3GPP
OVERVIEW
SUMIT PANWAR
M. Tech ,M.BA(I.T),
B.Tech(Electronics & Comm Engineering)
ecesumitpanwar@gmail.com
“What is 3GPP ? ”
 3GPP Stands for 3rd Generation Partnership Project (3GPP)
 The 3GPP is a collaboration between groups of telecommunications
associations, known as the Organizational Partners.
 Contribution driven companies participate in 3GPP through their membership
of one of these “Organizational Partners”.
 Currently more than 350 Individual Members (Operators, Vendors,
Regulators) 14 Market Representation Partners (giving perspectives on market
needs and drivers).
 The Partners are Standards Developing Organizations like
 ARIB & TTC - Japan, ETSI - Europe
 ATIS - USA, TTA - Korea
 CCSA - China, TSDSI – India
“3GPP Organization
Structure”
. TSG RAN
“The Way of Working”
 3GPP is not constrained to 3rd Generation. It includes work on both 2nd and 4th generation
technologies.
 New work initiated by member companies via Work Items outlining scope and time plan.
 Work Items prioritised if all estimated work cannot be done by the scheduled release
deadline.
 All 3GPP member companies contributes on equal terms on any work item.
 3GPP seeks consensus on all technical matters (but has mechanisms if consensus cannot
be reached).
 Release deadline respected, unfinished work deferred to a later release
 3GPP Membership is now at an all-time high, with 387 Individual members. In addition, there are
17 companies having Guest Status, which are potential IMs of the future.
 Growth in 3GPP Company Membership:
• 380 Companies
• 150 meetings/year (incl. W/Gs)
• 39 Countries
“3GPP Technology”
 3GPP has the following technologies –
 GSM : Global System for Mobile GSM.
 GPRS : General Packet Radio Service.
 EDGE : Enhanced Data rates for Global Evolution.
 WCDMA : Wideband Code Division Multiple Access.
 HSPA : High Speed Packet Access.
 LTE : Long Term Evolution.
 LTE - A : Long Term Evolution-Advanced.
“ What does 3GPP specify ”
 3GPP Specified Radio Interfaces
 2G radio : GSM, GPRS, EDGE
 3G radio : WCDMA, HSPA, LTE
 4G radio : LTE Advanced
 3GPP Core Network
 2G/3G : GSM core network
 3G/4G : Evolved Packet Core (EPC)
 3GPP Service Layer
 GSM services
 IP Multimedia Subsystem (IMS)
 Multimedia Telephony (MMTEL)
 Support of Messaging and other OMA functionality
 Emergency services and public warning Etc.
“General Directions of 3GPP
Evolution”
.
Sr. No. Radio Interfaces IP Core Network Service Layer
1. Higher Data Throughput Support of non-3GPP
Accesses
More IMS Applications &
IMS
2. Lower Latency Packet Only Support MBMS,PSS, mobile TV
3. More Spectrum
Flexibility
Improved Security Greater session
continuity
4. Improved CAPEX and
OPEX
Greater Device Diversity Legacy
Interworking
(Incl. GELTE)
“3GPP standards are
structured as Releases”
.
Sr. No. Version Released year Information
1. Phase 1 1992
 GSM Features introduced
2. Release 96/97 1997/98
 GSM Features.
 14.4 kbit/s User Data Rate.
 GPRS
3. Release 98 1999
 GSM Features,
 AMR,
 EDGE,
 GPRS for PCS1900
4. Release 99 2000
 W-CDMA - Specified the
first UMTS 3G networks,
 Incorporating a CDMA air
interface
“3GPP standards are structured
as Releases”
.Sr.
No.
Version Released Year Information
5. Release 4 2001
 C-Plane/U-Plane splits on CS Network.
 Originally called the Release 2000.
 added features including an all-IP Core
Network, MMS, Call & Bearer Separation for CS,
 TDD – 1.28Mcps,
 DL- 384kbps (typ.),
 UL-128kbps (typ.),
 Round Trip ~ 150ms.
6. Release 5 2002
 Introduced IMS : SIP & IP v6 (stage I),
 IP transport in UTRAN,
 WCDMA IN 1800 &1900 Band,
 HSDPA,
 HSPA – DL.
.
Sr. No. Version Released Year Information
7. Release 6 2005
 Integrated operation with Wireless LAN
networks and adds HSUPA.
 HSPA – UL.
 IMS (Stage-II)
 MBMS (Initial Stage)
 enhancements to IMS such as Push to Talk
over Cellular (PoC)
 GAN, VoIP (Stage-I)
 DL- 14Mbps (peak)
 UL- 5.7Mbps (peak)
 Round Trip < 100ms
8. Release 7 2008
 MMTel
 HSPA+ (High Speed Packet Access Evolution)
 MIMO , 16QAM UL / 64QAM DL
 Higher Order Modulation & Focuses on
decreasing latency
 Improvements to QoS & real-time applications
such as VoIP.
