ENGINEER'S ESTIMATE
CONSTRUCTION OF TECHNICAL BUILDING
FOR NATIONAL REFINERY - KARACHI
GROUND FLOOR
Sr. Description Quantity Unit
No.
1 Excavation in Foundation (as per D.I - 1)
a) 0 to 5 feet depth. 20,500.00 Cft.
b) Below 5 to 10 feet depth. 20,500.00 Cft.
c) Below 10 to 15 feet depth 6,250.00 Cft.
2 Filling earth under floor (as per D.I - 2)
a) From outside sources 25,000.00 Cft.
3 Providing and laying Termite Treatment (as per D.I - 3) 7,500.00 Sft.
4 Providing and laying soling stone under floors
(as per D.I - 4) 3,650.00 Cft.
5 Providing and laying DPC 1:2:4 (as per D.I - 5) 580.00 Sft.
6 Providing & laying C.C. 1:4:8 (Class-E) concrete
(as per D.I - 6)
a. In foundation 2,200.00 Cft.
7 Providing & laying C.C. 1:3:6 (Class-D) concrete
(as per D.I - 7)
a. Under Floor 2,400.00 Cft.
b. In Step 24.00 Cft.
8 Providing & laying C.C. 1:1½:3 (Class-B) concrete
using SR Cement (as per D.I - 8)
a. Column and Wall Footing 5,750.00 Cft.
b. Column upto Plinth 975.00 Cft.
c. Walls upto Plinth 1,150.00 Cft.
d. Plinth Beams 2,300.00 Cft.
9 Providing and laying Class "B" 1:1½:3 Concrete
using O.P. Cement (as per D.I - 9)
a) Column Superstructure 700.00 Cft.
b) Wall Superstructure 1,050.00 Cft.
c) Beams / Lintels 1,550.00 Cft.
d) Slab 6" thick 3,800.00 Cft.
Sr. Description Quantity Unit
No.
e) Staircase 400.00 Cft.
Sr. Description Quantity Unit
No.
10 Providing & laying Steel Reinforcement
(as per D.I - 10)
a. Mild Steel Bars 3.00 Tonne
b. TOR Steel Bars 40.00 Tonne
11 Providing & laying Solid Block Masonry walls in
superstructure (as per D.I - 11)
a. 6" thick walls 4,500.00 Cft.
b. 4" thick walls 20.00 Cft.
12 Providing and laying ½" thick plain cement plaster
in 1:4 cement mortar (as per D.I - 12)
a. Ceiling 1,500.00 Sft.
b. Internal walls 13,500.00 Sft.
13 Providing and laying 3/4" thick plain cement plaster
on external walls (as per D.I - 13) 9,000.00 Sft.
14 Providing and laying C.C. 1:2:4 floor (as per D.I - 14) 630.00 Sft.
15 Providing and laying China Verona Marble Tiles
floor (as per D.I - 15) 6,600.00 Sft.
16 Providing and laying China Verona Marble Tiles
skirting (as per D.I - 16) 760.00 Sft.
17 Providing and laying China Verona Marble Tiles
on steps (as per D.I - 17)
a) Treads 400.00 Sft.
b) Risers 250.00 Sft.
18 Providing and laying non-skid Ceramic Tile Floor
in Bath (as per D.I. - 18) 350.00 Sft.
19 Providing and laying Glazed Tiles in Dado
(as per D.I - 19) 1,000.00 Sft.
20 Providing and applying oil bound distemper on ceiling
(as per D.I - 20) 1,500.00 Sft.
21 Providing and applying Plastic Emulsion Paint on
internal walls (as per D.I - 21) 13,500.00 Sft.
Sr. Description Quantity Unit
No.
22 Providing and fixing commercial ply flush door
shutter with frame (as per D.I - 22) 600.00 Sft.
23 Providing and fixing aluminum fully glazed door
(as per D.I - 23)
a) With side panels 110.00 Sft.
b) Without side panels 175.00 Sft.
