A STUDY OF COST COMPARISON OF OUTSOURCING VERSUS INBUILT FACILITY FOR BIOMEDICAL WASTE MANAGEMENT IN GOVERNMENT MEDICAL COLLEGE AND HOSPITAL, CHANDIGARH.
Objective. Introduction  Methodology Observations and results Interesting facts. References Agenda
Objective General To calculate and compare the cost of outsourcing versus erecting facility for bio-medical waste management at Government Medical College and Hospital, Chandigarh. 	   Specific  To study the process of biomedical waste management. To calculate the cost incurred on outsourcing of biomedical waste management  To calculate the cost of setting up biomedical waste management facility.  To suggest measures, if any, to improve the process and to increase its efficiency to benefit the hospital.
Hospitals are health institutions providing patient care services. Directly through patient care or indirectly by ensuring a clean, healthy environment for their employees and the community. In the process of health care, waste is generated which usually includes sharps, human tissues or body parts and other infectious materials also referred to as ‘‘Hospital Solid Waste’’ and ‘‘Bio-medical Solid Waste.’’ The onus lies on hospitals and other health care institutions to ensure that there are no adverse health and environmental consequences as a result of their waste handling, treatment and disposal activities Introduction
Methodology Study Design The study was descriptive and observational in nature to understand the biomedical waste management process in the hospital. The study was designed towards achievement of all its objectives Study Area The study was carried out in Government Medical College and Hospital, Chandigarh from 15 May 2010 to 15 June 2010.  Study population Manufacturers of incinerators, contractors, engineers, supervisors and workers of biomedical waste handling were included in the study.
Continued…. Study Tools Observation was main tool to study the handling, transportation and disposal of biomedical waste. Unstructured Interview of the contractors, manufacturers and engineers was done to estimate the cost of installation of new incinerator.  Records Study was done to know the amount of waste generation and cost of current process of disposal. Data Analysis The data collected was analyzed using Microsoft Excel. The various costs were studied to find out the total cost of setting up of incinerator and compare it with current process of waste disposal.
Observation and Results Total amount of waste generated in a day approx. 150 kg. Sent to the GMSH, Chandigarh for disposal. Sent to the PGIMER, Chandigarh only when GMSH’s incinerator is not working and on first day of every week when quantity of biomedical waste generated is more than 150 Kg. The present model reflects a net saving of Rs. 2.27/bed/day as the inbuilt biomedical waste management facility would cost Rs. 8.6/bed/day if the incinerator of capacity 100 kg/hour was working for 2 hours in a day as compared to outsourcing which would cost around Rs. 10.90/bed/day.  In both the cases the cost related to handling, segregation and salary of the staff except salary of the operator remained the same, so these were not included in calculating the cost
Break up of Outsourcing Cost per Bed
INSTALLATION COST Cost of the destromatpyrolytic incinerator with  = 		              6400000 venturi scrubber capacity 100 KG/HR (thermax make)	   2.	    Construction cost including incinerator   =			                650000  	      building, waste storage room, offices      Total installation cost			          		              7050000 Break up of In-House Facility Cost
OPERATING COST: FIXED COST Depreciation on machine =				                384000 									 Depreciation on building on the basis of = 				  34411 Salary of the operator = 						360000 Maintenance cost = 					              	300000 Total fixed operating cost 					              1078411
VARIABLE OPERATING COST Fuel consumption = 					              1012364 Electricity consumption =  				                  30660 Total variable operating cost =				              1043024   Total fixed operating cost 					              1078411 Total annual operating cost  =				              2121435 Total operating cost (rupees/bed/day) =	       			       8.6
Interesting Facts Annual cost of outsourcing of biomedical waste management was Rs.2673000, Annual cost of erecting the facility was Rs.2121435.  Net saving of Rs.551565 per year which accounts for 21 % of the total cost incurred during outsourcing of biomedical waste disposal. The installation cost of erecting the facility can be covered in just 12 and a half years. Which can be reduced further to 5 years if the hospital extend this facility to other biomedical waste generating units. Suppose for 100 Kg of biomedical waste per day  outsourced for other hospital, the net revenue earned per year would be Rs.792488 after deducting increased variable and fixed operating cost from total revenue generated and this would ultimately increase our net saving to Rs.1344053.  
Secondly if in the future hospital will increase its bed capacity by 100 beds, the average biomedical waste generation will increase by 22 Kg. Thus for that increased part of biomedical waste the outsourcing cost will increase by Rs.392040 per year whereas there will not be any rise in the operating cost of running the facility. Thus this will further increase our net savings.
Conclusion May be this study is not important for installation of individual incinerator because Government of India has discouraged this practice under new regulations but it can be  useful in CBWTF as it can help State Pollution Control Boards in negotiating with  Private Suppliers by calculating their cost of  providing the service and profit margins.
For Further Details Kindly Contact.. Dr. VarunGoyal Project Associate EPOS HEALTH (INDIA) PVT.  LTD. 445,   UdyogVihar  Phase-III Gurgaon - 122016,  Haryana,  India Ph #. 91 9650639318  Tel #: 91 124 4264900 Fax #:91 124 4264906 Email: varun.goyal@epos.in Skype: varungoyal1984 Website – www.epos.in

