10/10/2003 ISO-9001:2000 Requirements 1
ISOISO--9001:20009001:2000
Quality Management SystemsQuality Management Systems
REQUIREMENTSREQUIREMENTS
10/10/2003 ISO-9001:2000 Requirements 2
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
10/10/2003 ISO-9001:2000 Requirements 3
THETHE
PDCAPDCA
CYCLECYCLE
PLANPLAN
DODO
IMPLEMENTIMPLEMENT
CHECKCHECK
STUDYSTUDY
ACTACT
EVALUATEEVALUATE
VERIFYVERIFY
VALIDATEVALIDATE
10/10/2003 ISO-9001:2000 Requirements 4
ISOISO--9000:2000 Family Structure9000:2000 Family Structure
Quality Management SystemQuality Management System
PROCESS MODELPROCESS MODEL
QualityQuality
ManagementManagement
SystemsSystems --
RequirementsRequirements
ISO 9001ISO 9001
REFERENCEREFERENCE
STANDARDSTANDARD
QualityQuality
ManagementManagement
SystemsSystems ––
FundamentalsFundamentals
& Vocabulary& Vocabulary
ISO 9000ISO 9000
ISO 9004ISO 9004
GuidelinesGuidelines
ForFor
PerformancePerformance
ImprovementsImprovements
SUPPORTING STANDARDSSUPPORTING STANDARDS
ISO 10012ISO 10012
RequirementsRequirements
forfor
MeasurementMeasurement
Processes &Processes &
MeasuringMeasuring
EquipmentEquipment
OTHER STANDARDSOTHER STANDARDS ISO 19011ISO 19011
GuidelinesGuidelines
on Qualityon Quality
& EMS& EMS
AuditingAuditing
ISO/IEC 17025ISO/IEC 17025
Competence ofCompetence of
Testing &Testing &
CalibrationCalibration
LabsLabs
ISO/TS 16949ISO/TS 16949
Quality MgmtQuality Mgmt
SystemsSystems --
AutomotiveAutomotive
ISO 13485ISO 13485
MedicalMedical
DevicesDevices --
Quality MgmtQuality Mgmt
SystemsSystems
ISO 14001ISO 14001
EnvironmentalEnvironmental
ManagementManagement
SystemSystem
ISO 15189ISO 15189
Medical LabsMedical Labs ––
Quality &Quality &
CompetenceCompetence
ISO 10013ISO 10013
GuidelinesGuidelines
forfor
DevelopingDeveloping
QMSQMS
DocumentsDocuments
ISO 10014ISO 10014
GuidelinesGuidelines
ManagingManaging
thethe
EconomicsEconomics
of Qualityof Quality
ISO 10017ISO 10017
GuidanceGuidance
onon
StatisticalStatistical
TechniquesTechniques
ISO 10005ISO 10005
GuidelinesGuidelines
for Qualityfor Quality
PlansPlans
ISO 10006ISO 10006
GuidelinesGuidelines
in Projectin Project
MgmtMgmt
ISO 10007ISO 10007
GuidelinesGuidelines
forfor ConfigConfig..
MgmtMgmt
ISO 10015ISO 10015
GuidelinesGuidelines
for Trainingfor Training
PHILOSOPHICAL GUIDELINESPHILOSOPHICAL GUIDELINES
10/10/2003 ISO-9001:2000 Requirements 5
QMS per ISOQMS per ISO--9001:20009001:2000
4 Quality Management System4 Quality Management System
General RequirementsGeneral Requirements
Documentation RequirementsDocumentation Requirements
10/10/2003 ISO-9001:2000 Requirements 6
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Requirements4.1 General Requirements
Establish, Document, Implement &
Maintain a QMSQMS and Continually ImproveContinually Improve
its Effectivenessits Effectiveness
Identify the ProcessesProcesses and their application
throughout the organization
10/10/2003 ISO-9001:2000 Requirements 7
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Rs– Continued
Determine the sequence and interaction of
these processesthese processes;
Determine criteria and methods to ensure
the operation and control of thesethese
processesprocesses are effective;
10/10/2003 ISO-9001:2000 Requirements 8
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Rs– Continued
Ensure necessary resources and informa-
tion are available to support the operation
and monitoring of these processesthese processes;
Monitor, Measure and analyze thesethese
processesprocesses;
Implement actions necessary to achieve
planned results and continual improvement
of these processesthese processes.
10/10/2003 ISO-9001:2000 Requirements 9
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Rs– Continued
Outsourced processes shall beshall be
identified and controlledidentified and controlled
Outside processes that affect productOutside processes that affect product
conformity with requirements;conformity with requirements;
10/10/2003 ISO-9001:2000 Requirements 10
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements4.2 Documentation Requirements
A QMS documentation shall include:
StatementsStatements of a Quality PolicyQuality Policy and QualityQuality
ObjectivesObjectives;
A Quality ManualQuality Manual;
ProceduresProcedures required by ISO (6);
RecordsRecords required by ISO (21);
10/10/2003 ISO-9001:2000 Requirements 11
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Quality Manual
ScopeScope of QMS
Detailed ExclusionsExclusions and their justification;
Documented ProceduresDocumented Procedures, or reference to
them; and
A description of the interactionA description of the interaction between the
QMS processes.
10/10/2003 ISO-9001:2000 Requirements 12
Exclusions to ISO-9001:2000
1.2 Application
All Requirements are generic and are intended
to be applicable to all organizations.
Where any requirements cannot be applied
due to the nature of an organization and its
product – an exclusion can be considered.
Exclusions are limited to requirements within
clause 7 – Product Realization.
10/10/2003 ISO-9001:2000 Requirements 13
Procedures Required by ISOProcedures Required by ISO
4.2.3 Control of DocumentsControl of Documents
4.2.4 Control of RecordsControl of Records
8.2.2 Internal AuditsInternal Audits
8.3 Control of Nonconforming ProductControl of Nonconforming Product
8.5.2 Corrective ActionCorrective Action
8.5.3 Preventive ActionPreventive Action
10/10/2003 ISO-9001:2000 Requirements 14
Records Required by ISORecords Required by ISO (21)(21)
4.2.4 Records shall be established andRecords shall be established and
maintained to provide evidence of conformity tomaintained to provide evidence of conformity to
requirements and of the effective operation of therequirements and of the effective operation of the
QMS.QMS.
5.6.1 Management Review – General, Records fromRecords from
Management ReviewsManagement Reviews shall be maintained ;
6.2.2 (Human Resources) Appropriate records ofrecords of
education, training, skills and experienceeducation, training, skills and experience;
7.1 (Planning of Product Realization) Records to
provide evidence that the realization processes andevidence that the realization processes and
resulting product meet requirementsresulting product meet requirements;
10/10/2003 ISO-9001:2000 Requirements 15
Records Required by ISORecords Required by ISO
7.2.2 (Customer Related Processes - Review of
Requirements related to the Product) Records of theRecords of the
results of the review and actions arising from it shall beresults of the review and actions arising from it shall be
maintainedmaintained;
7.3.2 (Design & Development – Inputs) Inputs relatingInputs relating
to product requirements shall be determined andto product requirements shall be determined and
records maintainedrecords maintained;
7.3.4 (Design & Development – Review) Records ofRecords of
the results of the reviews and any necessary actionsthe results of the reviews and any necessary actions
shall be maintainedshall be maintained;
7.3.5 (Design & Development – Verification) RecordsRecords
of the results of the verification and any necessaryof the results of the verification and any necessary
actions shall be maintainedactions shall be maintained.
10/10/2003 ISO-9001:2000 Requirements 16
Records Required by ISORecords Required by ISO
7.3.6 (Design & Development – Validation) Records ofRecords of
the results of validation and any necessary actionsthe results of validation and any necessary actions
shall be maintainedshall be maintained;
7.3.7 (Control of Design & Development Changes)
Records of the results of the review and any necessaryRecords of the results of the review and any necessary
actions shall be maintainedactions shall be maintained;
7.4.1 (Purchasing Process) Records of the results ofRecords of the results of
evaluations and any necessary actions arising from theevaluations and any necessary actions arising from the
evaluation shall be maintainedevaluation shall be maintained;
7.5.2 ( Validation of ‘Special Processes’) The
organization shall establish arrangements for these
processes including – requirements for recordsrequirements for records;
10/10/2003 ISO-9001:2000 Requirements 17
Records Required by ISORecords Required by ISO
7.5.3 (Identification & Traceability) Where traceability is
a requirement, the organization shall control and
record the unique identification of the productrecord the unique identification of the product;
7.5.4 (Customer Property) If any customer property is
lost, damaged or otherwise found to be unsuitable for
use, this shall be reported to the customer and recordsthis shall be reported to the customer and records
maintainedmaintained;
7.6 (Control of Monitoring & Measuring Devices)
If calibrated/verified to nonIf calibrated/verified to non--national or international standardsnational or international standards ––
the basis shall be recorded.the basis shall be recorded.
Equipment found nonEquipment found non--conformingconforming –– validity of previousvalidity of previous
measurements shall be assessed & recorded;measurements shall be assessed & recorded;
Records of the results of calibration and verification shall beRecords of the results of calibration and verification shall be
maintainedmaintained;
10/10/2003 ISO-9001:2000 Requirements 18
Records Required by ISORecords Required by ISO
8.2.2 (Internal Audit) The responsibilities and
requirements for planning and conducting audits and
for reporting results and maintaining recordsand maintaining records…;
8.2.4 (Monitoring & Measurement of Product) Evidence
of conformity with the acceptance criteria shall be
maintained. Records shall indicate the person(s)Records shall indicate the person(s)
authorizing release of productauthorizing release of product;
8.3 (Control of Nonconforming Product) Records of theRecords of the
nature of nonconformities and any subsequent actionsnature of nonconformities and any subsequent actions
taken, including concessions obtained, shall betaken, including concessions obtained, shall be
maintainedmaintained;
10/10/2003 ISO-9001:2000 Requirements 19
Records Required by ISORecords Required by ISO
8.5.2 (Improvement – Corrective Action) Records ofRecords of
the results of action takenthe results of action taken;
8.5.3 (Improvement – Preventive Action) Records ofRecords of
the results of action takenthe results of action taken.
10/10/2003 ISO-9001:2000 Requirements 20
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Control of DocumentsControl of Documents
A documented procedure to define the
following controls:
–– Approve adequacy of documents prior to issueApprove adequacy of documents prior to issue;;
–– Review and update as necessary & ReReview and update as necessary & Re--
approveapprove;
–– Ensure changes and current revision status ofEnsure changes and current revision status of
documents are identifieddocuments are identified;
10/10/2003 ISO-9001:2000 Requirements 21
QMS per ISOQMS per ISO--9001:20009001:2000
Control of Documents-Cont’d
A documented procedure to define the
following controls: - Continued
– Ensure relevant versionsrelevant versions of applicable
documents are available at points of useare available at points of use;
– Ensure documents remain legible and readilyremain legible and readily
identifiable;identifiable;
– Ensure documents of external originexternal origin are
identified and their distribution controlled; and
–– Prevent the unintended use of obsoletePrevent the unintended use of obsolete
documentsdocuments, AND apply suitable ID if they areapply suitable ID if they are
retained for any purposeretained for any purpose;
10/10/2003 ISO-9001:2000 Requirements 22
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Control of Records
A documented procedure to define the
controls needed for the identification,
storage, protection, retrieval, retention time
and disposition of records.
4.2 Documentation Requirements-Continued
Control of RecordsControl of Records
A documented procedure to define the
controls needed for the identificationidentification,,
storagestorage,, protectionprotection,, retrievalretrieval,, retention timeretention time
andand dispositiondisposition of records.of records.
10/10/2003 ISO-9001:2000 Requirements 23
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
10/10/2003 ISO-9001:2000 Requirements 24
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5 Management Responsibility
Management Commitment
Customer Focus
Quality Policy
Planning
Management Review
5 Management Responsibility5 Management Responsibility
Management CommitmentManagement Commitment
Customer FocusCustomer Focus
Quality PolicyQuality Policy
PlanningPlanning
Management ReviewManagement Review
10/10/2003 ISO-9001:2000 Requirements 25
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.1 Management Commitment
Evidence of Commitment
Communicate to the Organization the
Importance of meeting Customer, Statutory,
and Regulatory Requirements
Establish the Quality Policy
Ensuring Quality Objectives are Established
Conduct Management Reviews
Ensure the Availability of Resources
5.1 Management Commitment5.1 Management Commitment
Evidence of CommitmentEvidence of Commitment
Communicate to the Organization the
Importance of meeting CustomerCustomer, StatutoryStatutory,
and RegulatoryRegulatory RequirementsRequirements
Establish the Quality PolicyQuality Policy
Ensuring Quality ObjectivesQuality Objectives are Established
Conduct Management ReviewsManagement Reviews
Ensure the Availability of ResourcesAvailability of Resources
10/10/2003 ISO-9001:2000 Requirements 26
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.2 Customer Focus
Ensure Customer Requirements are determined
and met, with the aim of enhancing customer
satisfaction
5.3 Quality Policy
Established, Appropriate, Framework for Quality
Objectives, Communicated & Understood, and
Reviewed for Continued Suitability
5.2 Customer Focus5.2 Customer Focus
Ensure Customer Requirements are determined
and met, with the aim of enhancing customeraim of enhancing customer
satisfactionsatisfaction
5.3 Quality Policy5.3 Quality Policy
Established, Appropriate, Framework for QualityFramework for Quality
ObjectivesObjectives, Communicated & UnderstoodCommunicated & Understood, and
Reviewed for Continued Suitability
10/10/2003 ISO-9001:2000 Requirements 27
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.4 Planning
Establish Quality Objectives at relevant levels
and functions within the Organization
Ensure that the planning of the QMS is carried
out to meet the General Requirements (4.1)
Maintain Integrity of the QMS when changes are
planned & implemented
5.4 Planning5.4 Planning
Establish Quality ObjectivesEstablish Quality Objectives at relevant levelsat relevant levels
and functions within the Organizationand functions within the Organization
Ensure that the planning of the QMS is carriedEnsure that the planning of the QMS is carried
outout to meet the General Requirementsto meet the General Requirements (4.1)(4.1)
Maintain Integrity of the QMSMaintain Integrity of the QMS when changes arewhen changes are
planned & implementedplanned & implemented
10/10/2003 ISO-9001:2000 Requirements 28
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.5 Responsibility, Authority and Communication
Ensure that responsibilities & authorities are
defined and communicated within the
organization
Appoint a Management Representative
Ensure appropriate communication processes
are established and Communication on the
Effectiveness of the QMS takes place
5.5 Responsibility, Authority and CommunicationResponsibility, Authority and Communication
Ensure that responsibilities & authorities are
defined and communicateddefined and communicated within the
organization
Appoint a Management RepresentativeManagement Representative
Ensure appropriate communication processescommunication processes
are established and Communication on the
Effectiveness of the QMS takes placeEffectiveness of the QMS takes place
10/10/2003 ISO-9001:2000 Requirements 29
Management RepresentativeManagement Representative
Irrespective of other responsibilities, shall
have the following responsibility & authority
Ensure that processesprocesses needed for the QMS are
established, implemented & maintained
Reports to Top Management on the performanceperformance
of the QMS and any need for improvementneed for improvement
Ensure the promotion & awarenesspromotion & awareness of Customer
requirements throughout the Organization
Can include being the liaison with external parties
on QMS matters
10/10/2003 ISO-9001:2000 Requirements 30
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.6 Management Review
Review the QMS at planned intervals
Ensure Continued Suitability, Adequacy, &
Effectiveness;
Include Assessing Opportunities for
Improvement & the need for changes –
including the Quality Policy and Quality
Objectives
5.6 Management Review
Review the QMS at planned intervalsat planned intervals
Ensure ContinuedContinued Suitability, Adequacy, &Suitability, Adequacy, &
EffectivenessEffectiveness;
Include Assessing Opportunities forOpportunities for
ImprovementImprovement & the need for changesneed for changes –
including the Quality Policy and Quality
Objectives
10/10/2003 ISO-9001:2000 Requirements 31
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.6 Management Review
Review Input
Results of Audits
Customer Feedback
Process Performance & Product Conformity
Status of Corrective & Preventive Actions
Follow-up Actions from Previous Reviews
Changes that could affect the QMS
Recommendations for Improvement
5.6 Management Review
Review InputReview Input
Results of AuditsResults of Audits
Customer FeedbackCustomer Feedback
Process Performance & Product ConformityProcess Performance & Product Conformity
Status of Corrective & Preventive ActionsStatus of Corrective & Preventive Actions
FollowFollow--up Actions from Previous Reviewsup Actions from Previous Reviews
Changes that could affect the QMSChanges that could affect the QMS
Recommendations for ImprovementRecommendations for Improvement
10/10/2003 ISO-9001:2000 Requirements 32
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.6 Management Review
Review Output
Decisions & Actions taken related to:
– Improvement on the effectiveness of the QMS & its
Processes
– Improvement of product related to customer
requirements
– Resource Needs
5.6 Management Review
Review OutputReview Output
Decisions & Actions takenDecisions & Actions taken related to:
–– Improvement on the effectiveness of the QMS & itsImprovement on the effectiveness of the QMS & its
ProcessesProcesses
–– Improvement of product related to customerImprovement of product related to customer
requirementsrequirements
–– Resource NeedsResource Needs
10/10/2003 ISO-9001:2000 Requirements 33
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
10/10/2003 ISO-9001:2000 Requirements 34
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6 Resource Management