24 Providing and fixing aluminum fully double glazed
sliding or fixed windows / ventilators (as per D.I.-24) 3,050.00 Sft.
25 Providing and fixing Acoustic Tiles false ceiling
(as per D.I. - 26) 7,000.00 Sft.
26 P/F Staircase Railing (as per D.I. - 27) 350.00 Sft.
27 Making flower beds (as per D.I. - 28) 2.00 Each
28 Providing and fixing Wooden Partitions
(as per D.I. - 29) 400.00 Sft.
29 Providing and fixing Weather Shield Paint on
external surface (as per D.I. - 30) 9,000.00 Sft.
30 Providing and fixing M.S. Grills
(as per D.I. - 31) 3,000.00 Sft.
31 Kitchen Cabinet (low level) (as per D.I. 32) 60.00 Sft.
32 Kitchen Cabinet (high level) (as per D.I. 33) 40.00 Sft.
33 Providing and fixing marble portition in urinals
(as per D.I. 35)
a) 2½" x 1½' size 1.00 No.
a) 2½" x 1' size 1.00 No.
Total ======>
ENGINEER'S ESTIMATE
UCTION OF TECHNICAL BUILDING
NATIONAL REFINERY - KARACHI
GROUND FLOOR
Rate Amount
(Rs.) (Rs.)
3.00 61,500.00
5.00 102,500.00
8.00 50,000.00
5.00 125,000.00
3.00 22,500.00
12.00 43,800.00
14.00 8,120.00
42.00 92,400.00
50.00 120,000.00
50.00 1,200.00
70.00 402,500.00
80.00 78,000.00
80.00 92,000.00
80.00 184,000.00
82.00 57,400.00
82.00 86,100.00
82.00 127,100.00
82.00 311,600.00
Rate Amount
(Rs.) (Rs.)
85.00 34,000.00
Rate Amount
(Rs.) (Rs.)
27,000.00 81,000.00
28,000.00 1,120,000.00
50.00 225,000.00
52.00 1,040.00
8.00 12,000.00
8.00 108,000.00
10.00 90,000.00
15.00 9,450.00
60.00 396,000.00
35.00 26,600.00
65.00 26,000.00
40.00 10,000.00
70.00 24,500.00
70.00 70,000.00
4.00 6,000.00
10.00 135,000.00
Rate Amount
(Rs.) (Rs.)
200.00 120,000.00
350.00 38,500.00
350.00 61,250.00
300.00 915,000.00
50.00 350,000.00
100.00 35,000.00
1,000.00 2,000.00
200.00 80,000.00
10.00 90,000.00
130.00 390,000.00
350.00 21,000.00
250.00 10,000.00
1,000.00 1,000.00
1,000.00 1,000.00
Total ======> 6,455,060.00
ENGINEER'S ESTIMATE
CONSTRUCTION OF TECHNICAL BUILDING
FOR NATIONAL REFINERY - KARACHI
FIRST FLOOR
Sr. Description Quantity Unit
No.
1 Providing & laying RCC Class-B (1:1½:3) concrete
(as per D.I - 8)
a. Beams / Lintels 1,300.00 Cft.
b. Column in super structure 850.00 Cft.
c. Roof Slab 3,950.00 Cft.
d. Wall 1,100.00 Cft.
e. Staircase 400.00 Cft.
f. Projection / Pardi 860.00 Cft.
2 Providing & laying Steel Reinforcement
(as per D.I - 10)
a. M.S. Bars 2.00 Tonne
b. TOR Steel Bars 24.00 Tonne
3 Providing & laying Solid Block Masonry wall in
superstructure (as per D.I - 11)
a. 6" thick walls 4,300.00 Cft.
b. 4" thick walls 20.00 Cft.
4 Providing and laying ½" thick plain cement plaster
in 1:4 cement mortar (as per D.I - 12)
a. Ceiling 1,500.00 Sft.
b. Internal walls 16,000.00 Sft.
5 Providing and laying 3/4" thick plain cement plaster
on external walls (as per D.I - 13) 14,500.00 Sft.
6 Providing and laying China Verona Marble Tiles
floor (as per D.I - 15) 6,800.00 Sft.
7 Providing and laying China Verona Marble Tiles