More Related Content

What's hot

Understanding of Waste Management in Bangladesh
Understanding of Waste Management in BangladeshUnderstanding of Waste Management in Bangladesh
Understanding of Waste Management in Bangladesh
Jahangirnagar University
 
Municipal Solid Waste Management Process
Municipal Solid Waste Management ProcessMunicipal Solid Waste Management Process
Municipal Solid Waste Management Process
Akash Tikhe
 
Municipal solid waste management ehc
Municipal solid waste management  ehcMunicipal solid waste management  ehc
Municipal solid waste management ehc
Amal K
 
Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)
City Brandon
 
Solid Waste Generation and Handling
Solid Waste Generation and HandlingSolid Waste Generation and Handling
Solid Waste Generation and Handling
mihretdananto
 
Solid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City CorporationSolid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City Corporation
Mosfiqur Rahman Saikat
 
Solid waste management of warangal city
Solid waste management of warangal citySolid waste management of warangal city
Solid waste management of warangal city
Rajesh Adatravu
 
Mahesh Joshi on need of segregation of solid waste
Mahesh Joshi on need of segregation of solid wasteMahesh Joshi on need of segregation of solid waste
Mahesh Joshi on need of segregation of solid waste
Mahesh Joshi
 
WASTE MINIMISATION TECHNIQUES
WASTE MINIMISATION TECHNIQUESWASTE MINIMISATION TECHNIQUES
WASTE MINIMISATION TECHNIQUES
DEEP SONI
 
Gspcb ppt
Gspcb pptGspcb ppt
Gspcb ppt
dominicfern
 
Coimbatore Solid waste management
Coimbatore Solid waste managementCoimbatore Solid waste management
Coimbatore Solid waste management
Mithilesh Mandal
 
Waste Reduction
Waste ReductionWaste Reduction
Waste Reduction
Harrison Smith
 
Conservation and waste minimisation
Conservation and waste minimisationConservation and waste minimisation
Conservation and waste minimisation
YCIS Beijing
 
Waste Management
Waste ManagementWaste Management
Waste Management
learnito
 
Efficient Waste Management in Schools
Efficient Waste Management in SchoolsEfficient Waste Management in Schools
Efficient Waste Management in Schools
Centre for Public Policy Research
 
Waste Management
Waste ManagementWaste Management
Waste Management
Prafulla Kharote
 
Understanding waste management (India)
Understanding waste management (India)Understanding waste management (India)
Understanding waste management (India)
Rajat Batra
 
Controlling industrial waste disposal
Controlling industrial waste disposalControlling industrial waste disposal
Controlling industrial waste disposal
Eli Za
 
Presentation On Waste Management Systems
Presentation On Waste Management SystemsPresentation On Waste Management Systems
Presentation On Waste Management Systems
Vasu Malhotra
 
Solid waste management, chandigarh
Solid waste management, chandigarhSolid waste management, chandigarh
Solid waste management, chandigarh
Surdeep Mahanta
 

What's hot (20)

Understanding of Waste Management in Bangladesh
Understanding of Waste Management in BangladeshUnderstanding of Waste Management in Bangladesh
Understanding of Waste Management in Bangladesh
 
Municipal Solid Waste Management Process
Municipal Solid Waste Management ProcessMunicipal Solid Waste Management Process
Municipal Solid Waste Management Process
 
Municipal solid waste management ehc
Municipal solid waste management  ehcMunicipal solid waste management  ehc
Municipal solid waste management ehc
 
Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)Solid Waste Collection System - proposed changes (December 2011 council meeting)
Solid Waste Collection System - proposed changes (December 2011 council meeting)
 
