What is a crew and how is it used
in cost estimating?
CREW
DEFINITION
CREW
DEFINITION
MERRIAM WEBSTER
DICTIONARY DEFINES A
CREW AS:
“ A COMPANY OF
PEOPLE WORKING
ON ONE JOB, OR
UNDER ONE
FOREMAN, OR
OPERATING A
MACHINE”
CONSTRUCTION
CREWS
CONSTRUCTION
CREWS
• CONSTRUCTION CREWS ARE RESOURCES,
SELECTED AND GROUPED TOGETHER FOR
THE PURPOSE OF PERFORMING SPECIFIC
CONSTRUCTION TASKS/ACTIVITIES.
CONSTRUCTION
CREWS
• CONSTRUCTION CREWS ARE RESOURCES,
SELECTED AND GROUPED TOGETHER FOR
THE PURPOSE OF PERFORMING SPECIFIC
CONSTRUCTION TASKS/ACTIVITIES.
• CONSTRUCTION CREWS RESOURCES:
CONSTRUCTION
CREWS
• CONSTRUCTION CREWS ARE RESOURCES,
SELECTED AND GROUPED TOGETHER FOR
THE PURPOSE OF PERFORMING SPECIFIC
CONSTRUCTION TASKS/ACTIVITIES.
• CONSTRUCTION CREWS RESOURCES:
• LABOUR
CONSTRUCTION
CREWS
• CONSTRUCTION CREWS ARE RESOURCES,
SELECTED AND GROUPED TOGETHER FOR
THE PURPOSE OF PERFORMING SPECIFIC
CONSTRUCTION TASKS/ACTIVITIES.
• CONSTRUCTION CREWS RESOURCES:
• LABOUR
• CONSTRUCTION EQUIPMENT
CONSTRUCTION
CREWS
• CONSTRUCTION CREWS ARE RESOURCES,
SELECTED AND GROUPED TOGETHER FOR
THE PURPOSE OF PERFORMING SPECIFIC
CONSTRUCTION TASKS/ACTIVITIES.
• CONSTRUCTION CREWS RESOURCES:
• LABOUR
• CONSTRUCTION EQUIPMENT
• SMALL TOOLS (OPTIONAL)
CONSTRUCTION
CREWS
• CONSTRUCTION CREWS ARE RESOURCES,
SELECTED AND GROUPED TOGETHER FOR
THE PURPOSE OF PERFORMING SPECIFIC
CONSTRUCTION TASKS/ACTIVITIES.
• CONSTRUCTION CREWS RESOURCES:
• LABOUR
• CONSTRUCTION EQUIPMENT
• SMALL TOOLS (OPTIONAL)
• TEMPORARY CONSTRUCTION
MATERIALS (OPTIONAL)
TYPES OF CONSTRUCTION
CREWS
TYPES OF CONSTRUCTION
CREWS
• LABOUR DRIVEN
TYPES OF CONSTRUCTION
CREWS
• LABOUR DRIVEN
• THE PERFORMANCE OF THE CREW IS BASED ON THE
OVERALL PERFORMANCE OF THE LABOUR COMPONENT
TYPES OF CONSTRUCTION
CREWS
• LABOUR DRIVEN
• THE PERFORMANCE OF THE CREW IS BASED ON THE
OVERALL PERFORMANCE OF THE LABOUR COMPONENT
• EQUIPMENT DRIVEN
TYPES OF CONSTRUCTION
CREWS
• LABOUR DRIVEN
• THE PERFORMANCE OF THE CREW IS BASED ON THE
OVERALL PERFORMANCE OF THE LABOUR COMPONENT
• EQUIPMENT DRIVEN
• THE PERFORMANCE OF THE CREW IS BASED ON THE
OVERALL PERFORMANCE OF THE EQUIPMENT
COMPONENT
WHY USE CONSTRUCTION
CREWS
WHY USE CONSTRUCTION
CREWS
• CONSTRUCTION OF A PROJECT IS A PROCESS COMPOSED OF
CONSTRUCTION ACTIVITIES/TASKS WHICH ARE CAREFULLY
PLANNED FOR OPTIMAL PROJECT PERFORMANCE.
