SlideShare a Scribd company logo
1 of 1
Download to read offline
600
F/F
'A'
'A'
1000
2799
2000
2660
3000
5580
1200
4900
'B''B'
2817
435
up
MH01
MH02
KITCHEN
DINING
BATHROOM
LIVING
PORCH
UPPER GARDEN
PATHWAY
UPPER DECKING
PATHWAY
Insulated cavity closers to be used at all
openings and fitted to manufacturers
instructions.
Existing retaining walls and steps.
Existing retaining
walls and steps.
Existing paving to be adjusted to suit
new extension, with falls towards existing
drainage. Existing paving slabs to be
carefully removed/stored and reused.
Distance between existing retaining
wall and new external wall to be
agreed on site.
Where existing walls are removed, all
areas exposed by removal are to be
made good to clients specifications.
1No. steel I beams to be installed to
support wall above opening created by
removal of wall.
Size and details to structural engineers
specification.
rwp
Line of existing extension
2No. steel I beams to be installed to
support cavity wall above opening
created by removal of wall.
Size and details to structural engineers
specification.
New kitchen to be fitted to clients
specification.
up
rwp
up
Line indicates foundations.
Excavation for new foundation to be
kept entirely within boundary line or
party wall agreement will be needed.
Boundary line
Scale 1:50
0 1000 2000 3000 4000 5000
N
SPECIFICATION CLAUSES
10.0 General
10.1 Work shall comply with all relevant and current Building Regulations and other statutory
requirements relating to the completed construction work. All work shall be carried out in a
proper, neat manor and with the highest level of workmanship. All service installations and
associated works shall comply with the Regulations and recommendations of the relevant
statutory undertakings or authorities, and to the satisfaction of the relevant inspectors. The
contractor is to give the required notice to the local authority for sections of work to be
inspected and before work commences. The contractor is responsible for checking all
dimensions on site prior to sections of the work commencing and for reporting any
discrepancies to the designer.
10.2 General Quality:
Supply of each product: From the same source or manufacturer.
Execution generally: Fix, apply, install or lay products securely, accurately, plumb, neatly and in
alignment.
Colour batching: Do not use different colour batches where they can be seen together.
Dimensions: Check on-site dimensions.
Finished work: Not defective, e.g. not damaged, disfigured, dirty, faulty, or out of tolerance.
10:3 Substitution (or equivalent):
Products: If an alternative product to that specified is proposed, obtain approval before ordering
the product. The alternative product must perform the same of better than that of the specified.
10:4 Manufacturers; recommendations:
General: Comply with manufacturer's current printed recommendations and instructions.
20.0 Demolition
20.1 The contractor is to carry out all demolitions and removal of existing structures, fittings and
dispose off site. The immediate surrounding areas are to be made good upon such work being
carried out.
20.2 Service regulations:
Work carried out to or which affects new or existing services: Carry out in accordance with
Byelaws or Regulations of the relevant Statutory Authority.
20.3 Drains in use:
Drains, manholes, inspection chambers, gullies, vent pipes and fittings still in use: Protect. Keep
free of debris and spillages. Make good any damage arising from demolition work. Leave clean
and in working order at completion.
20.4 Services which are in use:
Give notice and notify service authority or owner of damage arising from the execution of the
works. Repairs: Complete as directed, and to the satisfaction of the service authority or owner.
30.00 External Ground Works
30.1 Site clearance:
Clear footprint of rubbish, debris and vegetation.
30.2 Stripping topsoil:
Before commencing general excavation or filling, strip topsoil from areas where there will be
regarding, buildings or paving as shown on drawings.
40.00 Foundations
40.1 General:
600mm wide GEN1 concrete trench fill foundations to extend min. 1.0m below ground level,
final depth to LA approval. Give notice if a natural bearing formation of undisturbed
subsoil is not obtained at the depth shown, or the formation contains highly variable
material.
40.2 Trench fill foundations:
Excavate trench in one operation. Give notice for inspection, place concrete after inspection and
no more than 4 hours after exposing the formation. Ensure trench is free from loose soil,
rubbish and standing water. Do not place fill on frozen surfaces.
50.00 Below Ground Construction
50.1 General:
300mm Cavity wall construction to be built in dense concrete block work to comply with BS
5628, positioned centrally over foundations and cavity filled with GEN1 weak mix concrete as
work proceeds up to 225mm below dpc level.
50.2 Drainage and waste disposal:
All existing drains and connections are to be checked. If any drain runs are shared with
neighbouring properties then consent must be obtained prior to work commencing.
Contractor/Builder to inform Wessex Water of the intension to 'build over' the shared
sewage drain running across the property at the rear of the house. Note that the
application needs to be made a minimum of 1 month prior to work commencing and a fee is
payable at the time.
60.00 Ground Floor Construction
60.1 In-situ cast ground floor construction (0.21W/m2k):
65mm thick cement: sand screed laid in accordance with BS 8204: Part 1, on 500g separating
layer, on 75mm thick Celotex FR5000 insulation, on 1200g Visqueen (or
equivalent) polythene dpm, on 100mm thick concrete floor slab, on 150mm thick well
consolidated hardcore free from plaster, timber and metal. 25mm thick insulation to be turned
up at perimeter abutment of dpc 150mm above existing ground level. Dpc to have min. 100mm
lap welded junctions with existing membrane, using Visqueen Treadgaurd 1500 (or equivalent)
installed in strict accordance with manufacturers guidelines.
up
rwp
BEDROOM 1
BEDROOM 3 BEDROOM 2
FTP-V U3 780mm x 1180mm Fakro
centre pivot roof windows are to be
installed as per manufacturers
instructions. Insulation is required to be
installed around all four sides of the light
wells of the windows from the roof light
rwp
THIS DRAWING IS COPYRIGHT AND MUST NOT BE
REPRODUCED WITHOUT PRIOR CONSENT.
FIGURED DIMENSIONS TO BE USED ONLY. DO
NOT SCALE. SITE DIMENSIONS TO BE CHECKED /
VERIFIED BEFORE WORK IS COMMENCED.
NOTES:
Ground floor plan as proposed
First floor plan as proposed
Domestic project - Durrington
Single storey rear extension
Building control drawings