Solid Waste Generation and Handling
Solid Waste Generation and HandlingSolid Waste Generation and Handling
Solid Waste Generation and Handling
 
Solid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City CorporationSolid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City Corporation
 
Solid waste management of warangal city
Solid waste management of warangal citySolid waste management of warangal city
Solid waste management of warangal city
 
Mahesh Joshi on need of segregation of solid waste
Mahesh Joshi on need of segregation of solid wasteMahesh Joshi on need of segregation of solid waste
Mahesh Joshi on need of segregation of solid waste
 
WASTE MINIMISATION TECHNIQUES
WASTE MINIMISATION TECHNIQUESWASTE MINIMISATION TECHNIQUES
WASTE MINIMISATION TECHNIQUES
 
Gspcb ppt
Gspcb pptGspcb ppt
Gspcb ppt
 
Coimbatore Solid waste management
Coimbatore Solid waste managementCoimbatore Solid waste management
Coimbatore Solid waste management
 
Waste Reduction
Waste ReductionWaste Reduction
Waste Reduction
 
Conservation and waste minimisation
Conservation and waste minimisationConservation and waste minimisation
Conservation and waste minimisation
 
Waste Management
Waste ManagementWaste Management
Waste Management
 
Efficient Waste Management in Schools
Efficient Waste Management in SchoolsEfficient Waste Management in Schools
Efficient Waste Management in Schools
 
Waste Management
Waste ManagementWaste Management
Waste Management
 
Understanding waste management (India)
Understanding waste management (India)Understanding waste management (India)
Understanding waste management (India)
 
Controlling industrial waste disposal
Controlling industrial waste disposalControlling industrial waste disposal
Controlling industrial waste disposal
 
Presentation On Waste Management Systems
Presentation On Waste Management SystemsPresentation On Waste Management Systems
Presentation On Waste Management Systems
 
Solid waste management, chandigarh
Solid waste management, chandigarhSolid waste management, chandigarh
Solid waste management, chandigarh
 

Viewers also liked

Hazards of biomedical waste & its management
Hazards of biomedical waste & its managementHazards of biomedical waste & its management
Hazards of biomedical waste & its management
DR.NAVIN KUMAR
 
BIO MEDICAL WASTE MANAGEMENT
BIO MEDICAL WASTE MANAGEMENTBIO MEDICAL WASTE MANAGEMENT
BIO MEDICAL WASTE MANAGEMENT
Santosh Yadav
 
biomedical waste management
biomedical waste management biomedical waste management
biomedical waste management
Aditya Singh
 
Municipal Solid Waste Management - Observations on Presentations K D Bhardwaj
Municipal Solid Waste Management - Observations on Presentations K D BhardwajMunicipal Solid Waste Management - Observations on Presentations K D Bhardwaj
Municipal Solid Waste Management - Observations on Presentations K D Bhardwaj
Rojarsharin
 
Technologies for Sustainable e-Waste Management Solutions
Technologies for Sustainable e-Waste Management SolutionsTechnologies for Sustainable e-Waste Management Solutions
Technologies for Sustainable e-Waste Management Solutions
Ernesto Empig
 
E waste in-india
E waste in-indiaE waste in-india
E waste in-india
Rajendra Prasad
 
Biomedical waste 2003
Biomedical waste 2003Biomedical waste 2003
Biomedical waste 2003
Iqbal Singh
 
Municipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., indiaMunicipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., india
Niladri Roy
 
Biomedical waste and its management
Biomedical waste and its managementBiomedical waste and its management
Biomedical waste and its management
Divya Meril
 
Biomedical Waste Management
Biomedical Waste ManagementBiomedical Waste Management
Biomedical Waste Management
Gunwant Joshi
 
Hospital waste management
Hospital waste managementHospital waste management
Hospital waste management
Dr.Sharad H. Gajuryal
 
Biomedical waste management
Biomedical waste managementBiomedical waste management
Biomedical waste management
HemaliAmin
 

Viewers also liked (12)

Hazards of biomedical waste & its management
Hazards of biomedical waste & its managementHazards of biomedical waste & its management
Hazards of biomedical waste & its management
 
BIO MEDICAL WASTE MANAGEMENT
BIO MEDICAL WASTE MANAGEMENTBIO MEDICAL WASTE MANAGEMENT
BIO MEDICAL WASTE MANAGEMENT
 
biomedical waste management
biomedical waste management biomedical waste management
biomedical waste management
 
