7/11/2014 1
A FRAMEWORK OF BIM-BASED
CONSTRUCTION PROJECT MONITORING
SYSTEM FOR OWNERS
Advisor : Associate Professor Veerasak Likhitruangsilp, Ph.D.
Student : Souksavath Losavanh
Department of Civil Engineering
Faculty of Engineering
Chulalongkorn University
7/11/2014 2
# Building Information Modeling
(BIM) comes to be concerned issue of
the AEC Industry.
Source: Hooper, M. 2011
Background
# Transformation in construction
information exchange
7/11/2014 3
# BIM is increase productivity and improve the final project outcomes.
# Construction monitoring is the key elements to success of construction
project.
# Owners need BIM.
BIM + Construction
Monitoring
HOW ???
7/11/2014 4
Research Objective
Develop the framework of a BIM-based Construction monitoring
system for construction projects to owners.
Scope of Research
 Develop and implement framework of BIM-based.
 Apply to high-rise building ( Chamchuri 10 Building )
 The software that used in this thesis:
● Revit 2013.
● MS Excel 2010.
7/11/2014 5
Construction
Project
Building Model
Components
Visuanlisation
Information
Composition of BIM Requirement information
Planing and Design
• Identity data
- ID Code
- Mark Number
- OmniClass Number
- Work discipline
• Design data
- Category(Family)
- Name(Type)
- Dimension
- Material
- Cost
- Level
• Planning data
- Phase
- Plan start date
- Plan finish date
Construction
• Construction
- Actual Start date
- Actual finish date
- Percent of complet
- Site photo
• - Comment
Operation
• FM
- Room
- Space
- Function
Research Methodology
7/11/2014 6
BIM-based Construction monitoring system for construction project to
owners
Owner Office Construction Site
Transfer
SyncSync
Cloud Storage
Designer office
Documents
MEP
Engineer
Structural
Engineer
Architect
Designer Owner
7/11/2014 7
BIM-based Construction monitoring system for construction
project including of two stages and four part.
Stage 1: Pre-Construction
Stage 2: Construction
Part 1: Design
Part 2: Prepare for monitoring
Part 3: Construction and Monitoring
Part 4: Progress report
Stage: Part:
7/11/2014 8
Part 1: Design
Workflow:
Owner Office
Designer office
Documents
MEP
Engineer
Structural
EngineerArchitect
A
Start
Owner identify
necessary information
for project monitoring
Owner establish an
information packet for
project monitoring to
designer
Designer create a packet
of information to BIM-
Design model
Owner verify
BIM-Design model
BIM-Master model
Yes
No
B
7/11/2014 9
Part 2: Prepare for monitoring
Workflow:
Start
Designer transfer BIM-
Design model to Owner
(Arc, St and MEP file)
Owner create BIM-
Master
Owner upload BIM-
Design model to
database
Owner link BIM-Model
files to BIM-Master file
Owner share BIM-
Master files to owner
site office
Finish
B C
Owner Office
Designer office
Documents
MEP
Engineer
Structure
Engineer
Architect
7/11/2014 10
Workset file
BIM-Master model database
Workset Link Master file
MEP
STR
ARC
ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13
STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13
MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13
Owner office
CC10-STR-2013.03.03
Date
Type
Project
7/11/2014 11
Workflow:
MEP
STR
ARC
ARC P1-03-03-13 ARC P2-05-04-13 ARC P3-05-05-13
STR P1-03-03-13 STR P2-05-04-13 STR P3-05-05-13
MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13
Owner office
MEP
STR
ARC
Construction site
Start
Import BIM-Master
file from site office to
tablet PC
Engineer select
project phase
Engineer select object
to update
Take site
photo
Input current
progress information
Upload to
cloud storage
Generate
image URL
Construction
phase updated
Finish
Updated all
items
Yes
No
Export BIM
file to site
office
C D
Part 3: Construction and monitoring
7/11/2014 12
Part 4: Progress report
Workflow:
MEP
STR
ARC
Project progress
report
ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13
STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13
MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13
Owner office
Plan
Actual
In progress
SIT F16-C10-03-03-13 SIT F16-C11-03-03-13
SIT F16-C12-03-03-13 SIT F16-C13-03-03-13
Start
Import files from
Site office
Filter Information
Combine BIM-Record
model to BIM-Master
Export information to
text file
Import text file Excel
temple file
Report of project
progress
Finish
D E
7/11/2014 13
Tablet PC for collecting and updating
information on construction site Current construction site image
F16-A-03 F16-E-04
F16-F-08 F16-B-04
Report screen of project progress report at the owner office
7/11/2014 14
Conclusion
# This research has developed a framework of BIM-based construction monitoring system for the high
rise building construction project to the owners that can be used by the owner to monitoring project
progress.
# The purpose of this framework is shows the BIM-based construction monitoring system that reduce the
errors and omissions in paper on the paper-based modes of communication.
# This research data collected only reinforcement concrete structural system that included column, beam
and slab.
# This research were develop after project start.
7/11/2014 15
THANK YOU VERY MUCH
FOR YOUR ATTENTION