 Near Field Communication (NFC)
 EDGE evolution
 VoIP (Stage -II)
 Node B – RNC function
 DL-28Mbps (peak), UL-11Mbps (peak)
 Round Trip < 50ms
Release 8 focused on ….
 It ensure the continuity of competitiveness of the 3G system for
the future
 Provide solution for user demand for higher data rates and quality
of services
 Introduced Packet Switching optimised system
 Focused on Continued demand for cost reduction i.e. capital and
operational expenditures (CAPEX and OPEX)
 Improved work on Low complexity
 Avoid unnecessary fragmentation of technologies for paired and
unpaired band operation
.
Sr.
No.
Version Released
year
Information
9. Release 8 2009
 LTE Introduced, OFDMA, EPC, ETWS-I
 LTE : DL-302Mbps (peak) ,UL- 75Mbps (peak)
 MIMO – DL : 4X4 , UL : 2X2
 Support of variable bandwidth
• 1.4, 3, 5, 10, 15 and 20 MHz
 HSPA+ : DL- 42 Mbps(peak), UL-11 Mbps(peak)
 Round Trip ~ 10ms
 HeNB / CSG Support
 User Mobility – 350 km/hr
 Modulation - QPSK, 16 QAM, 64 QAM.
 UL – DFTS-OFDMA, DL- OFDMA
 DFTS‐OFDM(“Single‐Carrier FDMA”) in Uplink
• Low PAPR (minimum power consumption)
• User orthogonality in frequency domain
 FDD and TDD within a single radio access technology
 UMTS Femtocell
 SRVCC (basic) – one way HO of a single active
speech session from PS to CS domain.
 Advance Receiver for LTE with –
MMSE – Maximum Mean Square Error
MRC – Maximal Ratio Combiner
.
Sr.
No.
Version Released year Information
9. Release 8 2009
 Very low latency
• Short setup time & Short transfer delay
• Short HO latency and interruption time
• Short TTI, RRC procedure, Simple RRC states
• Link Layer < 5ms
• Handoff < 50 ms
 High spectral efficiency
• OFDM in Downlink
• Robust against multipath interference
• High affinity to advanced techniques
– Frequency domain channel‐dependent
scheduling
– MIMO
 Simple Architecture
• eNodeB as the only E‐UTRAN node
• Smaller number of RAN interfaces
• eNodeB ↔ MME/SAE‐Gateway(S1)
• eNodeB ↔ eNodeB(X2)
 Security – Common IMS Security, IMS Media
Security, SAE/LTE Security, non-3GPP access to
EPC, Home eNodeB Security.
.
Sr. No. Version Released year Information
9. Release 8 2009
 Simple protocol architecture
• Shared channel based
• PS mode only with VoIP (80 users per
sector/Mhz FDD) capability
 Compatibility and inter‐working with
earlier 3GPP Releases
 Inter‐working with other systems, e.g.
cdma2000
 Efficient Multicast/Broadcast
• Single frequency network by OFDM
 Support of Self‐Organising Network
(SON) operation :
- Self Establishment of enodeB
- Automatic Neighbor Relations.
 Inter Cell Interference Coordination (ICIC)
 Discontinuous Reception (DRX)
significantly reduces battery consumption
supported in all common and dedicated states.
“ Release 9 focused on
….
 Focus on improvement in LTE specially in VoLTE
 Improvement in SON technique is essential for smart LTE
 Improved SRVCC for better Handover
 User Data Convergence Services for simplified network topology and
interfaces
.
Sr. No. Version Released
year
Information
10. Release 9 2010
 LTE Improved, VoLTE
 TDD, FDD
 Support of variable bandwidth
• 1.4, 3, 5, 10, 15 and 20 MHz
 PWS – Public Warning System
 MIMO enhanced
 LCS - Location Services (positioning using
OTDOA )
 LTE Femtocell
 Proximity Indication – New RRC Uplink
Message
 Physical Cell Identification Confusion
Resolved
 MBMS Single Frequency
Network (MBSFN) transmission.
 Dual Carrier HSUPA, Dual Band HSDPA
.
Sr. No. Version Released year Information
10. Release 9 2010
 UDC – User Data Convergence (Stage I -
Service requirement for the User Data
Convergence) :
• Simplifies the overall network topology and
interfaces
• Overcomes the data capacity bottleneck of a
single entry point
• Avoids data duplication and inconsistency
• Reduces CAPEX and OPEX.
 SRVCC –
• Supplementary Service – Continuation of
Supplementary Service when the UE goes
through the SRVCC Handover.
• Emergency – SRVCC Handover for IMS
emergency sessions.
 SON Improvement -
• Mobility Robust Optimization
• RACH Optimization
• Mobility Load Balancing (MLB)
• Inter enodeB Energy Saving
.