Provision of Resources
Human Resources
Infrastructure
Work Environment
6 Resource Management6 Resource Management
Provision of ResourcesProvision of Resources
Human ResourcesHuman Resources
InfrastructureInfrastructure
Work EnvironmentWork Environment
10/10/2003 ISO-9001:2000 Requirements 35
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.1 Provision of Resources
Determine and Provide Resources needed to:
– Implement & Maintain the QMS
– Continually Improve Effectiveness of QMS
– Enhance Customer Satisfaction by meeting
customer requirements
6.1 Provision of Resources6.1 Provision of Resources
Determine and ProvideDetermine and Provide Resources needed to:Resources needed to:
–– Implement & Maintain the QMSImplement & Maintain the QMS
–– Continually Improve Effectiveness of QMSContinually Improve Effectiveness of QMS
–– Enhance Customer Satisfaction by meetingEnhance Customer Satisfaction by meeting
customer requirementscustomer requirements
10/10/2003 ISO-9001:2000 Requirements 36
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.2 Human Resources
Personnel performing work affecting product
quality shall be competent on the basis of
appropriate education, training, skills and
experience
6.2 Human Resources6.2 Human Resources
Personnel performing work affecting productPersonnel performing work affecting product
quality shall be competent on the basis ofquality shall be competent on the basis of
appropriate education, training, skills andappropriate education, training, skills and
experienceexperience
10/10/2003 ISO-9001:2000 Requirements 37
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.3 Competence,
Awareness and Training
Determine the necessary
competence
Provide Training or take
other actions to satisfy
Evaluate the Effectiveness
of actions taken
6.3 Competence,6.3 Competence,
Awareness and TrainingAwareness and Training
Determine the necessaryDetermine the necessary
competencecompetence
Provide Training or takeProvide Training or take
other actions to satisfyother actions to satisfy
Evaluate the EffectivenessEvaluate the Effectiveness
of actions takenof actions taken
10/10/2003 ISO-9001:2000 Requirements 38
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.3 Infrastructure
Determine, provide and maintain the
infrastructure needed to achieve conformity to
product requirements
6.3 Infrastructure6.3 Infrastructure
Determine, provide and maintain theDetermine, provide and maintain the
infrastructure needed to achieve conformity toinfrastructure needed to achieve conformity to
product requirementsproduct requirements
• Buildings, Workspace &
associated utilities
• Process equipment
(Hardware & Software)
• Supporting services (i.e.
transport or
communication)
•• Buildings, Workspace &Buildings, Workspace &
associated utilitiesassociated utilities
•• Process equipmentProcess equipment
(Hardware & Software)(Hardware & Software)
•• Supporting services (i.e.Supporting services (i.e.
transport ortransport or
communication)communication)
10/10/2003 ISO-9001:2000 Requirements 39
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.4 Work Environment
Determine & Manage the work
environment needed to achieve
conformity to product requirements
[Factors that influence motivation,
satisfaction, development and
performance of people.]
Psychological Factors
Physical Factors
6.4 Work Environment6.4 Work Environment
Determine & Manage the workDetermine & Manage the work
environment needed to achieveenvironment needed to achieve
conformity to product requirementsconformity to product requirements
[Factors that influence motivation,[Factors that influence motivation,
satisfaction, development andsatisfaction, development and
performance of people.]performance of people.]
Psychological FactorsPsychological Factors
Physical FactorsPhysical Factors
10/10/2003 ISO-9001:2000 Requirements 40
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
Work Environment - Continued
Psychological Factors
– Greater Involvement & Understanding of
Objectives to be Achieved
– Safety Rules & Procedures
– Recognition & Reward for Achievement,
Improvement & Innovation
– Career Planning & Development
Work EnvironmentWork Environment -- ContinuedContinued
Psychological FactorsPsychological Factors
–– Greater Involvement & Understanding ofGreater Involvement & Understanding of
Objectives to be AchievedObjectives to be Achieved
–– Safety Rules & ProceduresSafety Rules & Procedures
–– Recognition & Reward for Achievement,Recognition & Reward for Achievement,
Improvement & InnovationImprovement & Innovation
–– Career Planning & DevelopmentCareer Planning & Development
10/10/2003 ISO-9001:2000 Requirements 41
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
Work Environment - Continued
Physical Factors
– Ergonomics
– Temperature
– Light
– Noise
– Cleanliness
Work EnvironmentWork Environment -- ContinuedContinued
Physical FactorsPhysical Factors
–– ErgonomicsErgonomics
–– TemperatureTemperature
–– LightLight
–– NoiseNoise
–– CleanlinessCleanliness
10/10/2003 ISO-9001:2000 Requirements 42
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
10/10/2003 ISO-9001:2000 Requirements 43
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7 Product Realization7 Product Realization
Planning of Product RealizationPlanning of Product Realization
CustomerCustomer--related Processesrelated Processes
Design & DevelopmentDesign & Development
PurchasingPurchasing
Production and Service ProvisionProduction and Service Provision
Control of Monitoring and MeasuringControl of Monitoring and Measuring
DevicesDevices
10/10/2003 ISO-9001:2000 Requirements 44
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.1 Planning of Product Realization7.1 Planning of Product Realization
Plan & Develop the processes needed forPlan & Develop the processes needed for
Product RealizationProduct Realization
Planning shall determine the following asPlanning shall determine the following as
appropriate:appropriate:
Quality ObjectivesQuality Objectives && RequirementsRequirements for thefor the
Product;Product;
Need to establish processes, documents andNeed to establish processes, documents and
provide resources specific to the product;provide resources specific to the product;
10/10/2003 ISO-9001:2000 Requirements 45
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Planning shall determine the following:Planning shall determine the following:
ContinuedContinued
RequiredRequired vverification,erification, vvalidation,alidation, mmonitoring,onitoring,
inspection & testinspection & test activities specific to theactivities specific to the
productproduct and the criteria for productand the criteria for product
acceptanceacceptance
RecordsRecords needed to provide evidence thatneeded to provide evidence that
the realization processes and resultingthe realization processes and resulting
product meet requirementsproduct meet requirements
10/10/2003 ISO-9001:2000 Requirements 46
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
TheThe outputoutput of this planning shall be in aof this planning shall be in a formform
suitablesuitable for the organizationfor the organization’’s method ofs method of
operationsoperations
NOTE 1: A document specifying the QMS processesNOTE 1: A document specifying the QMS processes
(including the product realization processes) can be(including the product realization processes) can be
referred to as a Quality Planreferred to as a Quality Plan
NOTE 2: The Design & Development RequirementsNOTE 2: The Design & Development Requirements
(7.3) may also be applied to the development of the(7.3) may also be applied to the development of the
product realization processesproduct realization processes
10/10/2003 ISO-9001:2000 Requirements 47
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.2 Customer7.2 Customer--related Processesrelated Processes
DeterminationDetermination of requirementsof requirements related to therelated to the
productproduct
ReviewReview of requirementsof requirements related to the productrelated to the product
Customer CommunicationCustomer Communication
10/10/2003 ISO-9001:2000 Requirements 48
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Determination of requirementsDetermination of requirements related torelated to
the productthe product
RequirementsRequirements specified by the customer,specified by the customer,
including delivery & postincluding delivery & post--delivery activities;delivery activities;
RequirementsRequirements necessary for specified ornecessary for specified or
intended use, where known;intended use, where known;
Statutory and regulatory requirementsStatutory and regulatory requirements relatedrelated
to the product;to the product;
Any additional requirementsAny additional requirements determined by thedetermined by the
Organization.Organization.
10/10/2003 ISO-9001:2000 Requirements 49
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Review of requirementsReview of requirements related to therelated to the
productproduct
Shall be conducted prior to the commitment toShall be conducted prior to the commitment to
supply a product to the customer;supply a product to the customer;
Ensure that product requirements are defined;Ensure that product requirements are defined;
Ensure contract or order requirements differingEnsure contract or order requirements differing
from those previously expressed are resolved;from those previously expressed are resolved;
Ensure capable of meting the definedEnsure capable of meting the defined
requirements.requirements.
10/10/2003 ISO-9001:2000 Requirements 50
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Review of requirementsReview of requirements related to the productrelated to the product ––
ContinuedContinued
Customer Requirements shall beCustomer Requirements shall be confirmedconfirmed by theby the
organizationorganization before acceptancebefore acceptance, where no, where no
documented statement of requirements isdocumented statement of requirements is
provided by the customerprovided by the customer
Where Product Requirements are changed, theWhere Product Requirements are changed, the
organization shallorganization shall ensure that relevant documentsensure that relevant documents
are amended and that relevant personnel areare amended and that relevant personnel are
made aware of the changed requirementsmade aware of the changed requirements
10/10/2003 ISO-9001:2000 Requirements 51
Product Realization
per ISO-9001:2000
Customer CommunicationCustomer Communication
Determine and ImplementDetermine and Implement effectiveeffective
arrangements for communicatingarrangements for communicating with customerswith customers
in relation to:in relation to:
Product information;Product information;
Enquiries, contracts or order handling, includingEnquiries, contracts or order handling, including
amendments;amendments;
Customer feedback, including customerCustomer feedback, including customer
complaints.complaints.
10/10/2003 ISO-9001:2000 Requirements 52
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.3 Design & Development7.3 Design & Development
Design & DevelopmentDesign & Development PlanningPlanning
Design & DevelopmentDesign & Development InputsInputs
Design & DevelopmentDesign & Development OutputsOutputs
Design & DevelopmentDesign & Development ReviewReview
Design & DevelopmentDesign & Development VerificationVerification
Design & DevelopmentDesign & Development ValidationValidation
Control ofControl of Design & DevelopmentDesign & Development ChangesChanges
VVerificationerification
VValidationalidation
7.3.5 & 7.3.67.3.5 & 7.3.6
RRevieweview
at Suitableat Suitable
Stages of DesignStages of Design
& Development& Development
7.3.47.3.4
VVerificationerification
VValidationalidation
7.3.5 & 7.3.67.3.5 & 7.3.6
Design
Output
7.3.3
Design &Design &
DevelopmentDevelopment
ProcessProcess
End Item
Product
Design
Input
7.3.2
Application of Design
Control in Waterfall or Stair
Step Design Process
[with ISO-9001 Clauses]
PlanPlan
Design &Design &
DevelopmentDevelopment
Stages, AND theStages, AND the
VerificationVerification
& Validation for& Validation for
each Stage 7.3.1each Stage 7.3.1
User
Needs
7.3.2
10/10/2003 ISO-9001:2000 Requirements 54
Purchasing in ISOPurchasing in ISO--9001:20009001:2000
7.4 Purchasing7.4 Purchasing
PurchasingPurchasing ProcessProcess
PurchasingPurchasing InformationInformation
VerificationVerification of Purchased Productof Purchased Product
10/10/2003 ISO-9001:2000 Requirements 55
Purchasing in ISOPurchasing in ISO--9001:20009001:2000
PurchasingPurchasing ProcessProcess
Ensure purchased product conforms toEnsure purchased product conforms to
specified requirements.specified requirements.
Type and Extent of control shall be dependentType and Extent of control shall be dependent
upon the effect of the purchased product onupon the effect of the purchased product on
subsequent product realization or the finalsubsequent product realization or the final
product.product.
Suppliers shall be evaluated and selectedSuppliers shall be evaluated and selected
based on their ability to supply product IAW thebased on their ability to supply product IAW the
organizationorganization’’s requirements.s requirements.
10/10/2003 ISO-9001:2000 Requirements 56
Purchasing in ISOPurchasing in ISO--9001:20009001:2000
PurchasingPurchasing ProcessProcess -- ContinuedContinued
Criteria for selection, evaluation, & reCriteria for selection, evaluation, & re--
evaluation shall be established.evaluation shall be established.
Records of the results of evaluations and anyRecords of the results of evaluations and any
necessary actions arising from the evaluationnecessary actions arising from the evaluation
shall be maintainedshall be maintained
10/10/2003 ISO-9001:2000 Requirements 57
Purchasing in ISO-9001:2000
PurchasingPurchasing InformationInformation
Shall describe the product to be purchased,Shall describe the product to be purchased,
including where appropriate:including where appropriate:
–– Requirements for approval of product, procedures,Requirements for approval of product, procedures,
processes and equipment;processes and equipment;
–– Requirements for qualification of personnel, andRequirements for qualification of personnel, and
–– Quality Management SystemsQuality Management Systems
The organization shall ensure the adequacy ofThe organization shall ensure the adequacy of
specified purchase requirementsspecified purchase requirements priorprior to theirto their
communicationcommunication
10/10/2003 ISO-9001:2000 Requirements 58
Purchasing in ISO-9001:2000
VerificationVerification of Purchased Productof Purchased Product
Shall establish and implement the inspection orShall establish and implement the inspection or
other activities necessary for ensuring theother activities necessary for ensuring the
product meets specified purchaseproduct meets specified purchase
requirements.requirements.
Where the organization or its customer intendsWhere the organization or its customer intends
to perform verification at the supplierto perform verification at the supplier’’ss
premises, the intended verificationpremises, the intended verification
arrangements and the method of productarrangements and the method of product
release shall be stated in the purchasingrelease shall be stated in the purchasing
information.information.
10/10/2003 ISO-9001:2000 Requirements 59
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.5 Production and Service Provision7.5 Production and Service Provision
Control of Production & Service ProvisionControl of Production & Service Provision
Validation of Processes for Product &Validation of Processes for Product &
Service ProvisionService Provision
Identification & TraceabilityIdentification & Traceability
Customer PropertyCustomer Property
Preservation of ProductPreservation of Product
10/10/2003 ISO-9001:2000 Requirements 60
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Control of Production & Service ProvisionControl of Production & Service Provision
Plan & carry out provisions under controlledPlan & carry out provisions under controlled
conditions, including as applicable:conditions, including as applicable:
Availability of information that describesAvailability of information that describes thethe
product characteristicsproduct characteristics ;;
Availability ofAvailability of Work InstructionsWork Instructions, as necessary;, as necessary;
Use ofUse of suitable equipmentsuitable equipment;;
Availability & use ofAvailability & use of Monitoring and MeasuringMonitoring and Measuring
DevicesDevices;;
10/10/2003 ISO-9001:2000 Requirements 61
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
PlanPlan & carry out provisions under controlled& carry out provisions under controlled
conditions, including as applicable:conditions, including as applicable: ContCont’’dd
Implementation ofImplementation of MonitoringMonitoring andand
MeasurementMeasurement;;
Implementation ofImplementation of ReleaseRelease,, DeliveryDelivery
andand PostPost--Delivery Activities.Delivery Activities.
10/10/2003 ISO-9001:2000 Requirements 62
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Validation of Processes for Product &Validation of Processes for Product &
Service ProvisionService Provision
Validate any process for a provision whereValidate any process for a provision where
the resulting outputthe resulting output cannot be verified bycannot be verified by
subsequent monitoring or measurementsubsequent monitoring or measurement ––
wherewhere deficiencies become apparent onlydeficiencies become apparent only
after the product is in useafter the product is in use or the service hasor the service has
been deliveredbeen delivered
ValidationValidation demonstrates the abilitydemonstrates the ability of theof the
processprocess to achieve planned resultsto achieve planned results
10/10/2003 ISO-9001:2000 Requirements 63
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Validation of ProcessesValidation of Processes –– ContCont’’dd
Establish Arrangements for these processes (asEstablish Arrangements for these processes (as
applicable):applicable):
DefinedDefined Criteria for Review & ApprovalCriteria for Review & Approval of theof the
process;process;
Approval ofApproval of EquipmentEquipment & Qualification of& Qualification of
PersonnelPersonnel;;
Use ofUse of Specific Methods & ProceduresSpecific Methods & Procedures;;
Requirements forRequirements for RecordsRecords; and; and
RevalidationRevalidation..
10/10/2003 ISO-9001:2000 Requirements 64
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Identification & TraceabilityIdentification & Traceability
WhereWhere applicableapplicable,, product shall be identifiedproduct shall be identified
by a suitable means throughout itsby a suitable means throughout its
realization process.realization process.
It shallIt shall identify the product statusidentify the product status withwith
