5. Hill Roads
Topics As Per Syllabus
5.1 Introduction
5.2 Special Consideration in Hill Roads
5.2.1 Alignment of Hill Road Design: General Consideration, Route
Location in Hills, Gradient, Design and Types of Hair Pin Bends,
Different Types of Hill Road Cross-sections
5.3 Special Structures in Hill Roads
5.3.1 Types of Retaining Structures, River Training Structures, Landslide
Stabilization Structures and Gully Control Structures
1. Introduction
• A hill road is usually defined on the basis of terrain.
• As per NRS the cross slope may be classified as:
• Road which passes through with a cross slope of 25% or more i.e.
mountainous or steep is termed as “Hill Road”.
• Hill road-one which passes through terrain with cross slope of 25% or more.
• There are sections along hill road with cross slope less than 25%, esp. when
the road follows river route.
• It is the overall terrain that must be considered.
Why Hill Road in Nepal?
• Nepal area = 140,000 sq. km approx.
• 66% covered with thinly/sparsely populated hills, mountains.
• 90% population reside in hilly areas and depends on agro products.
• Waterways, railways, airways - difficult
• Hilly Regions – Extremes of Climatic Conditions, Difficult and Hazardous Terrain,
Topography and Vast High Altitude Areas
• Challenges of Hilly Areas: Floods, Landslides, Snowfall, etc. – Fairly Weathered
Roads Possible
• But Hilly Areas Rich: in Natural Resources, Flora and Fauna – Important to launch
development Projects (e.g. Hydropower, etc.), tourism, etc.
• For Transport, Economy, Social Reasons – Justify the Construction of Hill Roads in
the Hilly Regions.
• Where Tunnels, Viaduct – Possible but Not Economical
5.2 Special Consideration in Hill Roads
5.2.1 Design and Construction Problems of Hill Roads
• Characterized by a highly broken relief with widely differing elevations and
steep slopes, deep gorges and several watercourses — unnecessarily
increase in road length
• Complex geology - different rock bed- geology differs from place to place –
assessment for road foundation is not easy
• Environmental impact - removal of vegetation etc. - stable slope may
change to unstable slope after road construction
• Great Variation in hydrological condition [ground water condition] vary
from place to place – may lead to damages after road construction
• New earth fill for road embankment may overload the relatively weak
underlying soil layer on hill slope – may trigger new and recurrent slides
• Requires installation of various types of special various road structures -
cost may rise upto 50 - 60% of total construction
• Steep slopes – high speed of surface runoff - provision of erosion
protection works
• Construction along relatively small approach stretches– different
construction technology may be needed
• Need of special safety precaution during construction
• Variations of climatic conditions - precipitation [rain and snow] , velocity of
wind etc. - need considerations
• Frequent blasting
• Design of hairpin bends to get heights
लमजुङ र मनाङ सीमामा पने मार्दीभीरको कच्ची बाटोमा र्दैननक उपभोग्य वस्तु पुर्याएर फक
ं र्दै यात्रुवाहक
नजपहरू । यनिखेर मनाङमा ५० वटा नजपले उपभोग्य वस्तु, स्थानीयवासी र पययटक ओसारररहेका छन्
http://bit.ly/1P8Nrd2
5.2.2 Special Consideration in Hill Roads
1. Selection of Road Alignment
2. Special Geometric Standards (Gradient and Hari Pin Bends)
3. Cross-section Design
4. Design of Drainage Structures (Special Structures may Require)
5. Stability of Slopes
1. Selection of Road Alignment
• Alignment through hilly areas is slightly different from aligning through a flat
terrain.
• For the purpose of efficient and safe operation of vehicles through a hilly
terrain special care should be taken while aligning the highway.
• Alignment should be - short, easy, economical & safe
• Alignment survey
• Reconnaissance-
• Tentative alignment after map study-topographical, geological and
meteorological
• Trace cut-
• route selected in step 1 is translated on the ground to provide an
access for subsequent detailed survey. A 1-1.2 m wide track is
constructed with easier gradient
• Detailed survey
• Fixing of bench marks
• Cross section and longitudinal sections – 15 m on straight, 30 m at sharp
curves
• Design of horizontal curves and hair pin bends
• Soil investigation, geology, hydrology study
2. Special Geometric Standards
• The geometric standards followed in hilly areas are different from
those in at terrain.
• The alignment chosen should enable the ruling gradient to be