More Related Content

What's hot

2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REVPaula Davison
 
Mechanical, electrical, and plumbing engineering enhancements in revit 2016 nk
Mechanical, electrical, and plumbing engineering enhancements in revit 2016 nkMechanical, electrical, and plumbing engineering enhancements in revit 2016 nk
Mechanical, electrical, and plumbing engineering enhancements in revit 2016 nk
murala12
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 11st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
BIM User Day
 
BIM Assessment
BIM AssessmentBIM Assessment
BIM Assessment
Nguyen Manh Tuan
 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM
tekenstudio 3D
 
Quy trình BIM
Quy trình BIMQuy trình BIM
Quy trình BIM
Nguyen Manh Tuan
 
BEP
BEPBEP
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
BIM User Day
 
AEC Digital Solutions (Content Creation)
AEC Digital Solutions (Content Creation)AEC Digital Solutions (Content Creation)
AEC Digital Solutions (Content Creation)
AEC Digital Solutions LLC
 
BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3
Alfredo Carrato
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Sewell Construction
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentationCampus
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
Ibrahem Naeem
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use cases
Daan Moreels
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards
BIM User Day
 
Introduction to Revit Software from Autodesk
Introduction to Revit Software from AutodeskIntroduction to Revit Software from Autodesk
Introduction to Revit Software from AutodeskThomas Tate
 
What is bim execution plan why is it important
What is bim execution plan  why is it important What is bim execution plan  why is it important
What is bim execution plan why is it important
Krishna Outsourcing
 
ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)
Be2camp Admin
 

What's hot (20)

Presentation 5-tekla
Presentation 5-teklaPresentation 5-tekla
Presentation 5-tekla
 
2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV2015-0713_ASHE_CHCO-BIMpresentation_REV
2015-0713_ASHE_CHCO-BIMpresentation_REV
 
Mechanical, electrical, and plumbing engineering enhancements in revit 2016 nk
Mechanical, electrical, and plumbing engineering enhancements in revit 2016 nkMechanical, electrical, and plumbing engineering enhancements in revit 2016 nk
Mechanical, electrical, and plumbing engineering enhancements in revit 2016 nk
 
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 11st Qatar BIM User Day Business processes supported by BIM methodology, part 1
1st Qatar BIM User Day Business processes supported by BIM methodology, part 1
 
BIM Assessment
BIM AssessmentBIM Assessment
BIM Assessment
 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM
 
Quy trình BIM
Quy trình BIMQuy trình BIM
Quy trình BIM
 
BEP
BEPBEP
BEP
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
 
AEC Digital Solutions (Content Creation)
AEC Digital Solutions (Content Creation)AEC Digital Solutions (Content Creation)
AEC Digital Solutions (Content Creation)
 
BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentation
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use cases
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards
 
Introduction to Revit Software from Autodesk
Introduction to Revit Software from AutodeskIntroduction to Revit Software from Autodesk
Introduction to Revit Software from Autodesk
 
CV NK
CV NKCV NK
CV NK
 
What is bim execution plan why is it important
What is bim execution plan  why is it important What is bim execution plan  why is it important
What is bim execution plan why is it important
 
ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)
 

Viewers also liked

รายงาน
รายงานรายงาน
รายงาน
MUTCHI Villatoro B.
 
