This document provides an overview of the requirements of the ISO 9001:2000 quality management system standard. It describes the process-based approach, including inputs, processes, outputs and customer satisfaction. It summarizes key sections of the standard such as management responsibility requirements around commitment, customer focus, quality policy, planning and management review. It also describes documentation requirements for a quality manual, procedures, and records. The document provides a high-level summary of the ISO 9001:2000 requirements.
PECB Webinar: ISO 29001:2010 – Supplemental Requirements & Impact of ISO 9001...PECB
If you have wondered what are the similarities and differences of ISO 29001 and ISO 9001, this is your chance to learn it. You will also see the requirements and what impact does Quality Management System has in Oil and Gas industry, especially the requirements of ISO 29001.
You will learn all this in two sessions, which will be presented by PECB trainer David Smart, Managing Director of Smart ISO Systems / Smart Mentoring. David’s personal experience spans more than 40 years as a Manager, Auditor and Consultant, specializing in multiple fields related to ISO standards. He is a Lead auditor for ISO 27001, ISO 13485, ISO 9001, ISO 14001, ISO 29001, ISO 17025 and OHSAS 18001, and an active member of various institutes.
FDA Audit Process Training using turtle diagrams presented by Rob Packard, founder of http://MedicalDeviceAcademy.com and Brigid Glass, CEO of Brigid Glass & Associates.
ISO 9001 Documentation - You want to get certified to ISO 9001, with help from our ISO 9001 Masterclass you will be able to document all of your business processes in one week or less! YES! If you have been sitting around and contemplating you need to take time to document your business processes, well we have done all of the hard work for you. We have created the templates where you can just simply enter your process steps. All of the templates are in word editable version so you can edit the process flows in any way you want.
PECB Webinar: ISO 29001:2010 – Supplemental Requirements & Impact of ISO 9001...PECB
If you have wondered what are the similarities and differences of ISO 29001 and ISO 9001, this is your chance to learn it. You will also see the requirements and what impact does Quality Management System has in Oil and Gas industry, especially the requirements of ISO 29001.
You will learn all this in two sessions, which will be presented by PECB trainer David Smart, Managing Director of Smart ISO Systems / Smart Mentoring. David’s personal experience spans more than 40 years as a Manager, Auditor and Consultant, specializing in multiple fields related to ISO standards. He is a Lead auditor for ISO 27001, ISO 13485, ISO 9001, ISO 14001, ISO 29001, ISO 17025 and OHSAS 18001, and an active member of various institutes.
FDA Audit Process Training using turtle diagrams presented by Rob Packard, founder of http://MedicalDeviceAcademy.com and Brigid Glass, CEO of Brigid Glass & Associates.
ISO 9001 Documentation - You want to get certified to ISO 9001, with help from our ISO 9001 Masterclass you will be able to document all of your business processes in one week or less! YES! If you have been sitting around and contemplating you need to take time to document your business processes, well we have done all of the hard work for you. We have created the templates where you can just simply enter your process steps. All of the templates are in word editable version so you can edit the process flows in any way you want.
Bagi yang Membutuhkan Materi ini maupun Jasa Pelatihan Sistem Manajemen Mutu ISO 9001:2015 Versi Terbaru, bisa menghubungi : HARD-Hi SMART CONSULTING di Hotline Service 0878-7063-5053 (Fast Response). Terimakasih.
Module 01 Introduction To FdA and Quality System RegulationQACATX
An introduction to FDA and Quality System Regulations wherein participants will gain an understanding of the history of the Food and Drug Administration as well as an overview of Quality System Regulations.
A lição original com os textos bíblicos tem como finalidade; facilitar a leitura ou mesmo o estudo, os versos estão na sequência correta, evitando a necessidade de procurá-los, o que agiliza, para os que tem o tempo limitado, vc pode levá-la no ipad, no pendrive, celular e etc, ler a qualquer momento e em qualquer lugar que desejar, até sem a necessidade de estar conectado na internet.
Que... “Deus tenha misericórdia de nós e nós abençoe; e faça resplandecer o seu rosto sobre nós. Para que se conheça na terra o teu caminho, e em todas as nações a tua salvação”. Sal. 67:1-2.
Bom Estudo!
Bagi yang Membutuhkan Materi ini maupun Jasa Pelatihan Sistem Manajemen Mutu ISO 9001:2015 Versi Terbaru, bisa menghubungi : HARD-Hi SMART CONSULTING di Hotline Service 0878-7063-5053 (Fast Response). Terimakasih.
Module 01 Introduction To FdA and Quality System RegulationQACATX
An introduction to FDA and Quality System Regulations wherein participants will gain an understanding of the history of the Food and Drug Administration as well as an overview of Quality System Regulations.
A lição original com os textos bíblicos tem como finalidade; facilitar a leitura ou mesmo o estudo, os versos estão na sequência correta, evitando a necessidade de procurá-los, o que agiliza, para os que tem o tempo limitado, vc pode levá-la no ipad, no pendrive, celular e etc, ler a qualquer momento e em qualquer lugar que desejar, até sem a necessidade de estar conectado na internet.
Que... “Deus tenha misericórdia de nós e nós abençoe; e faça resplandecer o seu rosto sobre nós. Para que se conheça na terra o teu caminho, e em todas as nações a tua salvação”. Sal. 67:1-2.
Bom Estudo!
Outlines an experiment used to determine the formula of a common hydrate.
**More good stuff available at:
www.wsautter.com
and
http://www.youtube.com/results?search_query=wnsautter&aq=f
Fundamental knowledge on pharmaceutical
product development and translation from laboratory to market.
Quality management systems: Quality management & Certifications.
ISO Quality Standards
1. Quality Management System (QMS)
2. ISO Quality Standards
3. ISO 9000
4. ISO 9000 Series
5. Requirements of ISO 9000 Series
6. Advantages of ISO Certification
Dear Colleague,
If your organization has been already implemented ISO 9001, here is the comparison sheet with additional ISO/TS 22163:217 (IRIS) requirements which you need to be implemented to achieve the ISO/TS 22163:2017 (IRIS) Certification.
Soon I will share more details about IRIS (ISO 22163:2017).
Thanks
Francesca Gottschalk - How can education support child empowerment.pptxEduSkills OECD
Francesca Gottschalk from the OECD’s Centre for Educational Research and Innovation presents at the Ask an Expert Webinar: How can education support child empowerment?
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Honest Reviews of Tim Han LMA Course Program.pptxtimhan337
Personal development courses are widely available today, with each one promising life-changing outcomes. Tim Han’s Life Mastery Achievers (LMA) Course has drawn a lot of interest. In addition to offering my frank assessment of Success Insider’s LMA Course, this piece examines the course’s effects via a variety of Tim Han LMA course reviews and Success Insider comments.