WHY USE CONSTRUCTION
CREWS
• CONSTRUCTION OF A PROJECT IS A PROCESS COMPOSED OF
CONSTRUCTION ACTIVITIES/TASKS WHICH ARE CAREFULLY
PLANNED FOR OPTIMAL PROJECT PERFORMANCE.
• WE USE CREWS IN COST ESTIMATING TO PLAN AN EXPECTED
PROJECT PERFORMANCE.
WHY USE CONSTRUCTION
CREWS
• CONSTRUCTION OF A PROJECT IS A PROCESS COMPOSED OF
CONSTRUCTION ACTIVITIES/TASKS WHICH ARE CAREFULLY
PLANNED FOR OPTIMAL PROJECT PERFORMANCE.
• WE USE CREWS IN COST ESTIMATING TO PLAN AN EXPECTED
PROJECT PERFORMANCE.
• WE USE CREWS TO MEASURE ACTUAL PERFORMANCE AND
IMPROVE THE PROCESS FOR BETTER FUTURE PERFORMANCE.
HOW TO PLAN FOR:
CONSTRUCTION CREW COMPOSITION
HOW TO PLAN FOR:
CONSTRUCTION CREW COMPOSITION
• EXPERIENCE
HOW TO PLAN FOR:
CONSTRUCTION CREW COMPOSITION
• EXPERIENCE
• THE BEST WAY TO DETERMINE CONSTRUCTION CREW
COMPOSITION IS FROM EXPERIENCE ON PREVIOUS
PROJECTS
HOW TO PLAN FOR:
CONSTRUCTION CREW COMPOSITION
• EXPERIENCE
• THE BEST WAY TO DETERMINE CONSTRUCTION CREW
COMPOSITION IS FROM EXPERIENCE ON PREVIOUS
PROJECTS
• COMMERCIALLY AVAILABLE DATA
HOW TO PLAN FOR:
CONSTRUCTION CREW COMPOSITION
• EXPERIENCE
• THE BEST WAY TO DETERMINE CONSTRUCTION CREW
COMPOSITION IS FROM EXPERIENCE ON PREVIOUS
PROJECTS
• COMMERCIALLY AVAILABLE DATA
• THIS IS ONLY RECOMMENDED TO USE AS A STARTING
POINT. IT SHOULD NOT BE USED IN A COST ESTIMATE,
UNLESS IT CAN BE VALIDATED.
HOW TO PLAN FOR:
CONSTRUCTION CREW COMPOSITION
• EXPERIENCE
• THE BEST WAY TO DETERMINE CONSTRUCTION CREW
COMPOSITION IS FROM EXPERIENCE ON PREVIOUS
PROJECTS
• COMMERCIALLY AVAILABLE DATA
• THIS IS ONLY RECOMMENDED TO USE AS A STARTING
POINT. IT SHOULD NOT BE USED IN A COST ESTIMATE,
UNLESS IT CAN BE VALIDATED.
• THROUGH CONSULTATION WITH CONSTRUCTION
PROFESSIONALS EXPERIENCED IN THE TYPE OF PROJECT
PLANNED VS ACTUAL
PERFORMANCE
PLANNED VS ACTUAL
PERFORMANCE
CREW PERFORMANCE IS THE AMOUNT OF UNITS PER HOUR.
PLANNED VS ACTUAL
PERFORMANCE
CREW PERFORMANCE IS THE AMOUNT OF UNITS PER HOUR.
• PLANNED OR ESTIMATED PERFORMANCE IS CALLED
PRODUCTION RATE. IT IS THE AMOUNT OF UNITS WE
EXPECT THE CREW TO COMPLETE IN AN HOUR, BASED ON
PROJECT SPECIFIC CONDITIONS.
PLANNED VS ACTUAL
PERFORMANCE
CREW PERFORMANCE IS THE AMOUNT OF UNITS PER HOUR.
• PLANNED OR ESTIMATED PERFORMANCE IS CALLED
PRODUCTION RATE. IT IS THE AMOUNT OF UNITS WE
EXPECT THE CREW TO COMPLETE IN AN HOUR, BASED ON
PROJECT SPECIFIC CONDITIONS.
• ACTUAL PERFORMANCE IS CALLED PRODUCTIVITY.
