The document describes the Palomar Technologies 6500 Die Bonder, which is a precision assembly machine for semiconductor packaging. It can achieve placement accuracy of +/- 1.5 microns and has features like a 6 position tool turret, programmable eutectic pulse heating, and large work area. The die bonder is versatile and can be used for applications like hybrid modules, MEMS components, and optoelectronic packaging. Palomar also offers related equipment and automated assembly lines integrating die bonders, fluid dispensers, and other tools.
Performance paramter and suggestion to optizing the performnce of grid connec...Ashish Verma
performance evaluation of Solar PV plant ,in term of technology , financial investment , research and development is very important for growth of Solar PV Industry .
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...sdchrosis
The presentation given by REACH Solar Consultants at the Intersolar India Conference 2013 - Learnings from India's 2GW Installations featuring insights into CUF and Performance Ratio of Solar Power Plants.
Performance paramter and suggestion to optizing the performnce of grid connec...Ashish Verma
performance evaluation of Solar PV plant ,in term of technology , financial investment , research and development is very important for growth of Solar PV Industry .
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...sdchrosis
The presentation given by REACH Solar Consultants at the Intersolar India Conference 2013 - Learnings from India's 2GW Installations featuring insights into CUF and Performance Ratio of Solar Power Plants.
Increase service life of cables and hoses and reduce downtimesigus® GmbH
e-chains® and e-chain systems® are the umbilical cord of modern machines. They ensure the supply of energy, data and signals while in constant motion. igus® has been developing, producing and testing plastic energy chains since 1971. The expertise we have accumulated over the years is being continuously refined with the help of our customers and is directly incorporated in our serial production.
A Delay of a single day for a 10 MW plant can lead to a loss of Rs. 6.5 Lacs ($110,000) in addition to Statutory Losses. Here, we explore typical project execution timelines and possible reasons for delay. The presentation talks about Lead Times of Equipment, Key vendors, Permits Required, Construction & Engineering related delays and finally, gives recommendations on how to keep project on track.
This presentation gives a quick perspective on costs that are involved in executing a MW scale power project in the Indian context. Both the indicative costs and the cost split-up among the various BOQ items are laid out at the various project scales. Indicative costs are assumed from a pure EPC perspective. However, generally the EPC scopes of work are sliced and diced and further outsourced/subcontracted. In such a scenario the execution costs might increase from the indicated costs.
Gensol strives to add value from Project Conceptualisation to Commissioning to ensure timely, quality and cost effective completion. From drafting exhaustive EPC contracts to approving engineering drawings and quality control during construction, Gensol's experience of 1500 MW works to ensure Peace of Mind for the Project Developer.
Here are the details on 300MW Wind Power Project located in the Western Region of India presented by Gensol on the various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,
3)Statuary & legal approvals required,
4)Civil & electrical works,
5)Quality & material inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
Photovoltaic Systems: System Design ToolsGavin Harper
Prepared for the Welsh Energy Sector Training program, this presentation takes a whistlestop tour through some of the different tools used in PV system design. From tools that are used to collect data about the site - angles, overshadowing e.t.c. to software tools used to simulate PV systems designs.
What services should a solar project developer expect from solar park & how much each service can be valued.
The ppt clears concept on value add by solar park.
ORC Heat-to-Power Systems: Thoughts on Codes, Standards and RegulationsKeith D. Patch
2nd Meeting of the ASME IGTI ORC Power Systems Committee; Technical Subcommittee on Standards and Regulations; ASME Turbo Expo 2014; CCD Congress Center; Dusseldorf, Germany; Tuesday June 13, 2014; 5 - 8 PM CET
Ls catalog thiet bi tu dong power transformers 110816-dienhathe.vnDien Ha The
Khoa Học - Kỹ Thuật & Giải Trí: http://phongvan.org
Tài Liệu Khoa Học Kỹ Thuật: http://tailieukythuat.info
Thiết bị Điện Công Nghiệp - Điện Hạ Thế: http://dienhathe.org
Advance Electrical Design & Engineering Institute (AEDEI) ISO 9001:2008 Certified Institute of Electrical Design & Engineering training programs for Dedicated to Electrical Engineers . AEDEI is latest venture for providing the quality education in the best possible facilities is a key aim of Skill developments for various verticals in Electrical Engineering design.
ELECTRICAL SYSTEM DESIGN COURSE : Our trained Electrical Design Engineers working in various filed of Electrical industries (Design & Engineering, develops and supervises the manufacture, installation, operation and maintenance of equipment, machines and systems for the generation, distribution, utilization and control of electric power More..
SOLAR POWER PLANT DESIGN & ENGINEERING COURSE : The most significant future of solar energy is that it clean energy does not harm environments
TECHNICAL TRANSFORMER DESIGN COURSE : Transformer Design tool assists design engineers in choosing the most appropriate core material and size for a number of turn ratio and housing
Increase service life of cables and hoses and reduce downtimesigus® GmbH
e-chains® and e-chain systems® are the umbilical cord of modern machines. They ensure the supply of energy, data and signals while in constant motion. igus® has been developing, producing and testing plastic energy chains since 1971. The expertise we have accumulated over the years is being continuously refined with the help of our customers and is directly incorporated in our serial production.