respect torespect to monitoring & measurementmonitoring & measurement
requirements.requirements.
WhereWhere traceabilitytraceability is a requirement, theis a requirement, the
unique identification of the product shall beunique identification of the product shall be
controlled and recordedcontrolled and recorded..
10/10/2003 ISO-9001:2000 Requirements 65
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Customer PropertyCustomer Property
Care shall be exercisedCare shall be exercised with customerwith customer
property while under the organizationproperty while under the organization’’ss
control or being used by the organization.control or being used by the organization.
Customer Property shall beCustomer Property shall be identifiedidentified,,
verifiedverified,, protected and safeguardedprotected and safeguarded while inwhile in
use or being incorporated into the product.use or being incorporated into the product.
IfIf lostlost,, damageddamaged or otherwiseor otherwise found to befound to be
unsuitableunsuitable, it shall be reported and records, it shall be reported and records
maintained.maintained.
10/10/2003 ISO-9001:2000 Requirements 66
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Preservation of ProductPreservation of Product
ConformityConformity of the product shall beof the product shall be preservedpreserved
during internal processing and delivery to theduring internal processing and delivery to the
intended destination.intended destination.
PreservationPreservation shall includeshall include identificationidentification,,
handlinghandling,, packagingpackaging andand protectionprotection..
PreservationPreservation also applies to thealso applies to the constituentconstituent
parts of a productparts of a product..
10/10/2003 ISO-9001:2000 Requirements 67
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring7.6 Control of Monitoring and Measuring
DevicesDevices
Determine theDetermine the monitoringmonitoring andand
measurementmeasurement to be undertaken toto be undertaken to
provideprovide evidence of conformityevidence of conformity toto
determined requirements, AND thedetermined requirements, AND the
monitoring and measuringmonitoring and measuring devicesdevices
needed to ensure valid results.needed to ensure valid results.
10/10/2003 ISO-9001:2000 Requirements 68
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
EstablishEstablish processesprocesses to ensure thatto ensure that
monitoring and measurement can bemonitoring and measurement can be
carried out and in a mannercarried out and in a manner
consistent with the monitoring andconsistent with the monitoring and
measurement requirements.measurement requirements.
10/10/2003 ISO-9001:2000 Requirements 69
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
When necessary, measuring equipmentWhen necessary, measuring equipment
shall:shall:
BeBe calibrated or verifiedcalibrated or verified at specified intervals,at specified intervals,
or prior to use,or prior to use, against measurementagainst measurement
standards traceablestandards traceable to international or nationalto international or national
measurement standards;measurement standards;
Where no such standards exist, the basis use forWhere no such standards exist, the basis use for
calibration or verification shall be recorded.calibration or verification shall be recorded.
10/10/2003 ISO-9001:2000 Requirements 70
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
When necessary, measuring equipmentWhen necessary, measuring equipment
shall:shall: -- ContinuedContinued
BeBe adjustedadjusted oror rere--adjustedadjusted as necessary;as necessary;
BeBe identifiedidentified to enable theto enable the calibration statuscalibration status toto
be determined;be determined;
BeBe safeguardedsafeguarded from adjustments that wouldfrom adjustments that would
invalidate the measurement result;invalidate the measurement result;
BeBe protectedprotected from damage and deteriorationfrom damage and deterioration
during handling, maintenance and storage.during handling, maintenance and storage.
10/10/2003 ISO-9001:2000 Requirements 71
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
When the equipment isWhen the equipment is found not tofound not to
conformconform to requirements, theto requirements, the validity of thevalidity of the
previous measuring resultsprevious measuring results shall beshall be
assessed and recorded.assessed and recorded.
Appropriate action shall be taken on theAppropriate action shall be taken on the
equipmentequipment and anyand any product affectedproduct affected..
Records of the results of calibration andRecords of the results of calibration and
verification shall be maintained.verification shall be maintained.
10/10/2003 ISO-9001:2000 Requirements 72
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
77.6 Control of Monitoring and Measuring Devices.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
Computer softwareComputer software to be used in theto be used in the
monitoring and measurement of specifiedmonitoring and measurement of specified
requirements,requirements, shall be confirmedshall be confirmed as to itsas to its
ability to satisfy the intended application.ability to satisfy the intended application.
This confirmation shall be undertaken priorThis confirmation shall be undertaken prior
to initial use and reconfirmed asto initial use and reconfirmed as
necessary.necessary.
10/10/2003 ISO-9001:2000 Requirements 73
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
10/10/2003 ISO-9001:2000 Requirements 74
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8 Measurement, Analysis and Improvement8 Measurement, Analysis and Improvement
GeneralGeneral
Monitoring and MeasurementMonitoring and Measurement
Control of Nonconforming ProductControl of Nonconforming Product
Analysis of DataAnalysis of Data
ImprovementImprovement
10/10/2003 ISO-9001:2000 Requirements 75
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.1 General8.1 General
Plan & Implement the monitoring,Plan & Implement the monitoring,
measurement, analysis and improvementmeasurement, analysis and improvement
processes needed to :processes needed to :
DemonstrateDemonstrate conformity of the product;conformity of the product;
EnsureEnsure conformity of the QMS;conformity of the QMS;
Continually improveContinually improve the effectiveness of the QMSthe effectiveness of the QMS
Determine the applicable methods, includingDetermine the applicable methods, including
statistical techniques, and the extent of theirstatistical techniques, and the extent of their
useuse
10/10/2003 ISO-9001:2000 Requirements 76
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.2 Monitoring and Measurement8.2 Monitoring and Measurement
Customer SatisfactionCustomer Satisfaction
Internal AuditInternal Audit
Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes
Monitoring and Measurement of ProductMonitoring and Measurement of Product
10/10/2003 ISO-9001:2000 Requirements 77
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Customer SatisfactionCustomer Satisfaction
A QMS measurement of performanceA QMS measurement of performance
Monitor information relating toMonitor information relating to customercustomer
perceptionperception as to whether customeras to whether customer
requirements are being met;requirements are being met;
Determine the methods for obtaining andDetermine the methods for obtaining and
using this informationusing this information
10/10/2003 ISO-9001:2000 Requirements 78
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Internal AuditInternal Audit
Conduct internal audits at planned intervals toConduct internal audits at planned intervals to
determine whether the QMS:determine whether the QMS:
ConformsConforms to the planned arrangements, toto the planned arrangements, to
the requirements of ISOthe requirements of ISO--9001, and QMS9001, and QMS
requirements established by therequirements established by the
organization;organization;
Is effectively implementedIs effectively implemented and maintainedand maintained
10/10/2003 ISO-9001:2000 Requirements 79
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Internal AuditInternal Audit –– ConCon’’tt
An audit program shall be planned,An audit program shall be planned, consideringconsidering
the status and importance of the processes andthe status and importance of the processes and
areas to be auditedareas to be audited, as well as the results of the, as well as the results of the
previous audits.previous audits.
The auditThe audit criteriacriteria,, scopescope,, frequencyfrequency andand methodsmethods
shall be defined.shall be defined.
Selection of auditors and conduct of the auditsSelection of auditors and conduct of the audits
shallshall ensure objectivity and impartialityensure objectivity and impartiality of theof the
audit processaudit process
Auditors shall not audit their own workAuditors shall not audit their own work
10/10/2003 ISO-9001:2000 Requirements 80
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Internal AuditInternal Audit –– ContCont’’dd
TheThe management responsible for themanagement responsible for the
areas being auditedareas being audited shall ensure thatshall ensure that
actions are takenactions are taken without undue delaywithout undue delay toto
eliminate detected nonconformities andeliminate detected nonconformities and
their causes.their causes.
FollowFollow--up activitiesup activities shall include theshall include the
verification of the actions taken and theverification of the actions taken and the
reporting of verification results.reporting of verification results.
10/10/2003 ISO-9001:2000 Requirements 81
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes
Apply suitable methods for monitoring and,Apply suitable methods for monitoring and,
where applicable, measurement of the QMSwhere applicable, measurement of the QMS
processes.processes.
These methods shall demonstrate the ability ofThese methods shall demonstrate the ability of
the processes to achieve planned results.the processes to achieve planned results.
When planned results are not achieved,When planned results are not achieved,
correction and corrective action shall be takencorrection and corrective action shall be taken
as appropriate to ensure conformity of theas appropriate to ensure conformity of the
product.product.
10/10/2003 ISO-9001:2000 Requirements 82
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Monitoring and Measurement of ProductMonitoring and Measurement of Product
Monitor and measure theMonitor and measure the productproduct
characteristicscharacteristics to verify thatto verify that productproduct
requirementsrequirements have been met.have been met.
This is to be carried out at appropriateThis is to be carried out at appropriate
stages of the product realization processstages of the product realization process
IAW the planned arrangementsIAW the planned arrangements
10/10/2003 ISO-9001:2000 Requirements 83
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Monitoring and Measurement of ProductMonitoring and Measurement of Product –– ConCon’’tt
Evidence of conformityEvidence of conformity with thewith the acceptanceacceptance
criteriacriteria shall be maintainedshall be maintained
Records shall indicate theRecords shall indicate the person(s)person(s)
authorizing release of productauthorizing release of product
Product Release and Service DeliveryProduct Release and Service Delivery shall notshall not
proceedproceed until the planned arrangements haveuntil the planned arrangements have
been satisfactorily completed, unlessbeen satisfactorily completed, unless otherwiseotherwise
approved by a relevant authorityapproved by a relevant authority and whereand where
applicable by the customer.applicable by the customer.
10/10/2003 ISO-9001:2000 Requirements 84
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product
Ensure that product whichEnsure that product which does not conformdoes not conform
to product requirements isto product requirements is identifiedidentified andand
controlledcontrolled to prevent its unintended use orto prevent its unintended use or
delivery.delivery.
The controls and related responsibilities andThe controls and related responsibilities and
authorities for dealing with nonconformingauthorities for dealing with nonconforming
product shall be defined in a documentedproduct shall be defined in a documented
procedure.procedure.
10/10/2003 ISO-9001:2000 Requirements 85
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product –– ContCont’’dd
Nonconforming product shall be dealt with inNonconforming product shall be dealt with in
one or more of the following ways:one or more of the following ways:
TakingTaking action to eliminateaction to eliminate the detectedthe detected
nonconformity;nonconformity;
Authorizing its useAuthorizing its use, release or acceptance under, release or acceptance under
concession by a relevant authority and, whereconcession by a relevant authority and, where
applicable, by the customer;applicable, by the customer;
TakingTaking action to preclude its original intended useaction to preclude its original intended use
or applicationor application
10/10/2003 ISO-9001:2000 Requirements 86
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product –– ContCont’’dd
When nonconforming productWhen nonconforming product is correctedis corrected itit
shall beshall be subject to resubject to re--verificationverification toto
demonstrate conformity todemonstrate conformity to the requirements.the requirements.
When detected after delivery or use hasWhen detected after delivery or use has
started,started, actions shall be takenactions shall be taken with thewith the
nonconforming product , appropriate to thenonconforming product , appropriate to the
effects, or potential effects, of theeffects, or potential effects, of the
nonconformity.nonconformity.
10/10/2003 ISO-9001:2000 Requirements 87
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product ––
ContCont’’dd
RecordsRecords of the nature of nonconformitiesof the nature of nonconformities
and any subsequent actions taken,and any subsequent actions taken,
including concessions obtained, shall beincluding concessions obtained, shall be
maintainedmaintained
10/10/2003 ISO-9001:2000 Requirements 88
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.4 Analysis of Data8.4 Analysis of Data
Determine, collect and analyze appropriateDetermine, collect and analyze appropriate
datadata to demonstrateto demonstrate thethe suitabilitysuitability andand
effectivenesseffectiveness of the QMS andof the QMS and to evaluateto evaluate
wherewhere continual improvementcontinual improvement of theof the
effectiveness of the QMS can be madeeffectiveness of the QMS can be made
This shall include data generated as a result ofThis shall include data generated as a result of
monitoring and measurement and from othermonitoring and measurement and from other
relevant sourcesrelevant sources
10/10/2003 ISO-9001:2000 Requirements 89
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.4 Analysis of Data8.4 Analysis of Data –– ContCont’’dd
Analysis of Data shall provide informationAnalysis of Data shall provide information
relating to:relating to:
Customer satisfaction;Customer satisfaction;
Conformity to product requirements;Conformity to product requirements;
Characteristics and trends of processes andCharacteristics and trends of processes and
products including opportunities for preventiveproducts including opportunities for preventive
action;action;
SuppliersSuppliers
10/10/2003 ISO-9001:2000 Requirements 90
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.5 Improvement8.5 Improvement
Continual ImprovementContinual Improvement
Corrective ActionCorrective Action
Preventive ActionPreventive Action
10/10/2003 ISO-9001:2000 Requirements 91
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Continual ImprovementContinual Improvement
Continually improve the effectiveness of theContinually improve the effectiveness of the
QMS through the use of the:QMS through the use of the:
Quality PolicyQuality Policy;;
Quality ObjectivesQuality Objectives;;
Audit ResultsAudit Results;;
Analysis of DataAnalysis of Data;;
Corrective & Preventive ActionsCorrective & Preventive Actions
Management ReviewManagement Review
10/10/2003 ISO-9001:2000 Requirements 92
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Corrective ActionCorrective Action
Actions takenActions taken to eliminate the causeto eliminate the cause ofof
nonconformity in order tononconformity in order to preventprevent
recurrencerecurrence
They shall be appropriate to the effects ofThey shall be appropriate to the effects of
the nonconformities encountered.the nonconformities encountered.
10/10/2003 ISO-9001:2000 Requirements 93
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Corrective ActionCorrective Action-- ContCont’’dd
A documented procedure shall be establishedA documented procedure shall be established
to define requirements for:to define requirements for:
Reviewing nonconformities (including CustomerReviewing nonconformities (including Customer
Complaints);Complaints);
Determining the causes of nonconformities;Determining the causes of nonconformities;
Evaluating the need for action to ensure thatEvaluating the need for action to ensure that
nonconformities do not recur;nonconformities do not recur;
Determining & implementing action needed;Determining & implementing action needed;
Reviewing corrective action taken;Reviewing corrective action taken;
Records of results of action taken.Records of results of action taken.
10/10/2003 ISO-9001:2000 Requirements 94
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Preventive ActionPreventive Action
Actions takenActions taken to eliminate the causeto eliminate the cause ofof
potentialpotential nonconformities in order tononconformities in order to
prevent their occurrenceprevent their occurrence
They shall be appropriate to the effects ofThey shall be appropriate to the effects of
thethe potential problemspotential problems..
10/10/2003 ISO-9001:2000 Requirements 95
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Preventive ActionPreventive Action –– ContCont’’dd
A documented procedure shall be establishedA documented procedure shall be established
to define requirements for:to define requirements for:
Determining potential nonconformities and theirDetermining potential nonconformities and their
causes;causes;
Evaluating the need for action to prevent occurrenceEvaluating the need for action to prevent occurrence
of nonconformities;of nonconformities;
Determining & implementing action needed;Determining & implementing action needed;
Reviewing preventive action taken;Reviewing preventive action taken;
Records of the results of action taken.Records of the results of action taken.

