Oak Harbor Clean Water Facility
City Council Workshop - April 16, 2014
Agenda
• Milestones – Where we’ve been
• Schedule – Where we’re going
• Siting Factors – Challenges
• Concept Illustrations – Opportunities
• Charrette – Getting involved
4/16/2014 2
Milestones
• 2008 – Sewer Comp Plan Identified Need
• December 2010 – Started Facilities Plan
• August 2012 – Selected Windjammer Vicinity
• November 2013 – Facilities Plan Approved
• January 2014 – Navy non-committal
• February 2014 – Cultural Resource Investigation
• March 2014 –Purchased property
• March 2014 – PRC approved GC/CM application
4/16/2014 3
2014 2015 2016 2017
Activity Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GC/CM Selection Process
GC/CM Contract Negotiation
GC/CM Notice-to-Proceed
Preliminary Design (Equipment Procurement)
Design Development (30% Detail)
Design Development (60% Detail)
Design Development (90% Detail)
Final Design
Early Sitework Construction (Tentative)
WWTP Construction
WWTP Commissioning
WWTP Final Completion
Outfall Permitting/Design (99%)
Outfall 100% Design/Bid
Outfall Construction
Schedule
GC/
CM
Design
Construction
Outfall Construction
4/16/2014 4
Windjammer Vicinity
EXISTING TREATMENT
PLANT
ACQUIRED PROPERTY
Siting Factors
• Technical Factors
– Required/desired for the new treatment facility to
work properly in the Windjammer Vicinity
• Supplemental Factors
– Required/desired to gain the highest benefit for
the community
4/16/2014 6
Technical Factors
(no particular order)
Transportation Integrate with long-term transportation plan
Business Parking Retain minimum parking spaces required by Code
Geotechnical Minimize structures on deeper, poor soils
Cultural Risk Minimize excavation in higher-risk areas
WWTP Access Provide suitable ingress/egress to facility
WWTP Footprint Provide suitable area for facility (± 2.5 acres)
4/16/2014 7
Supplemental “Site” Factors
(no particular order)
Park Impact Minimize impact on Windjammer Park space
Site “Amenities” Allow for additional amenities now, in future
Ball Fields Evaluate impact on existing fields
Park Access Improve pedestrian access to Windjammer Park
Commercial Value Enhance frontage, access, lot configuration
Added Parking Retain/increase parking for peak demands
“Fix” Intersections Correct traffic flow at current intersections
4/16/2014 8
Illustration of Technical Factors
EXAMPLE
2.5 ACRE
FOOTPRINT
?
Illustration of Supplemental Factors
EXAMPLE
2.5 ACRE
FOOTPRINT
FIX
PARK
ACCESS
Illustration of Site Concept 1
FIX
Technical Supplemental Site
X
X
X
?
?
?
Illustration of Site Concept 2
PARK
ACCESS
Technical Supplemental Site
X
? ?
?
Park Impact
Site “Amenities”
Ball Fields
Park Access
Commercial Value
Added Parking
“Fix” Intersections
Transportation
Business Parking
Geotechnical
Cultural Risk
WWTP Access
WWTP Footprint
Have we considered the
appropriate “Siting Factors”?
Technical Supplemental Site
4/16/2014 15
Final Siting Approach
1.
Identify factors
that must be
considered
All
2.
Develop site
alternatives
Charrette
3.
Evaluate cost,
risk, long-term
benefit
Staff
4.
Select final
alternative
Council
(with public Input)
4/16/2014 16
2014 2015 2016 2017
Activity Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GC/CM Selection Process
GC/CM Contract Negotiation
GC/CM Notice-to-Proceed
Preliminary Design (Equipment Procurement)
Design Development (30% Detail)
Design Development (60% Detail)
Design Development (90% Detail)
Final Design
Early Sitework Construction (Tentative)
WWTP Construction
WWTP Commissioning
WWTP Final Completion
Outfall Permitting/Design (99%)
Outfall 100% Design/Bid
Outfall Construction
Charrette
“Siting” Charrette
May 15, 2014
“Design “Charrette
February 2015
4/16/2014 17
Sign up to participate!
FACILITY SITING CHARRETTE
DATE: May 15, 2014
CONTACT: John Piccone
(360) 914-7000 or
treatmentplant@oakharbor.org
4/16/2014 18
Questions?
4/16/2014 19