Safalta Digital marketing institute in Noida, provide complete applications that encompass a huge range of virtual advertising and marketing additives, which includes search engine optimization, virtual communication advertising, pay-per-click on marketing, content material advertising, internet analytics, and greater. These university courses are designed for students who possess a comprehensive understanding of virtual marketing strategies and attributes.Safalta Digital Marketing Institute in Noida is a first choice for young individuals or students who are looking to start their careers in the field of digital advertising. The institute gives specialized courses designed and certification.
for beginners, providing thorough training in areas such as SEO, digital communication marketing, and PPC training in Noida. After finishing the program, students receive the certifications recognised by top different universitie, setting a strong foundation for a successful career in digital marketing.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Normal Labour/ Stages of Labour/ Mechanism of LabourWasim Ak
Normal labor is also termed spontaneous labor, defined as the natural physiological process through which the fetus, placenta, and membranes are expelled from the uterus through the birth canal at term (37 to 42 weeks
2. 10/10/2003 ISO-9001:2000 Requirements 2
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
4. 10/10/2003 ISO-9001:2000 Requirements 4
ISOISO--9000:2000 Family Structure9000:2000 Family Structure
Quality Management SystemQuality Management System
PROCESS MODELPROCESS MODEL
QualityQuality
ManagementManagement
SystemsSystems --
RequirementsRequirements
ISO 9001ISO 9001
REFERENCEREFERENCE
STANDARDSTANDARD
QualityQuality
ManagementManagement
SystemsSystems ––
FundamentalsFundamentals
& Vocabulary& Vocabulary
ISO 9000ISO 9000
ISO 9004ISO 9004
GuidelinesGuidelines
ForFor
PerformancePerformance
ImprovementsImprovements
SUPPORTING STANDARDSSUPPORTING STANDARDS
ISO 10012ISO 10012
RequirementsRequirements
forfor
MeasurementMeasurement
Processes &Processes &
MeasuringMeasuring
EquipmentEquipment
OTHER STANDARDSOTHER STANDARDS ISO 19011ISO 19011
GuidelinesGuidelines
on Qualityon Quality
& EMS& EMS
AuditingAuditing
ISO/IEC 17025ISO/IEC 17025
Competence ofCompetence of
Testing &Testing &
CalibrationCalibration
LabsLabs
ISO/TS 16949ISO/TS 16949
Quality MgmtQuality Mgmt
SystemsSystems --
AutomotiveAutomotive
ISO 13485ISO 13485
MedicalMedical
DevicesDevices --
Quality MgmtQuality Mgmt
SystemsSystems
ISO 14001ISO 14001
EnvironmentalEnvironmental
ManagementManagement
SystemSystem
ISO 15189ISO 15189
Medical LabsMedical Labs ––
Quality &Quality &
CompetenceCompetence
ISO 10013ISO 10013
GuidelinesGuidelines
forfor
DevelopingDeveloping
QMSQMS
DocumentsDocuments
ISO 10014ISO 10014
GuidelinesGuidelines
ManagingManaging
thethe
EconomicsEconomics
of Qualityof Quality
ISO 10017ISO 10017
GuidanceGuidance
onon
StatisticalStatistical
TechniquesTechniques
ISO 10005ISO 10005
GuidelinesGuidelines
for Qualityfor Quality
PlansPlans
ISO 10006ISO 10006
GuidelinesGuidelines
in Projectin Project
MgmtMgmt
ISO 10007ISO 10007
GuidelinesGuidelines
forfor ConfigConfig..
MgmtMgmt
ISO 10015ISO 10015
GuidelinesGuidelines
for Trainingfor Training
PHILOSOPHICAL GUIDELINESPHILOSOPHICAL GUIDELINES
5. 10/10/2003 ISO-9001:2000 Requirements 5
QMS per ISOQMS per ISO--9001:20009001:2000
4 Quality Management System4 Quality Management System
General RequirementsGeneral Requirements
Documentation RequirementsDocumentation Requirements
6. 10/10/2003 ISO-9001:2000 Requirements 6
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Requirements4.1 General Requirements
Establish, Document, Implement &
Maintain a QMSQMS and Continually ImproveContinually Improve
its Effectivenessits Effectiveness
Identify the ProcessesProcesses and their application
throughout the organization
7. 10/10/2003 ISO-9001:2000 Requirements 7
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Rs– Continued
Determine the sequence and interaction of
these processesthese processes;
Determine criteria and methods to ensure
the operation and control of thesethese
processesprocesses are effective;
8. 10/10/2003 ISO-9001:2000 Requirements 8
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Rs– Continued
Ensure necessary resources and informa-
tion are available to support the operation
and monitoring of these processesthese processes;
Monitor, Measure and analyze thesethese
processesprocesses;
Implement actions necessary to achieve
planned results and continual improvement
of these processesthese processes.
9. 10/10/2003 ISO-9001:2000 Requirements 9
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Rs– Continued
Outsourced processes shall beshall be
identified and controlledidentified and controlled
Outside processes that affect productOutside processes that affect product
conformity with requirements;conformity with requirements;
10. 10/10/2003 ISO-9001:2000 Requirements 10
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements4.2 Documentation Requirements
A QMS documentation shall include:
StatementsStatements of a Quality PolicyQuality Policy and QualityQuality
ObjectivesObjectives;
A Quality ManualQuality Manual;
ProceduresProcedures required by ISO (6);
RecordsRecords required by ISO (21);
11. 10/10/2003 ISO-9001:2000 Requirements 11
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Quality Manual
ScopeScope of QMS
Detailed ExclusionsExclusions and their justification;
Documented ProceduresDocumented Procedures, or reference to
them; and
A description of the interactionA description of the interaction between the
QMS processes.
12. 10/10/2003 ISO-9001:2000 Requirements 12
Exclusions to ISO-9001:2000
1.2 Application
All Requirements are generic and are intended
to be applicable to all organizations.
Where any requirements cannot be applied
due to the nature of an organization and its
product – an exclusion can be considered.
Exclusions are limited to requirements within
clause 7 – Product Realization.
13. 10/10/2003 ISO-9001:2000 Requirements 13
Procedures Required by ISOProcedures Required by ISO
4.2.3 Control of DocumentsControl of Documents
4.2.4 Control of RecordsControl of Records
8.2.2 Internal AuditsInternal Audits
8.3 Control of Nonconforming ProductControl of Nonconforming Product
8.5.2 Corrective ActionCorrective Action
8.5.3 Preventive ActionPreventive Action
14. 10/10/2003 ISO-9001:2000 Requirements 14
Records Required by ISORecords Required by ISO (21)(21)
4.2.4 Records shall be established andRecords shall be established and
maintained to provide evidence of conformity tomaintained to provide evidence of conformity to
requirements and of the effective operation of therequirements and of the effective operation of the
QMS.QMS.
5.6.1 Management Review – General, Records fromRecords from
Management ReviewsManagement Reviews shall be maintained ;
6.2.2 (Human Resources) Appropriate records ofrecords of
education, training, skills and experienceeducation, training, skills and experience;
7.1 (Planning of Product Realization) Records to
provide evidence that the realization processes andevidence that the realization processes and
resulting product meet requirementsresulting product meet requirements;
15. 10/10/2003 ISO-9001:2000 Requirements 15
Records Required by ISORecords Required by ISO
7.2.2 (Customer Related Processes - Review of
Requirements related to the Product) Records of theRecords of the
results of the review and actions arising from it shall beresults of the review and actions arising from it shall be
maintainedmaintained;
7.3.2 (Design & Development – Inputs) Inputs relatingInputs relating
to product requirements shall be determined andto product requirements shall be determined and
records maintainedrecords maintained;
7.3.4 (Design & Development – Review) Records ofRecords of
the results of the reviews and any necessary actionsthe results of the reviews and any necessary actions
shall be maintainedshall be maintained;
7.3.5 (Design & Development – Verification) RecordsRecords
of the results of the verification and any necessaryof the results of the verification and any necessary
actions shall be maintainedactions shall be maintained.
16. 10/10/2003 ISO-9001:2000 Requirements 16
Records Required by ISORecords Required by ISO
7.3.6 (Design & Development – Validation) Records ofRecords of
the results of validation and any necessary actionsthe results of validation and any necessary actions
shall be maintainedshall be maintained;
7.3.7 (Control of Design & Development Changes)
Records of the results of the review and any necessaryRecords of the results of the review and any necessary
actions shall be maintainedactions shall be maintained;
7.4.1 (Purchasing Process) Records of the results ofRecords of the results of
evaluations and any necessary actions arising from theevaluations and any necessary actions arising from the
evaluation shall be maintainedevaluation shall be maintained;
7.5.2 ( Validation of ‘Special Processes’) The
organization shall establish arrangements for these
processes including – requirements for recordsrequirements for records;
17. 10/10/2003 ISO-9001:2000 Requirements 17
Records Required by ISORecords Required by ISO
7.5.3 (Identification & Traceability) Where traceability is
a requirement, the organization shall control and
record the unique identification of the productrecord the unique identification of the product;
7.5.4 (Customer Property) If any customer property is
lost, damaged or otherwise found to be unsuitable for
use, this shall be reported to the customer and recordsthis shall be reported to the customer and records
maintainedmaintained;
7.6 (Control of Monitoring & Measuring Devices)
If calibrated/verified to nonIf calibrated/verified to non--national or international standardsnational or international standards ––
the basis shall be recorded.the basis shall be recorded.
Equipment found nonEquipment found non--conformingconforming –– validity of previousvalidity of previous
measurements shall be assessed & recorded;measurements shall be assessed & recorded;
Records of the results of calibration and verification shall beRecords of the results of calibration and verification shall be
maintainedmaintained;
18. 10/10/2003 ISO-9001:2000 Requirements 18
Records Required by ISORecords Required by ISO
8.2.2 (Internal Audit) The responsibilities and
requirements for planning and conducting audits and
for reporting results and maintaining recordsand maintaining records…;
8.2.4 (Monitoring & Measurement of Product) Evidence
of conformity with the acceptance criteria shall be
maintained. Records shall indicate the person(s)Records shall indicate the person(s)
authorizing release of productauthorizing release of product;
8.3 (Control of Nonconforming Product) Records of theRecords of the
nature of nonconformities and any subsequent actionsnature of nonconformities and any subsequent actions
taken, including concessions obtained, shall betaken, including concessions obtained, shall be
maintainedmaintained;
19. 10/10/2003 ISO-9001:2000 Requirements 19
Records Required by ISORecords Required by ISO
8.5.2 (Improvement – Corrective Action) Records ofRecords of
the results of action takenthe results of action taken;
8.5.3 (Improvement – Preventive Action) Records ofRecords of
the results of action takenthe results of action taken.
20. 10/10/2003 ISO-9001:2000 Requirements 20
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Control of DocumentsControl of Documents
A documented procedure to define the
following controls:
–– Approve adequacy of documents prior to issueApprove adequacy of documents prior to issue;;
–– Review and update as necessary & ReReview and update as necessary & Re--
approveapprove;
–– Ensure changes and current revision status ofEnsure changes and current revision status of
documents are identifieddocuments are identified;
21. 10/10/2003 ISO-9001:2000 Requirements 21
QMS per ISOQMS per ISO--9001:20009001:2000
Control of Documents-Cont’d
A documented procedure to define the
following controls: - Continued
– Ensure relevant versionsrelevant versions of applicable
documents are available at points of useare available at points of use;
– Ensure documents remain legible and readilyremain legible and readily
identifiable;identifiable;
– Ensure documents of external originexternal origin are
identified and their distribution controlled; and
–– Prevent the unintended use of obsoletePrevent the unintended use of obsolete
documentsdocuments, AND apply suitable ID if they areapply suitable ID if they are
retained for any purposeretained for any purpose;
22. 10/10/2003 ISO-9001:2000 Requirements 22
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Control of Records
A documented procedure to define the
controls needed for the identification,
storage, protection, retrieval, retention time
and disposition of records.
4.2 Documentation Requirements-Continued
Control of RecordsControl of Records
A documented procedure to define the
controls needed for the identificationidentification,,
storagestorage,, protectionprotection,, retrievalretrieval,, retention timeretention time
andand dispositiondisposition of records.of records.
23. 10/10/2003 ISO-9001:2000 Requirements 23
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
25. 10/10/2003 ISO-9001:2000 Requirements 25
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.1 Management Commitment
Evidence of Commitment
Communicate to the Organization the
Importance of meeting Customer, Statutory,
and Regulatory Requirements
Establish the Quality Policy
Ensuring Quality Objectives are Established
Conduct Management Reviews
Ensure the Availability of Resources
5.1 Management Commitment5.1 Management Commitment
Evidence of CommitmentEvidence of Commitment
Communicate to the Organization the
Importance of meeting CustomerCustomer, StatutoryStatutory,
and RegulatoryRegulatory RequirementsRequirements
Establish the Quality PolicyQuality Policy
Ensuring Quality ObjectivesQuality Objectives are Established
Conduct Management ReviewsManagement Reviews
Ensure the Availability of ResourcesAvailability of Resources
26. 10/10/2003 ISO-9001:2000 Requirements 26
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.2 Customer Focus
Ensure Customer Requirements are determined
and met, with the aim of enhancing customer
satisfaction
5.3 Quality Policy
Established, Appropriate, Framework for Quality
Objectives, Communicated & Understood, and
Reviewed for Continued Suitability
5.2 Customer Focus5.2 Customer Focus
Ensure Customer Requirements are determined
and met, with the aim of enhancing customeraim of enhancing customer
satisfactionsatisfaction
5.3 Quality Policy5.3 Quality Policy
Established, Appropriate, Framework for QualityFramework for Quality
ObjectivesObjectives, Communicated & UnderstoodCommunicated & Understood, and
Reviewed for Continued Suitability
27. 10/10/2003 ISO-9001:2000 Requirements 27
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.4 Planning
Establish Quality Objectives at relevant levels
and functions within the Organization
Ensure that the planning of the QMS is carried
out to meet the General Requirements (4.1)
Maintain Integrity of the QMS when changes are
planned & implemented
5.4 Planning5.4 Planning
Establish Quality ObjectivesEstablish Quality Objectives at relevant levelsat relevant levels
and functions within the Organizationand functions within the Organization
Ensure that the planning of the QMS is carriedEnsure that the planning of the QMS is carried
outout to meet the General Requirementsto meet the General Requirements (4.1)(4.1)
Maintain Integrity of the QMSMaintain Integrity of the QMS when changes arewhen changes are
planned & implementedplanned & implemented
28. 10/10/2003 ISO-9001:2000 Requirements 28
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.5 Responsibility, Authority and Communication
Ensure that responsibilities & authorities are
defined and communicated within the
organization
Appoint a Management Representative
Ensure appropriate communication processes
are established and Communication on the
Effectiveness of the QMS takes place
5.5 Responsibility, Authority and CommunicationResponsibility, Authority and Communication
Ensure that responsibilities & authorities are
defined and communicateddefined and communicated within the
organization
Appoint a Management RepresentativeManagement Representative
Ensure appropriate communication processescommunication processes
are established and Communication on the
Effectiveness of the QMS takes placeEffectiveness of the QMS takes place
29. 10/10/2003 ISO-9001:2000 Requirements 29
Management RepresentativeManagement Representative
Irrespective of other responsibilities, shall
have the following responsibility & authority
Ensure that processesprocesses needed for the QMS are
established, implemented & maintained
Reports to Top Management on the performanceperformance
of the QMS and any need for improvementneed for improvement
Ensure the promotion & awarenesspromotion & awareness of Customer
requirements throughout the Organization
Can include being the liaison with external parties
on QMS matters
30. 10/10/2003 ISO-9001:2000 Requirements 30
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.6 Management Review
Review the QMS at planned intervals
Ensure Continued Suitability, Adequacy, &
Effectiveness;
Include Assessing Opportunities for
Improvement & the need for changes –
including the Quality Policy and Quality
Objectives
5.6 Management Review
Review the QMS at planned intervalsat planned intervals
Ensure ContinuedContinued Suitability, Adequacy, &Suitability, Adequacy, &
EffectivenessEffectiveness;
Include Assessing Opportunities forOpportunities for
ImprovementImprovement & the need for changesneed for changes –
including the Quality Policy and Quality
Objectives
31. 10/10/2003 ISO-9001:2000 Requirements 31
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.6 Management Review
Review Input
Results of Audits
Customer Feedback
Process Performance & Product Conformity
Status of Corrective & Preventive Actions
Follow-up Actions from Previous Reviews
Changes that could affect the QMS
Recommendations for Improvement
5.6 Management Review
Review InputReview Input
Results of AuditsResults of Audits
Customer FeedbackCustomer Feedback
Process Performance & Product ConformityProcess Performance & Product Conformity
Status of Corrective & Preventive ActionsStatus of Corrective & Preventive Actions
FollowFollow--up Actions from Previous Reviewsup Actions from Previous Reviews
Changes that could affect the QMSChanges that could affect the QMS
Recommendations for ImprovementRecommendations for Improvement
32. 10/10/2003 ISO-9001:2000 Requirements 32
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5.6 Management Review
Review Output
Decisions & Actions taken related to:
– Improvement on the effectiveness of the QMS & its
Processes
– Improvement of product related to customer
requirements
– Resource Needs
5.6 Management Review
Review OutputReview Output
Decisions & Actions takenDecisions & Actions taken related to:
–– Improvement on the effectiveness of the QMS & itsImprovement on the effectiveness of the QMS & its
ProcessesProcesses
–– Improvement of product related to customerImprovement of product related to customer
requirementsrequirements
–– Resource NeedsResource Needs
33. 10/10/2003 ISO-9001:2000 Requirements 33
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
34. 10/10/2003 ISO-9001:2000 Requirements 34
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6 Resource Management
Provision of Resources
Human Resources
Infrastructure
Work Environment
6 Resource Management6 Resource Management
Provision of ResourcesProvision of Resources
Human ResourcesHuman Resources
InfrastructureInfrastructure
Work EnvironmentWork Environment
35. 10/10/2003 ISO-9001:2000 Requirements 35
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.1 Provision of Resources
Determine and Provide Resources needed to:
– Implement & Maintain the QMS
– Continually Improve Effectiveness of QMS
– Enhance Customer Satisfaction by meeting
customer requirements
6.1 Provision of Resources6.1 Provision of Resources
Determine and ProvideDetermine and Provide Resources needed to:Resources needed to:
–– Implement & Maintain the QMSImplement & Maintain the QMS
–– Continually Improve Effectiveness of QMSContinually Improve Effectiveness of QMS
–– Enhance Customer Satisfaction by meetingEnhance Customer Satisfaction by meeting
customer requirementscustomer requirements
36. 10/10/2003 ISO-9001:2000 Requirements 36
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.2 Human Resources
Personnel performing work affecting product
quality shall be competent on the basis of
appropriate education, training, skills and
experience
6.2 Human Resources6.2 Human Resources
Personnel performing work affecting productPersonnel performing work affecting product
quality shall be competent on the basis ofquality shall be competent on the basis of
appropriate education, training, skills andappropriate education, training, skills and
experienceexperience
37. 10/10/2003 ISO-9001:2000 Requirements 37
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.3 Competence,
Awareness and Training
Determine the necessary
competence
Provide Training or take
other actions to satisfy
Evaluate the Effectiveness
of actions taken
6.3 Competence,6.3 Competence,
Awareness and TrainingAwareness and Training
Determine the necessaryDetermine the necessary
competencecompetence
Provide Training or takeProvide Training or take
other actions to satisfyother actions to satisfy
Evaluate the EffectivenessEvaluate the Effectiveness
of actions takenof actions taken
38. 10/10/2003 ISO-9001:2000 Requirements 38
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.3 Infrastructure
Determine, provide and maintain the
infrastructure needed to achieve conformity to
product requirements
6.3 Infrastructure6.3 Infrastructure
Determine, provide and maintain theDetermine, provide and maintain the
infrastructure needed to achieve conformity toinfrastructure needed to achieve conformity to
product requirementsproduct requirements
• Buildings, Workspace &
associated utilities
• Process equipment
(Hardware & Software)
• Supporting services (i.e.
transport or
communication)
•• Buildings, Workspace &Buildings, Workspace &
associated utilitiesassociated utilities
•• Process equipmentProcess equipment
(Hardware & Software)(Hardware & Software)
•• Supporting services (i.e.Supporting services (i.e.
transport ortransport or
communication)communication)
39. 10/10/2003 ISO-9001:2000 Requirements 39
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
6.4 Work Environment
Determine & Manage the work
environment needed to achieve
conformity to product requirements
[Factors that influence motivation,
satisfaction, development and
performance of people.]
Psychological Factors
Physical Factors
6.4 Work Environment6.4 Work Environment
Determine & Manage the workDetermine & Manage the work
environment needed to achieveenvironment needed to achieve
conformity to product requirementsconformity to product requirements
[Factors that influence motivation,[Factors that influence motivation,
satisfaction, development andsatisfaction, development and
performance of people.]performance of people.]
Psychological FactorsPsychological Factors
Physical FactorsPhysical Factors
40. 10/10/2003 ISO-9001:2000 Requirements 40
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
Work Environment - Continued
Psychological Factors
– Greater Involvement & Understanding of
Objectives to be Achieved
– Safety Rules & Procedures
– Recognition & Reward for Achievement,
Improvement & Innovation
– Career Planning & Development
Work EnvironmentWork Environment -- ContinuedContinued
Psychological FactorsPsychological Factors
–– Greater Involvement & Understanding ofGreater Involvement & Understanding of
Objectives to be AchievedObjectives to be Achieved
–– Safety Rules & ProceduresSafety Rules & Procedures
–– Recognition & Reward for Achievement,Recognition & Reward for Achievement,
Improvement & InnovationImprovement & Innovation
–– Career Planning & DevelopmentCareer Planning & Development
41. 10/10/2003 ISO-9001:2000 Requirements 41
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000
Work Environment - Continued
Physical Factors
– Ergonomics
– Temperature
– Light
– Noise
– Cleanliness
Work EnvironmentWork Environment -- ContinuedContinued
Physical FactorsPhysical Factors
–– ErgonomicsErgonomics
–– TemperatureTemperature
–– LightLight
–– NoiseNoise
–– CleanlinessCleanliness
42. 10/10/2003 ISO-9001:2000 Requirements 42
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
43. 10/10/2003 ISO-9001:2000 Requirements 43
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7 Product Realization7 Product Realization
Planning of Product RealizationPlanning of Product Realization
CustomerCustomer--related Processesrelated Processes
Design & DevelopmentDesign & Development
PurchasingPurchasing
Production and Service ProvisionProduction and Service Provision
Control of Monitoring and MeasuringControl of Monitoring and Measuring
DevicesDevices
44. 10/10/2003 ISO-9001:2000 Requirements 44
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.1 Planning of Product Realization7.1 Planning of Product Realization
Plan & Develop the processes needed forPlan & Develop the processes needed for
Product RealizationProduct Realization
Planning shall determine the following asPlanning shall determine the following as
appropriate:appropriate:
Quality ObjectivesQuality Objectives && RequirementsRequirements for thefor the
Product;Product;
Need to establish processes, documents andNeed to establish processes, documents and
provide resources specific to the product;provide resources specific to the product;
45. 10/10/2003 ISO-9001:2000 Requirements 45
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Planning shall determine the following:Planning shall determine the following:
ContinuedContinued
RequiredRequired vverification,erification, vvalidation,alidation, mmonitoring,onitoring,
inspection & testinspection & test activities specific to theactivities specific to the
productproduct and the criteria for productand the criteria for product
acceptanceacceptance
RecordsRecords needed to provide evidence thatneeded to provide evidence that
the realization processes and resultingthe realization processes and resulting
product meet requirementsproduct meet requirements
46. 10/10/2003 ISO-9001:2000 Requirements 46
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
TheThe outputoutput of this planning shall be in aof this planning shall be in a formform
suitablesuitable for the organizationfor the organization’’s method ofs method of
operationsoperations
NOTE 1: A document specifying the QMS processesNOTE 1: A document specifying the QMS processes
(including the product realization processes) can be(including the product realization processes) can be
referred to as a Quality Planreferred to as a Quality Plan
NOTE 2: The Design & Development RequirementsNOTE 2: The Design & Development Requirements
(7.3) may also be applied to the development of the(7.3) may also be applied to the development of the
product realization processesproduct realization processes
47. 10/10/2003 ISO-9001:2000 Requirements 47
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.2 Customer7.2 Customer--related Processesrelated Processes
DeterminationDetermination of requirementsof requirements related to therelated to the
productproduct
ReviewReview of requirementsof requirements related to the productrelated to the product
Customer CommunicationCustomer Communication
48. 10/10/2003 ISO-9001:2000 Requirements 48
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Determination of requirementsDetermination of requirements related torelated to
the productthe product
RequirementsRequirements specified by the customer,specified by the customer,
including delivery & postincluding delivery & post--delivery activities;delivery activities;
RequirementsRequirements necessary for specified ornecessary for specified or
intended use, where known;intended use, where known;
Statutory and regulatory requirementsStatutory and regulatory requirements relatedrelated
to the product;to the product;
Any additional requirementsAny additional requirements determined by thedetermined by the
Organization.Organization.
49. 10/10/2003 ISO-9001:2000 Requirements 49
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Review of requirementsReview of requirements related to therelated to the
productproduct
Shall be conducted prior to the commitment toShall be conducted prior to the commitment to
supply a product to the customer;supply a product to the customer;
Ensure that product requirements are defined;Ensure that product requirements are defined;
Ensure contract or order requirements differingEnsure contract or order requirements differing
from those previously expressed are resolved;from those previously expressed are resolved;
Ensure capable of meting the definedEnsure capable of meting the defined
requirements.requirements.
50. 10/10/2003 ISO-9001:2000 Requirements 50
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Review of requirementsReview of requirements related to the productrelated to the product ––
ContinuedContinued
Customer Requirements shall beCustomer Requirements shall be confirmedconfirmed by theby the
organizationorganization before acceptancebefore acceptance, where no, where no
documented statement of requirements isdocumented statement of requirements is
provided by the customerprovided by the customer
Where Product Requirements are changed, theWhere Product Requirements are changed, the
organization shallorganization shall ensure that relevant documentsensure that relevant documents
are amended and that relevant personnel areare amended and that relevant personnel are
made aware of the changed requirementsmade aware of the changed requirements
51. 10/10/2003 ISO-9001:2000 Requirements 51
Product Realization
per ISO-9001:2000
Customer CommunicationCustomer Communication
Determine and ImplementDetermine and Implement effectiveeffective
arrangements for communicatingarrangements for communicating with customerswith customers
in relation to:in relation to:
Product information;Product information;
Enquiries, contracts or order handling, includingEnquiries, contracts or order handling, including
amendments;amendments;
Customer feedback, including customerCustomer feedback, including customer
complaints.complaints.
52. 10/10/2003 ISO-9001:2000 Requirements 52
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.3 Design & Development7.3 Design & Development
Design & DevelopmentDesign & Development PlanningPlanning
Design & DevelopmentDesign & Development InputsInputs
Design & DevelopmentDesign & Development OutputsOutputs
Design & DevelopmentDesign & Development ReviewReview
Design & DevelopmentDesign & Development VerificationVerification
Design & DevelopmentDesign & Development ValidationValidation
Control ofControl of Design & DevelopmentDesign & Development ChangesChanges
53. VVerificationerification
VValidationalidation
7.3.5 & 7.3.67.3.5 & 7.3.6
RRevieweview
at Suitableat Suitable
Stages of DesignStages of Design
& Development& Development
7.3.47.3.4
VVerificationerification
VValidationalidation
7.3.5 & 7.3.67.3.5 & 7.3.6
Design
Output
7.3.3
Design &Design &
DevelopmentDevelopment
ProcessProcess
End Item
Product
Design
Input
7.3.2
Application of Design
Control in Waterfall or Stair
Step Design Process
[with ISO-9001 Clauses]
PlanPlan
Design &Design &
DevelopmentDevelopment
Stages, AND theStages, AND the
VerificationVerification
& Validation for& Validation for
each Stage 7.3.1each Stage 7.3.1
User
Needs
7.3.2
54. 10/10/2003 ISO-9001:2000 Requirements 54
Purchasing in ISOPurchasing in ISO--9001:20009001:2000
7.4 Purchasing7.4 Purchasing
PurchasingPurchasing ProcessProcess
PurchasingPurchasing InformationInformation
VerificationVerification of Purchased Productof Purchased Product
55. 10/10/2003 ISO-9001:2000 Requirements 55
Purchasing in ISOPurchasing in ISO--9001:20009001:2000
PurchasingPurchasing ProcessProcess
Ensure purchased product conforms toEnsure purchased product conforms to
specified requirements.specified requirements.
Type and Extent of control shall be dependentType and Extent of control shall be dependent
upon the effect of the purchased product onupon the effect of the purchased product on
subsequent product realization or the finalsubsequent product realization or the final
product.product.
Suppliers shall be evaluated and selectedSuppliers shall be evaluated and selected
based on their ability to supply product IAW thebased on their ability to supply product IAW the
organizationorganization’’s requirements.s requirements.
56. 10/10/2003 ISO-9001:2000 Requirements 56
Purchasing in ISOPurchasing in ISO--9001:20009001:2000
PurchasingPurchasing ProcessProcess -- ContinuedContinued
Criteria for selection, evaluation, & reCriteria for selection, evaluation, & re--
evaluation shall be established.evaluation shall be established.
Records of the results of evaluations and anyRecords of the results of evaluations and any
necessary actions arising from the evaluationnecessary actions arising from the evaluation
shall be maintainedshall be maintained
57. 10/10/2003 ISO-9001:2000 Requirements 57
Purchasing in ISO-9001:2000
PurchasingPurchasing InformationInformation
Shall describe the product to be purchased,Shall describe the product to be purchased,
including where appropriate:including where appropriate:
–– Requirements for approval of product, procedures,Requirements for approval of product, procedures,
processes and equipment;processes and equipment;
–– Requirements for qualification of personnel, andRequirements for qualification of personnel, and
–– Quality Management SystemsQuality Management Systems
The organization shall ensure the adequacy ofThe organization shall ensure the adequacy of
specified purchase requirementsspecified purchase requirements priorprior to theirto their
communicationcommunication
58. 10/10/2003 ISO-9001:2000 Requirements 58
Purchasing in ISO-9001:2000
VerificationVerification of Purchased Productof Purchased Product
Shall establish and implement the inspection orShall establish and implement the inspection or
other activities necessary for ensuring theother activities necessary for ensuring the
product meets specified purchaseproduct meets specified purchase
requirements.requirements.
Where the organization or its customer intendsWhere the organization or its customer intends
to perform verification at the supplierto perform verification at the supplier’’ss
premises, the intended verificationpremises, the intended verification
arrangements and the method of productarrangements and the method of product
release shall be stated in the purchasingrelease shall be stated in the purchasing
information.information.
59. 10/10/2003 ISO-9001:2000 Requirements 59
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.5 Production and Service Provision7.5 Production and Service Provision
Control of Production & Service ProvisionControl of Production & Service Provision
Validation of Processes for Product &Validation of Processes for Product &
Service ProvisionService Provision
Identification & TraceabilityIdentification & Traceability
Customer PropertyCustomer Property
Preservation of ProductPreservation of Product
60. 10/10/2003 ISO-9001:2000 Requirements 60
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Control of Production & Service ProvisionControl of Production & Service Provision
Plan & carry out provisions under controlledPlan & carry out provisions under controlled
conditions, including as applicable:conditions, including as applicable:
Availability of information that describesAvailability of information that describes thethe
product characteristicsproduct characteristics ;;
Availability ofAvailability of Work InstructionsWork Instructions, as necessary;, as necessary;
Use ofUse of suitable equipmentsuitable equipment;;
Availability & use ofAvailability & use of Monitoring and MeasuringMonitoring and Measuring
DevicesDevices;;
61. 10/10/2003 ISO-9001:2000 Requirements 61
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
PlanPlan & carry out provisions under controlled& carry out provisions under controlled
conditions, including as applicable:conditions, including as applicable: ContCont’’dd
Implementation ofImplementation of MonitoringMonitoring andand
MeasurementMeasurement;;
Implementation ofImplementation of ReleaseRelease,, DeliveryDelivery
andand PostPost--Delivery Activities.Delivery Activities.
62. 10/10/2003 ISO-9001:2000 Requirements 62
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Validation of Processes for Product &Validation of Processes for Product &
Service ProvisionService Provision
Validate any process for a provision whereValidate any process for a provision where
the resulting outputthe resulting output cannot be verified bycannot be verified by
subsequent monitoring or measurementsubsequent monitoring or measurement ––
wherewhere deficiencies become apparent onlydeficiencies become apparent only
after the product is in useafter the product is in use or the service hasor the service has
been deliveredbeen delivered
ValidationValidation demonstrates the abilitydemonstrates the ability of theof the
processprocess to achieve planned resultsto achieve planned results
63. 10/10/2003 ISO-9001:2000 Requirements 63
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Validation of ProcessesValidation of Processes –– ContCont’’dd
Establish Arrangements for these processes (asEstablish Arrangements for these processes (as
applicable):applicable):
DefinedDefined Criteria for Review & ApprovalCriteria for Review & Approval of theof the
process;process;
Approval ofApproval of EquipmentEquipment & Qualification of& Qualification of
PersonnelPersonnel;;
Use ofUse of Specific Methods & ProceduresSpecific Methods & Procedures;;
Requirements forRequirements for RecordsRecords; and; and
RevalidationRevalidation..
64. 10/10/2003 ISO-9001:2000 Requirements 64
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Identification & TraceabilityIdentification & Traceability
WhereWhere applicableapplicable,, product shall be identifiedproduct shall be identified
by a suitable means throughout itsby a suitable means throughout its
realization process.realization process.
It shallIt shall identify the product statusidentify the product status withwith
respect torespect to monitoring & measurementmonitoring & measurement
requirements.requirements.
WhereWhere traceabilitytraceability is a requirement, theis a requirement, the
unique identification of the product shall beunique identification of the product shall be
controlled and recordedcontrolled and recorded..
65. 10/10/2003 ISO-9001:2000 Requirements 65
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Customer PropertyCustomer Property
Care shall be exercisedCare shall be exercised with customerwith customer
property while under the organizationproperty while under the organization’’ss
control or being used by the organization.control or being used by the organization.
Customer Property shall beCustomer Property shall be identifiedidentified,,
verifiedverified,, protected and safeguardedprotected and safeguarded while inwhile in
use or being incorporated into the product.use or being incorporated into the product.
IfIf lostlost,, damageddamaged or otherwiseor otherwise found to befound to be
unsuitableunsuitable, it shall be reported and records, it shall be reported and records
maintained.maintained.
66. 10/10/2003 ISO-9001:2000 Requirements 66
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
Preservation of ProductPreservation of Product
ConformityConformity of the product shall beof the product shall be preservedpreserved
during internal processing and delivery to theduring internal processing and delivery to the
intended destination.intended destination.
PreservationPreservation shall includeshall include identificationidentification,,
handlinghandling,, packagingpackaging andand protectionprotection..
PreservationPreservation also applies to thealso applies to the constituentconstituent
parts of a productparts of a product..
67. 10/10/2003 ISO-9001:2000 Requirements 67
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring7.6 Control of Monitoring and Measuring
DevicesDevices
Determine theDetermine the monitoringmonitoring andand
measurementmeasurement to be undertaken toto be undertaken to
provideprovide evidence of conformityevidence of conformity toto
determined requirements, AND thedetermined requirements, AND the
monitoring and measuringmonitoring and measuring devicesdevices
needed to ensure valid results.needed to ensure valid results.
68. 10/10/2003 ISO-9001:2000 Requirements 68
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
EstablishEstablish processesprocesses to ensure thatto ensure that
monitoring and measurement can bemonitoring and measurement can be
carried out and in a mannercarried out and in a manner
consistent with the monitoring andconsistent with the monitoring and
measurement requirements.measurement requirements.
69. 10/10/2003 ISO-9001:2000 Requirements 69
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
When necessary, measuring equipmentWhen necessary, measuring equipment
shall:shall:
BeBe calibrated or verifiedcalibrated or verified at specified intervals,at specified intervals,
or prior to use,or prior to use, against measurementagainst measurement
standards traceablestandards traceable to international or nationalto international or national
measurement standards;measurement standards;
Where no such standards exist, the basis use forWhere no such standards exist, the basis use for
calibration or verification shall be recorded.calibration or verification shall be recorded.
70. 10/10/2003 ISO-9001:2000 Requirements 70
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
When necessary, measuring equipmentWhen necessary, measuring equipment
shall:shall: -- ContinuedContinued
BeBe adjustedadjusted oror rere--adjustedadjusted as necessary;as necessary;
BeBe identifiedidentified to enable theto enable the calibration statuscalibration status toto
be determined;be determined;
BeBe safeguardedsafeguarded from adjustments that wouldfrom adjustments that would
invalidate the measurement result;invalidate the measurement result;
BeBe protectedprotected from damage and deteriorationfrom damage and deterioration
during handling, maintenance and storage.during handling, maintenance and storage.
71. 10/10/2003 ISO-9001:2000 Requirements 71
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
7.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
When the equipment isWhen the equipment is found not tofound not to
conformconform to requirements, theto requirements, the validity of thevalidity of the
previous measuring resultsprevious measuring results shall beshall be
assessed and recorded.assessed and recorded.
Appropriate action shall be taken on theAppropriate action shall be taken on the
equipmentequipment and anyand any product affectedproduct affected..
Records of the results of calibration andRecords of the results of calibration and
verification shall be maintained.verification shall be maintained.
72. 10/10/2003 ISO-9001:2000 Requirements 72
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000
77.6 Control of Monitoring and Measuring Devices.6 Control of Monitoring and Measuring Devices –– ContCont’’dd
Computer softwareComputer software to be used in theto be used in the
monitoring and measurement of specifiedmonitoring and measurement of specified
requirements,requirements, shall be confirmedshall be confirmed as to itsas to its
ability to satisfy the intended application.ability to satisfy the intended application.
This confirmation shall be undertaken priorThis confirmation shall be undertaken prior
to initial use and reconfirmed asto initial use and reconfirmed as
necessary.necessary.
73. 10/10/2003 ISO-9001:2000 Requirements 73
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESS OUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
74. 10/10/2003 ISO-9001:2000 Requirements 74
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8 Measurement, Analysis and Improvement8 Measurement, Analysis and Improvement
GeneralGeneral
Monitoring and MeasurementMonitoring and Measurement
Control of Nonconforming ProductControl of Nonconforming Product
Analysis of DataAnalysis of Data
ImprovementImprovement
75. 10/10/2003 ISO-9001:2000 Requirements 75
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.1 General8.1 General
Plan & Implement the monitoring,Plan & Implement the monitoring,
measurement, analysis and improvementmeasurement, analysis and improvement
processes needed to :processes needed to :
DemonstrateDemonstrate conformity of the product;conformity of the product;
EnsureEnsure conformity of the QMS;conformity of the QMS;
Continually improveContinually improve the effectiveness of the QMSthe effectiveness of the QMS
Determine the applicable methods, includingDetermine the applicable methods, including
statistical techniques, and the extent of theirstatistical techniques, and the extent of their
useuse
76. 10/10/2003 ISO-9001:2000 Requirements 76
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.2 Monitoring and Measurement8.2 Monitoring and Measurement
Customer SatisfactionCustomer Satisfaction
Internal AuditInternal Audit
Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes
Monitoring and Measurement of ProductMonitoring and Measurement of Product
77. 10/10/2003 ISO-9001:2000 Requirements 77
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Customer SatisfactionCustomer Satisfaction
A QMS measurement of performanceA QMS measurement of performance
Monitor information relating toMonitor information relating to customercustomer
perceptionperception as to whether customeras to whether customer
requirements are being met;requirements are being met;
Determine the methods for obtaining andDetermine the methods for obtaining and
using this informationusing this information
78. 10/10/2003 ISO-9001:2000 Requirements 78
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Internal AuditInternal Audit
Conduct internal audits at planned intervals toConduct internal audits at planned intervals to
determine whether the QMS:determine whether the QMS:
ConformsConforms to the planned arrangements, toto the planned arrangements, to
the requirements of ISOthe requirements of ISO--9001, and QMS9001, and QMS
requirements established by therequirements established by the
organization;organization;
Is effectively implementedIs effectively implemented and maintainedand maintained
79. 10/10/2003 ISO-9001:2000 Requirements 79
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Internal AuditInternal Audit –– ConCon’’tt
An audit program shall be planned,An audit program shall be planned, consideringconsidering
the status and importance of the processes andthe status and importance of the processes and
areas to be auditedareas to be audited, as well as the results of the, as well as the results of the
previous audits.previous audits.
The auditThe audit criteriacriteria,, scopescope,, frequencyfrequency andand methodsmethods
shall be defined.shall be defined.
Selection of auditors and conduct of the auditsSelection of auditors and conduct of the audits
shallshall ensure objectivity and impartialityensure objectivity and impartiality of theof the
audit processaudit process
Auditors shall not audit their own workAuditors shall not audit their own work
80. 10/10/2003 ISO-9001:2000 Requirements 80
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Internal AuditInternal Audit –– ContCont’’dd
TheThe management responsible for themanagement responsible for the
areas being auditedareas being audited shall ensure thatshall ensure that
actions are takenactions are taken without undue delaywithout undue delay toto
eliminate detected nonconformities andeliminate detected nonconformities and
their causes.their causes.
FollowFollow--up activitiesup activities shall include theshall include the
verification of the actions taken and theverification of the actions taken and the
reporting of verification results.reporting of verification results.
81. 10/10/2003 ISO-9001:2000 Requirements 81
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes
Apply suitable methods for monitoring and,Apply suitable methods for monitoring and,
where applicable, measurement of the QMSwhere applicable, measurement of the QMS
processes.processes.
These methods shall demonstrate the ability ofThese methods shall demonstrate the ability of
the processes to achieve planned results.the processes to achieve planned results.
When planned results are not achieved,When planned results are not achieved,
correction and corrective action shall be takencorrection and corrective action shall be taken
as appropriate to ensure conformity of theas appropriate to ensure conformity of the
product.product.
82. 10/10/2003 ISO-9001:2000 Requirements 82
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Monitoring and Measurement of ProductMonitoring and Measurement of Product
Monitor and measure theMonitor and measure the productproduct
characteristicscharacteristics to verify thatto verify that productproduct
requirementsrequirements have been met.have been met.
This is to be carried out at appropriateThis is to be carried out at appropriate
stages of the product realization processstages of the product realization process
IAW the planned arrangementsIAW the planned arrangements
83. 10/10/2003 ISO-9001:2000 Requirements 83
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Monitoring and Measurement of ProductMonitoring and Measurement of Product –– ConCon’’tt
Evidence of conformityEvidence of conformity with thewith the acceptanceacceptance
criteriacriteria shall be maintainedshall be maintained
Records shall indicate theRecords shall indicate the person(s)person(s)
authorizing release of productauthorizing release of product
Product Release and Service DeliveryProduct Release and Service Delivery shall notshall not
proceedproceed until the planned arrangements haveuntil the planned arrangements have
been satisfactorily completed, unlessbeen satisfactorily completed, unless otherwiseotherwise
approved by a relevant authorityapproved by a relevant authority and whereand where
applicable by the customer.applicable by the customer.
84. 10/10/2003 ISO-9001:2000 Requirements 84
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product
Ensure that product whichEnsure that product which does not conformdoes not conform
to product requirements isto product requirements is identifiedidentified andand
controlledcontrolled to prevent its unintended use orto prevent its unintended use or
delivery.delivery.
The controls and related responsibilities andThe controls and related responsibilities and
authorities for dealing with nonconformingauthorities for dealing with nonconforming
product shall be defined in a documentedproduct shall be defined in a documented
procedure.procedure.
85. 10/10/2003 ISO-9001:2000 Requirements 85
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product –– ContCont’’dd
Nonconforming product shall be dealt with inNonconforming product shall be dealt with in
one or more of the following ways:one or more of the following ways:
TakingTaking action to eliminateaction to eliminate the detectedthe detected
nonconformity;nonconformity;
Authorizing its useAuthorizing its use, release or acceptance under, release or acceptance under
concession by a relevant authority and, whereconcession by a relevant authority and, where
applicable, by the customer;applicable, by the customer;
TakingTaking action to preclude its original intended useaction to preclude its original intended use
or applicationor application
86. 10/10/2003 ISO-9001:2000 Requirements 86
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product –– ContCont’’dd
When nonconforming productWhen nonconforming product is correctedis corrected itit
shall beshall be subject to resubject to re--verificationverification toto
demonstrate conformity todemonstrate conformity to the requirements.the requirements.
When detected after delivery or use hasWhen detected after delivery or use has
started,started, actions shall be takenactions shall be taken with thewith the
nonconforming product , appropriate to thenonconforming product , appropriate to the
effects, or potential effects, of theeffects, or potential effects, of the
nonconformity.nonconformity.
87. 10/10/2003 ISO-9001:2000 Requirements 87
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product ––
ContCont’’dd
RecordsRecords of the nature of nonconformitiesof the nature of nonconformities
and any subsequent actions taken,and any subsequent actions taken,
including concessions obtained, shall beincluding concessions obtained, shall be
maintainedmaintained
88. 10/10/2003 ISO-9001:2000 Requirements 88
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.4 Analysis of Data8.4 Analysis of Data
Determine, collect and analyze appropriateDetermine, collect and analyze appropriate
datadata to demonstrateto demonstrate thethe suitabilitysuitability andand
effectivenesseffectiveness of the QMS andof the QMS and to evaluateto evaluate
wherewhere continual improvementcontinual improvement of theof the
effectiveness of the QMS can be madeeffectiveness of the QMS can be made
This shall include data generated as a result ofThis shall include data generated as a result of
monitoring and measurement and from othermonitoring and measurement and from other
relevant sourcesrelevant sources
89. 10/10/2003 ISO-9001:2000 Requirements 89
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.4 Analysis of Data8.4 Analysis of Data –– ContCont’’dd
Analysis of Data shall provide informationAnalysis of Data shall provide information
relating to:relating to:
Customer satisfaction;Customer satisfaction;
Conformity to product requirements;Conformity to product requirements;
Characteristics and trends of processes andCharacteristics and trends of processes and
products including opportunities for preventiveproducts including opportunities for preventive
action;action;
SuppliersSuppliers
91. 10/10/2003 ISO-9001:2000 Requirements 91
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Continual ImprovementContinual Improvement
Continually improve the effectiveness of theContinually improve the effectiveness of the
QMS through the use of the:QMS through the use of the:
Quality PolicyQuality Policy;;
Quality ObjectivesQuality Objectives;;
Audit ResultsAudit Results;;
Analysis of DataAnalysis of Data;;
Corrective & Preventive ActionsCorrective & Preventive Actions
Management ReviewManagement Review
92. 10/10/2003 ISO-9001:2000 Requirements 92
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Corrective ActionCorrective Action
Actions takenActions taken to eliminate the causeto eliminate the cause ofof
nonconformity in order tononconformity in order to preventprevent
recurrencerecurrence
They shall be appropriate to the effects ofThey shall be appropriate to the effects of
the nonconformities encountered.the nonconformities encountered.
93. 10/10/2003 ISO-9001:2000 Requirements 93
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Corrective ActionCorrective Action-- ContCont’’dd
A documented procedure shall be establishedA documented procedure shall be established
to define requirements for:to define requirements for:
Reviewing nonconformities (including CustomerReviewing nonconformities (including Customer
Complaints);Complaints);
Determining the causes of nonconformities;Determining the causes of nonconformities;
Evaluating the need for action to ensure thatEvaluating the need for action to ensure that
nonconformities do not recur;nonconformities do not recur;
Determining & implementing action needed;Determining & implementing action needed;
Reviewing corrective action taken;Reviewing corrective action taken;
Records of results of action taken.Records of results of action taken.
94. 10/10/2003 ISO-9001:2000 Requirements 94
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Preventive ActionPreventive Action
Actions takenActions taken to eliminate the causeto eliminate the cause ofof
potentialpotential nonconformities in order tononconformities in order to
prevent their occurrenceprevent their occurrence
They shall be appropriate to the effects ofThey shall be appropriate to the effects of
thethe potential problemspotential problems..
95. 10/10/2003 ISO-9001:2000 Requirements 95
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Preventive ActionPreventive Action –– ContCont’’dd
A documented procedure shall be establishedA documented procedure shall be established
to define requirements for:to define requirements for:
Determining potential nonconformities and theirDetermining potential nonconformities and their
causes;causes;
Evaluating the need for action to prevent occurrenceEvaluating the need for action to prevent occurrence
of nonconformities;of nonconformities;
Determining & implementing action needed;Determining & implementing action needed;
Reviewing preventive action taken;Reviewing preventive action taken;
Records of the results of action taken.Records of the results of action taken.