• Stakeholders are individuals, persons or organizations who are actively involved in the project
or have interests that may be positively or negatively affected by the performance or
completion of the project
• Stakeholders have varying levels of responsibility and authority and can change over the
project life cycle
Who are Project Stakeholders?
2 PMP OnlineTests and KnowledgeAreaTests
Relationship Between Stakeholders And Project
Project management team must continuously identify both external and internal
stakeholders
Project manager must manage the influence of various stakeholders in relation to the
requirements and balance stakeholders interest
www.Testudaan.com3 PMP OnlineTests and KnowledgeAreaTests
Project Stakeholder Processes
www.Testudaan.com4 PMP OnlineTests and KnowledgeAreaTests
13.1 Identify Stakeholders
www.Testudaan.com5 PMP OnlineTests and KnowledgeAreaTests
13.1 Identify Stakeholders
The process of (a) identifying all people, groups or organizations that could impact or be impacted by a
decision, activity or outcome of the project, (b) analyzing and documenting relevant information
regarding their interest, involvement, interdependencies, influence and potential impact on project
success
13.1 Identify Stakeholders
Inputs
1.Project charter
2. Procurement
documents
3. Enterprise
environmental
factors
4. Organizational
process assets
Tools &Techniques
1.Stakeholder
analysis
2. Expert judgment
3. Meetings
Outputs
1. Stakeholder
Register
www.Testudaan.com6
PMP OnlineTests and KnowledgeAreaTests
13.1 Identify Stakeholders – Process Flow
4.1
Develop
Project
Charter
12.1
Plan
Procurement
Management
Enterprise /
Organization
5.2 Collect
Requirements
8.1
Plan Quality
Management
10.1 Plan
Communications
Management
11.1
Plan Risk
Management
11.2 Identity
Risks
12.1 Plan
Procurement
Management
13.1
Identity
Stakeholders
13.2 Plan
Stakeholder
Management
Stakeholder
register
Procurement
documents
Project charter
Organizational
Process assets
Enterprise
Environmental
factors
Stakeholder
register
Project Stakeholder Management
www.Testudaan.com7 PMP OnlineTests and KnowledgeAreaTests
Stakeholder Analysis
• Identifies stakeholders interests, influence, and expectations and relates them to the purpose
of the project
In StakeholderAnalysis, consideration is given to such questions as:
 Are they interested in the project succeeding?
 Will they benefit from the success of the project?
 Will they openly support the project, or not?
 Are they ambivalent ?
 Do they have reasons for wanting the project to fail?
 If their views are negative or ambivalent, can they be persuaded to change?
• A technique of systematically gathering and analyzing quantitative & qualitative information
to determine whose interests should be taken into account throughout the project
Identify Stakeholders –T &T
www.Testudaan.com8 PMP OnlineTests and KnowledgeAreaTests
Identify the potential impact OR support, each stakeholder could generate
Power
Interest
HIGH
HIGH
LOW
LOW
People need to be kept in loop,
you need these people to keep
satisfied with the project even if
they aren’t interested in it
Are the decision makers who
have the biggest impact on
project success, so closely
manage their expectations
You shouldn’t have to worry too
much about the people as they
require the least amount of
attention i.e. monitor
People should be kept in the
loop as the project progresses, If
they are kept informed your
project will get good buzz
Power - level of authority and
Interest - level of concern regarding the project outcomes
.. Power/interest grid
Stakeholders Analysis: Power / Interest Grid -Model
www.Testudaan.com9
PMP OnlineTests and KnowledgeAreaTests
13.2 Plan Stakeholder Management
10 www.Testudaan.com
PMP OnlineTests and KnowledgeAreaTests
The process of developing appropriate management strategies to
effectively engage stakeholders through the project life cycle, based on
analysis of their needs, interest and potential impact on project success
13.2 Plan Stakeholder Management
Inputs
1. Project
management plan
2. Stakeholder
3. Register
4. Enterprise
environmental
factors
5. Organizational
process assets
Tools &Techniques
1. Expert judgment
2. Meetings
3. Analytical
techniques
Outputs
1. Stakeholder
management
plan
2. Project
documents
updates
www.Testudaan.com11
PMP OnlineTests and KnowledgeAreaTests
13.2 Plan Stakeholder Management– Process Flow
4.1
Develop
Project
Charter
Enterprise /
Organization
Project
Documents
5.2
Collect
Requirements
13.2 Plan
Stakeholder
Management
13.3 Manage
Stakeholder
Engagement
Stakeholder
Management plan
Organizational
process assets
Enterprise
Environmental
factors
Project
Management
plan
Project
Documents
updates
Project Stakeholder Management
13.1 Identity
Stakeholders0
Stakeholder
register
www.Testudaan.com12
PMP OnlineTests and KnowledgeAreaTests
AnalyticalTechniques