PRODUCTIVITY IS THE ACTUAL AMOUNT OF UNITS
COMPLETED BY THE CREW IN AN HOUR.
PLANNED VS ACTUAL
PERFORMANCE
CREW PERFORMANCE IS THE AMOUNT OF UNITS PER HOUR.
• PLANNED OR ESTIMATED PERFORMANCE IS CALLED
PRODUCTION RATE. IT IS THE AMOUNT OF UNITS WE
EXPECT THE CREW TO COMPLETE IN AN HOUR, BASED ON
PROJECT SPECIFIC CONDITIONS.
• ACTUAL PERFORMANCE IS CALLED PRODUCTIVITY.
PRODUCTIVITY IS THE ACTUAL AMOUNT OF UNITS
COMPLETED BY THE CREW IN AN HOUR.
EFFICIENCY IS PRODUCTION RATE DIVIDED BY PRODUCTIVITY.
WE MEASURE EFFICIENCY AND USE IT TO ADJUST
PERFORMANCE.
COMPOSITE CREW RATES DATA
COMPOSITE CREW RATES DATA
USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE
MOST ACCURATE METHOD.
COMPOSITE CREW RATES DATA
USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE
MOST ACCURATE METHOD.
IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS
PURPOSES:
COMPOSITE CREW RATES DATA
USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE
MOST ACCURATE METHOD.
IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS
PURPOSES:
• SCHEDULING
COMPOSITE CREW RATES DATA
USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE
MOST ACCURATE METHOD.
IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS
PURPOSES:
• SCHEDULING
• CASH FLOW
COMPOSITE CREW RATES DATA
USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE MOST
ACCURATE METHOD.
IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS PURPOSES:
• SCHEDULING
• CASH FLOW
• UNIT RATES: LABOUR AND EQUIPMENT COST, MAN-HOURS AND CREW
HOURS.
COST ESTIMATING
CHALLENGES
COST ESTIMATING
CHALLENGES
• ACCESS TO EXISTING, VALIDATED DATA
COST ESTIMATING
CHALLENGES
• ACCESS TO EXISTING, VALIDATED DATA
• BALANCE THE JUDGEMENT OF ADJUSTING FACTORS
COST ESTIMATING
CHALLENGES
• ACCESS TO EXISTING, VALIDATED DATA
• BALANCE THE JUDGEMENT OF ADJUSTING FACTORS
• KEEPING UP WITH NEW CONSTRUCTION
TECHNOLOGIES
COST ESTIMATING
CHALLENGES
• ACCESS TO EXISTING, VALIDATED DATA
• BALANCE THE JUDGEMENT OF ADJUSTING FACTORS
• KEEPING UP WITH NEW CONSTRUCTION
TECHNOLOGIES
• ESTIMATING A TYPE OF PROJECT FOR THE FIRST TIME
COST ESTIMATING
CHALLENGES
• ACCESS TO EXISTING, VALIDATED DATA
• BALANCE THE JUDGEMENT OF ADJUSTING FACTORS
• KEEPING UP WITH NEW CONSTRUCTION
TECHNOLOGIES
• ESTIMATING A TYPE OF PROJECT FOR THE FIRST TIME
• OTHERS. THERE IS NO SHORTAGE OF CHALLENGES
THAT A COST ESTIMATOR HAS TO OVERCOME.
LEARNING WHERE TO TURN FOR GUIDANCE IS THE
IMPORTANT THING TO KNOW.
DID YOU LIKE THIS PRESENTATION?
JOIN ME FOR A FREE WEBINAR, JULY 18TH, 2016 AT 18:00 PST, WHERE I DISCUSS THIS ISSUES IN
MORE DETAILS.
CLICK HERE TO REGISTER, OR GO TO HTTPS://GOO.GL/IEPHYM
CANNOT ATTEND? NO PROBLEM, REGISTER FOR THE WEBINAR AND I WILL SEND YOU THE FULL
RECORDING.
WANT TO LEARN MORE ABOUT COST ESTIMATING? FOLLOW ME AT:
HTTP://WWW.LEARNCOSTESTIMATING.COM
HTTP://WWW.EMERALDGROUP-LEARNING.CA

Composite Crews in Construction Cost Estimating

  • 2.
    What is acrew and how is it used in cost estimating?
  • 3.
  • 4.
    CREW DEFINITION MERRIAM WEBSTER DICTIONARY DEFINESA CREW AS: “ A COMPANY OF PEOPLE WORKING ON ONE JOB, OR UNDER ONE FOREMAN, OR OPERATING A MACHINE”
  • 5.
  • 6.
    CONSTRUCTION CREWS • CONSTRUCTION CREWSARE RESOURCES, SELECTED AND GROUPED TOGETHER FOR THE PURPOSE OF PERFORMING SPECIFIC CONSTRUCTION TASKS/ACTIVITIES.
  • 7.
    CONSTRUCTION CREWS • CONSTRUCTION CREWSARE RESOURCES, SELECTED AND GROUPED TOGETHER FOR THE PURPOSE OF PERFORMING SPECIFIC CONSTRUCTION TASKS/ACTIVITIES. • CONSTRUCTION CREWS RESOURCES:
  • 8.
    CONSTRUCTION CREWS • CONSTRUCTION CREWSARE RESOURCES, SELECTED AND GROUPED TOGETHER FOR THE PURPOSE OF PERFORMING SPECIFIC CONSTRUCTION TASKS/ACTIVITIES. • CONSTRUCTION CREWS RESOURCES: • LABOUR
  • 9.
    CONSTRUCTION CREWS • CONSTRUCTION CREWSARE RESOURCES, SELECTED AND GROUPED TOGETHER FOR THE PURPOSE OF PERFORMING SPECIFIC CONSTRUCTION TASKS/ACTIVITIES. • CONSTRUCTION CREWS RESOURCES: • LABOUR • CONSTRUCTION EQUIPMENT
  • 10.
    CONSTRUCTION CREWS • CONSTRUCTION CREWSARE RESOURCES, SELECTED AND GROUPED TOGETHER FOR THE PURPOSE OF PERFORMING SPECIFIC CONSTRUCTION TASKS/ACTIVITIES. • CONSTRUCTION CREWS RESOURCES: • LABOUR • CONSTRUCTION EQUIPMENT • SMALL TOOLS (OPTIONAL)
  • 11.
    CONSTRUCTION CREWS • CONSTRUCTION CREWSARE RESOURCES, SELECTED AND GROUPED TOGETHER FOR THE PURPOSE OF PERFORMING SPECIFIC CONSTRUCTION TASKS/ACTIVITIES. • CONSTRUCTION CREWS RESOURCES: • LABOUR • CONSTRUCTION EQUIPMENT • SMALL TOOLS (OPTIONAL) • TEMPORARY CONSTRUCTION MATERIALS (OPTIONAL)
  • 12.
  • 13.
  • 14.
    TYPES OF CONSTRUCTION CREWS •LABOUR DRIVEN • THE PERFORMANCE OF THE CREW IS BASED ON THE OVERALL PERFORMANCE OF THE LABOUR COMPONENT
  • 15.
    TYPES OF CONSTRUCTION CREWS •LABOUR DRIVEN • THE PERFORMANCE OF THE CREW IS BASED ON THE OVERALL PERFORMANCE OF THE LABOUR COMPONENT • EQUIPMENT DRIVEN
  • 16.
    TYPES OF CONSTRUCTION CREWS •LABOUR DRIVEN • THE PERFORMANCE OF THE CREW IS BASED ON THE OVERALL PERFORMANCE OF THE LABOUR COMPONENT • EQUIPMENT DRIVEN • THE PERFORMANCE OF THE CREW IS BASED ON THE OVERALL PERFORMANCE OF THE EQUIPMENT COMPONENT
  • 17.
  • 18.
    WHY USE CONSTRUCTION CREWS •CONSTRUCTION OF A PROJECT IS A PROCESS COMPOSED OF CONSTRUCTION ACTIVITIES/TASKS WHICH ARE CAREFULLY PLANNED FOR OPTIMAL PROJECT PERFORMANCE.
  • 19.