Sr. No. Version Released year Information
10. Release 9 2010
CMAS – Commercial Mobile Alert System
 MSR - Multi – Standard Radio
 CSBF –
 MAPCON – Multi Access PDN Connectivity
(stage I) - It support to network and the UE can
only support 3GPP access based connection
via EPC.
 Security – Unsolicited Communication, IMS
Media Security, Backhaul Link Security,
Emergency Call in LTE, Key A5/4, HNB &
HeNB Security.
“ Release 10 focused on …
 Introduced as a LTE Advance basically research based on VoIP.
 Focus on improvement in career aggregation for existing and future
frequency band also.
 Enhancement of Self Organizing Network.
 Research focused on Security of a LTE system.
.
Sr.
No.
Version Released
year
Information
10. Release 10 2011
 LTE Advance, MTC enhancement, VoIP
 Career Aggregation - allow aggregation of not
only the existing bands, but also bands that are
introduced in future
 HeNB Mobility enhance
 Relay Technology
 CS Fallback
 NIMTC - Network Improvements for Machine
Type Communications – (Stage I)
 e- MPS – Enhanced Multimedia Priority Services.
 e- ICIC - Inter-cell interference coordination
 e-MIMO – DL - 8X8 MIMO, UL - 4X4 MIMO
 Duplex Mode – FDD & TDD
 Channel Bandwidth – 1.4,3,5,10,15,20 Mhz
 Latency - Link Layer < 5ms,
Handoff < 50 ms
 VoIP – Greater than 80 users per sector/Mhz FDD
.
Sr. No. Version Released year Information
10. Release 10 2010
 DL – OFDMA , 1Gbps, 4x4 MIMO
 UL- SC-OFDMA, 300Mbps, 2x4 MIMO at
20Mhz FDD.
 User Mobility – 320 km/hr
• 100 Mbps high mobility
• 1Gbps low mobility
 aSRVCC –
• PS & CS Access Transfer of Media of
an IM session in alerting phase.
 eSRVCC -
• Various SRVCC enhancement in the
network, no impact on the UE.
 MDT - Minimization of drive test
 MAPCON – Multi Access PDN Connectivity
support to multiple Packet Data Networks
(PDN) connections for a device.
.
Sr. No. Version Released
year
Information
10. Release 10 2010
 e-SON – Self Organizing Network
e- MLB -Enhanced Mobility Load
Balancing
• Improving reliability of MLB in intra-LTE
scenarios
• Improving functionality of the MLB in inter-
RAT scenarios.
CCO - Coverage and Capacity
Optimization
• Priority 1: coverage problems, e.g. coverage
holes
• Priority 2: capacity problems
e- MRO- Mobility Robustness
Optimization enhancements
The use case is to enable detection and to provide
tools for possible correction of following problems:
• Connection failures in inter-RAT environment:
Priority 1: at HOs from LTE to UMTS/GSM
Priority 2: at HOs from UMTS/GSM to LTE
.
Sr. No. Version Released
year
Information
10. Release 10 2010
• Obtaining UE measurements in case of
unsuccessful re-establishment after connection
failure
• Ping-pongs in idle mode (inter-RAT and intra-LTE
environment)
• Ping-pongs in active mode (inter-RAT)
• HO to wrong cell (in intra-LTE environment) that
does not cause connection failure
 Security – Alignment of Certificate’s IPsec and
TLS usage, Relay Mode Security, Key EEA3/EIA3,
UTRAN key Hierarchy.
Release 11
 3GPP Rel-11 standards for HSPA+ and LTE-Advanced were frozen in
December 2012 with the core network protocols stable in December 2012
and Radio Access Network (RAN) protocols stable in March 2013.
“ Release 11 focused
on….
 Service level aspects for direct IP inter-connection between Operators,
service level aspects for national transit IP interconnect and service level
aspects for next generation corporate network IP interconnect (peer-to-peer
business trunking)
 Service layer aspects for interconnection of voice services (e.g. toll-free,
premium rate and emergency calls)
 Service level aspects for IP Interconnection (service control and user plane
aspects) between Operators and 3rd party Application Providers
 M2M Technology
 Specifically the work covered in release 11 is as follows -
.
Sr. No. Version Released
year
Information
10. Release 11 2013
 Career Aggregation enhancement –DL intra
band non contiguous
 Wi-Fi Integration
 e- PDCCH - Enhanced Physical Control
Channel
 HNB & HeNB : Mobility enhancement
 Service Continuity for eMBMS
 FeICIC - Further enhanced Inter-Cell
Interference Coordination
• For non CA based deployment
• At the transmitter side in DL – Combination of
ABS (almost blank sub-frame)+ Power Reduction
at the Receiver side in DL.
 Advance LTE-A Receiver with –
• MMSE – IRC Interference rejection combining
• CRS - Cancellation Interference Cancellation
receivers.
.