skirting (as per D.I - 16) 875.00 Sft.
8 Providing and laying non-skid Ceramic Tile Floor
in Bath (as per D.I. - 18) 350.00 Sft.
Sr. Description Quantity Unit
No.
9 Providing and laying Glazed Tiles in Dado
(as per D.I - 19) 1,200.00 Sft.
10 Providing and applying oil bound distemper on
ceiling (as per D.I - 20) 1,500.00 Sft.
11 Providing and applying Plastic Emulsion Paint on
internal walls (as per D.I - 21) 16,000.00 Sft.
12 Providing and fixing commercial ply flush door
shutter with frame (as per D.I - 22) 650.00 Sft.
13 Providing and fixing aluminum fully glazed sliding
or fixed windows / ventilators (as per D.I. - 24) 3,100.00 Sft.
14 Providing and laying 2½" thick (average) C.C.
1:6 screed over roof (as per D.I. - 25) 6,500.00 Sft.
15 Providing and fixing Acoustic Tiles false ceiling
(as per D.I. - 26) 6,000.00 Sft.
16 P/F Staircase Railing (as per D.I. - 27) 350.00 Sft.
17 P/F Wooden Partitions (as per D.I. 29) 400.00 Sft.
18 P/A Weather Shield Paint on external surface 14,500.00 Sft.
(as per D.I. 30)
19 Providing and laying China Verona Marble Tiles
on steps (as per D.I - 17)
a) Treads 450.00 Sft.
b) Risers 200.00 Sft.
20 Providing and fixing M.S. Grills
(as per D.I. - 31) 3,100.00 Sft.
21 Kitchen Cabinet (low level) (as per D.I. 32) 60.00 Sft.
22 Kitchen Cabinet (high level) (as per D.I. 33) 40.00 Sft.
33 Providing and fixing marble partition in urinals
(as per D.I. 35)
a) 2½" x 1½' size 1.00 No.
a) 2½" x 1' size 1.00 No.
Sr. Description Quantity Unit
No.
34 Supply and fixing sand in sunk slab
(as per D.I. 34) 400.00 Cft.
Total ======>
ENGINEER'S ESTIMATE
RUCTION OF TECHNICAL BUILDING
NATIONAL REFINERY - KARACHI
FIRST FLOOR
Rate Amount
(Rs.) (Rs.)
82.00 106,600.00
82.00 69,700.00
82.00 323,900.00
82.00 90,200.00
85.00 34,000.00
85.00 73,100.00
27,000.00 54,000.00
28,000.00 672,000.00
50.00 215,000.00
52.00 1,040.00
8.00 12,000.00
8.00 128,000.00
10.00 145,000.00
60.00 408,000.00
35.00 30,625.00
70.00 24,500.00
Rate Amount
(Rs.) (Rs.)
70.00 84,000.00
4.00 6,000.00
10.00 160,000.00
200.00 130,000.00
300.00 930,000.00
12.00 78,000.00
50.00 300,000.00
100.00 35,000.00
200.00 80,000.00
10.00 145,000.00
65.00 29,250.00
40.00 8,000.00
130.00 403,000.00
350.00 21,000.00
250.00 10,000.00
1,000.00 1,000.00
1,000.00 1,000.00
Rate Amount
(Rs.) (Rs.)
10.00 4,000.00
Total ======> 4,812,915.00
ENGINEER'S ESTIMATE
CONSTRUCTION OF TECHNICAL BUILDING
FOR NATIONAL REFINERY - KARACHI
SUMMARY OF COST
FOR
CIVIL WORKS
1 Ground Floor Rs.
2 First Floor Rs.
Total Bid Rs.
Rebate (if any) Rs.
Net Bid Amount Rs.
Rupees in Word
One Crore Twelve Lacs Sixty Seven Thousands Nine
Hundred and Seventy Five Only
ENGINEER'S ESTIMATE
STRUCTION OF TECHNICAL BUILDING
OR NATIONAL REFINERY - KARACHI
SUMMARY OF COST
FOR
CIVIL WORKS
6,455,060
4,812,915
11,267,975
11,267,975
One Crore Twelve Lacs Sixty Seven Thousands Nine
Hundred and Seventy Five Only