More Related Content

What's hot

12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
imaduddin91
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Sin Byrne
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Sin Byrne
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
Will Butler, P.Eng
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part B
Pang Shuen
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
Yolanda Sewpersad
 

What's hot (19)

12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
Site Report
Site ReportSite Report
Site Report
 
Gate valve journey
Gate valve journeyGate valve journey
Gate valve journey
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
 
Spec bason
Spec basonSpec bason
Spec bason
 
VG check list for OHE foundation
VG check list for OHE foundation VG check list for OHE foundation
VG check list for OHE foundation
 
VG Check list using JCB near track rev 00
VG Check list using JCB near track rev 00VG Check list using JCB near track rev 00
VG Check list using JCB near track rev 00
 
Construction of residential building By Sharique
Construction of residential building By ShariqueConstruction of residential building By Sharique
Construction of residential building By Sharique
 
3D
3D3D
3D
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Yee s2&s2
Yee s2&s2Yee s2&s2
Yee s2&s2
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
 
Catalogue
CatalogueCatalogue
Catalogue
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part B
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
2004 0824 Mt
2004 0824 Mt2004 0824 Mt
2004 0824 Mt
 
Garbage Chutes By Technopenta Enterprises
Garbage Chutes By Technopenta EnterprisesGarbage Chutes By Technopenta Enterprises
Garbage Chutes By Technopenta Enterprises
 
Valmatic plug valve
Valmatic plug valveValmatic plug valve
Valmatic plug valve
 

Viewers also liked (9)

A2760 02 existing elevations
A2760 02 existing elevationsA2760 02 existing elevations
A2760 02 existing elevations
 
Elena clima oceania
Elena clima oceaniaElena clima oceania
Elena clima oceania
 
Curriculum 2016_Eng
Curriculum 2016_EngCurriculum 2016_Eng
Curriculum 2016_Eng
 
A2764 01 existing plans
A2764 01 existing plansA2764 01 existing plans
A2764 01 existing plans
 
Àfrica
Àfrica Àfrica
Àfrica
 
звездочка
звездочказвездочка
звездочка
 
Las categorías gramaticales
Las categorías gramaticalesLas categorías gramaticales
Las categorías gramaticales
 
Clima de asia alba
Clima de asia albaClima de asia alba
Clima de asia alba
 
Rehabilition manufacturers at original medical equipment company pvt. ltd.
Rehabilition manufacturers at original medical equipment company pvt. ltd.Rehabilition manufacturers at original medical equipment company pvt. ltd.
Rehabilition manufacturers at original medical equipment company pvt. ltd.
 