More Related Content

What's hot

Soal-soal Test SMM-ISO 9001-2008
Soal-soal Test SMM-ISO 9001-2008Soal-soal Test SMM-ISO 9001-2008
Soal-soal Test SMM-ISO 9001-2008
Shobrie Hardhi, SE, CFA, CLA, CPHR, CPTr.
 
Iso 9001 understanding rev3
Iso 9001 understanding rev3Iso 9001 understanding rev3
Iso 9001 understanding rev3jlcadarian
 
Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheet
Amit Mishra
 
QUALITY MANUAL with new times-1
QUALITY MANUAL with new times-1QUALITY MANUAL with new times-1
QUALITY MANUAL with new times-1Ronak Patel
 
Elements of a Quality System for Medical Devices
Elements of a Quality System for Medical DevicesElements of a Quality System for Medical Devices
Elements of a Quality System for Medical DevicesRaul Soto
 
Module 01 Introduction To FdA and Quality System Regulation
Module 01 Introduction To FdA and Quality System RegulationModule 01 Introduction To FdA and Quality System Regulation
Module 01 Introduction To FdA and Quality System Regulation
QACATX
 
محمد العتي تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...
محمد العتي          تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...محمد العتي          تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...
محمد العتي تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...qualitysummit
 
Iso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklistIso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklist
PHILIP TEO
 
Iso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis GovindIso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis Govind
Govind Ramu
 
Q7 a
Q7 aQ7 a
ISO 15189:2007 Quality Manual
ISO 15189:2007 Quality ManualISO 15189:2007 Quality Manual
ISO 15189:2007 Quality Manual
Bilal Al-kadri
 
Internal quality mgmt system audit checklist (iso 9000 2000)
Internal quality mgmt system audit checklist (iso 9000   2000)Internal quality mgmt system audit checklist (iso 9000   2000)
Internal quality mgmt system audit checklist (iso 9000 2000)Carlos Serra
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485
WQA APAC
 
Cairo Iso 2000
Cairo Iso 2000Cairo Iso 2000
Cairo Iso 2000
ahmad bassiouny
 
IATF 16949:2016 block diagram flow (Aug 7, 2018)
IATF 16949:2016 block diagram flow (Aug 7, 2018)IATF 16949:2016 block diagram flow (Aug 7, 2018)
IATF 16949:2016 block diagram flow (Aug 7, 2018)
Pricha Leelanukrom
 

What's hot (18)

Soal-soal Test SMM-ISO 9001-2008
Soal-soal Test SMM-ISO 9001-2008Soal-soal Test SMM-ISO 9001-2008
Soal-soal Test SMM-ISO 9001-2008
 
Iso 9001 understanding rev3
Iso 9001 understanding rev3Iso 9001 understanding rev3
Iso 9001 understanding rev3
 
Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheet
 
QUALITY MANUAL with new times-1
QUALITY MANUAL with new times-1QUALITY MANUAL with new times-1
QUALITY MANUAL with new times-1
 
Elements of a Quality System for Medical Devices
Elements of a Quality System for Medical DevicesElements of a Quality System for Medical Devices
Elements of a Quality System for Medical Devices
 
Module 01 Introduction To FdA and Quality System Regulation
Module 01 Introduction To FdA and Quality System RegulationModule 01 Introduction To FdA and Quality System Regulation
Module 01 Introduction To FdA and Quality System Regulation
 
QUALITY MANUAL System
QUALITY MANUAL SystemQUALITY MANUAL System
QUALITY MANUAL System
 
محمد العتي تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...
محمد العتي          تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...محمد العتي          تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...
محمد العتي تطبيق الجودة في الجهات الحكومية - الهيئة العامة للغذاء وا...
 
Iso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklistIso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklist
 
Iso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis GovindIso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis Govind
 
Q7 a
Q7 aQ7 a
Q7 a
 
Validation
ValidationValidation
Validation
 
ISO 15189:2007 Quality Manual
ISO 15189:2007 Quality ManualISO 15189:2007 Quality Manual
ISO 15189:2007 Quality Manual
 
Internal quality mgmt system audit checklist (iso 9000 2000)
Internal quality mgmt system audit checklist (iso 9000   2000)Internal quality mgmt system audit checklist (iso 9000   2000)
Internal quality mgmt system audit checklist (iso 9000 2000)
 
Gmpchecklist
GmpchecklistGmpchecklist
Gmpchecklist
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485
 
Cairo Iso 2000
Cairo Iso 2000Cairo Iso 2000
Cairo Iso 2000
 
IATF 16949:2016 block diagram flow (Aug 7, 2018)
IATF 16949:2016 block diagram flow (Aug 7, 2018)IATF 16949:2016 block diagram flow (Aug 7, 2018)
IATF 16949:2016 block diagram flow (Aug 7, 2018)
 

Viewers also liked

Quality Initiatives Iso 9001 2000[1]
Quality Initiatives Iso 9001 2000[1]Quality Initiatives Iso 9001 2000[1]
Quality Initiatives Iso 9001 2000[1]
ANNA UNIVERSITY
 
Omnex semiconductor1 may_2000
Omnex semiconductor1  may_2000Omnex semiconductor1  may_2000
Omnex semiconductor1 may_2000Omnex Inc.
 
Iso 9000 2000 Prs
Iso 9000 2000 PrsIso 9000 2000 Prs
Iso 9000 2000 Prsshajukhan21
 
Lição_122016_Filho de Davi_GGR
Lição_122016_Filho de Davi_GGRLição_122016_Filho de Davi_GGR
Lição_122016_Filho de Davi_GGR
Gerson G. Ramos
 
Reporte
ReporteReporte
Por que tantas igrejas se Deus é um so? palestra 22
Por que tantas igrejas se Deus é um so? palestra 22Por que tantas igrejas se Deus é um so? palestra 22
Por que tantas igrejas se Deus é um so? palestra 22
Rogerio Sena
 
The Formula of a Hydrate
The Formula of a HydrateThe Formula of a Hydrate
The Formula of a Hydrate
walt sautter
 
6 Estágios das lagartas voadoras - palestra 31
6 Estágios das lagartas voadoras - palestra 316 Estágios das lagartas voadoras - palestra 31
6 Estágios das lagartas voadoras - palestra 31
Rogerio Sena
 
Presentació
PresentacióPresentació
Presentació
Julián Vera López
 
Laboratorio n 16
Laboratorio n 16Laboratorio n 16
Laboratorio n 16
fernando paniagua
 
25 Ways To Take Initiative At Work
25 Ways To Take Initiative At Work25 Ways To Take Initiative At Work
25 Ways To Take Initiative At Work
ThriveYard
 
ISO 9001:2000 & 9004:2000 - Susan
ISO 9001:2000 & 9004:2000 - SusanISO 9001:2000 & 9004:2000 - Susan
ISO 9001:2000 & 9004:2000 - Susanelsanora
 
Prefabrication
PrefabricationPrefabrication
Prefabricationaaronetan
 
35 Simple Tips for Happiness and Success at Work
35 Simple Tips for Happiness and Success at Work35 Simple Tips for Happiness and Success at Work
35 Simple Tips for Happiness and Success at Work
ThriveYard
 
Conditional sentences (2ºeso)
Conditional sentences (2ºeso)Conditional sentences (2ºeso)
Conditional sentences (2ºeso)
Jesusmoron
 
Iso
IsoIso
Evaluation question one
Evaluation question oneEvaluation question one
Evaluation question one
francesca radley
 
Trigeminal neuralgia new classification and diagnostic grading for
Trigeminal neuralgia  new classification and diagnostic grading forTrigeminal neuralgia  new classification and diagnostic grading for
Trigeminal neuralgia new classification and diagnostic grading for
sandra mosses
 

Viewers also liked (20)

Quality Initiatives Iso 9001 2000[1]
Quality Initiatives Iso 9001 2000[1]Quality Initiatives Iso 9001 2000[1]
Quality Initiatives Iso 9001 2000[1]
 
Omnex semiconductor1 may_2000
Omnex semiconductor1  may_2000Omnex semiconductor1  may_2000
Omnex semiconductor1 may_2000
 
Iso 9000 2000 Prs
Iso 9000 2000 PrsIso 9000 2000 Prs
Iso 9000 2000 Prs
 
Lição_122016_Filho de Davi_GGR
Lição_122016_Filho de Davi_GGRLição_122016_Filho de Davi_GGR
Lição_122016_Filho de Davi_GGR
 
Reporte
ReporteReporte
Reporte
 
Por que tantas igrejas se Deus é um so? palestra 22
Por que tantas igrejas se Deus é um so? palestra 22Por que tantas igrejas se Deus é um so? palestra 22
Por que tantas igrejas se Deus é um so? palestra 22
 
The Formula of a Hydrate
The Formula of a HydrateThe Formula of a Hydrate
The Formula of a Hydrate
 
6 Estágios das lagartas voadoras - palestra 31
6 Estágios das lagartas voadoras - palestra 316 Estágios das lagartas voadoras - palestra 31
6 Estágios das lagartas voadoras - palestra 31
 