attained in minimum of the length, minimizing steep gradient, hairpin
bends and needless rise and fall.
3. Cross-section Design
4. Hill Side Drainage
• Adequate drainage facility should be provided across the road.
• Attempts should be made to align the roads in such a way where the
number of cross drainage structures required are minimum.
• This will reduce the construction cost.
5. Stability of Slopes
• For hilly areas, the road should be aligned through the side of the hill that is
stable.
• The common problem with hilly areas is that of landslides.
• Excessive cutting and filling for road constructions give way to steepening of
slopes which in turn will affect the stability.
Factors Affecting Selection of Alignment in Mountainous and Hilly Areas
• Following points to be considered while aligning the hill roads:
i) Temperature
• The temperature of air varies inversely with altitude.
• The temperature drop being about 0.50C per 100m of rise.
• Similarly, the amount of heat received by hill slopes varies enormously with their orientation
in relation to the exposure to sun.
• Temperature - lower temperature in hill – drop by 0.5 0C per 100m rise - slopes facing south
and north
ii) Rainfall
• The amount of rainfall in hilly region is inversely proportional to the altitude.
• In hilly regions, wind often flows along the valley and gorges, as consequence of which the
rainfall in the valley is substantially higher than on high-lands and water-sheds.
• Also, maximum rainfall occurs in few months only. So these all uneven situation create the
problem in construction and maintenance of the road.
• Rainfall- heavy rainfall affects construction and maintenance
iii) Atmospheric pressure and Winds
• Atmospheric pressure is inversely proportional to altitude.
• At high altitudes, the velocity of wind is frequently coming at 25 – 30 m/s.
• The change in character of wind is due to appreciable difference of atmospheric pressure in
valleys and on mountain passes.
• Wind-high wind velocity contribute to damage –weathering of rocks, blowing away binding
material in valley
iv) Geological condition
• The tendency of sedimentary rocks is to slip under the influence of force parallel to the layer.
• The degree of stability of hill slopes depends upon the type of rock, the degree of strata
inclination or dip, the occurrence of clay seem, the hardness of rock and presence of ground
water.
• The instability of road may be due to ground water, landslides and unstable folds.
v) Route location
• The approach to the location of hill road alignment varies for the sections along the valley
bottom and along the mountain pass.
• The first is called ‘river route’ and second is called ‘ridge route’.
Route Location
• Hill road follow twist and turns- curves
• Location of alignment varies for sections along valley and mountain pass
• Alignment through valley - river route; mountain - ridge route
• A hill road may be only river route, ridge route or combination of both
River Route
• Most frequent Gentle slope
• Serves rural settlement situated next to
the water course
• Low vehicle operation cost
• Availability of construction material and
water
• Involves numerous horizontal curves,
construction of large bridges
• Special retaining protection on hill sides
• River training works may be extensive-
toe cutting, etc.
Ridge Route
• Steep gradient, sharp curves including hair pin
bends
• Expensive rock works, successive mountain
pass
• Route climbs up continuously from the valley
till mountain pass and descends down
• Construction of special structures, tunnels,
snow fences etc.
• Are most stable
a) River Route
• The location of a route along the river valley is known as river route. River
route is frequently used in hill road due to comparatively gentle gradient.
- It is advantageous that availability of water and other construction material
in vicinity.
- However, a river route may involve numerous horizontal curves,
construction of large bridges over tributaries and on stretches along steeply
sloping hill sides.
- It may also be necessary to construct special structures on hill side for the
safe of road against landslides.
b) Ridge Route
• A ridge route is characterized by very steep gradient, numerous sharp curves
including hair pin bends and the expensive rock works.
- The road usually follows the top section of the hill system and crosses
successively mountain pass.
- Geologically stable and comparatively mild slope sections are selected for the
artificial development of the route.

