  1. 1. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM A B HARD LANDSCAPE WORKS Construct and complete including where necessary, excavation, lay and subgrade, lean concrete and related works which deem necessary for proper completion of the whole construction to the satisfaction of the Landscape Architect for the following items: Brick Works Pavement Pattern To construct and complete pavement pattern with 150mm thick R.C slab with BRC A8 Grade 30 to Engineer’s detail complete with concrete imprint pattern and colour to Landscape Architect drawing and specification. Brick Wall 110mm Thick in common clay bricks as described in composition mortar as described reinforced with and including brick reinforcement. m2 m2 54 30 160 110 8640 3300 Total to Hardscape Summary Page 11 940 BILLS OF QUANTITIES
  2. 2. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM A B C HARD LANDSCAPE WORKS Construct and complete including where necessary, excavation, lay and subgrade, lean concrete and related works which deem necessary for proper completion of the whole construction to the satisfaction of the Landscape Architect for the following items:- Open Space Benches To construct and complete 1500mm length × 1200mm width × 500mm high concrete benches with 100mm thick R.C benches top with pebble wash finish to Engineer’s detail inclusive of light brown broken stone cladding to L.A approval with 100mm thick brick wall to Engineer’s detail and R.C Slab to Engineer’s detail and all other related works as per L.A drawing and specification. Rubbish Bin To supply and install 540mmØ × 900mm high rubbish bin with 50mm × 10mm stainless steel at top and 50mm × 10mm stainless steel with 10mm dustbin stainless steel at the bottom to be bolt and nut with 20mm × 50mm × 575mm H.W complete with MPSJ logo in the 130mm × 145mm plate steel inclusive of 60mm dia. hollow stainless steel with 10mm dustbin stainless steel base and all other related works as per Landscape Architect drawing and specification and to Local Authority approval. Bug Zapper To supply, deliver to site, and install Flowtron BK-15D Electronic Insect Killer. m2 No. No. 7 1 3 5228 1600 272 36 596 1600 816 Total to Hardscape Summary Page 39 012 BILLS OF QUANTITIES
  3. 3. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM HARD LANDSCAPE WORKS SUMMARY PAGE Brick Works Open Space 11 940 39 012 Total to Project Summary Page 50 952 BILLS OF QUANTITIES
  4. 4. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM A 1 1 2 1 SOFT LANDSCAPE WORKS To supply nursery grown plants material as listed below, deliver to the site, provide labour and execute planting works as per planting details. All plants shall be free from pest, disease, discoloration and damage. Planting Materials Trees Peltophorum Pterocarpum ( Yellow Flame Tree ) ( 2.0m trunk height, 50-75mm trunk diameter ) Shrubs Aglaia Odorata ( Chinese Perfume Plant ) ( 350-500mm overall height, 250-350mm spread ) Murraya Paniculata ( Orange Jessamine ) ( 350-500mm overall height, 250-350mm spread ) Turfing Zoysia Matrella ( Manilla Grass ) ( 300mm × 300mm sodding size, 20mm thick topsoil ) No. No. No. No. 1 10 22 41 800 20 20 28 800 200 440 1148 Total to Softscape Summary Page 2588 BILLS OF QUANTITIES
  5. 5. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM A 1 2 1 2 3 1 2 SOFT LANDSCAPE WORKS To supply nursery grown plants material as listed below, deliver to the site, provide labour and execute planting works as per planting details. All plants shall be free from pest, disease, discoloration and damage. Planting Operation Hole Excavation To supply all labour, equipment, tool, transportation and excavation holes as following :- Trees ( 1.0m × 1.0m × 1.0m ) Shrubs ( 0.45m × 0.45m × 0.45m ) Topsoil & Soil Mixtures To prepare the ratio of 3 : 2 : 1 topsoil and mixtures :- 3 part is good quality top soil, 2 part is river sand and 1 part is organic fertilizer of well-rooted farmyard manure Trees ( 1.0m × 1.0m × 1.0m ) x 1 nos Shrubs ( 0.45m × 0.45m × 0.45m ) x 32 nos Turfing (0.20m x 41 m2) Tree Protection To supply all labour, materials and provide 50mm × 50mm Wooden stakes buried min. 900mm deep 2 per Tree and 4 nos per palm. Do not drive stake root ball. Nail wire to stakes to prevent down movement wire completed with encase galvanised wire in rubber at points of contact with tree. Nylon rope may be used in liew of wire as per Landscape Architect Drawing. Tree staking with ( 500mm × 50mm × 2.0m ) × 1 nos Mulching for trees and shrubs No. No. m3 m3 m3 No. m2 1 32 1 2.9 8.2 1 33 30 10 60 60 60 20 5 30 320 60 174 492 20 165 Total to Softscape Summary Page 1261 BILLS OF QUANTITIES
  6. 6. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM SOFT LANDSCAPE WORKS SUMMARY PAGE Planting Materials Planting Operation 2588 1261 Total to Project Summary Page 3849 BILLS OF QUANTITIES
  7. 7. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM MAINTENANCE The maintenance shall be carried during planting works and defect liability period which includes watering, fertilizing, pruning, aerifying the soil, site cleaning, pest control, thriving the unhealthy, replacing dead plants and other maintenance works and procedures plant as specified. During the maintenance period, Contractors to provide the following matters: i. 3 full time maintenance workers ii. Fertilizer, insecticide iii. Provision of maintenance machineries iv. To remove landscape debris away from the site to contractor’s own dumping ground. During warranty period, Landscape Contractors to prepare the following mater: i. Monthly maintenance work programme ii. Maintenance daily work programme or site iii. Attendance to be recorded and acknowledges by the project management, client representative and verify by Landscape Architect at site for monthly maintenance claim procedure. Note: Contractor to provide competent person to report to Landscape Architect during implementation and maintenance. mth 12 1500 18 000 Total to Project Summary Page 18 000 BILLS OF QUANTITIES
  8. 8. APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM PROJECT SUMMARY Hardscape Works Softscape Works Maintenance 50 952 3849 18 000 Total Project Cost 72 801 BILLS OF QUANTITIES

×