt
ssuser1f60f6
5 is 1554_2_pvc cables hd
5 is 1554_2_pvc cables hd
Samsher Singh
A study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendments
richa diptisikha
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Emeka Ojeah
66 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12
Yendapalli Chinnarao
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation 02
Sajeewa Lakmal
Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)
Ibrahim Ali
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e
Cesar Chilet
Unit 1-2-a
Unit 1-2-a
srichakra kripa
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
Thorne & Derrick International
Benefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systems
Messung Electrical Engineering
Similar to Dialectirc tests
(20)
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
Relay testing procedure
Relay testing procedure
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
INSPECTION AND TEST PROCEDURES FOR SWITCHGEAR AND SWITCHBOARD
61131730 transmission-line-case-study
61131730 transmission-line-case-study
EESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim Webster
conf-type-test-2007-03.ppt
conf-type-test-2007-03.ppt
5 is 1554_2_pvc cables hd
5 is 1554_2_pvc cables hd
A study on IEC 60947- 2 amendments
A study on IEC 60947- 2 amendments
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
66 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12
Specification for electrical automation and instrumentation 02
Specification for electrical automation and instrumentation 02
Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)
06612 iec zerti_rz11_e
06612 iec zerti_rz11_e
Unit 1-2-a
Unit 1-2-a
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
ENATS 12-24 Technical Specification For Plastic Ducts For Buried Electric Cables
Benefits of using iec 61439 standard in electrical busbar systems
Benefits of using iec 61439 standard in electrical busbar systems
Recently uploaded
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
Asst.prof M.Gokilavani
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
tanu pandey
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
mulugeta48
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
rs7054576148
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
JuliansyahHarahap1
Thermal Engineering Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
DineshKumar4165
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
JiananWang21
University management System project report..pdf
University management System project report..pdf
Kamal Acharya
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Call Girls in Nagpur High Profile
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Call Girls in Nagpur High Profile
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
DineshKumar4165
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
RagavanV2
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
Call Girls in Nagpur High Profile Call Girls
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
Recently uploaded
(20)
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Thermal Engineering Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
University management System project report..pdf
University management System project report..pdf
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Dialectirc tests
1.
60694 © IEC:1996+A1:2000+A2:2001
– 173 – d) tightness test in accordance with 7.4; e) design and visual checks in accordance with 7.5. Additional routine tests may be necessary and will be specified in the relevant IEC standards. When switchgear and controlgear are not completely assembled before transport, separate tests shall be made on all transport units. In this event, the manufacturer shall demonstrate the validity of his test (example: leakage rate, test voltage, resistance of part of the main circuit). Test reports of the routine tests are normally not necessary unless otherwise agreed upon between manufacturer and user. 7.1 Dielectric test on the main circuit A dry, short-duration power-frequency voltage test shall be applied. The test shall be made according to IEC 60060-1, and to 6.2 on complete apparatus or on separate poles, or on transport units in new, clean and dry conditions. The test voltage shall be that specified in column 2 of tables 1 or 2, according to the relevant IEC standards, or the applicable part of it. When the insulation of switchgear and controlgear is provided only by solid-core insulators and air at ambient pressure, the power-frequency voltage withstand test may be omitted if the dimensions between the conductive parts – between phases, across open switching device and between conductive parts and the frame – are checked by dimensional measurements. Bases for the checking of dimensions are the dimensional (outline) drawings, which are part of the type test report (or are referred to in it) of the particular switchgear and controlgear. Therefore, in these drawings all information necessary for dimensional checking including the permissible tolerances shall be given. 7.2 Tests on auxiliary and control circuits 7.2.1 Inspection of auxiliary and control circuits, and verification of conformity to the circuit diagrams and wiring diagrams The nature of the materials, the quality of assembly, the finish and, if necessary, the protective coatings against corrosion shall be checked. A visual inspection is also necessary to check the satisfactory installation of the thermal insulation. A visual inspection of actuators, interlocks, locks, etc., shall be made. Components for auxiliary and control circuits inside enclosures shall be checked for proper mounting. The location of the means provided for connecting external wiring shall be checked to ensure that there is sufficient wiring space for spreading of the cores of multi-core cables and for the proper connection of the conductors. The conductors and cables shall be checked for proper routing. Special attention shall be given to ensure that no mechanical damage can occur to conductors and cables due to the proximity of sharp edges or heating elements, or to the movement of moving parts.
Download now