More Related Content

What's hot

Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
Shahid Raza
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
Nikunj Hindocha
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
Amit Yadav
 
Classification and importance of hill roads
Classification and importance of hill roadsClassification and importance of hill roads
Classification and importance of hill roads
Surpal Zala
 
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTS
srinivas cnu
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
UMASOYA_KARTHIKEYAN
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
Latif Hyder Wadho
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
Mani Vel
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossings
ShivamSharma979
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
Kiranmoy Samanta
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highways
srinivas2036
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
Mani Das
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
Bathla Tuition Centre
 
Managing gravel road maintenance
Managing gravel road maintenanceManaging gravel road maintenance
Managing gravel road maintenance
Florida Public Works Expo
 
Geometric Design of highway
Geometric Design of highway Geometric Design of highway
Geometric Design of highway
RAMPRASAD KUMAWAT
 
Road
RoadRoad
Unit 5
Unit 5Unit 5
5. Hill Roads.pdf
5. Hill Roads.pdf5. Hill Roads.pdf
5. Hill Roads.pdf
Er. Bam Bhandari
 
Lecture#01
Lecture#01Lecture#01
Lecture#01
arslan000
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
jagadish chintu
 

What's hot (20)

Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Classification and importance of hill roads
Classification and importance of hill roadsClassification and importance of hill roads
Classification and importance of hill roads
 
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTS
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossings
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highways
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
Managing gravel road maintenance
Managing gravel road maintenanceManaging gravel road maintenance
Managing gravel road maintenance
 
Geometric Design of highway
Geometric Design of highway Geometric Design of highway
Geometric Design of highway
 
Road
RoadRoad
Road
 
Unit 5
Unit 5Unit 5
Unit 5
 
5. Hill Roads.pdf
5. Hill Roads.pdf5. Hill Roads.pdf
5. Hill Roads.pdf
 
Lecture#01
Lecture#01Lecture#01
Lecture#01
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 

Similar to 316823403-5-Hill-Roads-073-old-pptx (1).pptx

chapter 8.pptx
chapter 8.pptxchapter 8.pptx
chapter 8.pptx
MuuminCabdulle
 
chapter 8.pptx
chapter 8.pptxchapter 8.pptx
chapter 8.pptx
MuuminCabdulle
 
chapter 8.pptx
chapter 8.pptxchapter 8.pptx
chapter 8.pptx
MuuminCabdulle
 
DESIGN OF HILL ROADS AND ITS ALIGNMENT.pptx
DESIGN OF HILL ROADS AND ITS ALIGNMENT.pptxDESIGN OF HILL ROADS AND ITS ALIGNMENT.pptx
DESIGN OF HILL ROADS AND ITS ALIGNMENT.pptx
Samirsinh Parmar
 
Highway Geometric Design.pptx
Highway Geometric Design.pptxHighway Geometric Design.pptx
Highway Geometric Design.pptx
Priya Sarita Mane
 
Hill_Roads
Hill_RoadsHill_Roads
Hill_Roads
ArAayushGoel
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
swaongniyogi
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
DhananjayM13
 
Special problems and maintenance in hill roads,
Special problems and maintenance in hill roads,Special problems and maintenance in hill roads,
Special problems and maintenance in hill roads,
Dhrubajyoti Majumdar
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...
GauravGautam344043
 
SLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURESLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURE
SHIBASOUMYA GHOSH
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
DESHANTAGGARWAL1
 
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMSGEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
LorevieOlaes
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
ILIAS MICHALIS
 
Engineering Geology for Civil Engineering
Engineering Geology for Civil EngineeringEngineering Geology for Civil Engineering
Engineering Geology for Civil Engineering
RajkumarGhosh14
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
Gaurav Baviskar
 
Hill roads
Hill roadsHill roads
Hill roads
Satyapal Singh
 
Problems in hilly roads
Problems in hilly roadsProblems in hilly roads
Problems in hilly roads
Abhishek Bharti
 
Hill roads
Hill roadsHill roads
Hill roads
akshaydesai76
 
Highway engineering at high altitudes
Highway engineering at high altitudesHighway engineering at high altitudes
Highway engineering at high altitudes
Prashant Shekhar
 

