This document summarizes a presentation on BIM model analysis from a multidisciplinary perspective. It discusses what BIM is and its benefits, including clash detection and 4D, 5D, 6D, and 7D analyses. It presents a case study of a residential apartment model and analyzes its information, missing information, inconsistencies, and clashes. It also discusses collaboration, COBie, current limitations, and recommendations for future improvements including better standards, training, and multidisciplinary teamwork.
In this presentation, a quick but comprehensive introduction to Building Information Modeling (BIM) is provided, aiming at showing the benefits of BIM for all the actors of a construction project.
Keynote Speech
Mr. Kevin POOLEChairman, Committee on Environment, Innovation and Technology, Construction Industry Council
HKIPM‐HKIBIM Joint Conference: BIM in Project Management
Details of Conference
Date: 2‐Apr‐2014 (Wed)
Time: 2:00 pm – 5:00 pm
Venue: Chiang Chen Studio Theatre – The Hong Kong Polytechnic University
Organizers:
Hong Kong Institute of Project Management (HKIPM)
http://www.hkipm.org.hk/
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Sole Sponsor:
建造業議會 - Construction Industry Council
http://www.hkcic.org/
In this presentation, a quick but comprehensive introduction to Building Information Modeling (BIM) is provided, aiming at showing the benefits of BIM for all the actors of a construction project.
Keynote Speech
Mr. Kevin POOLEChairman, Committee on Environment, Innovation and Technology, Construction Industry Council
HKIPM‐HKIBIM Joint Conference: BIM in Project Management
Details of Conference
Date: 2‐Apr‐2014 (Wed)
Time: 2:00 pm – 5:00 pm
Venue: Chiang Chen Studio Theatre – The Hong Kong Polytechnic University
Organizers:
Hong Kong Institute of Project Management (HKIPM)
http://www.hkipm.org.hk/
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Sole Sponsor:
建造業議會 - Construction Industry Council
http://www.hkcic.org/
How BIM 360 construction document management facilitates building work proces...Shubham Bhatnagar
Autodesk BIM 360 enables you to connect and construct with centralized information. Tejjy Inc. accelerate the project outcome with improved decision making through document management, design collaboration, data analytics. Autodesk BIM 360 Virtual Reality delivers innovative designing solution with profitability and safety management. We as experienced BIM VR 360 service provider in USA deliver innovation design solutions in a risk managed environment. Tejjy Inc. is MBE/DBE Minority Certified Women Enterprise providing BIM, Architectural & Engineering Sevices, Construction Management services in US.
Integration of BIM 360 and InsiteVR facilitates coordination will managing constructability issues. BIM modelers with Revit have made Virtual Reality an integral part to design Autodesk BIM 360 gives capability to the MEP expert to enter the cloud access and visualize the construction.
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
BIM Building Information Modeling is much more than model creation, it is human and software collaboration through large volumes of construction data that is communicated at every point in the development life-cycle for a project(s).
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...BIM User Day
Author: Gunnar Godawa | HOCHTIEF ViCon Qatar
Content:
- Implementation and management strategy
- BIM process development and execution
- Case study: Qatar Rail Projects and Lusail City
About the Qatar BIM User Day:Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
When BIM tools and processes are combined with the desire to collaborate, the building design and construction project results are superior to projects using "traditional" methods. This presentation begins with a series of definitions and examples of BIM and includes a wide variety of projects where BIM saved the day for the team.
Revit Modeling India is a precursor in the application of the BIM software, methods and processes in the building engineering and construction sectors holding on to current project BIM requirements. Our experience with outsourcing has enabled us to understand the requirements of international customers and constantly provide reliable engineering services for a wide spectrum of industries. Revit Modeling India offers complete solutions for BIM technology from 3D modeling in Revit, 4D-enabling the manipulation of models through time, 5D-incorporating cost data, nD-extrapolating energy utilization and sustainability performance.
BIM status report 2016 - BIM use casesDaan Moreels
BIM use cases presented by Besix and deBIMspecialist during the BIM manifest event in Brussels, October 2015
Video about real-time collaboration from www.gdaas.com
What does BIM mean for Civil Engineers?Chun Keung Ng
BIM is a norm for the building industry. How about for infrastructures? Some countries are over confident on the implementation of BIM in both building and civil engineering industries. Is the BIM technology for infrastructures mature and easily available? Are the professionals ready for BIM?
