SlideShare a Scribd company logo
Objectives:
Provide Detailed Technical Analysis of Critical Design
Features
Characteristics:
• Limited Scope
• Performed by Technical Experts
• Answer Key Questions
• Degree of Rigor Commensurate with Stage of
Project Development
• Markets
• Inputs
• Location
• Technology
• Equipment
Comparing ProjectCharacteristicswith Criteria
• All Sectorsof Economy
• Revenueand Non-revenue Projects
• All Typesof Projects
• New Investment
• Modernization
• Expansion
• Privatization
• TechnologyAcquisition
• Equipment Replacement
• Public and Private Investment
• Commitmentof ScarceResources
• Expectation of Future Benefits
• Inherent Uncertainties
PARTICIPANT INVESTOR FINANCIER REGULATOR GUARANTOR SUPPLIER
Commercial 1 2 2 1 2
Market 1 2 2 1 2
Technology 1 2 2 2 2
Finance
•Return 1 2 2 2 2
•Liquidity 2 1 3 1 1
•Debt
Servic
e
2 1 3 1 2
Economy 3 3 1 3 3
1 VERYIMPORTANT
2 SOMEWHATIMPORTANT
3 NOTSOIMPORTANT
• Isit compatible with other Investment
Activities?
• Isthe Project potentially bankable?
• Doesthe project makethe best useof the
Sponsor’s Resources?
• DoI havethe capacity to energize the project
and to retain its momentumin the face of
obstaclesto growth?
Local Partner
(onthe ability of Foreign
Partner to contribute more
equity)
• “He canafford it.”
• “Theexchange rate is
wrong.”
• “He wantsour market.”
Foreign Partner
(onthe reason to offer lower
price for participation)
• “Political and EconomicRisk”
• “LowPurchasingPowerin the
Marketplace”
• “Uncertain Future Earnings”
• “Workers’ Demands”
• “Book Value isIrrelevant”
MICRO
ProjectLevel
COMMERCIAL
PROFIT
ABILITY
MACRO
NationalLevel
NATIONAL
PROFIT
ABILITY
• Doesthe Project Make Sensefor the Country?
• Consistentwith Development Goals?
• PositiveImpactonMacro-economicIndicators?
• Satisfy EconomicRateof ReturnCriterion?
• Purpose
• Project Background
• Analysis of
• Commercial/ Market
• Technology
• Environmental Impacts
• Institutional / Managerial
• Financial
• Economicand Social
• Conclusion
• Isit a SoundBusinessConcept?
• Isthere a Market for Product
/ Service?
• Isthe Marketing Strategy Viable?
• Are the SalesProjections Realistic?
• Isthe Distribution Plan Viable?
• Isthe production at a competitive price?
• Isthe processtechnologyaccessible?
• Are the operating conditions sustainable?
• Will webe able to provide the quality demanded by the
market?
• Are the inputsto the planning reliable?
• Are there adequate technical personnel?
• Do process emissions and
effluents meet or exceed
regulated standards?
• Are products environmentally
acceptable?
• Doimpactsindicate future
regulatory actions?
• Are the following Competent?
• Entrepreneur
• Implementation Management
• Operations Management
• Isthe organization capable of executing
necessary functions?
• Are the financial resourcesadequate to
planning?
• Will there be adequate returnsto the investor?
• Are the financial criteria of other participants
satisfied?
• Are the financial risksand risk sharing
acceptable?
• Isthe financial structure acceptable?
• Wrong Timing
• Non-optimal Financing
• Over-estimated Market Potential
• Under-estimated Capital Cost
• Under-estimated Competition
• Planned Capacity Inconsistentwith Market
• Unidentified Sourcesof Skilled Personnel
• Inadequate Infrastructure
• Project Design Alternatives
• Ineffective Planning
Theprocessof identification, analysis and either acceptance or
mitigation of uncertainty in investment decision-making.
Essentially,risk management occursanytime an investor or fund
manager analyzes and attempts to quantify the potential for
lossesin an investmentand thentakesthe appropriate action (or
inaction) given their investmentobjectives and risk tolerance.
Inadequate risk management canresult in severeconsequences
for companiesaswell asindividuals. Forexample, the recession
that began in 2008 waslargely causedby the loosecredit risk
managementof financialfirms.
Anyproject organization issubject to risks.One whichfinds itself in
a state of perpetual crisis,isfailing to manage risks properly.
Failure to manage risksischaracterized by inability to decide
what to do, whento do it, and whether enoughhasbeen done.
RiskManagement isa facet of Quality, usingbasic techniquesof
analysis and measurementto ensurethat risksare properly
identified, classified, and managed.
• Identify Uncertainties
Explore the entire project plans and look for areas of uncertainty.
• Analyze Risks
Specify howthoseareas of uncertainty canimpact the performance of the
project, either in duration, costor meeting the users' requirements.
• Prioritize Risks
Establishwhichof thoseRisksshouldbe eliminated completely, becauseof
potential extreme impact, whichshouldhave regular management
attention, and whichare sufficiently minor to avoid detailed management
attention.
• Mitigate Risks
T
akewhatever actions are possible in advance to reduce the effect of Risk. It
isbetter to spendmoneyonmitigation than to include contingency in the
plan.
• Planfor Emergencies
Forall thoseRiskswhichare deemed to be significant, have an emergency
plan in place before it happens.
• Measureand Control
Trackthe effects of the risksidentified and manage themto a successful
conclusion.
3 b. project life cycle and risk management
3 b. project life cycle and risk management