Sr. No. Version Released
year
Information
10. Release 11 2013
 EU Alert – European Public Warning System
• The EU-Alert is introduced under Public
Warning System (PWS) in parallel with Earthquake
& Tsunami Warning System (ETWS II).
• PWS- Blocked here in release 11.
• In fact, EU-Alert is sent as part of the Cell
Broadcast Message (CBS) using new identifiers
 eDDA – Enhance Device Detection Application
 Network Based Positioning
 v- SRVCC – Video Single Radio Voice Call
Continuity
• SRVCC for video call
 r- SRVCC – Reverse Single Radio Voice Call
Continuity
• Reverse SRVCC HO from CS fall to PS
 ESON – Enhanced Self Organizing Network
• Network Energy Saving
• Enhanced MDT
• Further SON enhancement
 ESM - Energy Savings Management
.
Sr. No. Version Released
year
 Information
10. Release 11 2013
 IMS - IP Multimedia Systems
• IMS based Peer-to-Peer Content Distribution
Services.
• Identifying the user cases to describe how
users, operators and service providers will benefit
by using/deploying IMS based content distribution
services.
• such as with the improvement of Peer-to-Peer
technology.
• The following shall be considered:
• Mobile access only (e.g. UTRAN, E-UTRAN)
• Fixed access only (e.g. xDSL, LAN)
• Identifying QoS, mobility, charging and security
related requirements in the case of content
distribution services on IMS.
•Identifying potential copyright issues
 UICC/USIM enhancements
• To identify use cases and requirements for new
USIM based services taking into account the
GSMA Smart SIM deliverables
.Sr. No. Version Released
year
Information
10. Release 11 2013
 QoS SSL - Quality of Service based on
Subscriber Spending Limits
• Service aspects : Charging and billing
• Modification of QoS based on subscriber’s
spending limits
• Enforcing of spending limits for roaming
subscribers without having dedicated support in
the visited network
 NOVES - Non Emergency Services
• SMS for Emergency purposes and eCall
3GPP has looked at non-voice alternatives for
Emergency purposes.
 Cell_FACH enhancement – Cell_FACH to
LTE Mobility
• This expectation that the UEs may stay
longer in the Cell_FACH state is in turn
motivating the mobility from Cell_FACH state to
LTE proposal.
Sr. No. Version Released
year
Information
10. Release 11 2013
 MTC - Machine Type Communication
• Effectively identify addressing method to be
used for end point devices
• Effectively route messaging between those
devices
• Support multiple methods for delivering
messages, as defined by 22.368
• Support land-based and wireless connectivity
• Make use of IP-based network architectures
• Addressing/identifiers must support mobility
and roaming
• Support on high speed packet
• Switched networks when available and on
circuit-switched networks
• Consider if there are security issues
associated with any alternatives.
 Security – IMS Security : Continuation on
unsolicited Communication, IMS Media Security
for non RTP Media.
Access Security : PWS Security, Security
Aspects for Machine type Communication.
Release 12
 3GPP started work on Rel-12 in December 2012 and an 18-month
timeframe for completion was planned. The work continues into 2014 and areas
that are still incomplete are carefully noted in the report. Work will be ratified by
June 2014 with the exception of RAN protocols which will be finalized by
September 2014.
 The motivation behind the release 12 is as follows.
 Capacity increase to cope with traffic explosion
 Energy saving
 Cost efficiency
 Support for diverse application and traffic types
 Higher user experience/data rate
 Backhaul enhancement
“ Release 12 focused
on….
 It focus on network and services enhancements for MTC, public safety and
Wi-Fi integration, system capacity and stability, Web Real-Time
Communication, further network energy savings, multimedia and Policy and
Charging Control framework.
 Multiuser MIMO technology makes it possible to raise wireless
transmission speed by increasing the number of antennas at the base station,
without consuming more frequency bandwidth or increasing modulation
multiple-values & DIDO (Distributed-Input-Distributed-Output).
.Sr. No. Version Released
year
Information
11. Release 12 2015
 Proe, GCSE
 E4C’s- Enhancement in Coverage,
Coordination, Cost and Capacity
• User plane congestion (UPCON)
• Core Network Overload (FS_CNO)
• HetNet Coordination
 D2D –Device to Device
 FDD / TDD CA
 Wi-Fi Integration
 Multi-acces - operators can influence the
selection
 Dual-stack IPv4/v6 connectivity
 Network initiated QoS, PCC
 Various ways to combine or split traffic off
inside the network
• Local IP Access (LIPA)
• Selective IP Traffic Offloading (SIPTO)
• WLAN offloading
 IP Multimedia Subsystem - eIMS
 Single Radio Voice Call Continuity (SRVCC)
 Network Sharing
.