How BIM 360 construction document management facilitates building work proces...Shubham Bhatnagar
Autodesk BIM 360 enables you to connect and construct with centralized information. Tejjy Inc. accelerate the project outcome with improved decision making through document management, design collaboration, data analytics. Autodesk BIM 360 Virtual Reality delivers innovative designing solution with profitability and safety management. We as experienced BIM VR 360 service provider in USA deliver innovation design solutions in a risk managed environment. Tejjy Inc. is MBE/DBE Minority Certified Women Enterprise providing BIM, Architectural & Engineering Sevices, Construction Management services in US.
Integration of BIM 360 and InsiteVR facilitates coordination will managing constructability issues. BIM modelers with Revit have made Virtual Reality an integral part to design Autodesk BIM 360 gives capability to the MEP expert to enter the cloud access and visualize the construction.
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
BIM Building Information Modeling is much more than model creation, it is human and software collaboration through large volumes of construction data that is communicated at every point in the development life-cycle for a project(s).
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...BIM User Day
Author: Gunnar Godawa | HOCHTIEF ViCon Qatar
Content:
- Implementation and management strategy
- BIM process development and execution
- Case study: Qatar Rail Projects and Lusail City
About the Qatar BIM User Day:Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
When BIM tools and processes are combined with the desire to collaborate, the building design and construction project results are superior to projects using "traditional" methods. This presentation begins with a series of definitions and examples of BIM and includes a wide variety of projects where BIM saved the day for the team.
Revit Modeling India is a precursor in the application of the BIM software, methods and processes in the building engineering and construction sectors holding on to current project BIM requirements. Our experience with outsourcing has enabled us to understand the requirements of international customers and constantly provide reliable engineering services for a wide spectrum of industries. Revit Modeling India offers complete solutions for BIM technology from 3D modeling in Revit, 4D-enabling the manipulation of models through time, 5D-incorporating cost data, nD-extrapolating energy utilization and sustainability performance.
BIM status report 2016 - BIM use casesDaan Moreels
BIM use cases presented by Besix and deBIMspecialist during the BIM manifest event in Brussels, October 2015
Video about real-time collaboration from www.gdaas.com
What does BIM mean for Civil Engineers?Chun Keung Ng
BIM is a norm for the building industry. How about for infrastructures? Some countries are over confident on the implementation of BIM in both building and civil engineering industries. Is the BIM technology for infrastructures mature and easily available? Are the professionals ready for BIM?
Plan de ejecución bim (El BEP, BIM Execution Plan o Plan de Ejecución BIM es un documento en el que se definen las bases, reglas y normas internas de un proyecto que se va a desarrollar bajo metodología BIM, para que todos los agentes implicados hagan un trabajo coordinado y coherente). El BEP debe incluir información crítica para el proyecto, cómo son: la ubicación del mismo, la descripción de proyecto, fechas, hitos y programación. Responsables y Contacto: El contacto de cada uno de los profesionales intervinientes y responsables del proyecto
From 3D to 6D Managing the Information Labyrinth of BIM.pdfVincentPoon15
As the Building Information Modeling (BIM) concept continually matures and gains wider recognition as a crucial collaborative process within the building design and construction industry, the demand for BIM services from construction managers, architects, and engineering firms is on the rise. In response to this growing need, AEC (Architecture, Engineering, and Construction) firms are proactively investing in BIM technologies to enhance their capabilities across various project phases, including bidding, preconstruction, construction, and post-construction stages.
This presentation equips participants with essential skills and best practices for effectively managing BIM data throughout the entire project lifecycle. Through a series of scenario-based presentations and real-world case studies, attendees gain valuable insights into the seamless flow of BIM information from the initial design phases to ongoing building maintenance. Furthermore, this course emphasizes the synergistic potential of integrating specification writing seamlessly into the BIM workflow.
By the conclusion of this course, participants will have acquired a thorough comprehension of how BIM data evolves as it progresses through the design, construction management, and, ultimately, building operation and maintenance phases.