More Related Content

What's hot

Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
Ron Montgomery
 
Rescuing a failing project
Rescuing a failing projectRescuing a failing project
Rescuing a failing projectMaksym Markov
 
Project management
Project managementProject management
Project management
Moocs Engine
 
Managing in the Times of Covid 19 - Employee Communication, Employee Platform...
Managing in the Times of Covid 19 - Employee Communication, Employee Platform...Managing in the Times of Covid 19 - Employee Communication, Employee Platform...
Managing in the Times of Covid 19 - Employee Communication, Employee Platform...
Xoxoday
 
Project Success Assessment
Project Success AssessmentProject Success Assessment
Project Success Assessment
Glen Alleman
 
Next Gen Project Manager
Next Gen Project ManagerNext Gen Project Manager
Next Gen Project Manager
Ishan Wiratunga
 
Agile Leadership: Accelerating Business Agility - Context
Agile Leadership: Accelerating Business Agility - ContextAgile Leadership: Accelerating Business Agility - Context
Agile Leadership: Accelerating Business Agility - Context
Kent McDonald
 
Project management evaluation kpi
Project management evaluation kpiProject management evaluation kpi
Project management evaluation kpi
Olivier Laquinte
 
18611 project identification
18611 project identification18611 project identification
18611 project identificationSingh Deep
 
Project management (2)
Project management (2)Project management (2)
Project management (2)ritivaid
 
Leading and Managing Innovation
Leading and Managing InnovationLeading and Managing Innovation
Leading and Managing Innovation
Russell Archibald
 
Critical Success Factors & Project Management
Critical Success Factors & Project ManagementCritical Success Factors & Project Management
Critical Success Factors & Project Management
Abhinav Sabharwal- Business Analyst Mumbai
 
Project Ranking
Project RankingProject Ranking
Project Ranking
UW Madison
 
Technology strategy
Technology strategyTechnology strategy
Technology strategy
jigyashamaru
 
Project Management for Real Estate
Project Management for Real EstateProject Management for Real Estate
Project Management for Real Estate
Mayer Segal
 
Agile Portfolio Management - The Secret Sauce for Sustainable Business Growth
Agile Portfolio Management - The Secret Sauce for Sustainable Business GrowthAgile Portfolio Management - The Secret Sauce for Sustainable Business Growth
Agile Portfolio Management - The Secret Sauce for Sustainable Business Growth
KeyedIn Projects
 
Leading Transition From Strategy Development to Deployment
Leading Transition From Strategy Development to DeploymentLeading Transition From Strategy Development to Deployment
Leading Transition From Strategy Development to Deployment
Human Capital Media
 
5 Pitfalls of Project Management Software Implementation
5 Pitfalls of Project Management Software Implementation 5 Pitfalls of Project Management Software Implementation
5 Pitfalls of Project Management Software Implementation
Project Insight
 

What's hot (19)

Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
 
Rescuing a failing project
Rescuing a failing projectRescuing a failing project
Rescuing a failing project
 
Project management
Project managementProject management
Project management
 
Managing in the Times of Covid 19 - Employee Communication, Employee Platform...
Managing in the Times of Covid 19 - Employee Communication, Employee Platform...Managing in the Times of Covid 19 - Employee Communication, Employee Platform...
Managing in the Times of Covid 19 - Employee Communication, Employee Platform...
 