More Related Content

What's hot

April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forumpublicinvolvement
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open Housepublicinvolvement
 
Preview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City CouncilPreview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City Councilpublicinvolvement
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Councilpublicinvolvement
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationpublicinvolvement
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
Final Design Presentation
Final Design PresentationFinal Design Presentation
Final Design PresentationBrian Weaver
 
Alamo Heights CCM 01.14.19 Item #7 PPT Const Update 5500 Broadway
Alamo Heights CCM 01.14.19 Item #7  PPT Const Update 5500 BroadwayAlamo Heights CCM 01.14.19 Item #7  PPT Const Update 5500 Broadway
Alamo Heights CCM 01.14.19 Item #7 PPT Const Update 5500 Broadwayahcitycouncil
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15VDOT Northern Virginia
 
Progress update please do not remove
Progress update   please do not removeProgress update   please do not remove
Progress update please do not removeamberaley
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOCity of College Station
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Crosstown TO
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationFairfax County
 
Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13cityofevanston
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 

What's hot (20)

April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open House
 
Preview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City CouncilPreview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City Council
 
December 6 Public Forum
December 6 Public ForumDecember 6 Public Forum
December 6 Public Forum
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Council
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentation
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Final Design Presentation
Final Design PresentationFinal Design Presentation
Final Design Presentation
 
Alamo Heights CCM 01.14.19 Item #7 PPT Const Update 5500 Broadway
Alamo Heights CCM 01.14.19 Item #7  PPT Const Update 5500 BroadwayAlamo Heights CCM 01.14.19 Item #7  PPT Const Update 5500 Broadway
Alamo Heights CCM 01.14.19 Item #7 PPT Const Update 5500 Broadway
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
2019 MATC Intern Program - Jacob Hudgens
2019 MATC Intern Program - Jacob Hudgens2019 MATC Intern Program - Jacob Hudgens
2019 MATC Intern Program - Jacob Hudgens
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15
 
Progress update please do not remove
Progress update   please do not removeProgress update   please do not remove
Progress update please do not remove
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 

Viewers also liked

C7 aug 14 city council meeting 120814_final
C7 aug 14 city council meeting 120814_finalC7 aug 14 city council meeting 120814_final
C7 aug 14 city council meeting 120814_finalpublicinvolvement
 
C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11publicinvolvement
 
March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshoppublicinvolvement
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forumpublicinvolvement
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshoppublicinvolvement
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Updatepublicinvolvement
 
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Roompublicinvolvement
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimatepublicinvolvement
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Financepublicinvolvement
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshoppublicinvolvement
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7publicinvolvement
 
Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4publicinvolvement
 
C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1publicinvolvement
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Previewpublicinvolvement
 
July 31 public forum & workshop
July 31 public forum & workshopJuly 31 public forum & workshop
July 31 public forum & workshoppublicinvolvement
 
C8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_finalC8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_finalpublicinvolvement
 
Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9publicinvolvement
 
Presentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City CouncilPresentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City Councilpublicinvolvement
 

Viewers also liked (20)

C7 aug 14 city council meeting 120814_final
C7 aug 14 city council meeting 120814_finalC7 aug 14 city council meeting 120814_final
C7 aug 14 city council meeting 120814_final
 
C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11C5 Council Workshop Presentation 7-27-11
C5 Council Workshop Presentation 7-27-11
 
March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshop
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forum
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshop
 
Oak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design UpdateOak Harbor City Council Workshop: Design Update
Oak Harbor City Council Workshop: Design Update
 
Oak Harbor Rate Study
Oak Harbor Rate StudyOak Harbor Rate Study
Oak Harbor Rate Study
 
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimate
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Finance
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshop
 
T5 further refine alts min
T5 further refine alts minT5 further refine alts min
T5 further refine alts min
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7
 
Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4
 
C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1C6 further refine_alts_council_4-18_rev1
C6 further refine_alts_council_4-18_rev1
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Preview
 