Sr. No. Version Released
year
Information
11. Release 12 2015
 LTE Multi-Antenna/site technologies such
as:
• 3D MIMO/beam-forming to allow beam
control in both horizontal and vertical
directions
 Active Antena System
 Spatial Multiplexing
 SON – Self Organizing Network
• LTE – HRPD SON
• EMBMS MDT
 Small Cell Enhancements like Macrocell,
Picocell and Femtocell.
 Public Safety and Critical
Communications
 Enhance Security Procedure

3 gpp – sum,it pdf

  • 1.
    3GPP OVERVIEW SUMIT PANWAR M. Tech,M.BA(I.T), B.Tech(Electronics & Comm Engineering) ecesumitpanwar@gmail.com
  • 2.
    “What is 3GPP? ”  3GPP Stands for 3rd Generation Partnership Project (3GPP)  The 3GPP is a collaboration between groups of telecommunications associations, known as the Organizational Partners.  Contribution driven companies participate in 3GPP through their membership of one of these “Organizational Partners”.  Currently more than 350 Individual Members (Operators, Vendors, Regulators) 14 Market Representation Partners (giving perspectives on market needs and drivers).  The Partners are Standards Developing Organizations like  ARIB & TTC - Japan, ETSI - Europe  ATIS - USA, TTA - Korea  CCSA - China, TSDSI – India
  • 3.
  • 4.
    “The Way ofWorking”  3GPP is not constrained to 3rd Generation. It includes work on both 2nd and 4th generation technologies.  New work initiated by member companies via Work Items outlining scope and time plan.  Work Items prioritised if all estimated work cannot be done by the scheduled release deadline.  All 3GPP member companies contributes on equal terms on any work item.  3GPP seeks consensus on all technical matters (but has mechanisms if consensus cannot be reached).  Release deadline respected, unfinished work deferred to a later release  3GPP Membership is now at an all-time high, with 387 Individual members. In addition, there are 17 companies having Guest Status, which are potential IMs of the future.  Growth in 3GPP Company Membership: • 380 Companies • 150 meetings/year (incl. W/Gs) • 39 Countries
  • 5.
    “3GPP Technology”  3GPPhas the following technologies –  GSM : Global System for Mobile GSM.  GPRS : General Packet Radio Service.  EDGE : Enhanced Data rates for Global Evolution.  WCDMA : Wideband Code Division Multiple Access.  HSPA : High Speed Packet Access.  LTE : Long Term Evolution.  LTE - A : Long Term Evolution-Advanced.
  • 6.
    “ What does3GPP specify ”  3GPP Specified Radio Interfaces  2G radio : GSM, GPRS, EDGE  3G radio : WCDMA, HSPA, LTE  4G radio : LTE Advanced  3GPP Core Network  2G/3G : GSM core network  3G/4G : Evolved Packet Core (EPC)  3GPP Service Layer  GSM services  IP Multimedia Subsystem (IMS)  Multimedia Telephony (MMTEL)  Support of Messaging and other OMA functionality  Emergency services and public warning Etc.
  • 7.
    “General Directions of3GPP Evolution” . Sr. No. Radio Interfaces IP Core Network Service Layer 1. Higher Data Throughput Support of non-3GPP Accesses More IMS Applications & IMS 2. Lower Latency Packet Only Support MBMS,PSS, mobile TV 3. More Spectrum Flexibility Improved Security Greater session continuity 4. Improved CAPEX and OPEX Greater Device Diversity Legacy Interworking (Incl. GELTE)
  • 8.
    “3GPP standards are structuredas Releases” . Sr. No. Version Released year Information 1. Phase 1 1992  GSM Features introduced 2. Release 96/97 1997/98  GSM Features.  14.4 kbit/s User Data Rate.  GPRS 3. Release 98 1999  GSM Features,  AMR,  EDGE,  GPRS for PCS1900 4. Release 99 2000  W-CDMA - Specified the first UMTS 3G networks,  Incorporating a CDMA air interface
  • 9.
    “3GPP standards arestructured as Releases” .Sr. No. Version Released Year Information 5. Release 4 2001  C-Plane/U-Plane splits on CS Network.  Originally called the Release 2000.  added features including an all-IP Core Network, MMS, Call & Bearer Separation for CS,  TDD – 1.28Mcps,  DL- 384kbps (typ.),  UL-128kbps (typ.),  Round Trip ~ 150ms. 6. Release 5 2002  Introduced IMS : SIP & IP v6 (stage I),  IP transport in UTRAN,  WCDMA IN 1800 &1900 Band,  HSDPA,  HSPA – DL.
  • 10.