Project Success Assessment
Project Success AssessmentProject Success Assessment
Project Success Assessment
 
Next Gen Project Manager
Next Gen Project ManagerNext Gen Project Manager
Next Gen Project Manager
 
Agile Leadership: Accelerating Business Agility - Context
Agile Leadership: Accelerating Business Agility - ContextAgile Leadership: Accelerating Business Agility - Context
Agile Leadership: Accelerating Business Agility - Context
 
Project management evaluation kpi
Project management evaluation kpiProject management evaluation kpi
Project management evaluation kpi
 
18611 project identification
18611 project identification18611 project identification
18611 project identification
 
Managing Risk Attitude
Managing Risk AttitudeManaging Risk Attitude
Managing Risk Attitude
 
Project management (2)
Project management (2)Project management (2)
Project management (2)
 
Leading and Managing Innovation
Leading and Managing InnovationLeading and Managing Innovation
Leading and Managing Innovation
 
Critical Success Factors & Project Management
Critical Success Factors & Project ManagementCritical Success Factors & Project Management
Critical Success Factors & Project Management
 
Project Ranking
Project RankingProject Ranking
Project Ranking
 
Technology strategy
Technology strategyTechnology strategy
Technology strategy
 
Project Management for Real Estate
Project Management for Real EstateProject Management for Real Estate
Project Management for Real Estate
 
Agile Portfolio Management - The Secret Sauce for Sustainable Business Growth
Agile Portfolio Management - The Secret Sauce for Sustainable Business GrowthAgile Portfolio Management - The Secret Sauce for Sustainable Business Growth
Agile Portfolio Management - The Secret Sauce for Sustainable Business Growth
 
Leading Transition From Strategy Development to Deployment
Leading Transition From Strategy Development to DeploymentLeading Transition From Strategy Development to Deployment
Leading Transition From Strategy Development to Deployment
 
5 Pitfalls of Project Management Software Implementation
5 Pitfalls of Project Management Software Implementation 5 Pitfalls of Project Management Software Implementation
5 Pitfalls of Project Management Software Implementation
 

Similar to 3 b. project life cycle and risk management

Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussion
Abigail Pugal-Somera
 
MODULE 1.pptx
MODULE 1.pptxMODULE 1.pptx
MODULE 1.pptx
mbaf12
 
Unit 1 PM.pptx
Unit 1 PM.pptxUnit 1 PM.pptx
Unit 1 PM.pptx
YogeshKumar841711
 
Day 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieterDay 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieter
Boundless Southern Africa
 
project management
project managementproject management
project management
KomalaselvanV1
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business Analysis
Mihika-QA
 
Strategic planning and technology management
Strategic planning and technology managementStrategic planning and technology management
Strategic planning and technology management
Self employed
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
Himani Maheshwari
 
Project Managemet Basics
Project Managemet BasicsProject Managemet Basics
Project Managemet Basics
Лана Ратнер
 
Real estate advisory services
Real estate advisory servicesReal estate advisory services
Real estate advisory services
Hema Luqman
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
Aswin prakash i , Xantus Technologies
 
WHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxWHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptx
Kashif-khan
 
Unit viii preparation of project report
Unit viii preparation of project reportUnit viii preparation of project report
Unit viii preparation of project report
taruian
 
Unit 2 rorest based enterprse.pptx
Unit 2 rorest based enterprse.pptxUnit 2 rorest based enterprse.pptx
Unit 2 rorest based enterprse.pptx
NabarajUpadhaya
 
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
Ali Zeeshan
 
A business analyst approach
A business analyst approachA business analyst approach
A business analyst approach
Ali Zeeshan
 
Eng - Company Profile TrustPartners Nov 2010
Eng - Company Profile TrustPartners Nov 2010Eng - Company Profile TrustPartners Nov 2010
Eng - Company Profile TrustPartners Nov 2010
TrustPartners
 
Project planning and analysis
Project planning and analysisProject planning and analysis
Project planning and analysis
Vimal SB
 