Municipal Solid Waste Management - Observations on Presentations K D Bhardwaj
Municipal Solid Waste Management - Observations on Presentations K D BhardwajMunicipal Solid Waste Management - Observations on Presentations K D Bhardwaj
Municipal Solid Waste Management - Observations on Presentations K D Bhardwaj
 
Technologies for Sustainable e-Waste Management Solutions
Technologies for Sustainable e-Waste Management SolutionsTechnologies for Sustainable e-Waste Management Solutions
Technologies for Sustainable e-Waste Management Solutions
 
E waste in-india
E waste in-indiaE waste in-india
E waste in-india
 
Biomedical waste 2003
Biomedical waste 2003Biomedical waste 2003
Biomedical waste 2003
 
Municipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., indiaMunicipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., india
 
Biomedical waste and its management
Biomedical waste and its managementBiomedical waste and its management
Biomedical waste and its management
 
Biomedical Waste Management
Biomedical Waste ManagementBiomedical Waste Management
Biomedical Waste Management
 
Hospital waste management
Hospital waste managementHospital waste management
Hospital waste management
 
Biomedical waste management
Biomedical waste managementBiomedical waste management
Biomedical waste management
 

Similar to A study of Cost Comparison of Outsourcing vs Inbuilt facility for Biomedical Waste Management in a 700 bedded hospital

IRJET- Production and Analysis of Biogas from Municipal Solid Waste
IRJET- Production and Analysis of Biogas from Municipal Solid WasteIRJET- Production and Analysis of Biogas from Municipal Solid Waste
IRJET- Production and Analysis of Biogas from Municipal Solid Waste
IRJET Journal
 
WBA-presentation-20-05-2020 (1).pdf
WBA-presentation-20-05-2020 (1).pdfWBA-presentation-20-05-2020 (1).pdf
WBA-presentation-20-05-2020 (1).pdf
sandipa7
 
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA  An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
civej
 
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCAAn Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
civejjour
 
Cost accountancy mcom part1 sem 2
Cost accountancy  mcom part1 sem 2Cost accountancy  mcom part1 sem 2
Cost accountancy mcom part1 sem 2
Rutuja Chudnaik
 
Ijmet 10 01_099
Ijmet 10 01_099Ijmet 10 01_099
Ijmet 10 01_099
IAEME Publication
 
IRJET- Performance and Evaluation Studies on Dairy Effluent Treatment Pla...
IRJET-  	  Performance and Evaluation Studies on Dairy Effluent Treatment Pla...IRJET-  	  Performance and Evaluation Studies on Dairy Effluent Treatment Pla...
IRJET- Performance and Evaluation Studies on Dairy Effluent Treatment Pla...
IRJET Journal
 
Bpr report mavericks
Bpr report  mavericksBpr report  mavericks
Bpr report mavericks
Sheema Adil
 
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCAAn Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
civej
 
Gem ppt-8-waste to energy
Gem ppt-8-waste to energyGem ppt-8-waste to energy
Gem ppt-8-waste to energy
ijcparish
 
Chamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy EfficiencyChamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy Efficiency
eecfncci
 
Entrepreneurship Final project
Entrepreneurship Final projectEntrepreneurship Final project
Entrepreneurship Final project
Muhammad Usman
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptx
ssuser9b43b32
 
A sustainability assessment of biofuel supply chain.pdf
A sustainability assessment of biofuel supply chain.pdfA sustainability assessment of biofuel supply chain.pdf
A sustainability assessment of biofuel supply chain.pdf
Amber Ford
 
Government failure-on-air-pollution-pd
Government failure-on-air-pollution-pdGovernment failure-on-air-pollution-pd
Government failure-on-air-pollution-pd
BharatJhunjhunwalaEn
 
Evaluation of green act in small scale foundry
Evaluation of green act in small scale foundryEvaluation of green act in small scale foundry
Evaluation of green act in small scale foundry
eSAT Publishing House
 
Cost Analysis Team Project
Cost Analysis Team Project  Cost Analysis Team Project
Cost Analysis Team Project
Modupe Sarratt
 
Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...
Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...
Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...
IRJET Journal
 
การบรรยาย รพ.ลดโลกร้อน (2)
การบรรยาย รพ.ลดโลกร้อน  (2)การบรรยาย รพ.ลดโลกร้อน  (2)
การบรรยาย รพ.ลดโลกร้อน (2)
Benjawan Tawatsupa
 
Waste Recycling
Waste RecyclingWaste Recycling
Waste Recycling
Perth Now
 

Similar to A study of Cost Comparison of Outsourcing vs Inbuilt facility for Biomedical Waste Management in a 700 bedded hospital (20)