Presentació
PresentacióPresentació
Presentació
 
A18
A18A18
A18
 
ISO 9004
ISO 9004ISO 9004
ISO 9004
 
Laboratorio n 16
Laboratorio n 16Laboratorio n 16
Laboratorio n 16
 
25 Ways To Take Initiative At Work
25 Ways To Take Initiative At Work25 Ways To Take Initiative At Work
25 Ways To Take Initiative At Work
 
ISO 9001:2000 & 9004:2000 - Susan
ISO 9001:2000 & 9004:2000 - SusanISO 9001:2000 & 9004:2000 - Susan
ISO 9001:2000 & 9004:2000 - Susan
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
35 Simple Tips for Happiness and Success at Work
35 Simple Tips for Happiness and Success at Work35 Simple Tips for Happiness and Success at Work
35 Simple Tips for Happiness and Success at Work
 
Conditional sentences (2ºeso)
Conditional sentences (2ºeso)Conditional sentences (2ºeso)
Conditional sentences (2ºeso)
 
Iso
IsoIso
Iso
 
Evaluation question one
Evaluation question oneEvaluation question one
Evaluation question one
 
Trigeminal neuralgia new classification and diagnostic grading for
Trigeminal neuralgia  new classification and diagnostic grading forTrigeminal neuralgia  new classification and diagnostic grading for
Trigeminal neuralgia new classification and diagnostic grading for
 

Similar to 3844652 iso-9001-2000-auditor-training

presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
AhmedAltantawi
 
mgmt160-ISO 9000-s04.ppt
mgmt160-ISO 9000-s04.pptmgmt160-ISO 9000-s04.ppt
mgmt160-ISO 9000-s04.ppt
ssuser43ef56
 
Mgmt160 iso 9000-s04
Mgmt160 iso 9000-s04Mgmt160 iso 9000-s04
Mgmt160 iso 9000-s04
Mansoor06
 
Qms iso 9000 (ISO 9000 series of quality systems standards)
Qms  iso 9000 (ISO 9000 series of quality systems standards)Qms  iso 9000 (ISO 9000 series of quality systems standards)
Qms iso 9000 (ISO 9000 series of quality systems standards)
Dr Ajay Kumar Tiwari
 
Iso 9001 2008 qms
Iso 9001 2008 qmsIso 9001 2008 qms
Iso 9001 2008 qms
Charlton Inao
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
Dr Fereidoun Dejahang
 
ISO Intro1.pptx
ISO Intro1.pptxISO Intro1.pptx
ISO Intro1.pptx
Chandrasen Sharma
 
Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)
Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)
Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)
USL International Quality Services
 
Iso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlinesIso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlines
Rajeesh Thumpayil
 
ISO DOcumentation tips
ISO DOcumentation tipsISO DOcumentation tips
ISO DOcumentation tips
Ganapathi subramania sreedharan
 
Quality manual for small and medium companies
Quality manual for small and medium companiesQuality manual for small and medium companies
Quality manual for small and medium companies
billwillis66
 
Iso 9000 1 2015
Iso 9000 1 2015Iso 9000 1 2015
Iso 9000 1 2015
raafat atta
 
ISO series, guide of pharmaceutical manufacturing facilities, productivity b...
 ISO series, guide of pharmaceutical manufacturing facilities, productivity b... ISO series, guide of pharmaceutical manufacturing facilities, productivity b...
ISO series, guide of pharmaceutical manufacturing facilities, productivity b...
Kailash Vilegave
 
Iso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & ChangesIso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & Changes
bkerkstra
 
ISO 9000
ISO 9000ISO 9000
ISO 9000
Haroon Abbu
 
Iso90011
Iso90011Iso90011
Iso90011
ahmad bassiouny
 
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdfISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
Haris Waseem
 

Similar to 3844652 iso-9001-2000-auditor-training (20)

presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
mgmt160-ISO 9000-s04.ppt
mgmt160-ISO 9000-s04.pptmgmt160-ISO 9000-s04.ppt
mgmt160-ISO 9000-s04.ppt
 
Mgmt160 iso 9000-s04
Mgmt160 iso 9000-s04Mgmt160 iso 9000-s04
Mgmt160 iso 9000-s04
 
Qms iso 9000 (ISO 9000 series of quality systems standards)
Qms  iso 9000 (ISO 9000 series of quality systems standards)Qms  iso 9000 (ISO 9000 series of quality systems standards)
Qms iso 9000 (ISO 9000 series of quality systems standards)
 
Iso 9001 2008 qms
Iso 9001 2008 qmsIso 9001 2008 qms
Iso 9001 2008 qms
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
 
API.pptx
API.pptxAPI.pptx
API.pptx
 
ISO Intro1.pptx
ISO Intro1.pptxISO Intro1.pptx
ISO Intro1.pptx
 
Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)
Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)
Clause by Clause Comparison sheet (ISO 9001:2015 and ISO 22163:2017 IRIS)
 
Iso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlinesIso 9001 2015 documented information guidlines
Iso 9001 2015 documented information guidlines
 
ISO DOcumentation tips
ISO DOcumentation tipsISO DOcumentation tips
ISO DOcumentation tips
 
Quality manual for small and medium companies
Quality manual for small and medium companiesQuality manual for small and medium companies
Quality manual for small and medium companies
 
Iso 9000 1 2015
Iso 9000 1 2015Iso 9000 1 2015
Iso 9000 1 2015
 
ISO series, guide of pharmaceutical manufacturing facilities, productivity b...
 ISO series, guide of pharmaceutical manufacturing facilities, productivity b... ISO series, guide of pharmaceutical manufacturing facilities, productivity b...
ISO series, guide of pharmaceutical manufacturing facilities, productivity b...
 
Iso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & ChangesIso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & Changes
 
ISO 9000
ISO 9000ISO 9000
ISO 9000
 
Iso90011
Iso90011Iso90011
Iso90011
 
Iso90011
Iso90011Iso90011
Iso90011
 
9001 2008 details
9001 2008 details9001 2008 details
9001 2008 details
 
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdfISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
 

Recently uploaded

Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
gb193092
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
kimdan468
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
Wasim Ak
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 

Recently uploaded (20)

Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 

3844652 iso-9001-2000-auditor-training

  • 1. 10/10/2003 ISO-9001:2000 Requirements 1 ISOISO--9001:20009001:2000 Quality Management SystemsQuality Management Systems REQUIREMENTSREQUIREMENTS
  • 2. 10/10/2003 ISO-9001:2000 Requirements 2 Process Based ApproachProcess Based Approach MANAGEMENTMANAGEMENT RESPONSIBILITYRESPONSIBILITY RESOURCE MANAGEMENTRESOURCE MANAGEMENT MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS & IMPROVEMENTIMPROVEMENT INPUT PROCESS OUTPUT CC UU SS TT OO MM EE RR P DC A PRODUCT REALIZATIONPRODUCT REALIZATION SatisfactionSatisfaction C U S T O M E R RequirementsRequirements
  • 3. 10/10/2003 ISO-9001:2000 Requirements 3 THETHE PDCAPDCA CYCLECYCLE PLANPLAN DODO IMPLEMENTIMPLEMENT CHECKCHECK STUDYSTUDY ACTACT EVALUATEEVALUATE VERIFYVERIFY VALIDATEVALIDATE
  • 4. 10/10/2003 ISO-9001:2000 Requirements 4 ISOISO--9000:2000 Family Structure9000:2000 Family Structure Quality Management SystemQuality Management System PROCESS MODELPROCESS MODEL QualityQuality ManagementManagement SystemsSystems -- RequirementsRequirements ISO 9001ISO 9001 REFERENCEREFERENCE STANDARDSTANDARD QualityQuality ManagementManagement SystemsSystems –– FundamentalsFundamentals & Vocabulary& Vocabulary ISO 9000ISO 9000 ISO 9004ISO 9004 GuidelinesGuidelines ForFor PerformancePerformance ImprovementsImprovements SUPPORTING STANDARDSSUPPORTING STANDARDS ISO 10012ISO 10012 RequirementsRequirements forfor MeasurementMeasurement Processes &Processes & MeasuringMeasuring EquipmentEquipment OTHER STANDARDSOTHER STANDARDS ISO 19011ISO 19011 GuidelinesGuidelines on Qualityon Quality & EMS& EMS AuditingAuditing ISO/IEC 17025ISO/IEC 17025 Competence ofCompetence of Testing &Testing & CalibrationCalibration LabsLabs ISO/TS 16949ISO/TS 16949 Quality MgmtQuality Mgmt SystemsSystems -- AutomotiveAutomotive ISO 13485ISO 13485 MedicalMedical DevicesDevices -- Quality MgmtQuality Mgmt SystemsSystems ISO 14001ISO 14001 EnvironmentalEnvironmental ManagementManagement SystemSystem ISO 15189ISO 15189 Medical LabsMedical Labs –– Quality &Quality & CompetenceCompetence ISO 10013ISO 10013 GuidelinesGuidelines forfor DevelopingDeveloping QMSQMS DocumentsDocuments ISO 10014ISO 10014 GuidelinesGuidelines ManagingManaging thethe EconomicsEconomics of Qualityof Quality ISO 10017ISO 10017 GuidanceGuidance onon StatisticalStatistical TechniquesTechniques ISO 10005ISO 10005 GuidelinesGuidelines for Qualityfor Quality PlansPlans ISO 10006ISO 10006 GuidelinesGuidelines in Projectin Project MgmtMgmt ISO 10007ISO 10007 GuidelinesGuidelines forfor ConfigConfig.. MgmtMgmt ISO 10015ISO 10015 GuidelinesGuidelines for Trainingfor Training PHILOSOPHICAL GUIDELINESPHILOSOPHICAL GUIDELINES
  • 5. 10/10/2003 ISO-9001:2000 Requirements 5 QMS per ISOQMS per ISO--9001:20009001:2000 4 Quality Management System4 Quality Management System General RequirementsGeneral Requirements Documentation RequirementsDocumentation Requirements
  • 6. 10/10/2003 ISO-9001:2000 Requirements 6 QMS per ISOQMS per ISO--9001:20009001:2000 4.1 General Requirements4.1 General Requirements Establish, Document, Implement & Maintain a QMSQMS and Continually ImproveContinually Improve its Effectivenessits Effectiveness Identify the ProcessesProcesses and their application throughout the organization
  • 7. 10/10/2003 ISO-9001:2000 Requirements 7 QMS per ISOQMS per ISO--9001:20009001:2000 4.1 General Rs– Continued Determine the sequence and interaction of these processesthese processes; Determine criteria and methods to ensure the operation and control of thesethese processesprocesses are effective;
  • 8. 10/10/2003 ISO-9001:2000 Requirements 8 QMS per ISOQMS per ISO--9001:20009001:2000 4.1 General Rs– Continued Ensure necessary resources and informa- tion are available to support the operation and monitoring of these processesthese processes; Monitor, Measure and analyze thesethese processesprocesses; Implement actions necessary to achieve planned results and continual improvement of these processesthese processes.
  • 9. 10/10/2003 ISO-9001:2000 Requirements 9 QMS per ISOQMS per ISO--9001:20009001:2000 4.1 General Rs– Continued Outsourced processes shall beshall be identified and controlledidentified and controlled Outside processes that affect productOutside processes that affect product conformity with requirements;conformity with requirements;
  • 10. 10/10/2003 ISO-9001:2000 Requirements 10 QMS per ISOQMS per ISO--9001:20009001:2000 4.2 Documentation Requirements4.2 Documentation Requirements A QMS documentation shall include: StatementsStatements of a Quality PolicyQuality Policy and QualityQuality ObjectivesObjectives; A Quality ManualQuality Manual; ProceduresProcedures required by ISO (6); RecordsRecords required by ISO (21);
  • 11. 10/10/2003 ISO-9001:2000 Requirements 11 QMS per ISOQMS per ISO--9001:20009001:2000 4.2 Documentation Requirements-Continued Quality Manual ScopeScope of QMS Detailed ExclusionsExclusions and their justification; Documented ProceduresDocumented Procedures, or reference to them; and A description of the interactionA description of the interaction between the QMS processes.
  • 12. 10/10/2003 ISO-9001:2000 Requirements 12 Exclusions to ISO-9001:2000 1.2 Application All Requirements are generic and are intended to be applicable to all organizations. Where any requirements cannot be applied due to the nature of an organization and its product – an exclusion can be considered. Exclusions are limited to requirements within clause 7 – Product Realization.
  • 13. 10/10/2003 ISO-9001:2000 Requirements 13 Procedures Required by ISOProcedures Required by ISO 4.2.3 Control of DocumentsControl of Documents 4.2.4 Control of RecordsControl of Records 8.2.2 Internal AuditsInternal Audits 8.3 Control of Nonconforming ProductControl of Nonconforming Product 8.5.2 Corrective ActionCorrective Action 8.5.3 Preventive ActionPreventive Action
  • 14. 10/10/2003 ISO-9001:2000 Requirements 14 Records Required by ISORecords Required by ISO (21)(21) 4.2.4 Records shall be established andRecords shall be established and maintained to provide evidence of conformity tomaintained to provide evidence of conformity to requirements and of the effective operation of therequirements and of the effective operation of the QMS.QMS. 5.6.1 Management Review – General, Records fromRecords from Management ReviewsManagement Reviews shall be maintained ; 6.2.2 (Human Resources) Appropriate records ofrecords of education, training, skills and experienceeducation, training, skills and experience; 7.1 (Planning of Product Realization) Records to provide evidence that the realization processes andevidence that the realization processes and resulting product meet requirementsresulting product meet requirements;
  • 15. 10/10/2003 ISO-9001:2000 Requirements 15 Records Required by ISORecords Required by ISO 7.2.2 (Customer Related Processes - Review of Requirements related to the Product) Records of theRecords of the results of the review and actions arising from it shall beresults of the review and actions arising from it shall be maintainedmaintained; 7.3.2 (Design & Development – Inputs) Inputs relatingInputs relating to product requirements shall be determined andto product requirements shall be determined and records maintainedrecords maintained; 7.3.4 (Design & Development – Review) Records ofRecords of the results of the reviews and any necessary actionsthe results of the reviews and any necessary actions shall be maintainedshall be maintained; 7.3.5 (Design & Development – Verification) RecordsRecords of the results of the verification and any necessaryof the results of the verification and any necessary actions shall be maintainedactions shall be maintained.
  • 16. 10/10/2003 ISO-9001:2000 Requirements 16 Records Required by ISORecords Required by ISO 7.3.6 (Design & Development – Validation) Records ofRecords of the results of validation and any necessary actionsthe results of validation and any necessary actions shall be maintainedshall be maintained; 7.3.7 (Control of Design & Development Changes) Records of the results of the review and any necessaryRecords of the results of the review and any necessary actions shall be maintainedactions shall be maintained; 7.4.1 (Purchasing Process) Records of the results ofRecords of the results of evaluations and any necessary actions arising from theevaluations and any necessary actions arising from the evaluation shall be maintainedevaluation shall be maintained; 7.5.2 ( Validation of ‘Special Processes’) The organization shall establish arrangements for these processes including – requirements for recordsrequirements for records;
  • 17. 10/10/2003 ISO-9001:2000 Requirements 17 Records Required by ISORecords Required by ISO 7.5.3 (Identification & Traceability) Where traceability is a requirement, the organization shall control and record the unique identification of the productrecord the unique identification of the product; 7.5.4 (Customer Property) If any customer property is lost, damaged or otherwise found to be unsuitable for use, this shall be reported to the customer and recordsthis shall be reported to the customer and records maintainedmaintained; 7.6 (Control of Monitoring & Measuring Devices) If calibrated/verified to nonIf calibrated/verified to non--national or international standardsnational or international standards –– the basis shall be recorded.the basis shall be recorded. Equipment found nonEquipment found non--conformingconforming –– validity of previousvalidity of previous measurements shall be assessed & recorded;measurements shall be assessed & recorded; Records of the results of calibration and verification shall beRecords of the results of calibration and verification shall be maintainedmaintained;
  • 18. 10/10/2003 ISO-9001:2000 Requirements 18 Records Required by ISORecords Required by ISO 8.2.2 (Internal Audit) The responsibilities and requirements for planning and conducting audits and for reporting results and maintaining recordsand maintaining records…; 8.2.4 (Monitoring & Measurement of Product) Evidence of conformity with the acceptance criteria shall be maintained. Records shall indicate the person(s)Records shall indicate the person(s) authorizing release of productauthorizing release of product; 8.3 (Control of Nonconforming Product) Records of theRecords of the nature of nonconformities and any subsequent actionsnature of nonconformities and any subsequent actions taken, including concessions obtained, shall betaken, including concessions obtained, shall be maintainedmaintained;
  • 19. 10/10/2003 ISO-9001:2000 Requirements 19 Records Required by ISORecords Required by ISO 8.5.2 (Improvement – Corrective Action) Records ofRecords of the results of action takenthe results of action taken; 8.5.3 (Improvement – Preventive Action) Records ofRecords of the results of action takenthe results of action taken.
  • 20. 10/10/2003 ISO-9001:2000 Requirements 20 QMS per ISOQMS per ISO--9001:20009001:2000 4.2 Documentation Requirements-Continued Control of DocumentsControl of Documents A documented procedure to define the following controls: –– Approve adequacy of documents prior to issueApprove adequacy of documents prior to issue;; –– Review and update as necessary & ReReview and update as necessary & Re-- approveapprove; –– Ensure changes and current revision status ofEnsure changes and current revision status of documents are identifieddocuments are identified;
  • 21. 10/10/2003 ISO-9001:2000 Requirements 21 QMS per ISOQMS per ISO--9001:20009001:2000 Control of Documents-Cont’d A documented procedure to define the following controls: - Continued – Ensure relevant versionsrelevant versions of applicable documents are available at points of useare available at points of use; – Ensure documents remain legible and readilyremain legible and readily identifiable;identifiable; – Ensure documents of external originexternal origin are identified and their distribution controlled; and –– Prevent the unintended use of obsoletePrevent the unintended use of obsolete documentsdocuments, AND apply suitable ID if they areapply suitable ID if they are retained for any purposeretained for any purpose;
  • 22. 10/10/2003 ISO-9001:2000 Requirements 22 QMS per ISOQMS per ISO--9001:20009001:2000 4.2 Documentation Requirements-Continued Control of Records A documented procedure to define the controls needed for the identification, storage, protection, retrieval, retention time and disposition of records. 4.2 Documentation Requirements-Continued Control of RecordsControl of Records A documented procedure to define the controls needed for the identificationidentification,, storagestorage,, protectionprotection,, retrievalretrieval,, retention timeretention time andand dispositiondisposition of records.of records.
  • 23. 10/10/2003 ISO-9001:2000 Requirements 23 Process Based ApproachProcess Based Approach MANAGEMENTMANAGEMENT RESPONSIBILITYRESPONSIBILITY RESOURCE MANAGEMENTRESOURCE MANAGEMENT MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS & IMPROVEMENTIMPROVEMENT INPUT PROCESS OUTPUT CC UU SS TT OO MM EE RR P DC A PRODUCT REALIZATIONPRODUCT REALIZATION SatisfactionSatisfaction C U S T O M E R RequirementsRequirements
  • 24. 10/10/2003 ISO-9001:2000 Requirements 24 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5 Management Responsibility Management Commitment Customer Focus Quality Policy Planning Management Review 5 Management Responsibility5 Management Responsibility Management CommitmentManagement Commitment Customer FocusCustomer Focus Quality PolicyQuality Policy PlanningPlanning Management ReviewManagement Review
  • 25. 10/10/2003 ISO-9001:2000 Requirements 25 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5.1 Management Commitment Evidence of Commitment Communicate to the Organization the Importance of meeting Customer, Statutory, and Regulatory Requirements Establish the Quality Policy Ensuring Quality Objectives are Established Conduct Management Reviews Ensure the Availability of Resources 5.1 Management Commitment5.1 Management Commitment Evidence of CommitmentEvidence of Commitment Communicate to the Organization the Importance of meeting CustomerCustomer, StatutoryStatutory, and RegulatoryRegulatory RequirementsRequirements Establish the Quality PolicyQuality Policy Ensuring Quality ObjectivesQuality Objectives are Established Conduct Management ReviewsManagement Reviews Ensure the Availability of ResourcesAvailability of Resources
  • 26. 10/10/2003 ISO-9001:2000 Requirements 26 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5.2 Customer Focus Ensure Customer Requirements are determined and met, with the aim of enhancing customer satisfaction 5.3 Quality Policy Established, Appropriate, Framework for Quality Objectives, Communicated & Understood, and Reviewed for Continued Suitability 5.2 Customer Focus5.2 Customer Focus Ensure Customer Requirements are determined and met, with the aim of enhancing customeraim of enhancing customer satisfactionsatisfaction 5.3 Quality Policy5.3 Quality Policy Established, Appropriate, Framework for QualityFramework for Quality ObjectivesObjectives, Communicated & UnderstoodCommunicated & Understood, and Reviewed for Continued Suitability
  • 27. 10/10/2003 ISO-9001:2000 Requirements 27 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5.4 Planning Establish Quality Objectives at relevant levels and functions within the Organization Ensure that the planning of the QMS is carried out to meet the General Requirements (4.1) Maintain Integrity of the QMS when changes are planned & implemented 5.4 Planning5.4 Planning Establish Quality ObjectivesEstablish Quality Objectives at relevant levelsat relevant levels and functions within the Organizationand functions within the Organization Ensure that the planning of the QMS is carriedEnsure that the planning of the QMS is carried outout to meet the General Requirementsto meet the General Requirements (4.1)(4.1) Maintain Integrity of the QMSMaintain Integrity of the QMS when changes arewhen changes are planned & implementedplanned & implemented
  • 28. 10/10/2003 ISO-9001:2000 Requirements 28 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5.5 Responsibility, Authority and Communication Ensure that responsibilities & authorities are defined and communicated within the organization Appoint a Management Representative Ensure appropriate communication processes are established and Communication on the Effectiveness of the QMS takes place 5.5 Responsibility, Authority and CommunicationResponsibility, Authority and Communication Ensure that responsibilities & authorities are defined and communicateddefined and communicated within the organization Appoint a Management RepresentativeManagement Representative Ensure appropriate communication processescommunication processes are established and Communication on the Effectiveness of the QMS takes placeEffectiveness of the QMS takes place
  • 29. 10/10/2003 ISO-9001:2000 Requirements 29 Management RepresentativeManagement Representative Irrespective of other responsibilities, shall have the following responsibility & authority Ensure that processesprocesses needed for the QMS are established, implemented & maintained Reports to Top Management on the performanceperformance of the QMS and any need for improvementneed for improvement Ensure the promotion & awarenesspromotion & awareness of Customer requirements throughout the Organization Can include being the liaison with external parties on QMS matters
  • 30. 10/10/2003 ISO-9001:2000 Requirements 30 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5.6 Management Review Review the QMS at planned intervals Ensure Continued Suitability, Adequacy, & Effectiveness; Include Assessing Opportunities for Improvement & the need for changes – including the Quality Policy and Quality Objectives 5.6 Management Review Review the QMS at planned intervalsat planned intervals Ensure ContinuedContinued Suitability, Adequacy, &Suitability, Adequacy, & EffectivenessEffectiveness; Include Assessing Opportunities forOpportunities for ImprovementImprovement & the need for changesneed for changes – including the Quality Policy and Quality Objectives
  • 31. 10/10/2003 ISO-9001:2000 Requirements 31 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5.6 Management Review Review Input Results of Audits Customer Feedback Process Performance & Product Conformity Status of Corrective & Preventive Actions Follow-up Actions from Previous Reviews Changes that could affect the QMS Recommendations for Improvement 5.6 Management Review Review InputReview Input Results of AuditsResults of Audits Customer FeedbackCustomer Feedback Process Performance & Product ConformityProcess Performance & Product Conformity Status of Corrective & Preventive ActionsStatus of Corrective & Preventive Actions FollowFollow--up Actions from Previous Reviewsup Actions from Previous Reviews Changes that could affect the QMSChanges that could affect the QMS Recommendations for ImprovementRecommendations for Improvement
  • 32. 10/10/2003 ISO-9001:2000 Requirements 32 Management ResponsibilityManagement Responsibility per ISOper ISO--9001:20009001:2000 5.6 Management Review Review Output Decisions & Actions taken related to: – Improvement on the effectiveness of the QMS & its Processes – Improvement of product related to customer requirements – Resource Needs 5.6 Management Review Review OutputReview Output Decisions & Actions takenDecisions & Actions taken related to: –– Improvement on the effectiveness of the QMS & itsImprovement on the effectiveness of the QMS & its ProcessesProcesses –– Improvement of product related to customerImprovement of product related to customer requirementsrequirements –– Resource NeedsResource Needs