• Current engagement levels of Stakeholders need to be routinely compared to planned
engagement levels that have been deemed essential for successful project completion
• Stakeholder engagement throughout the life cycle of the project is considered critical to
project success
• The engagement level of the Stakeholders can be classified as follows:
 Unaware: Unaware of project and potential impacts
 Resistant: Aware of project and potential impacts and resistant to change
 Neutral: Aware of project yet neither supportive nor resistant
 Supportive: Aware of project and potential impacts and supportive to change
 Leading: Aware of project and potential impacts and actively
engaged in ensuring the project is a success
Plan Stakeholder Management –T &T
www.Testudaan.com13 PMP OnlineTests and KnowledgeAreaTests
Stakeholder Engagement Assessment Matrix
• The current engagement can be documented using the
stakeholder EngagementAssessment Matrix, where C indicates
the current engagement and D indicate the desired engagement
Actions and communication required to close the gap can be
identified by the project team using expert judgment
Stakeholder Unaware Resistant Neutral Supportive Leading
Stakeholder 1
C D
Stakeholder 2
C D
Stakeholder 3
D C
Plan Stakeholder Management –T &T
www.Testudaan.com14 PMP OnlineTests and KnowledgeAreaTests
Stakeholder Management plan:
• Desired and current engagement levels of stakeholders
• Scope and impact of change to stakeholders
• Identified interrelationships and potential overlap between stakeholders
• Stakeholder communication requirements
• Information to be distributed to stakeholders , including language, format, content, and level
of detail
• Reason for the distribution of that information
• Timeframe and frequency for distribution of required information to stakeholders
• Method for updating and refining stakeholder management plan
• Stakeholder management strategy
Plan Stakeholder Management - Output
www.Testudaan.com15 PMP OnlineTests and KnowledgeAreaTests
Example : Stakeholder Management Strategies
www.Testudaan.com16 PMP OnlineTests and KnowledgeAreaTests
13.3 Manage Stakeholder Engagement
www.Testudaan.com17 PMP OnlineTests and KnowledgeAreaTests
The process of developing appropriate management strategies to
effectively engage stakeholders through the project life cycle, based on
analysis of their needs, interest and potential impact on project success
13.3 Manage Stakeholder Engagement
Inputs
1. Stakeholder
management plan
2. communications
management plan
3. Change log
4. Organizational
process assets
Tools &Techniques
1. Communication
methods
2. Interpersonal
skills
3. Management
skills
Outputs
1. Issue log
2. Change
requests
3. Project
management
Plan updates
4. Project
documents
updates
5. Organizational
process assets
updates
www.Testudaan.com18 PMP OnlineTests and KnowledgeAreaTests
13.3 Manage Stakeholder Engagement – Process Flow
10.1 Plan
Communicati
ons
Management
Project
Documents
10.3 Control
Communications
13.3 Manage
Stakeholder
Engagement
13.4 Control
Stakeholder
Engagement
Issue log
Chang log
Communication
management
plan
Project
Documents
updates
Project Stakeholder Management
13.2 Plan
Stakeholder
Management
Stakeholder
Management plan
4.5 Perform
Integrated
Change
Control
4.2 Develop
project
managements
plan
4.5 Perform
Integrated
change Control
9.4 Manage
projectTeamEnterprise /
Organization
Organizational
Process assets
Organizational
Process assets updates
Change requests
Project
Management
Plan updates
www.Testudaan.com19 PMP OnlineTests and KnowledgeAreaTests
• Engaging stakeholders at appropriate project stages to obtain or confirm their continued
commitment to the success of the project
• Managing stakeholder expectations through negotiation and communication, ensuring project
goals are achieved
• Addressing potential concerns that have not yet become issues and anticipating future
problems that may be raised by stakeholders
• Clarifying and addressing issues that have been identified
Manage Stakeholder Engagement - Activities
www.Testudaan.com20 PMP OnlineTests and KnowledgeAreaTests
Management Skills
Used here to coordinate and harmonize the group toward accomplishing the project
objectives. Such management skills might include:
• Facilitating consensus toward project objectives
• Influencing people to support the project
• Negotiating agreements to satisfy project needs
• Modifying organizational behaviour to accept the project outcomes
Interpersonal Skills
Applied by the project manager to manage stakeholders expectations, such skills might include,
above all:
• Building trust
• Resolving conflict
• Active listening
• Overcoming resistance to change
Manage Stakeholder Engagement –T &T
www.Testudaan.com21 PMP OnlineTests and KnowledgeAreaTests
13.4 Control Stakeholder Engagement