More Related Content

Viewers also liked

How to estimate the cost of a commercial fire alarm system
How to estimate the cost of a commercial fire alarm systemHow to estimate the cost of a commercial fire alarm system
How to estimate the cost of a commercial fire alarm systemRobert Tranford
 
Construction Estimate worksheet
Construction Estimate worksheetConstruction Estimate worksheet
Construction Estimate worksheet
Joseph V. Scorese
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Fire Alarm System Purchasing Guide - Purchasing.com
Fire Alarm System Purchasing Guide - Purchasing.comFire Alarm System Purchasing Guide - Purchasing.com
Fire Alarm System Purchasing Guide - Purchasing.com
Purchasing.com
 
How To Estimate Garage Building Costs ?
How To Estimate Garage Building Costs ?How To Estimate Garage Building Costs ?
How To Estimate Garage Building Costs ?
Behm Design
 
Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating
Doina Dobre, P.Eng, GSC
 
Construction Cost Estimating
Construction Cost Estimating Construction Cost Estimating
Construction Cost Estimating
Doina Dobre, P.Eng, GSC
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purposeAbhijeet Bhosale
 
Construction Estimating
Construction EstimatingConstruction Estimating
Construction Estimating
mauinick
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
Syafiq Deen
 
50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor
hlksd
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Waleed Liaqat
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
Manish Kandpal
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013nurun2010
 
ANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-I
Alok Kumar
 

Viewers also liked (20)

How to estimate the cost of a commercial fire alarm system
How to estimate the cost of a commercial fire alarm systemHow to estimate the cost of a commercial fire alarm system
How to estimate the cost of a commercial fire alarm system
 
Construction Estimate worksheet
Construction Estimate worksheetConstruction Estimate worksheet
Construction Estimate worksheet
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
truss design
truss designtruss design
truss design
 
Fire Alarm System Purchasing Guide - Purchasing.com
Fire Alarm System Purchasing Guide - Purchasing.comFire Alarm System Purchasing Guide - Purchasing.com
Fire Alarm System Purchasing Guide - Purchasing.com
 
Estimating 101
Estimating 101Estimating 101
Estimating 101
 
How To Estimate Garage Building Costs ?
How To Estimate Garage Building Costs ?How To Estimate Garage Building Costs ?
How To Estimate Garage Building Costs ?
 
Smm7 for QS Professionals
Smm7 for QS ProfessionalsSmm7 for QS Professionals
Smm7 for QS Professionals
 
Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating
 
Construction Cost Estimating
Construction Cost Estimating Construction Cost Estimating
Construction Cost Estimating
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
 
Construction Estimating
Construction EstimatingConstruction Estimating
Construction Estimating
 
Fire alarms
Fire alarmsFire alarms
Fire alarms
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor50639312 roll-of-quantity-surveyor
50639312 roll-of-quantity-surveyor
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
ANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-IANALYSS OF RATES-VOLUME-I
ANALYSS OF RATES-VOLUME-I
 

Similar to 22274325 engineer-s-estimate-construction-of-technical-building-for-national-refinery

12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
Fence BOQ with Materials.pdf
Fence BOQ with Materials.pdfFence BOQ with Materials.pdf
Fence BOQ with Materials.pdf
Mutha Morgan
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
ashleyyeap
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcostingimaduddin91
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimationimaduddin91
 
Road work construction proxy(2)
Road work   construction proxy(2)Road work   construction proxy(2)
Road work construction proxy(2)
FeteneBefekadu
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
SantinoDengAchuilAth
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimationimaduddin91
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
Deepak Patil
 
Intro. to management lecture 06
Intro. to management lecture 06Intro. to management lecture 06
Intro. to management lecture 06
Haitham Sharnouby
 
Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09
Haitham Sharnouby
 
Niand work profile
Niand work profileNiand work profile
Niand work profile
Dr. Ninad Dhawle
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
ssuserd43de8
 

Similar to 22274325 engineer-s-estimate-construction-of-technical-building-for-national-refinery (20)

E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
Fence BOQ with Materials.pdf
Fence BOQ with Materials.pdfFence BOQ with Materials.pdf
Fence BOQ with Materials.pdf
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Single storied house
Single storied houseSingle storied house
Single storied house
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimation
 
Road work construction proxy(2)
Road work   construction proxy(2)Road work   construction proxy(2)
Road work construction proxy(2)
 
Office building new
Office building newOffice building new
Office building new
 
Stilt house
Stilt houseStilt house
Stilt house
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
 
2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
 
RMC 34 KUMILY - POOPPARA ROAD
RMC 34 KUMILY - POOPPARA ROADRMC 34 KUMILY - POOPPARA ROAD
RMC 34 KUMILY - POOPPARA ROAD
 
Intro. to management lecture 06
Intro. to management lecture 06Intro. to management lecture 06
Intro. to management lecture 06
 
Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09
 
Niand work profile
Niand work profileNiand work profile
Niand work profile
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
Itemized project budget
Itemized project budgetItemized project budget
Itemized project budget
 

More from imaduddin91

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplicationsimaduddin91
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringimaduddin91
 