Key learning objectives
List the strengths, weaknesses, opportunities, and threats of BIM
implementation in the building design and construction industry
1. Identify current uses of BIM technologies in the architectural, engineering,
construction, and building management industry construction, and building management industry
2. Describe best practices for implementing BIM in an integrated work culture or
environment
3. Define the importance of integrating specification writing with BIM workflow
Streamlining the Project Turnover Process with BIM Deliverables at the Ohio S...Jad DELLEL
A presentation on BIM by Brian Skripac, Vice President & Director of Virtual Design & Construction at CannonDesign, for Autodesk's 3rd Enterprise Meetup in Montreal.
Digital construction for integrated project deliveryStephen Au
The industrial challenges and the value proposition, how and what are the Digital Construction with some case studies are discussed in the presentation.
2018 Australian Institute of Project Management (AIPM) National Conference Presentation on the benefits of BIM as a tool for Project Management.
Abstract:
Project planning, stakeholder engagement, cost and schedule management may all be improved if we think of Building Information Modeling (BIM) simply as information that needs to be managed. From the selection of a suitable work breakdown structure, to the type and nature of information being received, stored, processed and communicated, BIM is a model-centric structure for existing project management processes.
With this model centric view, a project may be broken into volumes, areas, models, assets and deliverables, with corresponding cost and reporting structures that enable monitoring of project performance and delivery of each asset. Aligning project delivery to the client’s view of an asset allows more transparent reporting and offers a clear understanding of not only the financial and schedule impacts of decisions throughout a project, but also the physical impacts and knock-on effects in the real world.
BIM also provides a rich focal point for stakeholder engagement. When combined with Virtual Reality and Augmented reality solutions, it offers a greater sense of awareness of project outcomes through real and interactive experiences for both the technical and non-technical stakeholder. Improving stakeholder interaction and the quality of feedback has been shown to improve buy-in to the final solution and reduces risk during implementation stages.
In this presentation I provide a simple way of looking at BIM, its benefits, and how one can use it to better manage projects in the future.
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Dr. Amarjeet Singh
While time passes and life changes, the development of technology is taking place in every part of our life quickly, also it affects daily life. it creates new tools, procedures, and methods for all sectors, and simplifies many operations. Nowadays, design tools that depend on computers have been used in the construction industry, it has a direct effect on the whole project life, and it has made a revolution in the construction sector. Building information modeling (BIM) simply refers to the development of a building model generated by using the computer, that model is rich of data, object-oriented, smart and also a parametric digital representation of the building.
This paper discusses the advantages of implementation of BIM technology for the small scale construction industry, it will mainly focus on quantity takeoff and accuracy of projects, firstly it presents the definition and the main concept of BIM. Then, a case study of a 3-storey building project in Baghdad is done to evaluate the effect of BIM quantity takeoff, tendering, and other effects on the project. At the end, results and challenges will be discussed.
Acorn Recovery: Restore IT infra within minutesIP ServerOne
Introducing Acorn Recovery as a Service, a simple, fast, and secure managed disaster recovery (DRaaS) by IP ServerOne. A DR solution that helps restore your IT infra within minutes.
0x01 - Newton's Third Law: Static vs. Dynamic AbusersOWASP Beja
f you offer a service on the web, odds are that someone will abuse it. Be it an API, a SaaS, a PaaS, or even a static website, someone somewhere will try to figure out a way to use it to their own needs. In this talk we'll compare measures that are effective against static attackers and how to battle a dynamic attacker who adapts to your counter-measures.
About the Speaker
===============
Diogo Sousa, Engineering Manager @ Canonical
An opinionated individual with an interest in cryptography and its intersection with secure software development.
Have you ever wondered how search works while visiting an e-commerce site, internal website, or searching through other types of online resources? Look no further than this informative session on the ways that taxonomies help end-users navigate the internet! Hear from taxonomists and other information professionals who have first-hand experience creating and working with taxonomies that aid in navigation, search, and discovery across a range of disciplines.