    . Sr. No. VersionReleased Year Information 7. Release 6 2005  Integrated operation with Wireless LAN networks and adds HSUPA.  HSPA – UL.  IMS (Stage-II)  MBMS (Initial Stage)  enhancements to IMS such as Push to Talk over Cellular (PoC)  GAN, VoIP (Stage-I)  DL- 14Mbps (peak)  UL- 5.7Mbps (peak)  Round Trip < 100ms 8. Release 7 2008  MMTel  HSPA+ (High Speed Packet Access Evolution)  MIMO , 16QAM UL / 64QAM DL  Higher Order Modulation & Focuses on decreasing latency  Improvements to QoS & real-time applications such as VoIP.  Near Field Communication (NFC)  EDGE evolution  VoIP (Stage -II)  Node B – RNC function  DL-28Mbps (peak), UL-11Mbps (peak)  Round Trip < 50ms
  • 11.
    Release 8 focusedon ….  It ensure the continuity of competitiveness of the 3G system for the future  Provide solution for user demand for higher data rates and quality of services  Introduced Packet Switching optimised system  Focused on Continued demand for cost reduction i.e. capital and operational expenditures (CAPEX and OPEX)  Improved work on Low complexity  Avoid unnecessary fragmentation of technologies for paired and unpaired band operation
  • 12.
    . Sr. No. Version Released year Information 9. Release8 2009  LTE Introduced, OFDMA, EPC, ETWS-I  LTE : DL-302Mbps (peak) ,UL- 75Mbps (peak)  MIMO – DL : 4X4 , UL : 2X2  Support of variable bandwidth • 1.4, 3, 5, 10, 15 and 20 MHz  HSPA+ : DL- 42 Mbps(peak), UL-11 Mbps(peak)  Round Trip ~ 10ms  HeNB / CSG Support  User Mobility – 350 km/hr  Modulation - QPSK, 16 QAM, 64 QAM.  UL – DFTS-OFDMA, DL- OFDMA  DFTS‐OFDM(“Single‐Carrier FDMA”) in Uplink • Low PAPR (minimum power consumption) • User orthogonality in frequency domain  FDD and TDD within a single radio access technology  UMTS Femtocell  SRVCC (basic) – one way HO of a single active speech session from PS to CS domain.  Advance Receiver for LTE with – MMSE – Maximum Mean Square Error MRC – Maximal Ratio Combiner
  • 13.
    . Sr. No. Version Released yearInformation 9. Release 8 2009  Very low latency • Short setup time & Short transfer delay • Short HO latency and interruption time • Short TTI, RRC procedure, Simple RRC states • Link Layer < 5ms • Handoff < 50 ms  High spectral efficiency • OFDM in Downlink • Robust against multipath interference • High affinity to advanced techniques – Frequency domain channel‐dependent scheduling – MIMO  Simple Architecture • eNodeB as the only E‐UTRAN node • Smaller number of RAN interfaces • eNodeB ↔ MME/SAE‐Gateway(S1) • eNodeB ↔ eNodeB(X2)  Security – Common IMS Security, IMS Media Security, SAE/LTE Security, non-3GPP access to EPC, Home eNodeB Security.
  • 14.
    . Sr. No. VersionReleased year Information 9. Release 8 2009  Simple protocol architecture • Shared channel based • PS mode only with VoIP (80 users per sector/Mhz FDD) capability  Compatibility and inter‐working with earlier 3GPP Releases  Inter‐working with other systems, e.g. cdma2000  Efficient Multicast/Broadcast • Single frequency network by OFDM  Support of Self‐Organising Network (SON) operation : - Self Establishment of enodeB - Automatic Neighbor Relations.  Inter Cell Interference Coordination (ICIC)  Discontinuous Reception (DRX) significantly reduces battery consumption supported in all common and dedicated states.
  • 15.
    “ Release 9focused on ….  Focus on improvement in LTE specially in VoLTE  Improvement in SON technique is essential for smart LTE  Improved SRVCC for better Handover  User Data Convergence Services for simplified network topology and interfaces
  • 16.
    . Sr. No. VersionReleased year Information 10. Release 9 2010  LTE Improved, VoLTE  TDD, FDD  Support of variable bandwidth • 1.4, 3, 5, 10, 15 and 20 MHz  PWS – Public Warning System  MIMO enhanced  LCS - Location Services (positioning using OTDOA )  LTE Femtocell  Proximity Indication – New RRC Uplink Message  Physical Cell Identification Confusion Resolved  MBMS Single Frequency Network (MBSFN) transmission.  Dual Carrier HSUPA, Dual Band HSDPA
  • 17.
    . Sr. No. VersionReleased year Information 10. Release 9 2010  UDC – User Data Convergence (Stage I - Service requirement for the User Data Convergence) : • Simplifies the overall network topology and interfaces • Overcomes the data capacity bottleneck of a single entry point • Avoids data duplication and inconsistency • Reduces CAPEX and OPEX.  SRVCC – • Supplementary Service – Continuation of Supplementary Service when the UE goes through the SRVCC Handover. • Emergency – SRVCC Handover for IMS emergency sessions.  SON Improvement - • Mobility Robust Optimization • RACH Optimization • Mobility Load Balancing (MLB) • Inter enodeB Energy Saving
  • 18.