07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural designimaduddin91
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplicationsimaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineeringimaduddin91
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsimaduddin91
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringimaduddin91
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural designimaduddin91
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesignimaduddin91
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagementimaduddin91
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplicationsimaduddin91
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagementimaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineeringimaduddin91
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcostingimaduddin91
 
Statistical metods
Statistical metodsStatistical metods
Statistical metodsimaduddin91
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference conceptsimaduddin91
 
Base 9.1 preparation guide
Base 9.1 preparation guideBase 9.1 preparation guide
Base 9.1 preparation guideimaduddin91
 

More from imaduddin91 (20)

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplications
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineering
 
07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural design
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplications
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineering
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural design
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagement
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
 
Statistical metods
Statistical metodsStatistical metods
Statistical metods
 
Sas cheat
Sas cheatSas cheat
Sas cheat
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference concepts
 
Base 9.1 preparation guide
Base 9.1 preparation guideBase 9.1 preparation guide
Base 9.1 preparation guide
 

22274325 engineer-s-estimate-construction-of-technical-building-for-national-refinery

  • 1. ENGINEER'S ESTIMATE CONSTRUCTION OF TECHNICAL BUILDING FOR NATIONAL REFINERY - KARACHI GROUND FLOOR Sr. Description Quantity Unit No. 1 Excavation in Foundation (as per D.I - 1) a) 0 to 5 feet depth. 20,500.00 Cft. b) Below 5 to 10 feet depth. 20,500.00 Cft. c) Below 10 to 15 feet depth 6,250.00 Cft. 2 Filling earth under floor (as per D.I - 2) a) From outside sources 25,000.00 Cft. 3 Providing and laying Termite Treatment (as per D.I - 3) 7,500.00 Sft. 4 Providing and laying soling stone under floors (as per D.I - 4) 3,650.00 Cft. 5 Providing and laying DPC 1:2:4 (as per D.I - 5) 580.00 Sft. 6 Providing & laying C.C. 1:4:8 (Class-E) concrete (as per D.I - 6) a. In foundation 2,200.00 Cft. 7 Providing & laying C.C. 1:3:6 (Class-D) concrete (as per D.I - 7) a. Under Floor 2,400.00 Cft. b. In Step 24.00 Cft. 8 Providing & laying C.C. 1:1½:3 (Class-B) concrete using SR Cement (as per D.I - 8) a. Column and Wall Footing 5,750.00 Cft. b. Column upto Plinth 975.00 Cft. c. Walls upto Plinth 1,150.00 Cft. d. Plinth Beams 2,300.00 Cft. 9 Providing and laying Class "B" 1:1½:3 Concrete using O.P. Cement (as per D.I - 9) a) Column Superstructure 700.00 Cft. b) Wall Superstructure 1,050.00 Cft. c) Beams / Lintels 1,550.00 Cft. d) Slab 6" thick 3,800.00 Cft.
  • 2. Sr. Description Quantity Unit No. e) Staircase 400.00 Cft.