    WHY USE CONSTRUCTION CREWS •CONSTRUCTION OF A PROJECT IS A PROCESS COMPOSED OF CONSTRUCTION ACTIVITIES/TASKS WHICH ARE CAREFULLY PLANNED FOR OPTIMAL PROJECT PERFORMANCE. • WE USE CREWS IN COST ESTIMATING TO PLAN AN EXPECTED PROJECT PERFORMANCE.
  • 20.
    WHY USE CONSTRUCTION CREWS •CONSTRUCTION OF A PROJECT IS A PROCESS COMPOSED OF CONSTRUCTION ACTIVITIES/TASKS WHICH ARE CAREFULLY PLANNED FOR OPTIMAL PROJECT PERFORMANCE. • WE USE CREWS IN COST ESTIMATING TO PLAN AN EXPECTED PROJECT PERFORMANCE. • WE USE CREWS TO MEASURE ACTUAL PERFORMANCE AND IMPROVE THE PROCESS FOR BETTER FUTURE PERFORMANCE.
  • 21.
    HOW TO PLANFOR: CONSTRUCTION CREW COMPOSITION
  • 22.
    HOW TO PLANFOR: CONSTRUCTION CREW COMPOSITION • EXPERIENCE
  • 23.
    HOW TO PLANFOR: CONSTRUCTION CREW COMPOSITION • EXPERIENCE • THE BEST WAY TO DETERMINE CONSTRUCTION CREW COMPOSITION IS FROM EXPERIENCE ON PREVIOUS PROJECTS
  • 24.
    HOW TO PLANFOR: CONSTRUCTION CREW COMPOSITION • EXPERIENCE • THE BEST WAY TO DETERMINE CONSTRUCTION CREW COMPOSITION IS FROM EXPERIENCE ON PREVIOUS PROJECTS • COMMERCIALLY AVAILABLE DATA
  • 25.
    HOW TO PLANFOR: CONSTRUCTION CREW COMPOSITION • EXPERIENCE • THE BEST WAY TO DETERMINE CONSTRUCTION CREW COMPOSITION IS FROM EXPERIENCE ON PREVIOUS PROJECTS • COMMERCIALLY AVAILABLE DATA • THIS IS ONLY RECOMMENDED TO USE AS A STARTING POINT. IT SHOULD NOT BE USED IN A COST ESTIMATE, UNLESS IT CAN BE VALIDATED.
  • 26.
    HOW TO PLANFOR: CONSTRUCTION CREW COMPOSITION • EXPERIENCE • THE BEST WAY TO DETERMINE CONSTRUCTION CREW COMPOSITION IS FROM EXPERIENCE ON PREVIOUS PROJECTS • COMMERCIALLY AVAILABLE DATA • THIS IS ONLY RECOMMENDED TO USE AS A STARTING POINT. IT SHOULD NOT BE USED IN A COST ESTIMATE, UNLESS IT CAN BE VALIDATED. • THROUGH CONSULTATION WITH CONSTRUCTION PROFESSIONALS EXPERIENCED IN THE TYPE OF PROJECT
  • 35.
  • 36.
    PLANNED VS ACTUAL PERFORMANCE CREWPERFORMANCE IS THE AMOUNT OF UNITS PER HOUR.
  • 37.
    PLANNED VS ACTUAL PERFORMANCE CREWPERFORMANCE IS THE AMOUNT OF UNITS PER HOUR. • PLANNED OR ESTIMATED PERFORMANCE IS CALLED PRODUCTION RATE. IT IS THE AMOUNT OF UNITS WE EXPECT THE CREW TO COMPLETE IN AN HOUR, BASED ON PROJECT SPECIFIC CONDITIONS.
  • 38.
    PLANNED VS ACTUAL PERFORMANCE CREWPERFORMANCE IS THE AMOUNT OF UNITS PER HOUR. • PLANNED OR ESTIMATED PERFORMANCE IS CALLED PRODUCTION RATE. IT IS THE AMOUNT OF UNITS WE EXPECT THE CREW TO COMPLETE IN AN HOUR, BASED ON PROJECT SPECIFIC CONDITIONS. • ACTUAL PERFORMANCE IS CALLED PRODUCTIVITY. PRODUCTIVITY IS THE ACTUAL AMOUNT OF UNITS COMPLETED BY THE CREW IN AN HOUR.