Using Project Management to Improve ROI Day 1 Event
Using Project Management to Improve ROI  Day 1 EventUsing Project Management to Improve ROI  Day 1 Event
Using Project Management to Improve ROI Day 1 Event
Ed Kozak
 

Similar to 3 b. project life cycle and risk management (20)

Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussion
 
MODULE 1.pptx
MODULE 1.pptxMODULE 1.pptx
MODULE 1.pptx
 
Unit 1 PM.pptx
Unit 1 PM.pptxUnit 1 PM.pptx
Unit 1 PM.pptx
 
Day 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieterDay 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieter
 
Pe ch 1
Pe ch   1Pe ch   1
Pe ch 1
 
project management
project managementproject management
project management
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business Analysis
 
Strategic planning and technology management
Strategic planning and technology managementStrategic planning and technology management
Strategic planning and technology management
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Project Managemet Basics
Project Managemet BasicsProject Managemet Basics
Project Managemet Basics
 
Real estate advisory services
Real estate advisory servicesReal estate advisory services
Real estate advisory services
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
WHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxWHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptx
 
Unit viii preparation of project report
Unit viii preparation of project reportUnit viii preparation of project report
Unit viii preparation of project report
 
Unit 2 rorest based enterprse.pptx
Unit 2 rorest based enterprse.pptxUnit 2 rorest based enterprse.pptx
Unit 2 rorest based enterprse.pptx
 
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
 
A business analyst approach
A business analyst approachA business analyst approach
A business analyst approach
 
Eng - Company Profile TrustPartners Nov 2010
Eng - Company Profile TrustPartners Nov 2010Eng - Company Profile TrustPartners Nov 2010
Eng - Company Profile TrustPartners Nov 2010
 
Project planning and analysis
Project planning and analysisProject planning and analysis
Project planning and analysis
 
Using Project Management to Improve ROI Day 1 Event
Using Project Management to Improve ROI  Day 1 EventUsing Project Management to Improve ROI  Day 1 Event
Using Project Management to Improve ROI Day 1 Event
 

More from Dr.R. SELVAM

7 breakeven analysis
7 breakeven analysis7 breakeven analysis
7 breakeven analysis
Dr.R. SELVAM
 
6 fixed assets, current assets, depreciation methods
6 fixed assets, current assets, depreciation methods6 fixed assets, current assets, depreciation methods
6 fixed assets, current assets, depreciation methods
Dr.R. SELVAM
 
5 preparation and interpretation of balance sheets
5 preparation and interpretation of balance sheets5 preparation and interpretation of balance sheets
5 preparation and interpretation of balance sheets
Dr.R. SELVAM
 
4 acounting principle
4 acounting principle4 acounting principle
4 acounting principle
Dr.R. SELVAM
 
3 capital structure
3 capital structure3 capital structure
3 capital structure
Dr.R. SELVAM
 
1 sources of finance
1 sources of finance1 sources of finance
1 sources of finance
Dr.R. SELVAM
 
2 term loan
2 term loan2 term loan
2 term loan
Dr.R. SELVAM
 
4 b. capital budgeting and cost analysis performance evaluation
4 b. capital budgeting and cost analysis   performance evaluation4 b. capital budgeting and cost analysis   performance evaluation
4 b. capital budgeting and cost analysis performance evaluation
Dr.R. SELVAM
 
4 a. capital budgeting and cost analysis
4 a. capital budgeting and cost analysis4 a. capital budgeting and cost analysis
4 a. capital budgeting and cost analysis
Dr.R. SELVAM
 
3 capital budgeting
3 capital budgeting3 capital budgeting
3 capital budgeting
Dr.R. SELVAM
 
2 working capital
2 working capital2 working capital
2 working capital
Dr.R. SELVAM
 
1 current assement management
1 current assement management1 current assement management
1 current assement management
Dr.R. SELVAM
 
2 b. project termination
2 b. project termination2 b. project termination
2 b. project termination
Dr.R. SELVAM
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditing
Dr.R. SELVAM
 
1 b, evaluation of project
1 b, evaluation of project1 b, evaluation of project
1 b, evaluation of project
Dr.R. SELVAM
 
1 a, monitoring and evaluation of PM
1 a, monitoring and evaluation of PM1 a, monitoring and evaluation of PM
1 a, monitoring and evaluation of PM
Dr.R. SELVAM
 