IRJET- Production and Analysis of Biogas from Municipal Solid Waste
IRJET- Production and Analysis of Biogas from Municipal Solid WasteIRJET- Production and Analysis of Biogas from Municipal Solid Waste
IRJET- Production and Analysis of Biogas from Municipal Solid Waste
 
WBA-presentation-20-05-2020 (1).pdf
WBA-presentation-20-05-2020 (1).pdfWBA-presentation-20-05-2020 (1).pdf
WBA-presentation-20-05-2020 (1).pdf
 
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA  An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
 
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCAAn Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
 
Cost accountancy mcom part1 sem 2
Cost accountancy  mcom part1 sem 2Cost accountancy  mcom part1 sem 2
Cost accountancy mcom part1 sem 2
 
Ijmet 10 01_099
Ijmet 10 01_099Ijmet 10 01_099
Ijmet 10 01_099
 
IRJET- Performance and Evaluation Studies on Dairy Effluent Treatment Pla...
IRJET-  	  Performance and Evaluation Studies on Dairy Effluent Treatment Pla...IRJET-  	  Performance and Evaluation Studies on Dairy Effluent Treatment Pla...
IRJET- Performance and Evaluation Studies on Dairy Effluent Treatment Pla...
 
Bpr report mavericks
Bpr report  mavericksBpr report  mavericks
Bpr report mavericks
 
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCAAn Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
An Ex-Ante Evaluation for Solid Waste Treatment Facilities using LCCA
 
Gem ppt-8-waste to energy
Gem ppt-8-waste to energyGem ppt-8-waste to energy
Gem ppt-8-waste to energy
 
Chamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy EfficiencyChamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy Efficiency
 
Entrepreneurship Final project
Entrepreneurship Final projectEntrepreneurship Final project
Entrepreneurship Final project
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptx
 
A sustainability assessment of biofuel supply chain.pdf
A sustainability assessment of biofuel supply chain.pdfA sustainability assessment of biofuel supply chain.pdf
A sustainability assessment of biofuel supply chain.pdf
 
Government failure-on-air-pollution-pd
Government failure-on-air-pollution-pdGovernment failure-on-air-pollution-pd
Government failure-on-air-pollution-pd
 
Evaluation of green act in small scale foundry
Evaluation of green act in small scale foundryEvaluation of green act in small scale foundry
Evaluation of green act in small scale foundry
 
Cost Analysis Team Project
Cost Analysis Team Project  Cost Analysis Team Project
Cost Analysis Team Project
 
Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...
Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...
Prognosis of Biogas Production from Sewage Treatment Plant using Machine Lear...
 
การบรรยาย รพ.ลดโลกร้อน (2)
การบรรยาย รพ.ลดโลกร้อน  (2)การบรรยาย รพ.ลดโลกร้อน  (2)
การบรรยาย รพ.ลดโลกร้อน (2)
 
Waste Recycling
Waste RecyclingWaste Recycling
Waste Recycling
 

Recently uploaded

Innovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and DesignInnovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and Design
Chandresh Chudasama
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
timesbpobusiness
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
Lacey Max
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
Charleston Alexander
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
dazzjoker
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
How HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdfHow HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdf
HumanResourceDimensi1
 

Recently uploaded (20)

Innovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and DesignInnovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and Design
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
How HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdfHow HR Search Helps in Company Success.pdf
How HR Search Helps in Company Success.pdf
 

A study of Cost Comparison of Outsourcing vs Inbuilt facility for Biomedical Waste Management in a 700 bedded hospital