This presentation by Morris Kleiner (University of Minnesota), was made during the discussion “Competition and Regulation in Professions and Occupations” held at the Working Party No. 2 on Competition and Regulation on 10 June 2024. More papers and presentations on the topic can be found out at oe.cd/crps.
This presentation was uploaded with the author’s consent.
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Orkestra
UIIN Conference, Madrid, 27-29 May 2024
James Wilson, Orkestra and Deusto Business School
Emily Wise, Lund University
Madeline Smith, The Glasgow School of Art
This presentation, created by Syed Faiz ul Hassan, explores the profound influence of media on public perception and behavior. It delves into the evolution of media from oral traditions to modern digital and social media platforms. Key topics include the role of media in information propagation, socialization, crisis awareness, globalization, and education. The presentation also examines media influence through agenda setting, propaganda, and manipulative techniques used by advertisers and marketers. Furthermore, it highlights the impact of surveillance enabled by media technologies on personal behavior and preferences. Through this comprehensive overview, the presentation aims to shed light on how media shapes collective consciousness and public opinion.
Media as a Mind Controlling Strategy In Old and Modern Era
BIM model analysis
1. MSc BIM & Integrated Design
BIM Model Analysis in
Multidisciplinary Perspective
Presented by:
Aravindh Rajendiran
Student ID: @00441255
Presented to:
Dr Paul Coates
Dr Jason Underwood
2. What is BIM?
It’s All about exchanging information with in the project and
collaboration between all team members.
Input
DWG
Point
Clouds
It’s NOT Technology
PDF
DGN
BIM Design model Output
Clash detection
Extracting BOQ
4D Construction
Sequencing
5D Cost Scheduling
6D Sustainability
&Energy
Analysis7D Facility management
Cobie spread sheet
Process/workflow
3. Proposed model and available information
Project Name : Residential Apartment (Pilot Project)
Location : Manchester
Project information
Geometric information
Material information
Interior details
Solar Analysis
6. Inconsistent found in model:
• Architectural wall & column intersection
not modeled properly
• Clearance between suspended
ceiling and front door
• Room spaces are not assigned
properly
8. 4D: Construction Sequencing
(Eastman, et al. 2008)
http://web.stanford.edu/~fischer/research/4DCADModeling.pdf
Refer :
• allows project stakeholders to view
the planned construction of a facility
over time on the screen
http://www.engr.psu.edu/ae/cic/publications/techreports/tr_051_wang_200
7_4d_modeling_in_education.pdf
• Improved site use planning and
coordination with ongoing operations
• Marketing purposes and publicity
Benefits:
9. Construction
Schedule
Linking into 4d software
and create selection set
4D model
construction
sequencing &
simulation
3d model
4D: Construction Sequencing
10. 5D: Cost Estimation
http://hc-qs.com/brochure/pdf/4-5%20BiM%20modelling.pdf
Refer :
(HC BIM QS) • construct a model from CAD
drawings, specifications and
other information available
• digitally measure geometric
information to produce
accurate quantities
• link the quantity information
with project specific Bills of
Quantities and Cost Plans
• create client specific reports
Revit model/IFC model Rib Itwo/5d model tool
• Link model and BOQ
Cost
estimation
Report
12. 7D:Facility management
Autodesk FM Desktop Black board salford
Refer :
https://bim.wikispaces.com/Facility+Asset+Management
• involvement at early stages to improve
operational performance.
CAPEX & OPEX
14. BIM collaboration in Multi Disciplinary
Perspective
MV-BIM
• Upto 15% of the cost of a project
is lost because of rework and
avoidable collisions between
trades
• Work parallel instead of linear
• Bring visibility and control to shared
Information Models
• Immediately review the design progression
during development and track critical
decision making
16. Current Limitations and disadvantages
• Model analysis incomplete (Structural & Light analysis
etc.)
• Missing information ex: STRUCTURAL, MEP which
affect the analysis workflow.
• Lack of standards.
• Current Model is incomplete in Relation to “BIM”.
• Conflicts within used software's.
17. Recommendations for Future Improvements
• Well designed BIM model in design stage.
• Multidisciplinary teams could then collaborate
successfully with their project teams.
• Proper guidance & trainings before starting
project.
• Information & knowledge sharing