3 industrial hydraulic circuits shapping, milling, drilling
3 industrial hydraulic circuits   shapping, milling, drilling3 industrial hydraulic circuits   shapping, milling, drilling
3 industrial hydraulic circuits shapping, milling, drilling
Dr.R. SELVAM
 
2 maintenance of hydraulic systems
2 maintenance of hydraulic systems2 maintenance of hydraulic systems
2 maintenance of hydraulic systems
Dr.R. SELVAM
 
1 hydraulic troubleshooting
1 hydraulic troubleshooting1 hydraulic troubleshooting
1 hydraulic troubleshooting
Dr.R. SELVAM
 
3 c. industrial pneumatic circuit logic
3 c. industrial pneumatic circuit   logic3 c. industrial pneumatic circuit   logic
3 c. industrial pneumatic circuit logic
Dr.R. SELVAM
 

More from Dr.R. SELVAM (20)

7 breakeven analysis
7 breakeven analysis7 breakeven analysis
7 breakeven analysis
 
6 fixed assets, current assets, depreciation methods
6 fixed assets, current assets, depreciation methods6 fixed assets, current assets, depreciation methods
6 fixed assets, current assets, depreciation methods
 
5 preparation and interpretation of balance sheets
5 preparation and interpretation of balance sheets5 preparation and interpretation of balance sheets
5 preparation and interpretation of balance sheets
 
4 acounting principle
4 acounting principle4 acounting principle
4 acounting principle
 
3 capital structure
3 capital structure3 capital structure
3 capital structure
 
1 sources of finance
1 sources of finance1 sources of finance
1 sources of finance
 
2 term loan
2 term loan2 term loan
2 term loan
 
4 b. capital budgeting and cost analysis performance evaluation
4 b. capital budgeting and cost analysis   performance evaluation4 b. capital budgeting and cost analysis   performance evaluation
4 b. capital budgeting and cost analysis performance evaluation
 
4 a. capital budgeting and cost analysis
4 a. capital budgeting and cost analysis4 a. capital budgeting and cost analysis
4 a. capital budgeting and cost analysis
 
3 capital budgeting
3 capital budgeting3 capital budgeting
3 capital budgeting
 
2 working capital
2 working capital2 working capital
2 working capital
 
1 current assement management
1 current assement management1 current assement management
1 current assement management
 
2 b. project termination
2 b. project termination2 b. project termination
2 b. project termination
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditing
 
1 b, evaluation of project
1 b, evaluation of project1 b, evaluation of project
1 b, evaluation of project
 
1 a, monitoring and evaluation of PM
1 a, monitoring and evaluation of PM1 a, monitoring and evaluation of PM
1 a, monitoring and evaluation of PM
 
3 industrial hydraulic circuits shapping, milling, drilling
3 industrial hydraulic circuits   shapping, milling, drilling3 industrial hydraulic circuits   shapping, milling, drilling
3 industrial hydraulic circuits shapping, milling, drilling
 
2 maintenance of hydraulic systems
2 maintenance of hydraulic systems2 maintenance of hydraulic systems
2 maintenance of hydraulic systems
 
1 hydraulic troubleshooting
1 hydraulic troubleshooting1 hydraulic troubleshooting
1 hydraulic troubleshooting
 
3 c. industrial pneumatic circuit logic
3 c. industrial pneumatic circuit   logic3 c. industrial pneumatic circuit   logic
3 c. industrial pneumatic circuit logic
 