  • 3. Sr. Description Quantity Unit No. 10 Providing & laying Steel Reinforcement (as per D.I - 10) a. Mild Steel Bars 3.00 Tonne b. TOR Steel Bars 40.00 Tonne 11 Providing & laying Solid Block Masonry walls in superstructure (as per D.I - 11) a. 6" thick walls 4,500.00 Cft. b. 4" thick walls 20.00 Cft. 12 Providing and laying ½" thick plain cement plaster in 1:4 cement mortar (as per D.I - 12) a. Ceiling 1,500.00 Sft. b. Internal walls 13,500.00 Sft. 13 Providing and laying 3/4" thick plain cement plaster on external walls (as per D.I - 13) 9,000.00 Sft. 14 Providing and laying C.C. 1:2:4 floor (as per D.I - 14) 630.00 Sft. 15 Providing and laying China Verona Marble Tiles floor (as per D.I - 15) 6,600.00 Sft. 16 Providing and laying China Verona Marble Tiles skirting (as per D.I - 16) 760.00 Sft. 17 Providing and laying China Verona Marble Tiles on steps (as per D.I - 17) a) Treads 400.00 Sft. b) Risers 250.00 Sft. 18 Providing and laying non-skid Ceramic Tile Floor in Bath (as per D.I. - 18) 350.00 Sft. 19 Providing and laying Glazed Tiles in Dado (as per D.I - 19) 1,000.00 Sft. 20 Providing and applying oil bound distemper on ceiling (as per D.I - 20) 1,500.00 Sft. 21 Providing and applying Plastic Emulsion Paint on internal walls (as per D.I - 21) 13,500.00 Sft.
  • 4. Sr. Description Quantity Unit No. 22 Providing and fixing commercial ply flush door shutter with frame (as per D.I - 22) 600.00 Sft. 23 Providing and fixing aluminum fully glazed door (as per D.I - 23) a) With side panels 110.00 Sft. b) Without side panels 175.00 Sft. 24 Providing and fixing aluminum fully double glazed sliding or fixed windows / ventilators (as per D.I.-24) 3,050.00 Sft. 25 Providing and fixing Acoustic Tiles false ceiling (as per D.I. - 26) 7,000.00 Sft. 26 P/F Staircase Railing (as per D.I. - 27) 350.00 Sft. 27 Making flower beds (as per D.I. - 28) 2.00 Each 28 Providing and fixing Wooden Partitions (as per D.I. - 29) 400.00 Sft. 29 Providing and fixing Weather Shield Paint on external surface (as per D.I. - 30) 9,000.00 Sft. 30 Providing and fixing M.S. Grills (as per D.I. - 31) 3,000.00 Sft. 31 Kitchen Cabinet (low level) (as per D.I. 32) 60.00 Sft. 32 Kitchen Cabinet (high level) (as per D.I. 33) 40.00 Sft. 33 Providing and fixing marble portition in urinals (as per D.I. 35) a) 2½" x 1½' size 1.00 No. a) 2½" x 1' size 1.00 No. Total ======>
  • 5. ENGINEER'S ESTIMATE UCTION OF TECHNICAL BUILDING NATIONAL REFINERY - KARACHI GROUND FLOOR Rate Amount (Rs.) (Rs.) 3.00 61,500.00 5.00 102,500.00 8.00 50,000.00 5.00 125,000.00 3.00 22,500.00 12.00 43,800.00 14.00 8,120.00 42.00 92,400.00 50.00 120,000.00 50.00 1,200.00 70.00 402,500.00 80.00 78,000.00 80.00 92,000.00 80.00 184,000.00 82.00 57,400.00 82.00 86,100.00 82.00 127,100.00 82.00 311,600.00
  • 7. Rate Amount (Rs.) (Rs.) 27,000.00 81,000.00 28,000.00 1,120,000.00 50.00 225,000.00 52.00 1,040.00 8.00 12,000.00 8.00 108,000.00 10.00 90,000.00 15.00 9,450.00 60.00 396,000.00 35.00 26,600.00 65.00 26,000.00 40.00 10,000.00 70.00 24,500.00 70.00 70,000.00 4.00 6,000.00 10.00 135,000.00
  • 8. Rate Amount (Rs.) (Rs.) 200.00 120,000.00 350.00 38,500.00 350.00 61,250.00 300.00 915,000.00 50.00 350,000.00 100.00 35,000.00 1,000.00 2,000.00 200.00 80,000.00 10.00 90,000.00 130.00 390,000.00 350.00 21,000.00 250.00 10,000.00 1,000.00 1,000.00 1,000.00 1,000.00 Total ======> 6,455,060.00