    . Sr. No. VersionReleased year Information 10. Release 9 2010 CMAS – Commercial Mobile Alert System  MSR - Multi – Standard Radio  CSBF –  MAPCON – Multi Access PDN Connectivity (stage I) - It support to network and the UE can only support 3GPP access based connection via EPC.  Security – Unsolicited Communication, IMS Media Security, Backhaul Link Security, Emergency Call in LTE, Key A5/4, HNB & HeNB Security.
  • 19.
    “ Release 10focused on …  Introduced as a LTE Advance basically research based on VoIP.  Focus on improvement in career aggregation for existing and future frequency band also.  Enhancement of Self Organizing Network.  Research focused on Security of a LTE system.
  • 20.
    . Sr. No. Version Released year Information 10. Release10 2011  LTE Advance, MTC enhancement, VoIP  Career Aggregation - allow aggregation of not only the existing bands, but also bands that are introduced in future  HeNB Mobility enhance  Relay Technology  CS Fallback  NIMTC - Network Improvements for Machine Type Communications – (Stage I)  e- MPS – Enhanced Multimedia Priority Services.  e- ICIC - Inter-cell interference coordination  e-MIMO – DL - 8X8 MIMO, UL - 4X4 MIMO  Duplex Mode – FDD & TDD  Channel Bandwidth – 1.4,3,5,10,15,20 Mhz  Latency - Link Layer < 5ms, Handoff < 50 ms  VoIP – Greater than 80 users per sector/Mhz FDD
  • 21.
    . Sr. No. VersionReleased year Information 10. Release 10 2010  DL – OFDMA , 1Gbps, 4x4 MIMO  UL- SC-OFDMA, 300Mbps, 2x4 MIMO at 20Mhz FDD.  User Mobility – 320 km/hr • 100 Mbps high mobility • 1Gbps low mobility  aSRVCC – • PS & CS Access Transfer of Media of an IM session in alerting phase.  eSRVCC - • Various SRVCC enhancement in the network, no impact on the UE.  MDT - Minimization of drive test  MAPCON – Multi Access PDN Connectivity support to multiple Packet Data Networks (PDN) connections for a device.
  • 22.
    . Sr. No. VersionReleased year Information 10. Release 10 2010  e-SON – Self Organizing Network e- MLB -Enhanced Mobility Load Balancing • Improving reliability of MLB in intra-LTE scenarios • Improving functionality of the MLB in inter- RAT scenarios. CCO - Coverage and Capacity Optimization • Priority 1: coverage problems, e.g. coverage holes • Priority 2: capacity problems e- MRO- Mobility Robustness Optimization enhancements The use case is to enable detection and to provide tools for possible correction of following problems: • Connection failures in inter-RAT environment: Priority 1: at HOs from LTE to UMTS/GSM Priority 2: at HOs from UMTS/GSM to LTE
  • 23.
    . Sr. No. VersionReleased year Information 10. Release 10 2010 • Obtaining UE measurements in case of unsuccessful re-establishment after connection failure • Ping-pongs in idle mode (inter-RAT and intra-LTE environment) • Ping-pongs in active mode (inter-RAT) • HO to wrong cell (in intra-LTE environment) that does not cause connection failure  Security – Alignment of Certificate’s IPsec and TLS usage, Relay Mode Security, Key EEA3/EIA3, UTRAN key Hierarchy.
  • 24.
    Release 11  3GPPRel-11 standards for HSPA+ and LTE-Advanced were frozen in December 2012 with the core network protocols stable in December 2012 and Radio Access Network (RAN) protocols stable in March 2013.
  • 25.
    “ Release 11focused on….  Service level aspects for direct IP inter-connection between Operators, service level aspects for national transit IP interconnect and service level aspects for next generation corporate network IP interconnect (peer-to-peer business trunking)  Service layer aspects for interconnection of voice services (e.g. toll-free, premium rate and emergency calls)  Service level aspects for IP Interconnection (service control and user plane aspects) between Operators and 3rd party Application Providers  M2M Technology  Specifically the work covered in release 11 is as follows -
  • 26.
    . Sr. No. VersionReleased year Information 10. Release 11 2013  Career Aggregation enhancement –DL intra band non contiguous  Wi-Fi Integration  e- PDCCH - Enhanced Physical Control Channel  HNB & HeNB : Mobility enhancement  Service Continuity for eMBMS  FeICIC - Further enhanced Inter-Cell Interference Coordination • For non CA based deployment • At the transmitter side in DL – Combination of ABS (almost blank sub-frame)+ Power Reduction at the Receiver side in DL.  Advance LTE-A Receiver with – • MMSE – IRC Interference rejection combining • CRS - Cancellation Interference Cancellation receivers.
  • 27.