  • 33. 10/10/2003 ISO-9001:2000 Requirements 33 Process Based ApproachProcess Based Approach MANAGEMENTMANAGEMENT RESPONSIBILITYRESPONSIBILITY RESOURCE MANAGEMENTRESOURCE MANAGEMENT MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS & IMPROVEMENTIMPROVEMENT INPUT PROCESS OUTPUT CC UU SS TT OO MM EE RR P DC A PRODUCT REALIZATIONPRODUCT REALIZATION SatisfactionSatisfaction C U S T O M E R RequirementsRequirements
  • 34. 10/10/2003 ISO-9001:2000 Requirements 34 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 6 Resource Management Provision of Resources Human Resources Infrastructure Work Environment 6 Resource Management6 Resource Management Provision of ResourcesProvision of Resources Human ResourcesHuman Resources InfrastructureInfrastructure Work EnvironmentWork Environment
  • 35. 10/10/2003 ISO-9001:2000 Requirements 35 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 6.1 Provision of Resources Determine and Provide Resources needed to: – Implement & Maintain the QMS – Continually Improve Effectiveness of QMS – Enhance Customer Satisfaction by meeting customer requirements 6.1 Provision of Resources6.1 Provision of Resources Determine and ProvideDetermine and Provide Resources needed to:Resources needed to: –– Implement & Maintain the QMSImplement & Maintain the QMS –– Continually Improve Effectiveness of QMSContinually Improve Effectiveness of QMS –– Enhance Customer Satisfaction by meetingEnhance Customer Satisfaction by meeting customer requirementscustomer requirements
  • 36. 10/10/2003 ISO-9001:2000 Requirements 36 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 6.2 Human Resources Personnel performing work affecting product quality shall be competent on the basis of appropriate education, training, skills and experience 6.2 Human Resources6.2 Human Resources Personnel performing work affecting productPersonnel performing work affecting product quality shall be competent on the basis ofquality shall be competent on the basis of appropriate education, training, skills andappropriate education, training, skills and experienceexperience
  • 37. 10/10/2003 ISO-9001:2000 Requirements 37 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 6.3 Competence, Awareness and Training Determine the necessary competence Provide Training or take other actions to satisfy Evaluate the Effectiveness of actions taken 6.3 Competence,6.3 Competence, Awareness and TrainingAwareness and Training Determine the necessaryDetermine the necessary competencecompetence Provide Training or takeProvide Training or take other actions to satisfyother actions to satisfy Evaluate the EffectivenessEvaluate the Effectiveness of actions takenof actions taken
  • 38. 10/10/2003 ISO-9001:2000 Requirements 38 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 6.3 Infrastructure Determine, provide and maintain the infrastructure needed to achieve conformity to product requirements 6.3 Infrastructure6.3 Infrastructure Determine, provide and maintain theDetermine, provide and maintain the infrastructure needed to achieve conformity toinfrastructure needed to achieve conformity to product requirementsproduct requirements • Buildings, Workspace & associated utilities • Process equipment (Hardware & Software) • Supporting services (i.e. transport or communication) •• Buildings, Workspace &Buildings, Workspace & associated utilitiesassociated utilities •• Process equipmentProcess equipment (Hardware & Software)(Hardware & Software) •• Supporting services (i.e.Supporting services (i.e. transport ortransport or communication)communication)
  • 39. 10/10/2003 ISO-9001:2000 Requirements 39 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 6.4 Work Environment Determine & Manage the work environment needed to achieve conformity to product requirements [Factors that influence motivation, satisfaction, development and performance of people.] Psychological Factors Physical Factors 6.4 Work Environment6.4 Work Environment Determine & Manage the workDetermine & Manage the work environment needed to achieveenvironment needed to achieve conformity to product requirementsconformity to product requirements [Factors that influence motivation,[Factors that influence motivation, satisfaction, development andsatisfaction, development and performance of people.]performance of people.] Psychological FactorsPsychological Factors Physical FactorsPhysical Factors
  • 40. 10/10/2003 ISO-9001:2000 Requirements 40 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 Work Environment - Continued Psychological Factors – Greater Involvement & Understanding of Objectives to be Achieved – Safety Rules & Procedures – Recognition & Reward for Achievement, Improvement & Innovation – Career Planning & Development Work EnvironmentWork Environment -- ContinuedContinued Psychological FactorsPsychological Factors –– Greater Involvement & Understanding ofGreater Involvement & Understanding of Objectives to be AchievedObjectives to be Achieved –– Safety Rules & ProceduresSafety Rules & Procedures –– Recognition & Reward for Achievement,Recognition & Reward for Achievement, Improvement & InnovationImprovement & Innovation –– Career Planning & DevelopmentCareer Planning & Development
  • 41. 10/10/2003 ISO-9001:2000 Requirements 41 Resource ManagementResource Management per ISOper ISO--9001:20009001:2000 Work Environment - Continued Physical Factors – Ergonomics – Temperature – Light – Noise – Cleanliness Work EnvironmentWork Environment -- ContinuedContinued Physical FactorsPhysical Factors –– ErgonomicsErgonomics –– TemperatureTemperature –– LightLight –– NoiseNoise –– CleanlinessCleanliness
  • 42. 10/10/2003 ISO-9001:2000 Requirements 42 Process Based ApproachProcess Based Approach MANAGEMENTMANAGEMENT RESPONSIBILITYRESPONSIBILITY RESOURCE MANAGEMENTRESOURCE MANAGEMENT MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS & IMPROVEMENTIMPROVEMENT INPUT PROCESS OUTPUT CC UU SS TT OO MM EE RR P DC A PRODUCT REALIZATIONPRODUCT REALIZATION SatisfactionSatisfaction C U S T O M E R RequirementsRequirements
  • 43. 10/10/2003 ISO-9001:2000 Requirements 43 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7 Product Realization7 Product Realization Planning of Product RealizationPlanning of Product Realization CustomerCustomer--related Processesrelated Processes Design & DevelopmentDesign & Development PurchasingPurchasing Production and Service ProvisionProduction and Service Provision Control of Monitoring and MeasuringControl of Monitoring and Measuring DevicesDevices
  • 44. 10/10/2003 ISO-9001:2000 Requirements 44 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.1 Planning of Product Realization7.1 Planning of Product Realization Plan & Develop the processes needed forPlan & Develop the processes needed for Product RealizationProduct Realization Planning shall determine the following asPlanning shall determine the following as appropriate:appropriate: Quality ObjectivesQuality Objectives && RequirementsRequirements for thefor the Product;Product; Need to establish processes, documents andNeed to establish processes, documents and provide resources specific to the product;provide resources specific to the product;
  • 45. 10/10/2003 ISO-9001:2000 Requirements 45 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Planning shall determine the following:Planning shall determine the following: ContinuedContinued RequiredRequired vverification,erification, vvalidation,alidation, mmonitoring,onitoring, inspection & testinspection & test activities specific to theactivities specific to the productproduct and the criteria for productand the criteria for product acceptanceacceptance RecordsRecords needed to provide evidence thatneeded to provide evidence that the realization processes and resultingthe realization processes and resulting product meet requirementsproduct meet requirements
  • 46. 10/10/2003 ISO-9001:2000 Requirements 46 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 TheThe outputoutput of this planning shall be in aof this planning shall be in a formform suitablesuitable for the organizationfor the organization’’s method ofs method of operationsoperations NOTE 1: A document specifying the QMS processesNOTE 1: A document specifying the QMS processes (including the product realization processes) can be(including the product realization processes) can be referred to as a Quality Planreferred to as a Quality Plan NOTE 2: The Design & Development RequirementsNOTE 2: The Design & Development Requirements (7.3) may also be applied to the development of the(7.3) may also be applied to the development of the product realization processesproduct realization processes
  • 47. 10/10/2003 ISO-9001:2000 Requirements 47 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.2 Customer7.2 Customer--related Processesrelated Processes DeterminationDetermination of requirementsof requirements related to therelated to the productproduct ReviewReview of requirementsof requirements related to the productrelated to the product Customer CommunicationCustomer Communication
  • 48. 10/10/2003 ISO-9001:2000 Requirements 48 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Determination of requirementsDetermination of requirements related torelated to the productthe product RequirementsRequirements specified by the customer,specified by the customer, including delivery & postincluding delivery & post--delivery activities;delivery activities; RequirementsRequirements necessary for specified ornecessary for specified or intended use, where known;intended use, where known; Statutory and regulatory requirementsStatutory and regulatory requirements relatedrelated to the product;to the product; Any additional requirementsAny additional requirements determined by thedetermined by the Organization.Organization.
  • 49. 10/10/2003 ISO-9001:2000 Requirements 49 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Review of requirementsReview of requirements related to therelated to the productproduct Shall be conducted prior to the commitment toShall be conducted prior to the commitment to supply a product to the customer;supply a product to the customer; Ensure that product requirements are defined;Ensure that product requirements are defined; Ensure contract or order requirements differingEnsure contract or order requirements differing from those previously expressed are resolved;from those previously expressed are resolved; Ensure capable of meting the definedEnsure capable of meting the defined requirements.requirements.
  • 50. 10/10/2003 ISO-9001:2000 Requirements 50 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Review of requirementsReview of requirements related to the productrelated to the product –– ContinuedContinued Customer Requirements shall beCustomer Requirements shall be confirmedconfirmed by theby the organizationorganization before acceptancebefore acceptance, where no, where no documented statement of requirements isdocumented statement of requirements is provided by the customerprovided by the customer Where Product Requirements are changed, theWhere Product Requirements are changed, the organization shallorganization shall ensure that relevant documentsensure that relevant documents are amended and that relevant personnel areare amended and that relevant personnel are made aware of the changed requirementsmade aware of the changed requirements
  • 51. 10/10/2003 ISO-9001:2000 Requirements 51 Product Realization per ISO-9001:2000 Customer CommunicationCustomer Communication Determine and ImplementDetermine and Implement effectiveeffective arrangements for communicatingarrangements for communicating with customerswith customers in relation to:in relation to: Product information;Product information; Enquiries, contracts or order handling, includingEnquiries, contracts or order handling, including amendments;amendments; Customer feedback, including customerCustomer feedback, including customer complaints.complaints.
  • 52. 10/10/2003 ISO-9001:2000 Requirements 52 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.3 Design & Development7.3 Design & Development Design & DevelopmentDesign & Development PlanningPlanning Design & DevelopmentDesign & Development InputsInputs Design & DevelopmentDesign & Development OutputsOutputs Design & DevelopmentDesign & Development ReviewReview Design & DevelopmentDesign & Development VerificationVerification Design & DevelopmentDesign & Development ValidationValidation Control ofControl of Design & DevelopmentDesign & Development ChangesChanges
  • 53. VVerificationerification VValidationalidation 7.3.5 & 7.3.67.3.5 & 7.3.6 RRevieweview at Suitableat Suitable Stages of DesignStages of Design & Development& Development 7.3.47.3.4 VVerificationerification VValidationalidation 7.3.5 & 7.3.67.3.5 & 7.3.6 Design Output 7.3.3 Design &Design & DevelopmentDevelopment ProcessProcess End Item Product Design Input 7.3.2 Application of Design Control in Waterfall or Stair Step Design Process [with ISO-9001 Clauses] PlanPlan Design &Design & DevelopmentDevelopment Stages, AND theStages, AND the VerificationVerification & Validation for& Validation for each Stage 7.3.1each Stage 7.3.1 User Needs 7.3.2
  • 54. 10/10/2003 ISO-9001:2000 Requirements 54 Purchasing in ISOPurchasing in ISO--9001:20009001:2000 7.4 Purchasing7.4 Purchasing PurchasingPurchasing ProcessProcess PurchasingPurchasing InformationInformation VerificationVerification of Purchased Productof Purchased Product
  • 55. 10/10/2003 ISO-9001:2000 Requirements 55 Purchasing in ISOPurchasing in ISO--9001:20009001:2000 PurchasingPurchasing ProcessProcess Ensure purchased product conforms toEnsure purchased product conforms to specified requirements.specified requirements. Type and Extent of control shall be dependentType and Extent of control shall be dependent upon the effect of the purchased product onupon the effect of the purchased product on subsequent product realization or the finalsubsequent product realization or the final product.product. Suppliers shall be evaluated and selectedSuppliers shall be evaluated and selected based on their ability to supply product IAW thebased on their ability to supply product IAW the organizationorganization’’s requirements.s requirements.
  • 56. 10/10/2003 ISO-9001:2000 Requirements 56 Purchasing in ISOPurchasing in ISO--9001:20009001:2000 PurchasingPurchasing ProcessProcess -- ContinuedContinued Criteria for selection, evaluation, & reCriteria for selection, evaluation, & re-- evaluation shall be established.evaluation shall be established. Records of the results of evaluations and anyRecords of the results of evaluations and any necessary actions arising from the evaluationnecessary actions arising from the evaluation shall be maintainedshall be maintained
  • 57. 10/10/2003 ISO-9001:2000 Requirements 57 Purchasing in ISO-9001:2000 PurchasingPurchasing InformationInformation Shall describe the product to be purchased,Shall describe the product to be purchased, including where appropriate:including where appropriate: –– Requirements for approval of product, procedures,Requirements for approval of product, procedures, processes and equipment;processes and equipment; –– Requirements for qualification of personnel, andRequirements for qualification of personnel, and –– Quality Management SystemsQuality Management Systems The organization shall ensure the adequacy ofThe organization shall ensure the adequacy of specified purchase requirementsspecified purchase requirements priorprior to theirto their communicationcommunication
  • 58. 10/10/2003 ISO-9001:2000 Requirements 58 Purchasing in ISO-9001:2000 VerificationVerification of Purchased Productof Purchased Product Shall establish and implement the inspection orShall establish and implement the inspection or other activities necessary for ensuring theother activities necessary for ensuring the product meets specified purchaseproduct meets specified purchase requirements.requirements. Where the organization or its customer intendsWhere the organization or its customer intends to perform verification at the supplierto perform verification at the supplier’’ss premises, the intended verificationpremises, the intended verification arrangements and the method of productarrangements and the method of product release shall be stated in the purchasingrelease shall be stated in the purchasing information.information.
  • 59. 10/10/2003 ISO-9001:2000 Requirements 59 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.5 Production and Service Provision7.5 Production and Service Provision Control of Production & Service ProvisionControl of Production & Service Provision Validation of Processes for Product &Validation of Processes for Product & Service ProvisionService Provision Identification & TraceabilityIdentification & Traceability Customer PropertyCustomer Property Preservation of ProductPreservation of Product
  • 60. 10/10/2003 ISO-9001:2000 Requirements 60 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Control of Production & Service ProvisionControl of Production & Service Provision Plan & carry out provisions under controlledPlan & carry out provisions under controlled conditions, including as applicable:conditions, including as applicable: Availability of information that describesAvailability of information that describes thethe product characteristicsproduct characteristics ;; Availability ofAvailability of Work InstructionsWork Instructions, as necessary;, as necessary; Use ofUse of suitable equipmentsuitable equipment;; Availability & use ofAvailability & use of Monitoring and MeasuringMonitoring and Measuring DevicesDevices;;
  • 61. 10/10/2003 ISO-9001:2000 Requirements 61 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 PlanPlan & carry out provisions under controlled& carry out provisions under controlled conditions, including as applicable:conditions, including as applicable: ContCont’’dd Implementation ofImplementation of MonitoringMonitoring andand MeasurementMeasurement;; Implementation ofImplementation of ReleaseRelease,, DeliveryDelivery andand PostPost--Delivery Activities.Delivery Activities.
  • 62. 10/10/2003 ISO-9001:2000 Requirements 62 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Validation of Processes for Product &Validation of Processes for Product & Service ProvisionService Provision Validate any process for a provision whereValidate any process for a provision where the resulting outputthe resulting output cannot be verified bycannot be verified by subsequent monitoring or measurementsubsequent monitoring or measurement –– wherewhere deficiencies become apparent onlydeficiencies become apparent only after the product is in useafter the product is in use or the service hasor the service has been deliveredbeen delivered ValidationValidation demonstrates the abilitydemonstrates the ability of theof the processprocess to achieve planned resultsto achieve planned results
  • 63. 10/10/2003 ISO-9001:2000 Requirements 63 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Validation of ProcessesValidation of Processes –– ContCont’’dd Establish Arrangements for these processes (asEstablish Arrangements for these processes (as applicable):applicable): DefinedDefined Criteria for Review & ApprovalCriteria for Review & Approval of theof the process;process; Approval ofApproval of EquipmentEquipment & Qualification of& Qualification of PersonnelPersonnel;; Use ofUse of Specific Methods & ProceduresSpecific Methods & Procedures;; Requirements forRequirements for RecordsRecords; and; and RevalidationRevalidation..