  • 9. ENGINEER'S ESTIMATE CONSTRUCTION OF TECHNICAL BUILDING FOR NATIONAL REFINERY - KARACHI FIRST FLOOR Sr. Description Quantity Unit No. 1 Providing & laying RCC Class-B (1:1½:3) concrete (as per D.I - 8) a. Beams / Lintels 1,300.00 Cft. b. Column in super structure 850.00 Cft. c. Roof Slab 3,950.00 Cft. d. Wall 1,100.00 Cft. e. Staircase 400.00 Cft. f. Projection / Pardi 860.00 Cft. 2 Providing & laying Steel Reinforcement (as per D.I - 10) a. M.S. Bars 2.00 Tonne b. TOR Steel Bars 24.00 Tonne 3 Providing & laying Solid Block Masonry wall in superstructure (as per D.I - 11) a. 6" thick walls 4,300.00 Cft. b. 4" thick walls 20.00 Cft. 4 Providing and laying ½" thick plain cement plaster in 1:4 cement mortar (as per D.I - 12) a. Ceiling 1,500.00 Sft. b. Internal walls 16,000.00 Sft. 5 Providing and laying 3/4" thick plain cement plaster on external walls (as per D.I - 13) 14,500.00 Sft. 6 Providing and laying China Verona Marble Tiles floor (as per D.I - 15) 6,800.00 Sft. 7 Providing and laying China Verona Marble Tiles skirting (as per D.I - 16) 875.00 Sft. 8 Providing and laying non-skid Ceramic Tile Floor in Bath (as per D.I. - 18) 350.00 Sft.
  • 10. Sr. Description Quantity Unit No. 9 Providing and laying Glazed Tiles in Dado (as per D.I - 19) 1,200.00 Sft. 10 Providing and applying oil bound distemper on ceiling (as per D.I - 20) 1,500.00 Sft. 11 Providing and applying Plastic Emulsion Paint on internal walls (as per D.I - 21) 16,000.00 Sft. 12 Providing and fixing commercial ply flush door shutter with frame (as per D.I - 22) 650.00 Sft. 13 Providing and fixing aluminum fully glazed sliding or fixed windows / ventilators (as per D.I. - 24) 3,100.00 Sft. 14 Providing and laying 2½" thick (average) C.C. 1:6 screed over roof (as per D.I. - 25) 6,500.00 Sft. 15 Providing and fixing Acoustic Tiles false ceiling (as per D.I. - 26) 6,000.00 Sft. 16 P/F Staircase Railing (as per D.I. - 27) 350.00 Sft. 17 P/F Wooden Partitions (as per D.I. 29) 400.00 Sft. 18 P/A Weather Shield Paint on external surface 14,500.00 Sft. (as per D.I. 30) 19 Providing and laying China Verona Marble Tiles on steps (as per D.I - 17) a) Treads 450.00 Sft. b) Risers 200.00 Sft. 20 Providing and fixing M.S. Grills (as per D.I. - 31) 3,100.00 Sft. 21 Kitchen Cabinet (low level) (as per D.I. 32) 60.00 Sft. 22 Kitchen Cabinet (high level) (as per D.I. 33) 40.00 Sft. 33 Providing and fixing marble partition in urinals (as per D.I. 35) a) 2½" x 1½' size 1.00 No. a) 2½" x 1' size 1.00 No.
  • 11. Sr. Description Quantity Unit No. 34 Supply and fixing sand in sunk slab (as per D.I. 34) 400.00 Cft. Total ======>
  • 12. ENGINEER'S ESTIMATE RUCTION OF TECHNICAL BUILDING NATIONAL REFINERY - KARACHI FIRST FLOOR Rate Amount (Rs.) (Rs.) 82.00 106,600.00 82.00 69,700.00 82.00 323,900.00 82.00 90,200.00 85.00 34,000.00 85.00 73,100.00 27,000.00 54,000.00 28,000.00 672,000.00 50.00 215,000.00 52.00 1,040.00 8.00 12,000.00 8.00 128,000.00 10.00 145,000.00 60.00 408,000.00 35.00 30,625.00 70.00 24,500.00
  • 13. Rate Amount (Rs.) (Rs.) 70.00 84,000.00 4.00 6,000.00 10.00 160,000.00 200.00 130,000.00 300.00 930,000.00 12.00 78,000.00 50.00 300,000.00 100.00 35,000.00 200.00 80,000.00 10.00 145,000.00 65.00 29,250.00 40.00 8,000.00 130.00 403,000.00 350.00 21,000.00 250.00 10,000.00 1,000.00 1,000.00 1,000.00 1,000.00
  • 14. Rate Amount (Rs.) (Rs.) 10.00 4,000.00 Total ======> 4,812,915.00
  • 15. ENGINEER'S ESTIMATE CONSTRUCTION OF TECHNICAL BUILDING FOR NATIONAL REFINERY - KARACHI SUMMARY OF COST FOR CIVIL WORKS 1 Ground Floor Rs. 2 First Floor Rs. Total Bid Rs. Rebate (if any) Rs. Net Bid Amount Rs. Rupees in Word One Crore Twelve Lacs Sixty Seven Thousands Nine Hundred and Seventy Five Only
  • 16. ENGINEER'S ESTIMATE STRUCTION OF TECHNICAL BUILDING OR NATIONAL REFINERY - KARACHI SUMMARY OF COST FOR CIVIL WORKS 6,455,060 4,812,915 11,267,975 11,267,975 One Crore Twelve Lacs Sixty Seven Thousands Nine Hundred and Seventy Five Only