    . Sr. No. VersionReleased year Information 10. Release 11 2013  EU Alert – European Public Warning System • The EU-Alert is introduced under Public Warning System (PWS) in parallel with Earthquake & Tsunami Warning System (ETWS II). • PWS- Blocked here in release 11. • In fact, EU-Alert is sent as part of the Cell Broadcast Message (CBS) using new identifiers  eDDA – Enhance Device Detection Application  Network Based Positioning  v- SRVCC – Video Single Radio Voice Call Continuity • SRVCC for video call  r- SRVCC – Reverse Single Radio Voice Call Continuity • Reverse SRVCC HO from CS fall to PS  ESON – Enhanced Self Organizing Network • Network Energy Saving • Enhanced MDT • Further SON enhancement  ESM - Energy Savings Management
  • 28.
    . Sr. No. VersionReleased year  Information 10. Release 11 2013  IMS - IP Multimedia Systems • IMS based Peer-to-Peer Content Distribution Services. • Identifying the user cases to describe how users, operators and service providers will benefit by using/deploying IMS based content distribution services. • such as with the improvement of Peer-to-Peer technology. • The following shall be considered: • Mobile access only (e.g. UTRAN, E-UTRAN) • Fixed access only (e.g. xDSL, LAN) • Identifying QoS, mobility, charging and security related requirements in the case of content distribution services on IMS. •Identifying potential copyright issues  UICC/USIM enhancements • To identify use cases and requirements for new USIM based services taking into account the GSMA Smart SIM deliverables
  • 29.
    .Sr. No. VersionReleased year Information 10. Release 11 2013  QoS SSL - Quality of Service based on Subscriber Spending Limits • Service aspects : Charging and billing • Modification of QoS based on subscriber’s spending limits • Enforcing of spending limits for roaming subscribers without having dedicated support in the visited network  NOVES - Non Emergency Services • SMS for Emergency purposes and eCall 3GPP has looked at non-voice alternatives for Emergency purposes.  Cell_FACH enhancement – Cell_FACH to LTE Mobility • This expectation that the UEs may stay longer in the Cell_FACH state is in turn motivating the mobility from Cell_FACH state to LTE proposal.
  • 30.
    Sr. No. VersionReleased year Information 10. Release 11 2013  MTC - Machine Type Communication • Effectively identify addressing method to be used for end point devices • Effectively route messaging between those devices • Support multiple methods for delivering messages, as defined by 22.368 • Support land-based and wireless connectivity • Make use of IP-based network architectures • Addressing/identifiers must support mobility and roaming • Support on high speed packet • Switched networks when available and on circuit-switched networks • Consider if there are security issues associated with any alternatives.  Security – IMS Security : Continuation on unsolicited Communication, IMS Media Security for non RTP Media. Access Security : PWS Security, Security Aspects for Machine type Communication.
  • 31.
    Release 12  3GPPstarted work on Rel-12 in December 2012 and an 18-month timeframe for completion was planned. The work continues into 2014 and areas that are still incomplete are carefully noted in the report. Work will be ratified by June 2014 with the exception of RAN protocols which will be finalized by September 2014.  The motivation behind the release 12 is as follows.  Capacity increase to cope with traffic explosion  Energy saving  Cost efficiency  Support for diverse application and traffic types  Higher user experience/data rate  Backhaul enhancement
  • 32.
    “ Release 12focused on….  It focus on network and services enhancements for MTC, public safety and Wi-Fi integration, system capacity and stability, Web Real-Time Communication, further network energy savings, multimedia and Policy and Charging Control framework.  Multiuser MIMO technology makes it possible to raise wireless transmission speed by increasing the number of antennas at the base station, without consuming more frequency bandwidth or increasing modulation multiple-values & DIDO (Distributed-Input-Distributed-Output).
  • 33.
    .Sr. No. VersionReleased year Information 11. Release 12 2015  Proe, GCSE  E4C’s- Enhancement in Coverage, Coordination, Cost and Capacity • User plane congestion (UPCON) • Core Network Overload (FS_CNO) • HetNet Coordination  D2D –Device to Device  FDD / TDD CA  Wi-Fi Integration  Multi-acces - operators can influence the selection  Dual-stack IPv4/v6 connectivity  Network initiated QoS, PCC  Various ways to combine or split traffic off inside the network • Local IP Access (LIPA) • Selective IP Traffic Offloading (SIPTO) • WLAN offloading  IP Multimedia Subsystem - eIMS  Single Radio Voice Call Continuity (SRVCC)  Network Sharing
  • 34.
    . Sr. No. VersionReleased year Information 11. Release 12 2015  LTE Multi-Antenna/site technologies such as: • 3D MIMO/beam-forming to allow beam control in both horizontal and vertical directions  Active Antena System  Spatial Multiplexing  SON – Self Organizing Network • LTE – HRPD SON • EMBMS MDT  Small Cell Enhancements like Macrocell, Picocell and Femtocell.  Public Safety and Critical Communications  Enhance Security Procedure