Similar to 316823403-5-Hill-Roads-073-old-pptx (1).pptx (20)

chapter 8.pptx
chapter 8.pptxchapter 8.pptx
chapter 8.pptx
 
chapter 8.pptx
chapter 8.pptxchapter 8.pptx
chapter 8.pptx
 
chapter 8.pptx
chapter 8.pptxchapter 8.pptx
chapter 8.pptx
 
DESIGN OF HILL ROADS AND ITS ALIGNMENT.pptx
DESIGN OF HILL ROADS AND ITS ALIGNMENT.pptxDESIGN OF HILL ROADS AND ITS ALIGNMENT.pptx
DESIGN OF HILL ROADS AND ITS ALIGNMENT.pptx
 
Highway Geometric Design.pptx
Highway Geometric Design.pptxHighway Geometric Design.pptx
Highway Geometric Design.pptx
 
Hill_Roads
Hill_RoadsHill_Roads
Hill_Roads
 
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.pptHill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
Hill_Roads_Part -1_Geometric_Design_of_Hill_Road_18817.ppt
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
 
Special problems and maintenance in hill roads,
Special problems and maintenance in hill roads,Special problems and maintenance in hill roads,
Special problems and maintenance in hill roads,
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...
 
SLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURESLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURE
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
 
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMSGEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
GEOLOGICAL CONDITIONS NECESSARY FOR CONSTRUCTION OF DAMS
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
 
Engineering Geology for Civil Engineering
Engineering Geology for Civil EngineeringEngineering Geology for Civil Engineering
Engineering Geology for Civil Engineering
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 
Hill roads
Hill roadsHill roads
Hill roads
 
Problems in hilly roads
Problems in hilly roadsProblems in hilly roads
Problems in hilly roads
 
Hill roads
Hill roadsHill roads
Hill roads
 
Highway engineering at high altitudes
Highway engineering at high altitudesHighway engineering at high altitudes
Highway engineering at high altitudes
 

More from ecep nurali

c951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdf
c951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdfc951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdf
c951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdf
ecep nurali
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdf
ecep nurali
 
180715749-4B-Creep-and-Shrinkage.pptx
180715749-4B-Creep-and-Shrinkage.pptx180715749-4B-Creep-and-Shrinkage.pptx
180715749-4B-Creep-and-Shrinkage.pptx
ecep nurali
 
Mekanika-Bahan.ppt
Mekanika-Bahan.pptMekanika-Bahan.ppt
Mekanika-Bahan.ppt
ecep nurali
 
Bridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptxBridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptx
ecep nurali
 
440360496-TANK-CLEANING-pptx.pptx
440360496-TANK-CLEANING-pptx.pptx440360496-TANK-CLEANING-pptx.pptx
440360496-TANK-CLEANING-pptx.pptx
ecep nurali
 
Bridge engnineering
Bridge engnineeringBridge engnineering
Bridge engnineering
ecep nurali
 

More from ecep nurali (7)

c951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdf
c951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdfc951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdf
c951a_Modul_6_-_Pemel._Bang_Pelengkap_jalan.pdf
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdf
 
180715749-4B-Creep-and-Shrinkage.pptx
180715749-4B-Creep-and-Shrinkage.pptx180715749-4B-Creep-and-Shrinkage.pptx
180715749-4B-Creep-and-Shrinkage.pptx
 
Mekanika-Bahan.ppt
Mekanika-Bahan.pptMekanika-Bahan.ppt
Mekanika-Bahan.ppt
 
Bridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptxBridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptx
 
440360496-TANK-CLEANING-pptx.pptx
440360496-TANK-CLEANING-pptx.pptx440360496-TANK-CLEANING-pptx.pptx
440360496-TANK-CLEANING-pptx.pptx
 
Bridge engnineering
Bridge engnineeringBridge engnineering
Bridge engnineering
 

Recently uploaded

Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
Harry Harrold
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
ijk38lw
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
talaatahm
 
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
yufen5
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
3vgr39kx
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
Jaime Brown
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
lhtvqoag
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
Bianca Woods
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
881evgn0
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
ellemjani
 
CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
PabloMartelLpez
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
tobbk6s8
 
modular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdfmodular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdf
RashmitaSwain3
 
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
kuapy
 
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
bo44ban1
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
wkip62b
 
