1. The document summarizes a presentation on a six-week internship at NKG Infrastructures Limited working on the construction of an army residential building in Jalandhar Cantt.
2. Key aspects of the project covered reinforcement standards, water tank specifications including capacity and materials, use of a batching plant, and plastering techniques including a grit wash external plaster layer.
3. Common construction defects observed were concrete not being properly filled and honeycombing in concrete surfaces.
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Construction of residential building By Sharique
1. 1
Presentation on six weeks internship
at
NKG Infrastructures Limited
“Construction of army residential building”
Jalandhar Cantt
Submitted by :-Md Sharique(11306175)
School Of Civil Engg.
Lovely Professional University
2. CONTENTS
Learning objectives
About project
Lap joints
Water Tank
Batching plant
Plastering(Grit wash)
Defects
Conclusion
2
3. ABOUT PROJECT
Grade of concrete used - M25
Lateral ties - 10 mm and 8mm
Design life - 80 years
Type/Class of structure - Class A
Type of foundation - Raft
Designed for fire resistance - 1.5 hours
3
4. LEARNING OBJECTIVES
All reinforcement bars should be Thermo Mechanically treated steel
bars of Fe-500 grade
Clear Cover to Reinforcement
1. For Footing bottom face -75mm
2. Footing side and top face - 50mm
3. Column - 40mm
4. Beam - 25mm
5. Slab - 20mm
For faces of members likely to be in direct contact with ground clear
cover should be greater of either
Dia of Main reinforcement bar
or
Equal to 50mm
4
5. Grade of conc. Tension bars Compression
bars
Remarks
M-25 40.5 x D 32.5 x D D is dia. Of
reinforcement
bars
5
6. WATER TANK
Capacity - 30,000 ltrs
Material - Rcc and concrete
Reinforcement used - 8 mm for tie bars and 10mm as
distribution bars bothway and 12 mm as main bars in
beams.
Size of Beam - 230× 450 mm
Grade of concrete –M25
Tank is divided in 3 equal portions i.e 10,000 ltrs in each
portion and baffel walls are made.
Two portions are used for drinking and other purposes
while 1 portion is used as reserved for fire and other
mishaps. 6
18. PLASTERING - GRIT WASH
(EXTERNAL PLASTER)
Plaster to be applied in two layers i.e after raking
first layer of 15 mm thick cement mortar (1:4) and
again make surface rough.
Curing to be done for atleast 7 days 19
19. SECOND LAYER
20
Making square boxes as per design
using thin tapered wooden batten fixed
over previous layer with nails. Battens
must be removed with great care so that
edges are not damaged.
Wash marble chipping with clean water
before application.
Wet the previous layer with water and
then apply mix.
Mix should be made with marble chipping 12mm mixed in grey 65% approx. and
white cement 35% approx.
1:0.5:2 where 1 proportion is of mixed grey and white cement, 0.5 is marble
powder and 2 represent marble chipping of 12mm size.
21. Mix made is applied in uniform thickness and is pressed properly
with wooden float for proper bonding with previous layer and is
finished upto true surface.
After initial setting it is watered to achieve strength.
H2SO4 mixed with water is used for washing and scrubbing
purposes. Suitable brushes are used and top layer is scrubbed
until natural colour of marble chipping is achieved.
22
24. CONCLUSION
Six weeks internship was very helpful to me. I get
practical knowledge that how task is executed.
I learnt about working of concrete pump, batching
plant, water tank, grit wash and some defects.
25