Uniclass 2015: As it lives and breathes | Empowering you in a BIM world
Uniclass 2015: As it lives and breathes | Empowering you in a BIM worldUniclass 2015: As it lives and breathes | Empowering you in a BIM world
Uniclass 2015: As it lives and breathes | Empowering you in a BIM world
The NBS
 
Ontology Across Building Emergency And Energ
Ontology Across Building Emergency And EnergOntology Across Building Emergency And Energ
Ontology Across Building Emergency And Energ
DMacP
 
NENA Additional Data Structures - Buildings
NENA Additional Data Structures - BuildingsNENA Additional Data Structures - Buildings
NENA Additional Data Structures - Buildings
DMacP
 
OmniClass for NBAC
OmniClass for NBACOmniClass for NBAC
OmniClass for NBAC
DMacP
 
WPL BIM Specs D Mac P
WPL BIM Specs D Mac PWPL BIM Specs D Mac P
WPL BIM Specs D Mac P
DMacP
 
Government soft landings and the benefits of BIM to FM
Government soft landings and the benefits of BIM to FMGovernment soft landings and the benefits of BIM to FM
Government soft landings and the benefits of BIM to FM
Be2camp Admin
 
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
Protectionandmanagement
 
BIM Toolkit Preview with Stephen Hamil
BIM Toolkit Preview with Stephen HamilBIM Toolkit Preview with Stephen Hamil
BIM Toolkit Preview with Stephen Hamil
The NBS
 
Building Information Modelling (BIM) for Handover and Facilities Management
Building Information Modelling (BIM) for Handover and Facilities ManagementBuilding Information Modelling (BIM) for Handover and Facilities Management
Building Information Modelling (BIM) for Handover and Facilities Management
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 
CTM Program: Terminology, Vocabularies, and BIM
CTM Program: Terminology, Vocabularies, and BIMCTM Program: Terminology, Vocabularies, and BIM
CTM Program: Terminology, Vocabularies, and BIM
novacsi
 
Ramco ERP for Facility Management Services
Ramco ERP for Facility Management ServicesRamco ERP for Facility Management Services
Ramco ERP for Facility Management Services
Ramco Systems
 
May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...
May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...
May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...
novacsi
 
The NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of Work
The NBS
 
APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...
APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...
APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...
CA API Management
 
BIM Through The Project Timeline | Ecobuild 2016
BIM Through The Project Timeline | Ecobuild 2016BIM Through The Project Timeline | Ecobuild 2016
BIM Through The Project Timeline | Ecobuild 2016
The NBS
 
Honeywell Access OKH2N26 Data Sheet
Honeywell Access OKH2N26 Data SheetHoneywell Access OKH2N26 Data Sheet
Honeywell Access OKH2N26 Data Sheet
JMAC Supply
 
The Future of BIM
The Future of BIMThe Future of BIM
The Future of BIM
The NBS
 
Dữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong RevitDữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong Revit
congnghebim
 

Viewers also liked (20)

รายงาน
รายงานรายงาน
รายงาน
 
Uniclass 2015: As it lives and breathes | Empowering you in a BIM world
Uniclass 2015: As it lives and breathes | Empowering you in a BIM worldUniclass 2015: As it lives and breathes | Empowering you in a BIM world
Uniclass 2015: As it lives and breathes | Empowering you in a BIM world
 
Ontology Across Building Emergency And Energ
Ontology Across Building Emergency And EnergOntology Across Building Emergency And Energ
Ontology Across Building Emergency And Energ
 
Paul Nunn
Paul NunnPaul Nunn
Paul Nunn
 
NENA Additional Data Structures - Buildings
NENA Additional Data Structures - BuildingsNENA Additional Data Structures - Buildings
NENA Additional Data Structures - Buildings
 
OmniClass for NBAC
OmniClass for NBACOmniClass for NBAC
OmniClass for NBAC
 
WPL BIM Specs D Mac P
WPL BIM Specs D Mac PWPL BIM Specs D Mac P
WPL BIM Specs D Mac P
 
Government soft landings and the benefits of BIM to FM
Government soft landings and the benefits of BIM to FMGovernment soft landings and the benefits of BIM to FM
Government soft landings and the benefits of BIM to FM
 
