Basic of 5S Process
What is 5S?
&
Why do we want to do it ?
5S is Short For:
 SORT
 SET IN ORDER
 SHINE
 STANDARDIZE
 SUSTAIN
 5S represents 5 disciplines for maintaining a visual workplace (visual
controls and information systems).
 These are foundational to continuous improvement and a manufacturing
strategy based "Lean Manufacturing" (waste removing) concepts.
 5S is one of the activities that will help ensure our company’s survival.
5S
1. Sort - All unneeded tools, parts and supplies are removed from the area
 2. Set in Order - A place for everything and everything is in its place
 3. Shine - The area is cleaned as the work is performed
 4. Standardize - Cleaning and identification methods are
consistently applied
 5. Sustain - 5S is a habit and is continually improved
Also - Work areas are safe and free of hazardous or dangerous conditions
Some 5S Examples
Before 5S
After 5S - Cleaned, organized
and drawers labeled (less time
and frustration hunting)
5S Examples - Sort, Set in
Order
See the difference…
1. Sort - All unneeded tools, parts and supplies are removed
from the area
2. Set in Order - A place for everything and everything is
in its place
5S Examples – Shine
 Before
 After
3. Shine - The area is cleaned as the work is performed (best) andor
there is a routine to keep the work area clean.
5S Examples - Standardize
4. Standardize - Cleaning and identification methods are
consistently applied
Departments have weekly 5S tours
Every job has duties that use Sort, Set in Order and Shine
We all have common duties to do our part to keep all areas
of the plant in shape – break room, restrooms, locker area,
parking lot, etc
5S Examples - Sustain
5. Sustain - 5S is a habit and is continually improved
5S is a simple concept with powerful results.
You will get additional information on 5S so that you will be well
equipped.
Our experience is that the more we do 5S the better the work
environment becomes: cleaner, safer, more organized, the work is
easier, less confusion and less stress.
Use the 5S (workhomeplay) - The more you use it the easier it
becomes and life just gets better and better.
What is Waste ?
Some of the main forms of waste are: Overproduction
Waiting for materials, machines, or instruction
Transportation or movement
Excessive inventory
Inefficient machine processing and/or operation
Producing defects
Part or line changeover or machine setup
Inadequate housekeeping
Miscommunication or inadequate instruction
Improvement Principles
 Get rid of all old (false) assumptions.
 Don't look for excuses, look for ways to make it happen
 Don't worry about being perfect - even if you only get it half right “start
NOW”!
 If something is wrong “Fix it NOW”.
 Good ideas flow when the going gets tough.
 Ask "WHY" five times - get to the root cause.
 Look for wisdom from Ten people rather than one.
 Never stop doing Improvement.
Summary
 5-S is for you.
 Clean-up and organize your work area every day so that each new day is
easier and safer than the day before
 Share your input with your leaders so that the tools you need will be
available to you, increasing your efficiency.
 Volunteer to help with the 5S tours and 5S events.
 Take a good look around...Imagine zero waste/zero confusion!
Thank You!!!

More Related Content

What's hot

Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
Jan Sabat
 
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training ppt
beskidek
 
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
krishnaheda
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
flevko
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
Adrian Oprea
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4dottinger
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
Clive Sury
 
5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology 5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology
Mastermind Training and Consulting Services
 
5 "S" A brief presentation by shihab
5 "S" A brief presentation by shihab5 "S" A brief presentation by shihab
5 "S" A brief presentation by shihab
Shihab Uddin Khan
 
5s
5s5s
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
VISCAR INDUSTRIAL CAPACITY
 
Free Guide to 5S
Free Guide to 5SFree Guide to 5S
Free Guide to 5S
Ben Geck
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
Zakir Husain
 
5s a basic introduction
5s a basic introduction5s a basic introduction
5s a basic introduction
sarah bridge
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation Pranav B. Gujjar
 
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6S
Tim McMahon
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
DEEPAK SAHOO
 

What's hot (20)

5s ppt
5s ppt5s ppt
5s ppt
 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
 
5S
5S5S
5S
 
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training ppt
 
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
 
5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology 5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology
 
5 "S" A brief presentation by shihab
5 "S" A brief presentation by shihab5 "S" A brief presentation by shihab
5 "S" A brief presentation by shihab
 
5s
5s5s
5s
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Free Guide to 5S
Free Guide to 5SFree Guide to 5S
Free Guide to 5S
 
5 s
5 s5 s
5 s
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
 
5s a basic introduction
5s a basic introduction5s a basic introduction
5s a basic introduction
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation
 
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6S
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
 

Similar to 5 s process training

Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
shubham gupta
 
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Shubham Gupta
 
Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]
Shubham Gupta
 
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Shubham Gupta
 
5S-house_keeping -rev.ppt
5S-house_keeping -rev.ppt5S-house_keeping -rev.ppt
5S-house_keeping -rev.ppt
DeepakMore54
 
5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf
VivekAnand457893
 
ACADEMIC_5s.ppt
ACADEMIC_5s.pptACADEMIC_5s.ppt
ACADEMIC_5s.ppt
AnnaLee335678
 
5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION .ppt
5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION  .ppt5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION  .ppt
5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION .ppt
hiren65650
 
5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf
markjeffries15
 
5s.pptx
5s.pptx5s.pptx
5s System
5s System5s System
5s System
Mohammed Imran
 
5sbasictrainingppt
5sbasictrainingppt5sbasictrainingppt
5sbasictrainingppt
Pratiksha Kadam
 
5S Training Presentation
5S Training Presentation5S Training Presentation
5S Training Presentation
Parth Devariya
 