Similar to A2768 103 - floor plans - building regs

Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
grahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
grahamelanders
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
grahamelanders
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
Danny Chiverton
 
02725 sewer manholes
02725 sewer manholes02725 sewer manholes
02725 sewer manholes
Ani Alikaj
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Sin Byrne
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Sin Byrne
 

Similar to A2768 103 - floor plans - building regs (20)

7545 101 final elevations as proposed
7545 101 final elevations as proposed7545 101 final elevations as proposed
7545 101 final elevations as proposed
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
 
Aluminum work
Aluminum workAluminum work
Aluminum work
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
02725 sewer manholes
02725 sewer manholes02725 sewer manholes
02725 sewer manholes
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
KEYSTONE-GRSW retaining_walls.pdf
KEYSTONE-GRSW retaining_walls.pdfKEYSTONE-GRSW retaining_walls.pdf
KEYSTONE-GRSW retaining_walls.pdf
 
Husam CV updated (1)
Husam CV updated (1)Husam CV updated (1)
Husam CV updated (1)
 
PROJECT 3-Layout1 (2)
PROJECT 3-Layout1 (2)PROJECT 3-Layout1 (2)
PROJECT 3-Layout1 (2)
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 
2 nd floor plan (2)
2 nd floor plan (2)2 nd floor plan (2)
2 nd floor plan (2)
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 

More from Southampton Solent University

More from Southampton Solent University (13)

A2764 03 proposed plan & elevations
A2764 03 proposed plan & elevations A2764 03 proposed plan & elevations
A2764 03 proposed plan & elevations
 
A2764 04 3 d proposals
A2764 04 3 d proposalsA2764 04 3 d proposals
A2764 04 3 d proposals
 
A2760 03 proposed site plan
A2760 03 proposed site planA2760 03 proposed site plan
A2760 03 proposed site plan
 
A2760 04 proposed elevations
A2760 04 proposed elevationsA2760 04 proposed elevations
A2760 04 proposed elevations
 
A2764 02 existing elevations
A2764 02 existing elevationsA2764 02 existing elevations
A2764 02 existing elevations
 
A2760 01 existing site plan
A2760 01 existing site planA2760 01 existing site plan
A2760 01 existing site plan
 
A2759 02 proposed
A2759   02 proposedA2759   02 proposed
A2759 02 proposed
 
A2759 00 site plan
A2759   00 site planA2759   00 site plan
A2759 00 site plan
 
A2759 01 existing
A2759   01 existingA2759   01 existing
A2759 01 existing
 
7545 107 Final M&E as proposed
7545 107 Final M&E as proposed7545 107 Final M&E as proposed
7545 107 Final M&E as proposed
 
7545 105 final sections as proposed
7545 105 final sections as proposed7545 105 final sections as proposed
7545 105 final sections as proposed
 
7545 103 final plans as proposed
7545 103 final plans as proposed7545 103 final plans as proposed
7545 103 final plans as proposed
 
7545 104 final sections as proposed
7545 104 final sections as proposed7545 104 final sections as proposed
7545 104 final sections as proposed
 

Recently uploaded

Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
soniya singh
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
amitlee9823
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
shivubhavv
 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
suhanimunjal27
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
jeswinjees
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
kumaririma588
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
tbatkhuu1
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
tbatkhuu1
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
aroranaina404
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 

Recently uploaded (20)

Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 

A2768 103 - floor plans - building regs

  • 1. 600 F/F 'A' 'A' 1000 2799 2000 2660 3000 5580 1200 4900 'B''B' 2817 435 up MH01 MH02 KITCHEN DINING BATHROOM LIVING PORCH UPPER GARDEN PATHWAY UPPER DECKING PATHWAY Insulated cavity closers to be used at all openings and fitted to manufacturers instructions. Existing retaining walls and steps. Existing retaining walls and steps. Existing paving to be adjusted to suit new extension, with falls towards existing drainage. Existing paving slabs to be carefully removed/stored and reused. Distance between existing retaining wall and new external wall to be agreed on site. Where existing walls are removed, all areas exposed by removal are to be made good to clients specifications. 1No. steel I beams to be installed to support wall above opening created by removal of wall. Size and details to structural engineers specification. rwp Line of existing extension 2No. steel I beams to be installed to support cavity wall above opening created by removal of wall. Size and details to structural engineers specification. New kitchen to be fitted to clients specification. up rwp up Line indicates foundations. Excavation for new foundation to be kept entirely within boundary line or party wall agreement will be needed. Boundary line Scale 1:50 0 1000 2000 3000 4000 5000 N SPECIFICATION CLAUSES 10.0 General 10.1 Work shall comply with all relevant and current Building Regulations and other statutory requirements relating to the completed construction work. All work shall be carried out in a proper, neat manor and with the highest level of workmanship. All service installations and associated works shall comply with the Regulations and recommendations of the relevant statutory undertakings or authorities, and to the satisfaction of the relevant inspectors. The contractor is to give the required notice to the local authority for sections of work to be inspected and before work commences. The contractor is responsible for checking all dimensions on site prior to sections of the work commencing and for reporting any discrepancies to the designer. 10.2 General Quality: Supply of each product: From the same source or manufacturer. Execution generally: Fix, apply, install or lay products securely, accurately, plumb, neatly and in alignment. Colour batching: Do not use different colour batches where they can be seen together. Dimensions: Check on-site dimensions. Finished work: Not defective, e.g. not damaged, disfigured, dirty, faulty, or out of tolerance. 10:3 Substitution (or equivalent): Products: If an alternative product to that specified is proposed, obtain approval before ordering the product. The alternative product must perform the same of better than that of the specified. 10:4 Manufacturers; recommendations: General: Comply with manufacturer's current printed recommendations and instructions. 20.0 Demolition 20.1 The contractor is to carry out all demolitions and removal of existing structures, fittings and dispose off site. The immediate surrounding areas are to be made good upon such work being carried out. 20.2 Service regulations: Work carried out to or which affects new or existing services: Carry out in accordance with Byelaws or Regulations of the relevant Statutory Authority. 20.3 Drains in use: Drains, manholes, inspection chambers, gullies, vent pipes and fittings still in use: Protect. Keep free of debris and spillages. Make good any damage arising from demolition work. Leave clean and in working order at completion. 20.4 Services which are in use: Give notice and notify service authority or owner of damage arising from the execution of the works. Repairs: Complete as directed, and to the satisfaction of the service authority or owner. 30.00 External Ground Works 30.1 Site clearance: Clear footprint of rubbish, debris and vegetation. 30.2 Stripping topsoil: Before commencing general excavation or filling, strip topsoil from areas where there will be regarding, buildings or paving as shown on drawings. 40.00 Foundations 40.1 General: 600mm wide GEN1 concrete trench fill foundations to extend min. 1.0m below ground level, final depth to LA approval. Give notice if a natural bearing formation of undisturbed subsoil is not obtained at the depth shown, or the formation contains highly variable material. 40.2 Trench fill foundations: Excavate trench in one operation. Give notice for inspection, place concrete after inspection and no more than 4 hours after exposing the formation. Ensure trench is free from loose soil, rubbish and standing water. Do not place fill on frozen surfaces. 50.00 Below Ground Construction 50.1 General: 300mm Cavity wall construction to be built in dense concrete block work to comply with BS 5628, positioned centrally over foundations and cavity filled with GEN1 weak mix concrete as work proceeds up to 225mm below dpc level. 50.2 Drainage and waste disposal: All existing drains and connections are to be checked. If any drain runs are shared with neighbouring properties then consent must be obtained prior to work commencing. Contractor/Builder to inform Wessex Water of the intension to 'build over' the shared sewage drain running across the property at the rear of the house. Note that the application needs to be made a minimum of 1 month prior to work commencing and a fee is payable at the time. 60.00 Ground Floor Construction 60.1 In-situ cast ground floor construction (0.21W/m2k): 65mm thick cement: sand screed laid in accordance with BS 8204: Part 1, on 500g separating layer, on 75mm thick Celotex FR5000 insulation, on 1200g Visqueen (or equivalent) polythene dpm, on 100mm thick concrete floor slab, on 150mm thick well consolidated hardcore free from plaster, timber and metal. 25mm thick insulation to be turned up at perimeter abutment of dpc 150mm above existing ground level. Dpc to have min. 100mm lap welded junctions with existing membrane, using Visqueen Treadgaurd 1500 (or equivalent) installed in strict accordance with manufacturers guidelines. up rwp BEDROOM 1 BEDROOM 3 BEDROOM 2 FTP-V U3 780mm x 1180mm Fakro centre pivot roof windows are to be installed as per manufacturers instructions. Insulation is required to be installed around all four sides of the light wells of the windows from the roof light rwp THIS DRAWING IS COPYRIGHT AND MUST NOT BE REPRODUCED WITHOUT PRIOR CONSENT. FIGURED DIMENSIONS TO BE USED ONLY. DO NOT SCALE. SITE DIMENSIONS TO BE CHECKED / VERIFIED BEFORE WORK IS COMMENCED. NOTES: Ground floor plan as proposed First floor plan as proposed Domestic project - Durrington Single storey rear extension Building control drawings