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
 
BIM Toolkit Preview with Stephen Hamil
BIM Toolkit Preview with Stephen HamilBIM Toolkit Preview with Stephen Hamil
BIM Toolkit Preview with Stephen Hamil
 
Building Information Modelling (BIM) for Handover and Facilities Management
Building Information Modelling (BIM) for Handover and Facilities ManagementBuilding Information Modelling (BIM) for Handover and Facilities Management
Building Information Modelling (BIM) for Handover and Facilities Management
 
CTM Program: Terminology, Vocabularies, and BIM
CTM Program: Terminology, Vocabularies, and BIMCTM Program: Terminology, Vocabularies, and BIM
CTM Program: Terminology, Vocabularies, and BIM
 
Ramco ERP for Facility Management Services
Ramco ERP for Facility Management ServicesRamco ERP for Facility Management Services
Ramco ERP for Facility Management Services
 
May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...
May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...
May Chapter Meeting: OmniClass, CSI Formats, and Their Role in BIM (Joint Mee...
 
The NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of Work
 
APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...
APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...
APIs Fueling the Connected Car Opportunity - Scott Morrison, SVP & Distinguis...
 
BIM Through The Project Timeline | Ecobuild 2016
BIM Through The Project Timeline | Ecobuild 2016BIM Through The Project Timeline | Ecobuild 2016
BIM Through The Project Timeline | Ecobuild 2016
 
Honeywell Access OKH2N26 Data Sheet
Honeywell Access OKH2N26 Data SheetHoneywell Access OKH2N26 Data Sheet
Honeywell Access OKH2N26 Data Sheet
 
The Future of BIM
The Future of BIMThe Future of BIM
The Future of BIM
 
Dữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong RevitDữ liệu Cobie và hệ thống phân loại trong Revit
Dữ liệu Cobie và hệ thống phân loại trong Revit
 

Similar to A Framework of BIM-Based Construction Project Monitoring System for Owner

Mutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenMutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de Ven
Niels van de Ven
 
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Dr. Amarjeet Singh
 
Professional BIM Program for Arch | Structural | MEP | Construction
Professional BIM Program for Arch | Structural | MEP | Construction Professional BIM Program for Arch | Structural | MEP | Construction
Professional BIM Program for Arch | Structural | MEP | Construction
BIMLABS GLOBAL
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
Kiran Birdi
 
BIM DAY 2016-BIM Execution Plan(English Edition)
BIM DAY 2016-BIM Execution Plan(English Edition)BIM DAY 2016-BIM Execution Plan(English Edition)
BIM DAY 2016-BIM Execution Plan(English Edition)
AIJ, Information Technologies in Design and Production
 
Using an openBim Workflow
Using an openBim WorkflowUsing an openBim Workflow
Using an openBim Workflow
Jeffrey Ouellette
 
Digital construction for integrated project delivery
Digital construction for integrated project deliveryDigital construction for integrated project delivery
Digital construction for integrated project delivery
Stephen Au
 
Christopher Buehler portfolio
Christopher Buehler portfolioChristopher Buehler portfolio
Christopher Buehler portfolio
Christopher Buehler
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in CaliforniaGaurav Kumar
 
Structural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebarStructural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebar
Carl Spalding FISM
 
Scandinavian Rail Development 2013 - Laura Järvinen
Scandinavian Rail Development 2013 - Laura JärvinenScandinavian Rail Development 2013 - Laura Järvinen
Scandinavian Rail Development 2013 - Laura JärvinenRussell Publishing
 
BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...
BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...
BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...
Pieter Pauwels
 
IPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo RoadIPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo Road
Toronto 2030 District
 
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014   MEGSUS14 - GQM on energy for SaaS - CETICIWSM2014   MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
Nesma
 
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
gmundacat
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
ssuser3f4412
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
JessDazaOsorio
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
JessDazaOsorio
 
BIM and electrical engineers. An insight on elec calc™ BIM
BIM and electrical engineers. An insight on elec calc™ BIM BIM and electrical engineers. An insight on elec calc™ BIM
BIM and electrical engineers. An insight on elec calc™ BIM
Trace Software International
 