July 31 public forum & workshop
July 31 public forum & workshopJuly 31 public forum & workshop
July 31 public forum & workshop
 
C8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_finalC8 nov20 city council meeting 121120_final
C8 nov20 city council meeting 121120_final
 
Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9
 
Presentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City CouncilPresentation of Windjammer Park Integration Plan to City Council
Presentation of Windjammer Park Integration Plan to City Council
 

Similar to 140416 oak_harbor_workshp_presentation

Substantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook TrailSubstantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook TrailFairfax County
 
Item # 6 Parking study
Item # 6   Parking studyItem # 6   Parking study
Item # 6 Parking studyahcitycouncil
 
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016Fairfax County
 
Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014Island Health
 
Oak harbor workshop slides
Oak harbor workshop slidesOak harbor workshop slides
Oak harbor workshop slidesenviroissues
 
A5 ladd multiuse trail v7 2014 03-10 council presentation ladd
A5 ladd multiuse trail v7 2014 03-10 council presentation laddA5 ladd multiuse trail v7 2014 03-10 council presentation ladd
A5 ladd multiuse trail v7 2014 03-10 council presentation laddcityofevanston
 
Sp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation ladd
Sp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation laddSp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation ladd
Sp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation laddcityofevanston
 
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14cityofevanston
 
Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailFairfax County
 
Springfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking GarageSpringfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking GarageFairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017West Central Association
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsFairfax County
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011Fairfax County
 
Southside Green - Team 4
Southside Green -  Team 4Southside Green -  Team 4
Southside Green - Team 4M. Damon Weiss
 
Workhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadWorkhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 

Similar to 140416 oak_harbor_workshp_presentation (20)

Substantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook TrailSubstantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
 
Item # 6 Parking study
Item # 6   Parking studyItem # 6   Parking study
Item # 6 Parking study
 
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
 
Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014
 
Oak harbor workshop slides
Oak harbor workshop slidesOak harbor workshop slides
Oak harbor workshop slides
 
A5 ladd multiuse trail v7 2014 03-10 council presentation ladd
A5 ladd multiuse trail v7 2014 03-10 council presentation laddA5 ladd multiuse trail v7 2014 03-10 council presentation ladd
A5 ladd multiuse trail v7 2014 03-10 council presentation ladd
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Sp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation ladd
Sp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation laddSp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation ladd
Sp3 v6 Ladd Arbortetum Multiuse Trail 2014 02-17 council presentation ladd
 
Lick Creek Hike & Bike Trail
Lick Creek Hike & Bike TrailLick Creek Hike & Bike Trail
Lick Creek Hike & Bike Trail
 
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
Sp2 2014 03-31 Capital Improvement public works presentation final 3.31.14
 
Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County Trail
 
Springfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking GarageSpringfield Community Business Center Commuter Parking Garage
Springfield Community Business Center Commuter Parking Garage
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017Fulton Market Taskforce Meeting 10-04-2017
Fulton Market Taskforce Meeting 10-04-2017
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
 
Southside Green - Team 4
Southside Green -  Team 4Southside Green -  Team 4
Southside Green - Team 4
 
Workhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadWorkhouse Arts Foundation Access Road
Workhouse Arts Foundation Access Road
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 

More from publicinvolvement

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13publicinvolvement
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5publicinvolvement
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5publicinvolvement
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan publicinvolvement
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open housepublicinvolvement
 
Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1publicinvolvement
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Updatepublicinvolvement
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revisedpublicinvolvement
 

More from publicinvolvement (9)

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13
 
Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5Windjammer Park Integration Plan Community Advisory Group meeting 5
Windjammer Park Integration Plan Community Advisory Group meeting 5
 
Community Advisory Group meeting 5
Community Advisory Group meeting 5Community Advisory Group meeting 5
Community Advisory Group meeting 5
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open house
 
Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1Windjammer Park Integration Plan CAG meeting 1
Windjammer Park Integration Plan CAG meeting 1
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
 
Volume i executive summary
Volume i executive summaryVolume i executive summary
Volume i executive summary
 

Recently uploaded

2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneVIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 

Recently uploaded (20)

2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneVIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 