  • 39.
    PLANNED VS ACTUAL PERFORMANCE CREWPERFORMANCE IS THE AMOUNT OF UNITS PER HOUR. • PLANNED OR ESTIMATED PERFORMANCE IS CALLED PRODUCTION RATE. IT IS THE AMOUNT OF UNITS WE EXPECT THE CREW TO COMPLETE IN AN HOUR, BASED ON PROJECT SPECIFIC CONDITIONS. • ACTUAL PERFORMANCE IS CALLED PRODUCTIVITY. PRODUCTIVITY IS THE ACTUAL AMOUNT OF UNITS COMPLETED BY THE CREW IN AN HOUR. EFFICIENCY IS PRODUCTION RATE DIVIDED BY PRODUCTIVITY. WE MEASURE EFFICIENCY AND USE IT TO ADJUST PERFORMANCE.
  • 40.
  • 41.
    COMPOSITE CREW RATESDATA USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE MOST ACCURATE METHOD.
  • 42.
    COMPOSITE CREW RATESDATA USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE MOST ACCURATE METHOD. IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS PURPOSES:
  • 43.
    COMPOSITE CREW RATESDATA USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE MOST ACCURATE METHOD. IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS PURPOSES: • SCHEDULING
  • 44.
    COMPOSITE CREW RATESDATA USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE MOST ACCURATE METHOD. IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS PURPOSES: • SCHEDULING • CASH FLOW
  • 45.
    COMPOSITE CREW RATESDATA USING COMPOSITE CREWS TO DEVELOP COST ESTIMATING IS THE MOST ACCURATE METHOD. IT ALSO SERVES THE PURPOSE OF EXTRACTING DATA FOR VARIOUS PURPOSES: • SCHEDULING • CASH FLOW • UNIT RATES: LABOUR AND EQUIPMENT COST, MAN-HOURS AND CREW HOURS.
  • 46.
  • 47.
    COST ESTIMATING CHALLENGES • ACCESSTO EXISTING, VALIDATED DATA
  • 48.
    COST ESTIMATING CHALLENGES • ACCESSTO EXISTING, VALIDATED DATA • BALANCE THE JUDGEMENT OF ADJUSTING FACTORS
  • 49.
    COST ESTIMATING CHALLENGES • ACCESSTO EXISTING, VALIDATED DATA • BALANCE THE JUDGEMENT OF ADJUSTING FACTORS • KEEPING UP WITH NEW CONSTRUCTION TECHNOLOGIES
  • 50.
    COST ESTIMATING CHALLENGES • ACCESSTO EXISTING, VALIDATED DATA • BALANCE THE JUDGEMENT OF ADJUSTING FACTORS • KEEPING UP WITH NEW CONSTRUCTION TECHNOLOGIES • ESTIMATING A TYPE OF PROJECT FOR THE FIRST TIME
  • 51.
    COST ESTIMATING CHALLENGES • ACCESSTO EXISTING, VALIDATED DATA • BALANCE THE JUDGEMENT OF ADJUSTING FACTORS • KEEPING UP WITH NEW CONSTRUCTION TECHNOLOGIES • ESTIMATING A TYPE OF PROJECT FOR THE FIRST TIME • OTHERS. THERE IS NO SHORTAGE OF CHALLENGES THAT A COST ESTIMATOR HAS TO OVERCOME. LEARNING WHERE TO TURN FOR GUIDANCE IS THE IMPORTANT THING TO KNOW.
  • 52.
    DID YOU LIKETHIS PRESENTATION? JOIN ME FOR A FREE WEBINAR, JULY 18TH, 2016 AT 18:00 PST, WHERE I DISCUSS THIS ISSUES IN MORE DETAILS. CLICK HERE TO REGISTER, OR GO TO HTTPS://GOO.GL/IEPHYM CANNOT ATTEND? NO PROBLEM, REGISTER FOR THE WEBINAR AND I WILL SEND YOU THE FULL RECORDING. WANT TO LEARN MORE ABOUT COST ESTIMATING? FOLLOW ME AT: HTTP://WWW.LEARNCOSTESTIMATING.COM HTTP://WWW.EMERALDGROUP-LEARNING.CA