BIM model analysis
BIM model analysisBIM model analysis
BIM model analysis
ARAVINDH TAMIL
 

Similar to A Framework of BIM-Based Construction Project Monitoring System for Owner (20)

Mutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de VenMutation management in BIM models during O&M: presentation - Niels van de Ven
Mutation management in BIM models during O&M: presentation - Niels van de Ven
 
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
 
Professional BIM Program for Arch | Structural | MEP | Construction
Professional BIM Program for Arch | Structural | MEP | Construction Professional BIM Program for Arch | Structural | MEP | Construction
Professional BIM Program for Arch | Structural | MEP | Construction
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
BIM DAY 2016-BIM Execution Plan(English Edition)
BIM DAY 2016-BIM Execution Plan(English Edition)BIM DAY 2016-BIM Execution Plan(English Edition)
BIM DAY 2016-BIM Execution Plan(English Edition)
 
Using an openBim Workflow
Using an openBim WorkflowUsing an openBim Workflow
Using an openBim Workflow
 
Digital construction for integrated project delivery
Digital construction for integrated project deliveryDigital construction for integrated project delivery
Digital construction for integrated project delivery
 
Christopher Buehler portfolio
Christopher Buehler portfolioChristopher Buehler portfolio
Christopher Buehler portfolio
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in California
 
Structural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebarStructural BIM workflows - design-to-fabrication for steel and rebar
Structural BIM workflows - design-to-fabrication for steel and rebar
 
Scandinavian Rail Development 2013 - Laura Järvinen
Scandinavian Rail Development 2013 - Laura JärvinenScandinavian Rail Development 2013 - Laura Järvinen
Scandinavian Rail Development 2013 - Laura Järvinen
 
BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...
BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...
BIMMeeting 2016 - BIM-Infra-GIS: building bridges from single buildings to di...
 
IPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo RoadIPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo Road
 
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014   MEGSUS14 - GQM on energy for SaaS - CETICIWSM2014   MEGSUS14 - GQM on energy for SaaS - CETIC
IWSM2014 MEGSUS14 - GQM on energy for SaaS - CETIC
 
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
04d_Process_Map_Templates-V2.0_(PowerPiont).ppt
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.pptTemplate-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
 
BIM and electrical engineers. An insight on elec calc™ BIM
BIM and electrical engineers. An insight on elec calc™ BIM BIM and electrical engineers. An insight on elec calc™ BIM
BIM and electrical engineers. An insight on elec calc™ BIM
 
BIM model analysis
BIM model analysisBIM model analysis
BIM model analysis
 

Recently uploaded

RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
Ethernet Routing and switching chapter 1.ppt
Ethernet Routing and switching chapter 1.pptEthernet Routing and switching chapter 1.ppt
Ethernet Routing and switching chapter 1.ppt
azkamurat
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx
benykoy2024
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 

Recently uploaded (20)

RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
Ethernet Routing and switching chapter 1.ppt
Ethernet Routing and switching chapter 1.pptEthernet Routing and switching chapter 1.ppt
Ethernet Routing and switching chapter 1.ppt
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx01-GPON Fundamental fttx ftth basic .pptx
01-GPON Fundamental fttx ftth basic .pptx
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 