140416 oak_harbor_workshp_presentation

  • 1. Oak Harbor Clean Water Facility City Council Workshop - April 16, 2014
  • 2. Agenda • Milestones – Where we’ve been • Schedule – Where we’re going • Siting Factors – Challenges • Concept Illustrations – Opportunities • Charrette – Getting involved 4/16/2014 2
  • 3. Milestones • 2008 – Sewer Comp Plan Identified Need • December 2010 – Started Facilities Plan • August 2012 – Selected Windjammer Vicinity • November 2013 – Facilities Plan Approved • January 2014 – Navy non-committal • February 2014 – Cultural Resource Investigation • March 2014 –Purchased property • March 2014 – PRC approved GC/CM application 4/16/2014 3
  • 4. 2014 2015 2016 2017 Activity Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec GC/CM Selection Process GC/CM Contract Negotiation GC/CM Notice-to-Proceed Preliminary Design (Equipment Procurement) Design Development (30% Detail) Design Development (60% Detail) Design Development (90% Detail) Final Design Early Sitework Construction (Tentative) WWTP Construction WWTP Commissioning WWTP Final Completion Outfall Permitting/Design (99%) Outfall 100% Design/Bid Outfall Construction Schedule GC/ CM Design Construction Outfall Construction 4/16/2014 4
  • 6. Siting Factors • Technical Factors – Required/desired for the new treatment facility to work properly in the Windjammer Vicinity • Supplemental Factors – Required/desired to gain the highest benefit for the community 4/16/2014 6
  • 7. Technical Factors (no particular order) Transportation Integrate with long-term transportation plan Business Parking Retain minimum parking spaces required by Code Geotechnical Minimize structures on deeper, poor soils Cultural Risk Minimize excavation in higher-risk areas WWTP Access Provide suitable ingress/egress to facility WWTP Footprint Provide suitable area for facility (± 2.5 acres) 4/16/2014 7
  • 8. Supplemental “Site” Factors (no particular order) Park Impact Minimize impact on Windjammer Park space Site “Amenities” Allow for additional amenities now, in future Ball Fields Evaluate impact on existing fields Park Access Improve pedestrian access to Windjammer Park Commercial Value Enhance frontage, access, lot configuration Added Parking Retain/increase parking for peak demands “Fix” Intersections Correct traffic flow at current intersections 4/16/2014 8
  • 9. Illustration of Technical Factors EXAMPLE 2.5 ACRE FOOTPRINT ?
  • 10. Illustration of Supplemental Factors EXAMPLE 2.5 ACRE FOOTPRINT FIX PARK ACCESS
  • 11. Illustration of Site Concept 1 FIX Technical Supplemental Site X X X ? ? ?
  • 12. Illustration of Site Concept 2 PARK ACCESS Technical Supplemental Site X ? ? ?
  • 13. Park Impact Site “Amenities” Ball Fields Park Access Commercial Value Added Parking “Fix” Intersections Transportation Business Parking Geotechnical Cultural Risk WWTP Access WWTP Footprint Have we considered the appropriate “Siting Factors”? Technical Supplemental Site 4/16/2014 15
  • 14. Final Siting Approach 1. Identify factors that must be considered All 2. Develop site alternatives Charrette 3. Evaluate cost, risk, long-term benefit Staff 4. Select final alternative Council (with public Input) 4/16/2014 16
  • 15. 2014 2015 2016 2017 Activity Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec GC/CM Selection Process GC/CM Contract Negotiation GC/CM Notice-to-Proceed Preliminary Design (Equipment Procurement) Design Development (30% Detail) Design Development (60% Detail) Design Development (90% Detail) Final Design Early Sitework Construction (Tentative) WWTP Construction WWTP Commissioning WWTP Final Completion Outfall Permitting/Design (99%) Outfall 100% Design/Bid Outfall Construction Charrette “Siting” Charrette May 15, 2014 “Design “Charrette February 2015 4/16/2014 17
  • 16. Sign up to participate! FACILITY SITING CHARRETTE DATE: May 15, 2014 CONTACT: John Piccone (360) 914-7000 or treatmentplant@oakharbor.org 4/16/2014 18