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build  Your Online Presence 2024.pptxBest Digital Marketing Strategy Build  Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
pavankumarpayexelsol
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
qo1as76n
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Designforuminternational
 
Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
bagmai
 

Recently uploaded (20)

Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
 
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
 
CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
 
modular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdfmodular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdf
 
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
 
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
 
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build  Your Online Presence 2024.pptxBest Digital Marketing Strategy Build  Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
 
Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
 

316823403-5-Hill-Roads-073-old-pptx (1).pptx

  • 2. Topics As Per Syllabus 5.1 Introduction 5.2 Special Consideration in Hill Roads 5.2.1 Alignment of Hill Road Design: General Consideration, Route Location in Hills, Gradient, Design and Types of Hair Pin Bends, Different Types of Hill Road Cross-sections 5.3 Special Structures in Hill Roads 5.3.1 Types of Retaining Structures, River Training Structures, Landslide Stabilization Structures and Gully Control Structures
  • 3. 1. Introduction • A hill road is usually defined on the basis of terrain. • As per NRS the cross slope may be classified as: • Road which passes through with a cross slope of 25% or more i.e. mountainous or steep is termed as “Hill Road”. • Hill road-one which passes through terrain with cross slope of 25% or more. • There are sections along hill road with cross slope less than 25%, esp. when the road follows river route. • It is the overall terrain that must be considered.
  • 4. Why Hill Road in Nepal? • Nepal area = 140,000 sq. km approx. • 66% covered with thinly/sparsely populated hills, mountains. • 90% population reside in hilly areas and depends on agro products. • Waterways, railways, airways - difficult • Hilly Regions – Extremes of Climatic Conditions, Difficult and Hazardous Terrain, Topography and Vast High Altitude Areas • Challenges of Hilly Areas: Floods, Landslides, Snowfall, etc. – Fairly Weathered Roads Possible • But Hilly Areas Rich: in Natural Resources, Flora and Fauna – Important to launch development Projects (e.g. Hydropower, etc.), tourism, etc. • For Transport, Economy, Social Reasons – Justify the Construction of Hill Roads in the Hilly Regions. • Where Tunnels, Viaduct – Possible but Not Economical
  • 6. 5.2.1 Design and Construction Problems of Hill Roads • Characterized by a highly broken relief with widely differing elevations and steep slopes, deep gorges and several watercourses — unnecessarily increase in road length • Complex geology - different rock bed- geology differs from place to place – assessment for road foundation is not easy • Environmental impact - removal of vegetation etc. - stable slope may change to unstable slope after road construction • Great Variation in hydrological condition [ground water condition] vary from place to place – may lead to damages after road construction • New earth fill for road embankment may overload the relatively weak underlying soil layer on hill slope – may trigger new and recurrent slides
  • 7. • Requires installation of various types of special various road structures - cost may rise upto 50 - 60% of total construction • Steep slopes – high speed of surface runoff - provision of erosion protection works • Construction along relatively small approach stretches– different construction technology may be needed • Need of special safety precaution during construction • Variations of climatic conditions - precipitation [rain and snow] , velocity of wind etc. - need considerations • Frequent blasting • Design of hairpin bends to get heights
  • 8. लमजुङ र मनाङ सीमामा पने मार्दीभीरको कच्ची बाटोमा र्दैननक उपभोग्य वस्तु पुर्याएर फक ं र्दै यात्रुवाहक नजपहरू । यनिखेर मनाङमा ५० वटा नजपले उपभोग्य वस्तु, स्थानीयवासी र पययटक ओसारररहेका छन् http://bit.ly/1P8Nrd2
  • 9. 5.2.2 Special Consideration in Hill Roads 1. Selection of Road Alignment 2. Special Geometric Standards (Gradient and Hari Pin Bends) 3. Cross-section Design 4. Design of Drainage Structures (Special Structures may Require) 5. Stability of Slopes
  • 10. 1. Selection of Road Alignment • Alignment through hilly areas is slightly different from aligning through a flat terrain. • For the purpose of efficient and safe operation of vehicles through a hilly terrain special care should be taken while aligning the highway. • Alignment should be - short, easy, economical & safe
  • 11. • Alignment survey • Reconnaissance- • Tentative alignment after map study-topographical, geological and meteorological • Trace cut- • route selected in step 1 is translated on the ground to provide an access for subsequent detailed survey. A 1-1.2 m wide track is constructed with easier gradient