www.Testudaan.com22 PMP OnlineTests and KnowledgeAreaTests
Control Stakeholder Engagement is the process of (a) monitoring overall project stakeholder
relationships and (b) adjusting strategies and plans for engaging stakeholders
13.4 Control Stakeholder Engagement
Inputs
1. Project management
plan
2. Issue log
3. Work performance
data
4. Project documents
Tools &Techniques
1. Information
management
systems
2. Expert judgment
3. Meetings
Outputs
1. Work
performance
information
2. Change requests
3. Project
management Plan
updates
4. Project
documents
updates
5. Organizational
process assets
updates
www.Testudaan.com23 PMP OnlineTests and KnowledgeAreaTests
13.4 Control Stakeholder Engagement – Process Flow
4.3 Direct
and Manage
ProjectWork
4.5 Perform
Integrated
Change Control
13.4 Control
Stakeholder
Engagement
Change Requests
Project Management
Plan
Work
performance
Project Stakeholder Management
13.3 Manage
Stakeholder
Management
Issue log
4.2 Develop
project
managements
plan
Enterprise /
Organization
4.4 Monitor and
Control Project
work
Project
Documents
Project
documents
Project documents
updates
Work performance
information
Organizational
Process assets
updates
Project
Management
Plan updates
www.Testudaan.com24
PMP OnlineTests and KnowledgeAreaTests
• An information management system provides a standard tool for the project manager to capture,
store and distribute information to stakeholders about the project cost, schedule progress, and
performance
• It also allows the project manager to consolidate reports from several systems and facilitate
report distribution to the project stakeholders
Distribution formats may include :
• Table reporting
• Spreadsheet analysis
• Presentations
• Graphical capabilities can be used to create visual representations of project
performance information
Information Management System
Control Stakeholder Engagement –T &T
www.Testudaan.com25 PMP OnlineTests and KnowledgeAreaTests
End of Chapter Quiz: PMP Questions 1/3
Q.1 Dan is a senior project manager. He has been assigned to work on a new important project. He is currently
documenting Project Manager Assigned and Authority Level, High Level Projects Risks. What else he need to
write in that document?
(A) Measurable Project Objectives
(C) Stakeholders Requirements
(B) ProjectApproval Requirements
(D)All of the above
Q.2 Jack is currently working as a manager in Spark Logistics. He has been given responsibility for moving infrastructure of
Manoj Consulting Services to the newly procured office. He is currently identifying stakeholders of your project. Which of the
following people's expectations should be closely managed as per salience model?
(A) Interest – Legitimacy
(C) Power - Urgency
(B) Legitimacy - Power
(D) Power - Legitimacy - Urgency
26 www.Testudaan.com
PMP OnlineTests and KnowledgeAreaTests
End of Chapter Quiz: PMP Questions 2/3
Q.3 An important part of stakeholder analysis is documenting quantifiable expectations. Which one of these expectations are
quantifiable?
(A) Project must reduce 15% cost of the Product.
(C)A&B
(B) Project should follow 6 sigma process
(D) improve upon present customer satisfaction level of 7.5
Q.4 You are working as a Project Manager in an leading consulting company. You have been assigned a new project. You have
already identified stakeholders and gathered other relevant information, such as their roles, departments, interests, knowledge,
expectations, and influence levels.What would you do next?
(A) Start assessing how key stakeholders are likely to react
or respond in various situations
(C) Start working on engagement strategy for each one of
them
(B) Analyze the potential impact or support each stakeholder
could generate
(D) None of the above
27 www.Testudaan.com
PMP OnlineTests and KnowledgeAreaTests
End of Chapter Quiz: Solutions 3/3
Q.1 CorrectAnswer is D.
Explanation: Project charter is very important as it contains Project Title, Description, Duration, Initial Risks
identified, Measurable Project Objectives, Project Approval Requirements and Stakeholders Requirements.
Q.2 CorrectAnswer is D.
Explanation: Stakeholders with Power, legitimate demands and urgency are required to be managed closely. .
Q.3 CorrectAnswer is A
Explanation. Correct option is A. 15% reduction of present product cost is a very clear quantifiable expectation.
Option B is about following a stringent process involving six sigma methodology. Option D mentions regarding
improvement upon present customer satisfaction level but not quantifies clearly as to what is customer
satisfaction level that organization is aiming for.
Q.4 CorrectAnswer is B
Explanation: Impact Analysis is followed by stakeholder classification and then, approach strategy is prepared for
each stakeholder.
28
www.Testudaan.com PMP OnlineTests and KnowledgeAreaTests
Thank you
www.Testudaan.com29 PMP OnlineTests and KnowledgeAreaTests