A Framework of BIM-Based Construction Project Monitoring System for Owner

  • 1. 7/11/2014 1 A FRAMEWORK OF BIM-BASED CONSTRUCTION PROJECT MONITORING SYSTEM FOR OWNERS Advisor : Associate Professor Veerasak Likhitruangsilp, Ph.D. Student : Souksavath Losavanh Department of Civil Engineering Faculty of Engineering Chulalongkorn University
  • 2. 7/11/2014 2 # Building Information Modeling (BIM) comes to be concerned issue of the AEC Industry. Source: Hooper, M. 2011 Background # Transformation in construction information exchange
  • 3. 7/11/2014 3 # BIM is increase productivity and improve the final project outcomes. # Construction monitoring is the key elements to success of construction project. # Owners need BIM. BIM + Construction Monitoring HOW ???
  • 4. 7/11/2014 4 Research Objective Develop the framework of a BIM-based Construction monitoring system for construction projects to owners. Scope of Research  Develop and implement framework of BIM-based.  Apply to high-rise building ( Chamchuri 10 Building )  The software that used in this thesis: ● Revit 2013. ● MS Excel 2010.
  • 5. 7/11/2014 5 Construction Project Building Model Components Visuanlisation Information Composition of BIM Requirement information Planing and Design • Identity data - ID Code - Mark Number - OmniClass Number - Work discipline • Design data - Category(Family) - Name(Type) - Dimension - Material - Cost - Level • Planning data - Phase - Plan start date - Plan finish date Construction • Construction - Actual Start date - Actual finish date - Percent of complet - Site photo • - Comment Operation • FM - Room - Space - Function Research Methodology
  • 6. 7/11/2014 6 BIM-based Construction monitoring system for construction project to owners Owner Office Construction Site Transfer SyncSync Cloud Storage Designer office Documents MEP Engineer Structural Engineer Architect Designer Owner
  • 7. 7/11/2014 7 BIM-based Construction monitoring system for construction project including of two stages and four part. Stage 1: Pre-Construction Stage 2: Construction Part 1: Design Part 2: Prepare for monitoring Part 3: Construction and Monitoring Part 4: Progress report Stage: Part:
  • 8. 7/11/2014 8 Part 1: Design Workflow: Owner Office Designer office Documents MEP Engineer Structural EngineerArchitect A Start Owner identify necessary information for project monitoring Owner establish an information packet for project monitoring to designer Designer create a packet of information to BIM- Design model Owner verify BIM-Design model BIM-Master model Yes No B
  • 9. 7/11/2014 9 Part 2: Prepare for monitoring Workflow: Start Designer transfer BIM- Design model to Owner (Arc, St and MEP file) Owner create BIM- Master Owner upload BIM- Design model to database Owner link BIM-Model files to BIM-Master file Owner share BIM- Master files to owner site office Finish B C Owner Office Designer office Documents MEP Engineer Structure Engineer Architect
  • 10. 7/11/2014 10 Workset file BIM-Master model database Workset Link Master file MEP STR ARC ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13 STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13 MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13 Owner office CC10-STR-2013.03.03 Date Type Project
  • 11. 7/11/2014 11 Workflow: MEP STR ARC ARC P1-03-03-13 ARC P2-05-04-13 ARC P3-05-05-13 STR P1-03-03-13 STR P2-05-04-13 STR P3-05-05-13 MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13 Owner office MEP STR ARC Construction site Start Import BIM-Master file from site office to tablet PC Engineer select project phase Engineer select object to update Take site photo Input current progress information Upload to cloud storage Generate image URL Construction phase updated Finish Updated all items Yes No Export BIM file to site office C D Part 3: Construction and monitoring
  • 12. 7/11/2014 12 Part 4: Progress report Workflow: MEP STR ARC Project progress report ARCH P1-03-03-13 ARCH P2-05-04-13 ARCH P3-05-05-13 STRUCT P1-03-03-13 STRUCT P2-05-04-13 STRUCT P3-05-05-13 MEP P1-03-03-13 MEP P2-05-04-13 MEP P3-05-05-13 Owner office Plan Actual In progress SIT F16-C10-03-03-13 SIT F16-C11-03-03-13 SIT F16-C12-03-03-13 SIT F16-C13-03-03-13 Start Import files from Site office Filter Information Combine BIM-Record model to BIM-Master Export information to text file Import text file Excel temple file Report of project progress Finish D E
  • 13. 7/11/2014 13 Tablet PC for collecting and updating information on construction site Current construction site image F16-A-03 F16-E-04 F16-F-08 F16-B-04 Report screen of project progress report at the owner office
  • 14. 7/11/2014 14 Conclusion # This research has developed a framework of BIM-based construction monitoring system for the high rise building construction project to the owners that can be used by the owner to monitoring project progress. # The purpose of this framework is shows the BIM-based construction monitoring system that reduce the errors and omissions in paper on the paper-based modes of communication. # This research data collected only reinforcement concrete structural system that included column, beam and slab. # This research were develop after project start.
  • 15. 7/11/2014 15 THANK YOU VERY MUCH FOR YOUR ATTENTION