5S Concept is applicable all working areas
5S Concept  is applicable all working areas5S Concept  is applicable all working areas
5S Concept is applicable all working areasRamakrishna Vegi
 
295910 633971289061398750
295910 633971289061398750295910 633971289061398750
295910 633971289061398750mefaiqahmed
 
5 S Basic Training
5 S Basic Training5 S Basic Training
5 S Basic Training
Ali Asghar Dossa
 
BASIC OF TRAINING
BASIC OF TRAININGBASIC OF TRAINING
BASIC OF TRAINING
Brahmas Pandey
 
5s.presentation akash
5s.presentation akash5s.presentation akash
5s.presentation akash
Akash Randheer
 

Similar to 5 s process training (20)

Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
 
5s
5s5s
5s
 
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
 
Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1]_[imnu]_[shubham gupta]
 
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]Qcl 15-v4 [challenge-no 1  5s]_[imnu]_[shubham gupta]
Qcl 15-v4 [challenge-no 1 5s]_[imnu]_[shubham gupta]
 
5S-house_keeping -rev.ppt
5S-house_keeping -rev.ppt5S-house_keeping -rev.ppt
5S-house_keeping -rev.ppt
 
5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf
 
ACADEMIC_5s.ppt
ACADEMIC_5s.pptACADEMIC_5s.ppt
ACADEMIC_5s.ppt
 
5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION .ppt
5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION  .ppt5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION  .ppt
5s-5S 5S 5S 5S 5S 5S 5S PRESENTATION .ppt
 
5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf5s-150828003523-lva1-app6891.pdf
5s-150828003523-lva1-app6891.pdf
 
5s.pptx
5s.pptx5s.pptx
5s.pptx
 
5s System
5s System5s System
5s System
 
5sbasictrainingppt
5sbasictrainingppt5sbasictrainingppt
5sbasictrainingppt
 
5S Training Presentation
5S Training Presentation5S Training Presentation
5S Training Presentation
 
5S Concept is applicable all working areas
5S Concept  is applicable all working areas5S Concept  is applicable all working areas
5S Concept is applicable all working areas
 
5s
5s5s
5s
 
295910 633971289061398750
295910 633971289061398750295910 633971289061398750
295910 633971289061398750
 
5 S Basic Training
5 S Basic Training5 S Basic Training
5 S Basic Training
 
BASIC OF TRAINING
BASIC OF TRAININGBASIC OF TRAINING
BASIC OF TRAINING
 
5s.presentation akash
5s.presentation akash5s.presentation akash
5s.presentation akash
 

Recently uploaded

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 

Recently uploaded (20)

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 

5 s process training

  • 2. Basic of 5S Process What is 5S? & Why do we want to do it ?
  • 3. 5S is Short For:  SORT  SET IN ORDER  SHINE  STANDARDIZE  SUSTAIN
  • 4.  5S represents 5 disciplines for maintaining a visual workplace (visual controls and information systems).  These are foundational to continuous improvement and a manufacturing strategy based "Lean Manufacturing" (waste removing) concepts.  5S is one of the activities that will help ensure our company’s survival.
  • 5. 5S 1. Sort - All unneeded tools, parts and supplies are removed from the area  2. Set in Order - A place for everything and everything is in its place  3. Shine - The area is cleaned as the work is performed  4. Standardize - Cleaning and identification methods are consistently applied  5. Sustain - 5S is a habit and is continually improved Also - Work areas are safe and free of hazardous or dangerous conditions
  • 6. Some 5S Examples Before 5S After 5S - Cleaned, organized and drawers labeled (less time and frustration hunting)
  • 7. 5S Examples - Sort, Set in Order See the difference… 1. Sort - All unneeded tools, parts and supplies are removed from the area 2. Set in Order - A place for everything and everything is in its place
  • 8. 5S Examples – Shine  Before  After 3. Shine - The area is cleaned as the work is performed (best) andor there is a routine to keep the work area clean.
  • 9. 5S Examples - Standardize 4. Standardize - Cleaning and identification methods are consistently applied Departments have weekly 5S tours Every job has duties that use Sort, Set in Order and Shine We all have common duties to do our part to keep all areas of the plant in shape – break room, restrooms, locker area, parking lot, etc
  • 10. 5S Examples - Sustain 5. Sustain - 5S is a habit and is continually improved 5S is a simple concept with powerful results. You will get additional information on 5S so that you will be well equipped. Our experience is that the more we do 5S the better the work environment becomes: cleaner, safer, more organized, the work is easier, less confusion and less stress. Use the 5S (workhomeplay) - The more you use it the easier it becomes and life just gets better and better.
  • 11. What is Waste ? Some of the main forms of waste are: Overproduction Waiting for materials, machines, or instruction Transportation or movement Excessive inventory Inefficient machine processing and/or operation Producing defects Part or line changeover or machine setup Inadequate housekeeping Miscommunication or inadequate instruction
  • 12. Improvement Principles  Get rid of all old (false) assumptions.  Don't look for excuses, look for ways to make it happen  Don't worry about being perfect - even if you only get it half right “start NOW”!  If something is wrong “Fix it NOW”.  Good ideas flow when the going gets tough.  Ask "WHY" five times - get to the root cause.  Look for wisdom from Ten people rather than one.  Never stop doing Improvement.
  • 13. Summary  5-S is for you.  Clean-up and organize your work area every day so that each new day is easier and safer than the day before  Share your input with your leaders so that the tools you need will be available to you, increasing your efficiency.  Volunteer to help with the 5S tours and 5S events.  Take a good look around...Imagine zero waste/zero confusion!

Editor's Notes

  1. Confidential Information of Huawei. No Spreading Without Permission
  2. Confidential Information of Huawei. No Spreading Without Permission