This document provides details about an architecture, engineering, and construction project to create BIM models for a 6-story building in California. It discusses the client, a large construction firm, and the project details. It then describes the challenges in modeling the structure based on limited drawings, solving issues with basement dimensions, and coordinating the architectural, structural, and MEP models. The process took 6 weeks to create Revit models and perform clash detection. Quality control processes were followed and the outputs included 3D rendered views, plans, and sections of the BIM models.
Hii, this is ramanjaneyulu i had overall 3+ years of experience in Construction industry. I had worked in medium raised, High raised Buildings in various countries. Currently i'm working in sekar developers as an Engineer - Civil, it's located in Bangalore.
Architect with 13 years experience in consultant field, with varied experience in large and complex projects including Schools, villas,High Rise Building,
AEC Digital Solutions LLC (www.aecdsl.co) is a pioneering Building Information Modelling (BIM) services firm, providing Virtual Design & Construction (VDC) technology services, and global sourcing solutions to leading international architects, engineering and construction firms. AEC's objective is to leverage international best practices and latest advancements in BIM technology, to add value to clients businesses, and help client's save time and money.
AEC Digital Solutions LLC (www.aecdsl.co) is a pioneering Building Information Modelling (BIM) services firm, providing Virtual Design & Construction (VDC) technology services, and global sourcing solutions to leading international architects, engineering and construction firms. AEC's objective is to leverage international best practices and latest advancements in BIM technology, to add value to clients businesses, and help client's save time and money.
Hii, this is ramanjaneyulu i had overall 3+ years of experience in Construction industry. I had worked in medium raised, High raised Buildings in various countries. Currently i'm working in sekar developers as an Engineer - Civil, it's located in Bangalore.
Architect with 13 years experience in consultant field, with varied experience in large and complex projects including Schools, villas,High Rise Building,
AEC Digital Solutions LLC (www.aecdsl.co) is a pioneering Building Information Modelling (BIM) services firm, providing Virtual Design & Construction (VDC) technology services, and global sourcing solutions to leading international architects, engineering and construction firms. AEC's objective is to leverage international best practices and latest advancements in BIM technology, to add value to clients businesses, and help client's save time and money.
AEC Digital Solutions LLC (www.aecdsl.co) is a pioneering Building Information Modelling (BIM) services firm, providing Virtual Design & Construction (VDC) technology services, and global sourcing solutions to leading international architects, engineering and construction firms. AEC's objective is to leverage international best practices and latest advancements in BIM technology, to add value to clients businesses, and help client's save time and money.
BIM Designer having 6 years of professional experience in design, modeling and coordination of commercial,residential, hospital projects seeking for a better opportunity.
Dear Sir:
I would like to apply for a position in your company in the capacity that is commensurate to my past experiences and qualifications. I am currently on visit visa. I am able to start anytime for your convenience.
Given the chance, I can prove to you that I am able to support my claims. I am a fast learner and quick thinker, can easily adapt to a new working environment and can work equally well either by myself or as a part of a team.
Enclosed for your perusal is my resume. I am confident that you will give this offer a well – deserved attention and I am looking forward to discuss the possibilities with you.
With good wishes, I am
NERAMEL Z. TONGOL
Trusted BIM: Accurate As-Builts for Project CoordinationClearEdge3D Inc
Watch the Presentation: http://www.clearedge3d.com/free-demand-webinar-trusted-bim-accurate-builts-project-coordination/
Learn More: http://www.clearedge3d.com/request-demo/
Selling services can be tough! A less-than-compelling deliverable can cause permanent damage to the relationship between provider and customer. As those customers demand better quality at faster speeds and lower costs, Service providers need to strike a fine balance between the those three dimensions. Improving along one can’t come at the expense of the others.
During our March webinar hear from an Engineering and a Surveying service providers who are leveraging Building Information Modeling (BIM) and technology to improve the customer relationship across quality, speed and cost dimensions for scan-to-model projects. In doing so they’re increasing the value of their deliverable and their impact on the project delivery process. As a result, they’re delighting their customers and winning repeat business.
Take a trip into the field and hear experiences from two active projects. Attend the webinar and you’ll learn:
• The importance of ensuring highest levels of accuracy in a collaborative environment
• How industry peers are ensuring and benefiting from automated workflows
• Tips and tricks for increasing accuracy of BIM deliverables
• Best practice data processing and modeling tips to speed your back office workflow
Join laser scanning, modeling and BIM experts Daniel Niziolek of Ramboll UK and Les Carter of Cannon US share their experiences and best practices for capturing and accelerating scan-to-model workflows in case study format.
Request an EdgeWise Demo: http://www.clearedge3d.com/request-demo/
BIM Designer having 6 years of professional experience in design, modeling and coordination of commercial,residential, hospital projects seeking for a better opportunity.
Dear Sir:
I would like to apply for a position in your company in the capacity that is commensurate to my past experiences and qualifications. I am currently on visit visa. I am able to start anytime for your convenience.
Given the chance, I can prove to you that I am able to support my claims. I am a fast learner and quick thinker, can easily adapt to a new working environment and can work equally well either by myself or as a part of a team.
Enclosed for your perusal is my resume. I am confident that you will give this offer a well – deserved attention and I am looking forward to discuss the possibilities with you.
With good wishes, I am
NERAMEL Z. TONGOL
Trusted BIM: Accurate As-Builts for Project CoordinationClearEdge3D Inc
Watch the Presentation: http://www.clearedge3d.com/free-demand-webinar-trusted-bim-accurate-builts-project-coordination/
Learn More: http://www.clearedge3d.com/request-demo/
Selling services can be tough! A less-than-compelling deliverable can cause permanent damage to the relationship between provider and customer. As those customers demand better quality at faster speeds and lower costs, Service providers need to strike a fine balance between the those three dimensions. Improving along one can’t come at the expense of the others.
During our March webinar hear from an Engineering and a Surveying service providers who are leveraging Building Information Modeling (BIM) and technology to improve the customer relationship across quality, speed and cost dimensions for scan-to-model projects. In doing so they’re increasing the value of their deliverable and their impact on the project delivery process. As a result, they’re delighting their customers and winning repeat business.
Take a trip into the field and hear experiences from two active projects. Attend the webinar and you’ll learn:
• The importance of ensuring highest levels of accuracy in a collaborative environment
• How industry peers are ensuring and benefiting from automated workflows
• Tips and tricks for increasing accuracy of BIM deliverables
• Best practice data processing and modeling tips to speed your back office workflow
Join laser scanning, modeling and BIM experts Daniel Niziolek of Ramboll UK and Les Carter of Cannon US share their experiences and best practices for capturing and accelerating scan-to-model workflows in case study format.
Request an EdgeWise Demo: http://www.clearedge3d.com/request-demo/
Revit Modeling India is a precursor in the application of the BIM software, methods and processes in the building engineering and construction sectors holding on to current project BIM requirements. Our experience with outsourcing has enabled us to understand the requirements of international customers and constantly provide reliable engineering services for a wide spectrum of industries. Revit Modeling India offers complete solutions for BIM technology from 3D modeling in Revit, 4D-enabling the manipulation of models through time, 5D-incorporating cost data, nD-extrapolating energy utilization and sustainability performance.
The presentation covers following areas:
- Typical Problems in Construction Industry
- What is BIM?
-BIM Process
- Influence of BIM on Industry Problems
- BIM Application
- BIM Advantages
- BIM Workflow
- BIM & Project Management
- BIM & Design Team Members
- BIM around the Globe
- Construction Industry with BIM
All work presented in the presentation is carried out by graduates of NUST, Islambad including Abdul Mughees Khan, Syed Kashif Ali Shah, Sharjeel Ahmad Tariq, Malik Awais Ahmad and Hamza Khan Shinwari.
Special credit of the work goes to Engr Tahir Shamshad, Vice President NESPAK and Engr Zia Ud Din, Asst Professor NUST under guidance and mentor ship the whole work was performed.
For more details feel free to contact: amugheeskhan@gmail.com
presentation by Paul Wilkinson to CIMCIG BIM conference, Building Centre, London WC1 on Wednesday 25 April 2012.
Presentation explains what BIM is (and isn't), and outlines why it has become important in 2012, as the UK construction industry looks to meet a UK Government BIM deadline by 2016.
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Sewell Construction
Partners shared BIM lessons learned to date on the University of Hull's £30 million student accommodation complex.
The project will see six new accommodation blocks, housing 560 students, open in 2016.
A new protocol for Building Information Modelling (BIM) has been followed from the outset of the project, which saw developers Sewell Construction start on site in June.
BIM already sees collaboration and information shared between engineers, clients, architects and contractors in a 3D format and is widely used within the construction industry, however, the Government will mandate BIM Level 2 for all centrally-procured government contracts from April 2016.
Using these new guidelines on the university site means designs and briefs for the project have been more thorough than ever before, providing further cost and quality assurance for the university.
It also includes looking at the whole life of the building and ensuring facilities management plans are in place from the start, reducing variance in design.
Estates staff from the University of Hull along with project partners from Sewell Construction, ARUP, SES, GSS Architecture and Planon have shared their findings of a pragmatic approach to BIM Level 2 to date with University estates teams from across the Yorkshire region, in a bespoke event at the Hull campus.
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...Granit Architects
Architect James Munro was asked to speak at the Knowledge Transfer Network's Front Meeting of Skills event all about BIM.
BIM is short for building information modelling and it is a key tool in how Granit designs buildings. Not only does BIM enable us to design effectively and communicate design choices to our clients via 3D visuals, it is also key in how we collaborate with the other professionals such as structural, or M&E engineers.
This presentation was specifically about how to use BIM for green retrofit projects and James talked a lot about Granit's project at 1 Lambourn Road - which we designed and built as an example of what's possible with green retrofit. There are also two other schemes where we have used BIM extensively throughout the design process, one in Battersea and the other St John's Wood.
3. Index
9/30/2014 3
1. Project Type & Location
2. Client & Project Details
3. Project Process : Challenges & Execution
4. Project Process : Duration, Inputs, Output
5. Quality Process
6. Project Outputs
4. 9/30/2014 4
Project Type & Location
Project : Creation of BIM Models with LOD 300 in Architecture, Structure & MEP.
Location : California, USA
5. 9/30/2014 5
Client & Project Details
Client Profile:
• Client is a well known Construction Engineering Firm.
• It is based in USA having an employee strength of more than 400.
• It is into the Construction & Engineering Business since 80 years.
• It is one of the world’s top global construction contractors & undertakes large
infrastructure, commercial and residential projects having clients mostly in USA.
Project Details:
• The work was offered to us by one of the renowned construction company in USA.
• The project area was of around 10,500 sq. ft. The Residence Inn Indianapolis Carmel
located in an upscale suburb on the north side of Indianapolis. It is a 6 storied building
with basement for car parking.
• Hi-Tech created Architectural, Structural and MEP BIM Model for the client, with LOD
300 as output.
6. 9/30/2014 6
Project Process
Challenge:
• The structural drawings was missing in the file. We made a structure model on the basis of assumption
from the architectural drawings provided by the client. Later the client provided us with a hand sketch
which was 90% accurate to what we had assumed. The quality of engineers in Hi-Tech are beyond any
challenge.
• At the basement the side cutting fields were problematic, where the dimensions and survey points
were not matching, which was solved by Hi-Tech, with a sound solution to the client.
Execution:
• The inputs available with us were in the form of pdf files, which we were to convert into intelligent BIM
models using Revit.
• Next step was to create BIM models with different disciplines like Architectural, Structural & MEP which
was successfully accomplished as per client’s requirement in the form of 3D Revit Models.
• Finally after that we started to look into the coordination between the models, so called Clash
Detection & were successful in scrutinizing all the clashes.
• The clash detection process helped the client to nullify the clashes at a very initial stage which may
have created huge loss at the time of actual construction.
• Material take off & project completion schedules provided by us reduced client’s overall project time,
cost as well as made the complete process error free and smoother.
7. 9/30/2014 7
Project Process
Project Duration
• 6 Weeks
Input Received
• PDF’s with all building 2D drawings
Output Delivered
• BIM models with following disciplines:
1) Architecture
2) Structure
3) MEP
Software
• Revit
• Navisworks
8. 9/30/2014 8
Quality Process
Organization Quality
Standards, Quality
Documents & earlier
project reference
Quality Planning for
each project
Prepare
List of Quality
Parameters
Prepare
Responsibility
Matrix [RACI
Chart]
Prepare
Quality
Register
Prepare a
Preliminary Quality
List
1st Level – Self QC
2nd Level – Peer QC
3rd Level – Random Audit by Quality Manager
Update Quality register & if necessary update Quality List/ Quality Parameter
List
If any changes recommended by client
a. Part of SoW (Scope of Work): Iteration in above process
b. Any new changes included in SOW: Start
Engineering Change Management Process
Prepare a Final
Quality List
Project In
Quotation
Sample
Project
Customer
Feedback
Actual Project
Execution
Quality Check
Customer
Feedback
Final Delivery
17. 9/30/2014 17
T H A N K Y O U
L O C A T I O N S :
Hi-Tech House
Nr. Gurukul Tower,
Gurukul,
A h m e d a b a d,
Gujarat, India.
5th Floor, Commerce House – IV,
100 Ft. Road,
Prahladnagar,
A h m e d a b a d,
Gujarat, India.
43-A, E Block, 3rd Floor,
Cochin Special Economic Zone
Kakkanad,
Kochi,
Kerala, India.
Bhushan Avsatthi
Associate Director
Architecture Engineering Construction