  • 12. • Detailed survey • Fixing of bench marks • Cross section and longitudinal sections – 15 m on straight, 30 m at sharp curves • Design of horizontal curves and hair pin bends • Soil investigation, geology, hydrology study
  • 13. 2. Special Geometric Standards • The geometric standards followed in hilly areas are different from those in at terrain. • The alignment chosen should enable the ruling gradient to be attained in minimum of the length, minimizing steep gradient, hairpin bends and needless rise and fall.
  • 15. 4. Hill Side Drainage • Adequate drainage facility should be provided across the road. • Attempts should be made to align the roads in such a way where the number of cross drainage structures required are minimum. • This will reduce the construction cost.
  • 16. 5. Stability of Slopes • For hilly areas, the road should be aligned through the side of the hill that is stable. • The common problem with hilly areas is that of landslides. • Excessive cutting and filling for road constructions give way to steepening of slopes which in turn will affect the stability.
  • 17. Factors Affecting Selection of Alignment in Mountainous and Hilly Areas • Following points to be considered while aligning the hill roads: i) Temperature • The temperature of air varies inversely with altitude. • The temperature drop being about 0.50C per 100m of rise. • Similarly, the amount of heat received by hill slopes varies enormously with their orientation in relation to the exposure to sun. • Temperature - lower temperature in hill – drop by 0.5 0C per 100m rise - slopes facing south and north ii) Rainfall • The amount of rainfall in hilly region is inversely proportional to the altitude. • In hilly regions, wind often flows along the valley and gorges, as consequence of which the rainfall in the valley is substantially higher than on high-lands and water-sheds. • Also, maximum rainfall occurs in few months only. So these all uneven situation create the problem in construction and maintenance of the road. • Rainfall- heavy rainfall affects construction and maintenance
  • 18. iii) Atmospheric pressure and Winds • Atmospheric pressure is inversely proportional to altitude. • At high altitudes, the velocity of wind is frequently coming at 25 – 30 m/s. • The change in character of wind is due to appreciable difference of atmospheric pressure in valleys and on mountain passes. • Wind-high wind velocity contribute to damage –weathering of rocks, blowing away binding material in valley iv) Geological condition • The tendency of sedimentary rocks is to slip under the influence of force parallel to the layer. • The degree of stability of hill slopes depends upon the type of rock, the degree of strata inclination or dip, the occurrence of clay seem, the hardness of rock and presence of ground water. • The instability of road may be due to ground water, landslides and unstable folds. v) Route location • The approach to the location of hill road alignment varies for the sections along the valley bottom and along the mountain pass. • The first is called ‘river route’ and second is called ‘ridge route’.
  • 19. Route Location • Hill road follow twist and turns- curves • Location of alignment varies for sections along valley and mountain pass • Alignment through valley - river route; mountain - ridge route • A hill road may be only river route, ridge route or combination of both
  • 20. River Route • Most frequent Gentle slope • Serves rural settlement situated next to the water course • Low vehicle operation cost • Availability of construction material and water • Involves numerous horizontal curves, construction of large bridges • Special retaining protection on hill sides • River training works may be extensive- toe cutting, etc. Ridge Route • Steep gradient, sharp curves including hair pin bends • Expensive rock works, successive mountain pass • Route climbs up continuously from the valley till mountain pass and descends down • Construction of special structures, tunnels, snow fences etc. • Are most stable
  • 21. a) River Route • The location of a route along the river valley is known as river route. River route is frequently used in hill road due to comparatively gentle gradient. - It is advantageous that availability of water and other construction material in vicinity. - However, a river route may involve numerous horizontal curves, construction of large bridges over tributaries and on stretches along steeply sloping hill sides. - It may also be necessary to construct special structures on hill side for the safe of road against landslides.
  • 22. b) Ridge Route • A ridge route is characterized by very steep gradient, numerous sharp curves including hair pin bends and the expensive rock works. - The road usually follows the top section of the hill system and crosses successively mountain pass. - Geologically stable and comparatively mild slope sections are selected for the artificial development of the route.