Recently uploaded

"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 

3 b. project life cycle and risk management

  • 1.
  • 2. Objectives: Provide Detailed Technical Analysis of Critical Design Features Characteristics: • Limited Scope • Performed by Technical Experts • Answer Key Questions • Degree of Rigor Commensurate with Stage of Project Development
  • 3. • Markets • Inputs • Location • Technology • Equipment
  • 5. • All Sectorsof Economy • Revenueand Non-revenue Projects • All Typesof Projects • New Investment • Modernization • Expansion • Privatization • TechnologyAcquisition • Equipment Replacement • Public and Private Investment
  • 6. • Commitmentof ScarceResources • Expectation of Future Benefits • Inherent Uncertainties
  • 7.
  • 8. PARTICIPANT INVESTOR FINANCIER REGULATOR GUARANTOR SUPPLIER Commercial 1 2 2 1 2 Market 1 2 2 1 2 Technology 1 2 2 2 2 Finance •Return 1 2 2 2 2 •Liquidity 2 1 3 1 1 •Debt Servic e 2 1 3 1 2 Economy 3 3 1 3 3 1 VERYIMPORTANT 2 SOMEWHATIMPORTANT 3 NOTSOIMPORTANT
  • 9. • Isit compatible with other Investment Activities? • Isthe Project potentially bankable? • Doesthe project makethe best useof the Sponsor’s Resources? • DoI havethe capacity to energize the project and to retain its momentumin the face of obstaclesto growth?
  • 10. Local Partner (onthe ability of Foreign Partner to contribute more equity) • “He canafford it.” • “Theexchange rate is wrong.” • “He wantsour market.” Foreign Partner (onthe reason to offer lower price for participation) • “Political and EconomicRisk” • “LowPurchasingPowerin the Marketplace” • “Uncertain Future Earnings” • “Workers’ Demands” • “Book Value isIrrelevant”
  • 12. • Doesthe Project Make Sensefor the Country? • Consistentwith Development Goals? • PositiveImpactonMacro-economicIndicators? • Satisfy EconomicRateof ReturnCriterion?
  • 13. • Purpose • Project Background • Analysis of • Commercial/ Market • Technology • Environmental Impacts • Institutional / Managerial • Financial • Economicand Social • Conclusion
  • 14. • Isit a SoundBusinessConcept? • Isthere a Market for Product / Service? • Isthe Marketing Strategy Viable? • Are the SalesProjections Realistic? • Isthe Distribution Plan Viable?
  • 15. • Isthe production at a competitive price? • Isthe processtechnologyaccessible? • Are the operating conditions sustainable? • Will webe able to provide the quality demanded by the market? • Are the inputsto the planning reliable? • Are there adequate technical personnel?
  • 16. • Do process emissions and effluents meet or exceed regulated standards? • Are products environmentally acceptable? • Doimpactsindicate future regulatory actions?
  • 17. • Are the following Competent? • Entrepreneur • Implementation Management • Operations Management • Isthe organization capable of executing necessary functions?
  • 18. • Are the financial resourcesadequate to planning? • Will there be adequate returnsto the investor? • Are the financial criteria of other participants satisfied? • Are the financial risksand risk sharing acceptable? • Isthe financial structure acceptable?
  • 19. • Wrong Timing • Non-optimal Financing • Over-estimated Market Potential • Under-estimated Capital Cost • Under-estimated Competition • Planned Capacity Inconsistentwith Market • Unidentified Sourcesof Skilled Personnel • Inadequate Infrastructure • Project Design Alternatives • Ineffective Planning
  • 20.
  • 21. Theprocessof identification, analysis and either acceptance or mitigation of uncertainty in investment decision-making. Essentially,risk management occursanytime an investor or fund manager analyzes and attempts to quantify the potential for lossesin an investmentand thentakesthe appropriate action (or inaction) given their investmentobjectives and risk tolerance. Inadequate risk management canresult in severeconsequences for companiesaswell asindividuals. Forexample, the recession that began in 2008 waslargely causedby the loosecredit risk managementof financialfirms.
  • 22. Anyproject organization issubject to risks.One whichfinds itself in a state of perpetual crisis,isfailing to manage risks properly. Failure to manage risksischaracterized by inability to decide what to do, whento do it, and whether enoughhasbeen done. RiskManagement isa facet of Quality, usingbasic techniquesof analysis and measurementto ensurethat risksare properly identified, classified, and managed.
  • 23. • Identify Uncertainties Explore the entire project plans and look for areas of uncertainty. • Analyze Risks Specify howthoseareas of uncertainty canimpact the performance of the project, either in duration, costor meeting the users' requirements. • Prioritize Risks Establishwhichof thoseRisksshouldbe eliminated completely, becauseof potential extreme impact, whichshouldhave regular management attention, and whichare sufficiently minor to avoid detailed management attention.
  • 24. • Mitigate Risks T akewhatever actions are possible in advance to reduce the effect of Risk. It isbetter to spendmoneyonmitigation than to include contingency in the plan. • Planfor Emergencies Forall thoseRiskswhichare deemed to be significant, have an emergency plan in place before it happens. • Measureand Control Trackthe effects of the risksidentified and manage themto a successful conclusion.