  • 1. A STUDY OF COST COMPARISON OF OUTSOURCING VERSUS INBUILT FACILITY FOR BIOMEDICAL WASTE MANAGEMENT IN GOVERNMENT MEDICAL COLLEGE AND HOSPITAL, CHANDIGARH.
  • 2. Objective. Introduction Methodology Observations and results Interesting facts. References Agenda
  • 3. Objective General To calculate and compare the cost of outsourcing versus erecting facility for bio-medical waste management at Government Medical College and Hospital, Chandigarh. Specific  To study the process of biomedical waste management. To calculate the cost incurred on outsourcing of biomedical waste management To calculate the cost of setting up biomedical waste management facility. To suggest measures, if any, to improve the process and to increase its efficiency to benefit the hospital.
  • 4. Hospitals are health institutions providing patient care services. Directly through patient care or indirectly by ensuring a clean, healthy environment for their employees and the community. In the process of health care, waste is generated which usually includes sharps, human tissues or body parts and other infectious materials also referred to as ‘‘Hospital Solid Waste’’ and ‘‘Bio-medical Solid Waste.’’ The onus lies on hospitals and other health care institutions to ensure that there are no adverse health and environmental consequences as a result of their waste handling, treatment and disposal activities Introduction
  • 5. Methodology Study Design The study was descriptive and observational in nature to understand the biomedical waste management process in the hospital. The study was designed towards achievement of all its objectives Study Area The study was carried out in Government Medical College and Hospital, Chandigarh from 15 May 2010 to 15 June 2010. Study population Manufacturers of incinerators, contractors, engineers, supervisors and workers of biomedical waste handling were included in the study.
  • 6. Continued…. Study Tools Observation was main tool to study the handling, transportation and disposal of biomedical waste. Unstructured Interview of the contractors, manufacturers and engineers was done to estimate the cost of installation of new incinerator. Records Study was done to know the amount of waste generation and cost of current process of disposal. Data Analysis The data collected was analyzed using Microsoft Excel. The various costs were studied to find out the total cost of setting up of incinerator and compare it with current process of waste disposal.
  • 7. Observation and Results Total amount of waste generated in a day approx. 150 kg. Sent to the GMSH, Chandigarh for disposal. Sent to the PGIMER, Chandigarh only when GMSH’s incinerator is not working and on first day of every week when quantity of biomedical waste generated is more than 150 Kg. The present model reflects a net saving of Rs. 2.27/bed/day as the inbuilt biomedical waste management facility would cost Rs. 8.6/bed/day if the incinerator of capacity 100 kg/hour was working for 2 hours in a day as compared to outsourcing which would cost around Rs. 10.90/bed/day. In both the cases the cost related to handling, segregation and salary of the staff except salary of the operator remained the same, so these were not included in calculating the cost
  • 8. Break up of Outsourcing Cost per Bed
  • 9. INSTALLATION COST Cost of the destromatpyrolytic incinerator with = 6400000 venturi scrubber capacity 100 KG/HR (thermax make)   2. Construction cost including incinerator = 650000 building, waste storage room, offices     Total installation cost 7050000 Break up of In-House Facility Cost
  • 10. OPERATING COST: FIXED COST Depreciation on machine = 384000 Depreciation on building on the basis of = 34411 Salary of the operator = 360000 Maintenance cost = 300000 Total fixed operating cost 1078411
  • 11. VARIABLE OPERATING COST Fuel consumption = 1012364 Electricity consumption = 30660 Total variable operating cost = 1043024   Total fixed operating cost 1078411 Total annual operating cost = 2121435 Total operating cost (rupees/bed/day) = 8.6
  • 12. Interesting Facts Annual cost of outsourcing of biomedical waste management was Rs.2673000, Annual cost of erecting the facility was Rs.2121435. Net saving of Rs.551565 per year which accounts for 21 % of the total cost incurred during outsourcing of biomedical waste disposal. The installation cost of erecting the facility can be covered in just 12 and a half years. Which can be reduced further to 5 years if the hospital extend this facility to other biomedical waste generating units. Suppose for 100 Kg of biomedical waste per day outsourced for other hospital, the net revenue earned per year would be Rs.792488 after deducting increased variable and fixed operating cost from total revenue generated and this would ultimately increase our net saving to Rs.1344053.  
  • 13. Secondly if in the future hospital will increase its bed capacity by 100 beds, the average biomedical waste generation will increase by 22 Kg. Thus for that increased part of biomedical waste the outsourcing cost will increase by Rs.392040 per year whereas there will not be any rise in the operating cost of running the facility. Thus this will further increase our net savings.
  • 14. Conclusion May be this study is not important for installation of individual incinerator because Government of India has discouraged this practice under new regulations but it can be useful in CBWTF as it can help State Pollution Control Boards in negotiating with Private Suppliers by calculating their cost of providing the service and profit margins.
  • 15. For Further Details Kindly Contact.. Dr. VarunGoyal Project Associate EPOS HEALTH (INDIA) PVT. LTD. 445, UdyogVihar Phase-III Gurgaon - 122016, Haryana, India Ph #. 91 9650639318 Tel #: 91 124 4264900 Fax #:91 124 4264906 Email: varun.goyal@epos.in Skype: varungoyal1984 Website – www.epos.in