Editor's Notes

  1. # Good afternoon every one # My name is Souksavath Losavanh, I am master student in civil engineering at Chulalongkorn University, Thailand # My advisor is Associate Professor Veerasak Likhitruangsilp # Today, I will present my research # The topic is A FRAMEWORK OF BIM-BASED CONSRUCTION PROJECT MONITORING SYSTEM FOR OWNERS
  2. Building Information Modeling (BIM) comes to be concerned issue of the AEC Industry. Nowadays, they are many countries and organization that using BIM and already have BIM standard such as: -in USA, they have National BIM standard and BIM Planning guide. -in UK, They have ACE(UK) BIM Protocol. -in Australia, they have National guideline for digital modelling ============================================================= #Building Information Modeling (BIM) is rapidly reforming the way of construction project teams work together. # the Traditional process of construction project life cycle. every participant in the project have their own database, many type of files and information exchange system is very complicate. # BIM is reforming the way of construction project teams work together to rapidly, accurately, one data center and same information.
  3. # BIM is increase productivity and improve the final project outcomes (cost, time, quality, safety, functionality, maintainability, etc.) for all the parties involved. # Today, owners are rewriting the contract language, specifications, and project requirements to incorporate the use of BIM-based processes and technologies into their projects as much as possible. # Construction progress monitoring has been recognized as one of the key elements that lead to the success of a construction project. ==================================================== Furthermore: # In construction project, The owner care about construction progress of construction project. # owner see the several benefit of BIM that can provide the alternative way for monitoring constriction project. # But, the problem is How to using BIM for Construction monitoring ?
  4. Appropriates = ເໝາະສົມ # the objective of this research is Developing the framework of the BIM-based Construction monitoring system for construction project to owners. ========================================================== Scope of this research is : #Develop and Implement BIM for monitoring the status of construction project in the perspective ( ເພີສະເປກຖີບ ) of the project owner. # The application will be use in a high-rise building construction project. # Case study is Chamchuri 10 project own by Chulalongkorn University. # The software that used in this research includes : -Revit 2013 (Thirteen) for modeling the BIM model. -MS Excel 2010 for analysis the information.
  5. # In this research , I divide BIM to five layer of information: Construction project information Building information Component information Visualize information Nucleus of information ============================================= # After identify the information that require for monitoring construction project # The information can divide in to three group: -Planning and design information - Construction information -Operation information That is show in the figure
  6. # The illustration showing the overview of this system # In this system include of 2 main party: designer and owner.
  7. In this system divide to 2 stage and 4 part: #Stage 1 is Pre-construction stage #Stage 2 is Construction stage +Part1 is Design part +Part2 is Prepare for monitoring +Part3 is construction and monitoring +Part4 is Progress report
  8. Part1 is design part, that have 5 steps: 1.Owner identify necessary information for project monitoring 2.Owner establish an information packet for project monitoring to designer 3.Designer create a packet of information to BIM-Design model 4.Owner verify BIM-Design model 5. BIM-Design model
  9. Part2 is prepare for monitoring part, that have 5 steps: 1.Designer transfer BIM-Design model to Owner (Arc, St and MEP file) 2.Owner upload BIM-Design model to database 3.Owner create BIM-Master 4.Owner link BIM-Model files to BIM-Master file 5.Owner share BIM-Master files to owner site office
  10. The master model is the mainly BIM-model that combine of three type of design-model via link and woekset at owner office database
  11. Part3 is construction and monitoring part, that have 10 steps: 1.Import BIM-Master file from site office to tablet PC 2.Engineer select project phase 3.Engineer select object to update 4.Input current progress information 5.Take site photo, Upload to cloud storage and Generate image URL. 6.Updated all items 7.Export BIM file to site office
  12. Part4 is Progress report part, that have 5 steps: 1.Import files from Site office 2.Combine BIM-Record model to BIM-Master 3.Filter Information 4.Export information to text file 5.Import text file Excel temple file 6. Report of project progress
  13. # Tablet PC is used for collecting and updating information on construction site # Current construction site image is taken by Tablet-PC # Three wall screen is used for report of project progress at the owner office