  • 64. 10/10/2003 ISO-9001:2000 Requirements 64 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Identification & TraceabilityIdentification & Traceability WhereWhere applicableapplicable,, product shall be identifiedproduct shall be identified by a suitable means throughout itsby a suitable means throughout its realization process.realization process. It shallIt shall identify the product statusidentify the product status withwith respect torespect to monitoring & measurementmonitoring & measurement requirements.requirements. WhereWhere traceabilitytraceability is a requirement, theis a requirement, the unique identification of the product shall beunique identification of the product shall be controlled and recordedcontrolled and recorded..
  • 65. 10/10/2003 ISO-9001:2000 Requirements 65 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Customer PropertyCustomer Property Care shall be exercisedCare shall be exercised with customerwith customer property while under the organizationproperty while under the organization’’ss control or being used by the organization.control or being used by the organization. Customer Property shall beCustomer Property shall be identifiedidentified,, verifiedverified,, protected and safeguardedprotected and safeguarded while inwhile in use or being incorporated into the product.use or being incorporated into the product. IfIf lostlost,, damageddamaged or otherwiseor otherwise found to befound to be unsuitableunsuitable, it shall be reported and records, it shall be reported and records maintained.maintained.
  • 66. 10/10/2003 ISO-9001:2000 Requirements 66 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 Preservation of ProductPreservation of Product ConformityConformity of the product shall beof the product shall be preservedpreserved during internal processing and delivery to theduring internal processing and delivery to the intended destination.intended destination. PreservationPreservation shall includeshall include identificationidentification,, handlinghandling,, packagingpackaging andand protectionprotection.. PreservationPreservation also applies to thealso applies to the constituentconstituent parts of a productparts of a product..
  • 67. 10/10/2003 ISO-9001:2000 Requirements 67 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.6 Control of Monitoring and Measuring7.6 Control of Monitoring and Measuring DevicesDevices Determine theDetermine the monitoringmonitoring andand measurementmeasurement to be undertaken toto be undertaken to provideprovide evidence of conformityevidence of conformity toto determined requirements, AND thedetermined requirements, AND the monitoring and measuringmonitoring and measuring devicesdevices needed to ensure valid results.needed to ensure valid results.
  • 68. 10/10/2003 ISO-9001:2000 Requirements 68 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd EstablishEstablish processesprocesses to ensure thatto ensure that monitoring and measurement can bemonitoring and measurement can be carried out and in a mannercarried out and in a manner consistent with the monitoring andconsistent with the monitoring and measurement requirements.measurement requirements.
  • 69. 10/10/2003 ISO-9001:2000 Requirements 69 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd When necessary, measuring equipmentWhen necessary, measuring equipment shall:shall: BeBe calibrated or verifiedcalibrated or verified at specified intervals,at specified intervals, or prior to use,or prior to use, against measurementagainst measurement standards traceablestandards traceable to international or nationalto international or national measurement standards;measurement standards; Where no such standards exist, the basis use forWhere no such standards exist, the basis use for calibration or verification shall be recorded.calibration or verification shall be recorded.
  • 70. 10/10/2003 ISO-9001:2000 Requirements 70 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd When necessary, measuring equipmentWhen necessary, measuring equipment shall:shall: -- ContinuedContinued BeBe adjustedadjusted oror rere--adjustedadjusted as necessary;as necessary; BeBe identifiedidentified to enable theto enable the calibration statuscalibration status toto be determined;be determined; BeBe safeguardedsafeguarded from adjustments that wouldfrom adjustments that would invalidate the measurement result;invalidate the measurement result; BeBe protectedprotected from damage and deteriorationfrom damage and deterioration during handling, maintenance and storage.during handling, maintenance and storage.
  • 71. 10/10/2003 ISO-9001:2000 Requirements 71 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd When the equipment isWhen the equipment is found not tofound not to conformconform to requirements, theto requirements, the validity of thevalidity of the previous measuring resultsprevious measuring results shall beshall be assessed and recorded.assessed and recorded. Appropriate action shall be taken on theAppropriate action shall be taken on the equipmentequipment and anyand any product affectedproduct affected.. Records of the results of calibration andRecords of the results of calibration and verification shall be maintained.verification shall be maintained.
  • 72. 10/10/2003 ISO-9001:2000 Requirements 72 Product RealizationProduct Realization per ISOper ISO--9001:20009001:2000 77.6 Control of Monitoring and Measuring Devices.6 Control of Monitoring and Measuring Devices –– ContCont’’dd Computer softwareComputer software to be used in theto be used in the monitoring and measurement of specifiedmonitoring and measurement of specified requirements,requirements, shall be confirmedshall be confirmed as to itsas to its ability to satisfy the intended application.ability to satisfy the intended application. This confirmation shall be undertaken priorThis confirmation shall be undertaken prior to initial use and reconfirmed asto initial use and reconfirmed as necessary.necessary.
  • 73. 10/10/2003 ISO-9001:2000 Requirements 73 Process Based ApproachProcess Based Approach MANAGEMENTMANAGEMENT RESPONSIBILITYRESPONSIBILITY RESOURCE MANAGEMENTRESOURCE MANAGEMENT MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS & IMPROVEMENTIMPROVEMENT INPUT PROCESS OUTPUT CC UU SS TT OO MM EE RR P DC A PRODUCT REALIZATIONPRODUCT REALIZATION SatisfactionSatisfaction C U S T O M E R RequirementsRequirements
  • 74. 10/10/2003 ISO-9001:2000 Requirements 74 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8 Measurement, Analysis and Improvement8 Measurement, Analysis and Improvement GeneralGeneral Monitoring and MeasurementMonitoring and Measurement Control of Nonconforming ProductControl of Nonconforming Product Analysis of DataAnalysis of Data ImprovementImprovement
  • 75. 10/10/2003 ISO-9001:2000 Requirements 75 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.1 General8.1 General Plan & Implement the monitoring,Plan & Implement the monitoring, measurement, analysis and improvementmeasurement, analysis and improvement processes needed to :processes needed to : DemonstrateDemonstrate conformity of the product;conformity of the product; EnsureEnsure conformity of the QMS;conformity of the QMS; Continually improveContinually improve the effectiveness of the QMSthe effectiveness of the QMS Determine the applicable methods, includingDetermine the applicable methods, including statistical techniques, and the extent of theirstatistical techniques, and the extent of their useuse
  • 76. 10/10/2003 ISO-9001:2000 Requirements 76 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.2 Monitoring and Measurement8.2 Monitoring and Measurement Customer SatisfactionCustomer Satisfaction Internal AuditInternal Audit Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes Monitoring and Measurement of ProductMonitoring and Measurement of Product
  • 77. 10/10/2003 ISO-9001:2000 Requirements 77 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Customer SatisfactionCustomer Satisfaction A QMS measurement of performanceA QMS measurement of performance Monitor information relating toMonitor information relating to customercustomer perceptionperception as to whether customeras to whether customer requirements are being met;requirements are being met; Determine the methods for obtaining andDetermine the methods for obtaining and using this informationusing this information
  • 78. 10/10/2003 ISO-9001:2000 Requirements 78 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Internal AuditInternal Audit Conduct internal audits at planned intervals toConduct internal audits at planned intervals to determine whether the QMS:determine whether the QMS: ConformsConforms to the planned arrangements, toto the planned arrangements, to the requirements of ISOthe requirements of ISO--9001, and QMS9001, and QMS requirements established by therequirements established by the organization;organization; Is effectively implementedIs effectively implemented and maintainedand maintained
  • 79. 10/10/2003 ISO-9001:2000 Requirements 79 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Internal AuditInternal Audit –– ConCon’’tt An audit program shall be planned,An audit program shall be planned, consideringconsidering the status and importance of the processes andthe status and importance of the processes and areas to be auditedareas to be audited, as well as the results of the, as well as the results of the previous audits.previous audits. The auditThe audit criteriacriteria,, scopescope,, frequencyfrequency andand methodsmethods shall be defined.shall be defined. Selection of auditors and conduct of the auditsSelection of auditors and conduct of the audits shallshall ensure objectivity and impartialityensure objectivity and impartiality of theof the audit processaudit process Auditors shall not audit their own workAuditors shall not audit their own work
  • 80. 10/10/2003 ISO-9001:2000 Requirements 80 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Internal AuditInternal Audit –– ContCont’’dd TheThe management responsible for themanagement responsible for the areas being auditedareas being audited shall ensure thatshall ensure that actions are takenactions are taken without undue delaywithout undue delay toto eliminate detected nonconformities andeliminate detected nonconformities and their causes.their causes. FollowFollow--up activitiesup activities shall include theshall include the verification of the actions taken and theverification of the actions taken and the reporting of verification results.reporting of verification results.
  • 81. 10/10/2003 ISO-9001:2000 Requirements 81 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes Apply suitable methods for monitoring and,Apply suitable methods for monitoring and, where applicable, measurement of the QMSwhere applicable, measurement of the QMS processes.processes. These methods shall demonstrate the ability ofThese methods shall demonstrate the ability of the processes to achieve planned results.the processes to achieve planned results. When planned results are not achieved,When planned results are not achieved, correction and corrective action shall be takencorrection and corrective action shall be taken as appropriate to ensure conformity of theas appropriate to ensure conformity of the product.product.
  • 82. 10/10/2003 ISO-9001:2000 Requirements 82 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Monitoring and Measurement of ProductMonitoring and Measurement of Product Monitor and measure theMonitor and measure the productproduct characteristicscharacteristics to verify thatto verify that productproduct requirementsrequirements have been met.have been met. This is to be carried out at appropriateThis is to be carried out at appropriate stages of the product realization processstages of the product realization process IAW the planned arrangementsIAW the planned arrangements
  • 83. 10/10/2003 ISO-9001:2000 Requirements 83 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Monitoring and Measurement of ProductMonitoring and Measurement of Product –– ConCon’’tt Evidence of conformityEvidence of conformity with thewith the acceptanceacceptance criteriacriteria shall be maintainedshall be maintained Records shall indicate theRecords shall indicate the person(s)person(s) authorizing release of productauthorizing release of product Product Release and Service DeliveryProduct Release and Service Delivery shall notshall not proceedproceed until the planned arrangements haveuntil the planned arrangements have been satisfactorily completed, unlessbeen satisfactorily completed, unless otherwiseotherwise approved by a relevant authorityapproved by a relevant authority and whereand where applicable by the customer.applicable by the customer.
  • 84. 10/10/2003 ISO-9001:2000 Requirements 84 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product Ensure that product whichEnsure that product which does not conformdoes not conform to product requirements isto product requirements is identifiedidentified andand controlledcontrolled to prevent its unintended use orto prevent its unintended use or delivery.delivery. The controls and related responsibilities andThe controls and related responsibilities and authorities for dealing with nonconformingauthorities for dealing with nonconforming product shall be defined in a documentedproduct shall be defined in a documented procedure.procedure.
  • 85. 10/10/2003 ISO-9001:2000 Requirements 85 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product –– ContCont’’dd Nonconforming product shall be dealt with inNonconforming product shall be dealt with in one or more of the following ways:one or more of the following ways: TakingTaking action to eliminateaction to eliminate the detectedthe detected nonconformity;nonconformity; Authorizing its useAuthorizing its use, release or acceptance under, release or acceptance under concession by a relevant authority and, whereconcession by a relevant authority and, where applicable, by the customer;applicable, by the customer; TakingTaking action to preclude its original intended useaction to preclude its original intended use or applicationor application
  • 86. 10/10/2003 ISO-9001:2000 Requirements 86 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product –– ContCont’’dd When nonconforming productWhen nonconforming product is correctedis corrected itit shall beshall be subject to resubject to re--verificationverification toto demonstrate conformity todemonstrate conformity to the requirements.the requirements. When detected after delivery or use hasWhen detected after delivery or use has started,started, actions shall be takenactions shall be taken with thewith the nonconforming product , appropriate to thenonconforming product , appropriate to the effects, or potential effects, of theeffects, or potential effects, of the nonconformity.nonconformity.
  • 87. 10/10/2003 ISO-9001:2000 Requirements 87 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product –– ContCont’’dd RecordsRecords of the nature of nonconformitiesof the nature of nonconformities and any subsequent actions taken,and any subsequent actions taken, including concessions obtained, shall beincluding concessions obtained, shall be maintainedmaintained
  • 88. 10/10/2003 ISO-9001:2000 Requirements 88 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.4 Analysis of Data8.4 Analysis of Data Determine, collect and analyze appropriateDetermine, collect and analyze appropriate datadata to demonstrateto demonstrate thethe suitabilitysuitability andand effectivenesseffectiveness of the QMS andof the QMS and to evaluateto evaluate wherewhere continual improvementcontinual improvement of theof the effectiveness of the QMS can be madeeffectiveness of the QMS can be made This shall include data generated as a result ofThis shall include data generated as a result of monitoring and measurement and from othermonitoring and measurement and from other relevant sourcesrelevant sources
  • 89. 10/10/2003 ISO-9001:2000 Requirements 89 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.4 Analysis of Data8.4 Analysis of Data –– ContCont’’dd Analysis of Data shall provide informationAnalysis of Data shall provide information relating to:relating to: Customer satisfaction;Customer satisfaction; Conformity to product requirements;Conformity to product requirements; Characteristics and trends of processes andCharacteristics and trends of processes and products including opportunities for preventiveproducts including opportunities for preventive action;action; SuppliersSuppliers
  • 90. 10/10/2003 ISO-9001:2000 Requirements 90 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 8.5 Improvement8.5 Improvement Continual ImprovementContinual Improvement Corrective ActionCorrective Action Preventive ActionPreventive Action
  • 91. 10/10/2003 ISO-9001:2000 Requirements 91 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Continual ImprovementContinual Improvement Continually improve the effectiveness of theContinually improve the effectiveness of the QMS through the use of the:QMS through the use of the: Quality PolicyQuality Policy;; Quality ObjectivesQuality Objectives;; Audit ResultsAudit Results;; Analysis of DataAnalysis of Data;; Corrective & Preventive ActionsCorrective & Preventive Actions Management ReviewManagement Review
  • 92. 10/10/2003 ISO-9001:2000 Requirements 92 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Corrective ActionCorrective Action Actions takenActions taken to eliminate the causeto eliminate the cause ofof nonconformity in order tononconformity in order to preventprevent recurrencerecurrence They shall be appropriate to the effects ofThey shall be appropriate to the effects of the nonconformities encountered.the nonconformities encountered.
  • 93. 10/10/2003 ISO-9001:2000 Requirements 93 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Corrective ActionCorrective Action-- ContCont’’dd A documented procedure shall be establishedA documented procedure shall be established to define requirements for:to define requirements for: Reviewing nonconformities (including CustomerReviewing nonconformities (including Customer Complaints);Complaints); Determining the causes of nonconformities;Determining the causes of nonconformities; Evaluating the need for action to ensure thatEvaluating the need for action to ensure that nonconformities do not recur;nonconformities do not recur; Determining & implementing action needed;Determining & implementing action needed; Reviewing corrective action taken;Reviewing corrective action taken; Records of results of action taken.Records of results of action taken.
  • 94. 10/10/2003 ISO-9001:2000 Requirements 94 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Preventive ActionPreventive Action Actions takenActions taken to eliminate the causeto eliminate the cause ofof potentialpotential nonconformities in order tononconformities in order to prevent their occurrenceprevent their occurrence They shall be appropriate to the effects ofThey shall be appropriate to the effects of thethe potential problemspotential problems..
  • 95. 10/10/2003 ISO-9001:2000 Requirements 95 Measurement, Analysis &Measurement, Analysis & Improvement per ISOImprovement per ISO--9001:20009001:2000 Preventive ActionPreventive Action –– ContCont’’dd A documented procedure shall be establishedA documented procedure shall be established to define requirements for:to define requirements for: Determining potential nonconformities and theirDetermining potential nonconformities and their causes;causes; Evaluating the need for action to prevent occurrenceEvaluating the need for action to prevent occurrence of nonconformities;of nonconformities; Determining & implementing action needed;Determining & implementing action needed; Reviewing preventive action taken;Reviewing preventive action taken; Records of the results of action taken.Records of the results of action taken.