A Delay of a single day for a 10 MW plant can lead to a loss of Rs. 6.5 Lacs ($110,000) in addition to Statutory Losses. Here, we explore typical project execution timelines and possible reasons for delay. The presentation talks about Lead Times of Equipment, Key vendors, Permits Required, Construction & Engineering related delays and finally, gives recommendations on how to keep project on track.
This presentation gives a quick perspective on costs that are involved in executing a MW scale power project in the Indian context. Both the indicative costs and the cost split-up among the various BOQ items are laid out at the various project scales. Indicative costs are assumed from a pure EPC perspective. However, generally the EPC scopes of work are sliced and diced and further outsourced/subcontracted. In such a scenario the execution costs might increase from the indicated costs.
Gensol strives to add value from Project Conceptualisation to Commissioning to ensure timely, quality and cost effective completion. From drafting exhaustive EPC contracts to approving engineering drawings and quality control during construction, Gensol's experience of 1500 MW works to ensure Peace of Mind for the Project Developer.
Here are the details on 300MW Wind Power Project located in the Western Region of India presented by Gensol on the various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,
3)Statuary & legal approvals required,
4)Civil & electrical works,
5)Quality & material inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
Photovoltaic Systems: System Design ToolsGavin Harper
Prepared for the Welsh Energy Sector Training program, this presentation takes a whistlestop tour through some of the different tools used in PV system design. From tools that are used to collect data about the site - angles, overshadowing e.t.c. to software tools used to simulate PV systems designs.
What services should a solar project developer expect from solar park & how much each service can be valued.
The ppt clears concept on value add by solar park.
ORC Heat-to-Power Systems: Thoughts on Codes, Standards and RegulationsKeith D. Patch
2nd Meeting of the ASME IGTI ORC Power Systems Committee; Technical Subcommittee on Standards and Regulations; ASME Turbo Expo 2014; CCD Congress Center; Dusseldorf, Germany; Tuesday June 13, 2014; 5 - 8 PM CET
Ls catalog thiet bi tu dong power transformers 110816-dienhathe.vnDien Ha The
Khoa Học - Kỹ Thuật & Giải Trí: http://phongvan.org
Tài Liệu Khoa Học Kỹ Thuật: http://tailieukythuat.info
Thiết bị Điện Công Nghiệp - Điện Hạ Thế: http://dienhathe.org
Advance Electrical Design & Engineering Institute (AEDEI) ISO 9001:2008 Certified Institute of Electrical Design & Engineering training programs for Dedicated to Electrical Engineers . AEDEI is latest venture for providing the quality education in the best possible facilities is a key aim of Skill developments for various verticals in Electrical Engineering design.
ELECTRICAL SYSTEM DESIGN COURSE : Our trained Electrical Design Engineers working in various filed of Electrical industries (Design & Engineering, develops and supervises the manufacture, installation, operation and maintenance of equipment, machines and systems for the generation, distribution, utilization and control of electric power More..
SOLAR POWER PLANT DESIGN & ENGINEERING COURSE : The most significant future of solar energy is that it clean energy does not harm environments
TECHNICAL TRANSFORMER DESIGN COURSE : Transformer Design tool assists design engineers in choosing the most appropriate core material and size for a number of turn ratio and housing
EIM is a recognized brand leader from Emerson Process Management – Valve Automation. The EIM brand, established in 1949, has pioneered the industry with innovation and technical performance. EIM actuators and controls have myriad applications. They are found in virtually every part of the energy and hydrocarbon processing industries – oil and gas, power, refining chemical and petrochemical. In addition, EIM actuators and controls have established a significant track record for outstanding performance in water/wastewater, food and beverage, pulp and paper, and marine applications. After undergoing rigorous quality checks, EIM products are sold and serviced through Emerson’s strategically located World Area Configuration Centers, distribution partners and knowledgeable technical service teams.
Implementation of slow down and stop system:
• PDS system needs to be connected to engine protection system
• Parts needed for slow down and stop system
• Electronic floor mounted pedal
• Electronic control unit
• Electronic actuator
This is an overview of Gigalight's products and solutions. Gigalgiht provides customized passive optical components for both metro area network and 5G wireless optical transport network applications.
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Jeffrey Haguewood
Sidekick Solutions uses Bonterra Impact Management (fka Social Solutions Apricot) and automation solutions to integrate data for business workflows.
We believe integration and automation are essential to user experience and the promise of efficient work through technology. Automation is the critical ingredient to realizing that full vision. We develop integration products and services for Bonterra Case Management software to support the deployment of automations for a variety of use cases.
This video focuses on the notifications, alerts, and approval requests using Slack for Bonterra Impact Management. The solutions covered in this webinar can also be deployed for Microsoft Teams.
Interested in deploying notification automations for Bonterra Impact Management? Contact us at sales@sidekicksolutionsllc.com to discuss next steps.
Elevating Tactical DDD Patterns Through Object CalisthenicsDorra BARTAGUIZ
After immersing yourself in the blue book and its red counterpart, attending DDD-focused conferences, and applying tactical patterns, you're left with a crucial question: How do I ensure my design is effective? Tactical patterns within Domain-Driven Design (DDD) serve as guiding principles for creating clear and manageable domain models. However, achieving success with these patterns requires additional guidance. Interestingly, we've observed that a set of constraints initially designed for training purposes remarkably aligns with effective pattern implementation, offering a more ‘mechanical’ approach. Let's explore together how Object Calisthenics can elevate the design of your tactical DDD patterns, offering concrete help for those venturing into DDD for the first time!
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP