ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001
Two of the Most Important Objectives in the Revision of the ISO 9000- Standard To develop a simplified set of standards that will be equally applicable to small as well as medium and large organizations For the amount and detail of documentation required to be more relevant to the desired results of the organization’s process activities
ISO 9001:2000 Significantly reduces documentation requirements Is much less prescriptive Allows more flexibility in choice of documentation system
ISO 9001:2000 Enables each organization to develop the minimum amount of documentation needed in order to demonstrate the effective planning, operation and control of its processes and the implementation and continual improvement of the effectiveness of its quality management system
What Is a Document? Communication of information Evidence of conformity Knowledge sharing
Communication of Information The type and extent of the documentation will depend on the nature of the organization’s products and processes The degree of formality of communication systems The level of communication skills The organizational structure
Evidence of Conformity Provision of evidence that what was planned has actually been done. Say what you do, do what you say and prove it.
Knowledge Sharing In order to disseminate and preserve the organization’s experiences. Example: a technical specification, which can be used as a base for design and development of a new product.
Document Mediums Paper Magnetic Electronic Photographic Master Sample Other
Clause 4.1, General Requirements Documented statements of quality policy and quality objectives A quality manual Documented procedures required by the international standard Documents needed by the organization to ensure effective planning, operation and control of its processes Records required by the international standard
Documented Statements of Quality Policy (1 of 2) Defined in Clause 5.3 Appropriate to the purpose of the organization Includes a commitment to comply with requirements and continually improve the effectiveness of the Quality Management System A framework for establishing and quality objectives
Documented Statements of Quality Policy (2 of 2) Defined in Clause 5.3 Is communicated and understood within the organization Is reviewed for continuing suitability
Documented Statements of Quality Objectives Defined in Clause 5.4.1 Includes those needed to meet requirements for product [Clause 7.1] Are established at relevant functions and levels within the organization Are measurable and consistent with Quality Policy
Quality Manual Minimum content specified in Clause 4.2.2 Scope of the Quality Management System, including details of and justification for any exclusions Documented procedures established for the QMS, or references to them Description of the interaction between processes of the QMS
Quality Manual-Structure Structure of the manual is a decision for the organization based on: Organization’s size Organization’s complexity Organization’s culture Controlled in accordance with the requirements of Clause 4.2.3
Documented Procedures Required by ISO 9001:2000 Control of documents (Clause 4.2.3) Control of records (Clause 4.2.4) Internal Audit (Clause 8.2.2) Control of nonconforming product (Clause 8.3) Corrective action (Clause 8.5.2) Preventive Action (Clause 8.5.3)
Documents Needed by the Organization Specifically referenced in ISO 9001:2000 Quality policy (Clause 4.2.1a) Quality objectives (Clause 4.2.1a) Quality Manual (Clause 4.2.1b)
Additional Documentation  There are several requirements of ISO 9001:2000 where an organization could add value to its Quality Management System and demonstrate conformity by the preparation of other documents
Additional Documentation Process maps, process flow charts,and/or process descriptions Organization charts Specifications Work and/or test instructions Production schedules Approved suppliers lists Test and inspection plans Quality plans
Documented Procedures Controlled in accordance with Clause 4.2.3 May combine the procedure for several activities into one document May require more than one document for a single procedure May require additional procedures in order to implement an effective QMS
Records Requirements for control of records are different from those for other documents All records have to be controlled in accordance with the requirements of Clause 4.2.4 Organization are free to develop records that may be needed to demonstrate conformity of their processes, products, and QMS
Required Records (1 0f 2) Management reviews (5.6.1) Education, training, skills and experience (6.2.2e) Evidence that the realization processes and resulting product fulfill requirements (7.1d) Design and development inputs (7.3.2) Results of design and development reviews (7.3.4) Results of design and development verification Results of design and development validation Results of review of design and development changes (7.3.7)
Required Records (2 of 2) Results of supplier evaluations (7.4.1) To demonstrate process validity where output cannot be measured (7.5.2d) The unique identification of a product (7.5.3) Customer property (7.5.4) Basis for calibration of measuring equipment (7.6a) Results of calibration (7.6) Internal audits (8.2.2) Release of product (8.2.2) Nonconforming product (8.3) Results of corrective action (8.5.2) Results of preventive action (8.5.3)
Preparing to Implement a QMS Process approach Identify the processes necessary for effective implementation Understand interactions between these processes Document the processes to assure effective operation and control
Processes Include Management Resources Product realization Measurement
Process Analysis Should be driving force for defining amount of documentation, taking into account the requirements of ISO 9001:2000 Should  not  be the documentation that drives the processes
Demonstrating Conformity With ISO 9001:2000 May not need extensive documentation Must be able to provide objective evidence of effectiveness of processes and quality management system
Objective Evidence Data supporting the existence or verity of something (Clause 3.8.1 of ISO 9000:2000) May be obtained through observation, measurement, test or other means Does not necessarily depend on documented procedures, records or other documents except where specifically required by ISO 9001:2000
Objective Evidence Where the organization has no specific procedure for a particular activity, and this is not required by specification, it is acceptable for this activity to be conducted using as a basis the relevant clause of ISO 9001:2000 Example: Internal and external audits
Terms and Definitions Document - information and its supporting medium (ISO 9000:2000 Clause 3.7.2) Procedure – Specified way to carry out an activity (3.7.4) Quality Manual – Document specifying the quality management system of an organization Quality Plan – document specifying which procedures and associated resources shall be applied, by whom and when to a specific project (3.7.5) Record – document stating results achieved or providing evidence of activities performed (3.7.6) Specification – document stating requirements
Bibliography Guidance on the Documentation Requirements of ISO 9001:2000  ISO/TC 176/SC 2/N525R March 2001 Quality Management Systems – Requirements ISO/FDIS 9001

Iso90011

  • 1.
    ISO 9001:2000 DocumentationRequirements Based on ISO/TC 176/SC 2 March 2001
  • 2.
    Two of theMost Important Objectives in the Revision of the ISO 9000- Standard To develop a simplified set of standards that will be equally applicable to small as well as medium and large organizations For the amount and detail of documentation required to be more relevant to the desired results of the organization’s process activities
  • 3.
    ISO 9001:2000 Significantlyreduces documentation requirements Is much less prescriptive Allows more flexibility in choice of documentation system
  • 4.
    ISO 9001:2000 Enableseach organization to develop the minimum amount of documentation needed in order to demonstrate the effective planning, operation and control of its processes and the implementation and continual improvement of the effectiveness of its quality management system
  • 5.
    What Is aDocument? Communication of information Evidence of conformity Knowledge sharing
  • 6.
    Communication of InformationThe type and extent of the documentation will depend on the nature of the organization’s products and processes The degree of formality of communication systems The level of communication skills The organizational structure
  • 7.
    Evidence of ConformityProvision of evidence that what was planned has actually been done. Say what you do, do what you say and prove it.
  • 8.
    Knowledge Sharing Inorder to disseminate and preserve the organization’s experiences. Example: a technical specification, which can be used as a base for design and development of a new product.
  • 9.
    Document Mediums PaperMagnetic Electronic Photographic Master Sample Other
  • 10.
    Clause 4.1, GeneralRequirements Documented statements of quality policy and quality objectives A quality manual Documented procedures required by the international standard Documents needed by the organization to ensure effective planning, operation and control of its processes Records required by the international standard
  • 11.
    Documented Statements ofQuality Policy (1 of 2) Defined in Clause 5.3 Appropriate to the purpose of the organization Includes a commitment to comply with requirements and continually improve the effectiveness of the Quality Management System A framework for establishing and quality objectives
  • 12.
    Documented Statements ofQuality Policy (2 of 2) Defined in Clause 5.3 Is communicated and understood within the organization Is reviewed for continuing suitability
  • 13.
    Documented Statements ofQuality Objectives Defined in Clause 5.4.1 Includes those needed to meet requirements for product [Clause 7.1] Are established at relevant functions and levels within the organization Are measurable and consistent with Quality Policy
  • 14.
    Quality Manual Minimumcontent specified in Clause 4.2.2 Scope of the Quality Management System, including details of and justification for any exclusions Documented procedures established for the QMS, or references to them Description of the interaction between processes of the QMS
  • 15.
    Quality Manual-Structure Structureof the manual is a decision for the organization based on: Organization’s size Organization’s complexity Organization’s culture Controlled in accordance with the requirements of Clause 4.2.3
  • 16.
    Documented Procedures Requiredby ISO 9001:2000 Control of documents (Clause 4.2.3) Control of records (Clause 4.2.4) Internal Audit (Clause 8.2.2) Control of nonconforming product (Clause 8.3) Corrective action (Clause 8.5.2) Preventive Action (Clause 8.5.3)
  • 17.
    Documents Needed bythe Organization Specifically referenced in ISO 9001:2000 Quality policy (Clause 4.2.1a) Quality objectives (Clause 4.2.1a) Quality Manual (Clause 4.2.1b)
  • 18.
    Additional Documentation There are several requirements of ISO 9001:2000 where an organization could add value to its Quality Management System and demonstrate conformity by the preparation of other documents
  • 19.
    Additional Documentation Processmaps, process flow charts,and/or process descriptions Organization charts Specifications Work and/or test instructions Production schedules Approved suppliers lists Test and inspection plans Quality plans
  • 20.
    Documented Procedures Controlledin accordance with Clause 4.2.3 May combine the procedure for several activities into one document May require more than one document for a single procedure May require additional procedures in order to implement an effective QMS
  • 21.
    Records Requirements forcontrol of records are different from those for other documents All records have to be controlled in accordance with the requirements of Clause 4.2.4 Organization are free to develop records that may be needed to demonstrate conformity of their processes, products, and QMS
  • 22.
    Required Records (10f 2) Management reviews (5.6.1) Education, training, skills and experience (6.2.2e) Evidence that the realization processes and resulting product fulfill requirements (7.1d) Design and development inputs (7.3.2) Results of design and development reviews (7.3.4) Results of design and development verification Results of design and development validation Results of review of design and development changes (7.3.7)
  • 23.
    Required Records (2of 2) Results of supplier evaluations (7.4.1) To demonstrate process validity where output cannot be measured (7.5.2d) The unique identification of a product (7.5.3) Customer property (7.5.4) Basis for calibration of measuring equipment (7.6a) Results of calibration (7.6) Internal audits (8.2.2) Release of product (8.2.2) Nonconforming product (8.3) Results of corrective action (8.5.2) Results of preventive action (8.5.3)
  • 24.
    Preparing to Implementa QMS Process approach Identify the processes necessary for effective implementation Understand interactions between these processes Document the processes to assure effective operation and control
  • 25.
    Processes Include ManagementResources Product realization Measurement
  • 26.
    Process Analysis Shouldbe driving force for defining amount of documentation, taking into account the requirements of ISO 9001:2000 Should not be the documentation that drives the processes
  • 27.
    Demonstrating Conformity WithISO 9001:2000 May not need extensive documentation Must be able to provide objective evidence of effectiveness of processes and quality management system
  • 28.
    Objective Evidence Datasupporting the existence or verity of something (Clause 3.8.1 of ISO 9000:2000) May be obtained through observation, measurement, test or other means Does not necessarily depend on documented procedures, records or other documents except where specifically required by ISO 9001:2000
  • 29.
    Objective Evidence Wherethe organization has no specific procedure for a particular activity, and this is not required by specification, it is acceptable for this activity to be conducted using as a basis the relevant clause of ISO 9001:2000 Example: Internal and external audits
  • 30.
    Terms and DefinitionsDocument - information and its supporting medium (ISO 9000:2000 Clause 3.7.2) Procedure – Specified way to carry out an activity (3.7.4) Quality Manual – Document specifying the quality management system of an organization Quality Plan – document specifying which procedures and associated resources shall be applied, by whom and when to a specific project (3.7.5) Record – document stating results achieved or providing evidence of activities performed (3.7.6) Specification – document stating requirements
  • 31.
    Bibliography Guidance onthe Documentation Requirements of ISO 9001:2000 ISO/TC 176/SC 2/N525R March 2001 Quality Management Systems – Requirements ISO/FDIS 9001