More Related Content

What's hot

Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
Mark Ritchie
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
Alastair Cruickshank
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
Beesabathuni Jeevan
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
Agus Suhanto
 
Project Management Essentials: Stakeholder Management
Project Management Essentials: Stakeholder ManagementProject Management Essentials: Stakeholder Management
Project Management Essentials: Stakeholder Management
CTE Solutions Inc.
 
Stakeholder management - a short introduction
Stakeholder management - a short introduction Stakeholder management - a short introduction
Stakeholder management - a short introduction
Vincenzo Capozzoli
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement
DavidMcLachlan1
 
13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement
DavidMcLachlan1
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
pankajsh10
 
Project communication management
Project communication managementProject communication management
Project communication management
Takudzwa Chatora
 
Stakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder ManagementStakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder Management
Association for Project Management
 
Project Stakeholder Management
Project Stakeholder ManagementProject Stakeholder Management
Project Stakeholder Management
Andersson Lujan Ojeda
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
Project communication management
Project communication  managementProject communication  management
Project communication management
youness jabbar
 
Project managent communication
Project managent communicationProject managent communication
Project managent communication
Ambr Malyk
 
PMP_Project Communication Management
PMP_Project Communication ManagementPMP_Project Communication Management
PMP_Project Communication Management
Hisham Haridy MBA, PMP®, RMP®, SP®
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
Jeremy Jay V. Lim, MBB, PMP
 
Chap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderChap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholder
Anand Bobade
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
Anand Subramaniam
 
Project Communications Management
Project Communications ManagementProject Communications Management
Project Communications Management
Andersson Lujan Ojeda
 

What's hot (20)

Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
 
Project Management Essentials: Stakeholder Management
Project Management Essentials: Stakeholder ManagementProject Management Essentials: Stakeholder Management
Project Management Essentials: Stakeholder Management
 
Stakeholder management - a short introduction
Stakeholder management - a short introduction Stakeholder management - a short introduction
Stakeholder management - a short introduction
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement
 
13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Stakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder ManagementStakeholder Engagement vs Stakeholder Management
Stakeholder Engagement vs Stakeholder Management
 
Project Stakeholder Management
Project Stakeholder ManagementProject Stakeholder Management
Project Stakeholder Management
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
Project communication management
Project communication  managementProject communication  management
Project communication management
 
Project managent communication
Project managent communicationProject managent communication
Project managent communication
 
PMP_Project Communication Management
PMP_Project Communication ManagementPMP_Project Communication Management
PMP_Project Communication Management
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Chap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderChap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholder
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Project Communications Management
Project Communications ManagementProject Communications Management
Project Communications Management
 

Similar to 10. Stakeholder Management

Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptx
UmairZaman13
 
Topic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfTopic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdf
HuyNguyen657394
 
Project stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK SixthProject stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK Sixth
Dr. Pankaj Sharma PgMP,PMP,PMI-ACP, LSSMBB
 
Pmp stakeholder chapter 13
Pmp stakeholder chapter 13Pmp stakeholder chapter 13
Pmp stakeholder chapter 13
Ahmed Elshaboury,PMP,LEED GA
 
CAPM Week 5 Chapter 13
CAPM Week 5 Chapter 13CAPM Week 5 Chapter 13
CAPM Week 5 Chapter 13
Muzette Charles, PMP
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt
ItcHcm1
 
How to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project ManagersHow to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project Managers
MindCypress .
 
Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4Nam Trung
 
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge AreaOnline PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
GlobalSkillup
 
Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...Think For A Change
 
Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]
Astute Trainers and Consultants
 
Chapter 13
Chapter 13Chapter 13
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
Anand Subramaniam
 
Create Your End User Adoption Strategy
Create Your End User Adoption StrategyCreate Your End User Adoption Strategy
Create Your End User Adoption Strategy
Erica Toelle
 
Stages of Project Development
Stages of Project DevelopmentStages of Project Development
Stages of Project Development
Jo Balucanag - Bitonio
 
Stakeholder Management Knowledge Area
Stakeholder Management Knowledge AreaStakeholder Management Knowledge Area
Stakeholder Management Knowledge Area
Joshua Render
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
Yamanta Raj Niroula, PMP
 
Project initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder managementProject initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder management
RudreshSamant
 
Project Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or FailureProject Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or Failure
Khaled M. Al Kolfat MS.Eng,MoP,P3O,PMOC,PMP,M.ASCE
 

Similar to 10. Stakeholder Management (20)

Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptx
 
Topic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfTopic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdf
 
Project stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK SixthProject stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK Sixth
 
Pmp stakeholder chapter 13
Pmp stakeholder chapter 13Pmp stakeholder chapter 13
Pmp stakeholder chapter 13
 
CAPM Week 5 Chapter 13
CAPM Week 5 Chapter 13CAPM Week 5 Chapter 13
CAPM Week 5 Chapter 13
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt
 
How to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project ManagersHow to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project Managers
 
Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4
 
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge AreaOnline PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
 
Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...Project Management Foundations Series Course 103 - Project Stakeholder Manage...
Project Management Foundations Series Course 103 - Project Stakeholder Manage...
 
Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]Project Stakeholder Management [read-only] [compatibility mode]
Project Stakeholder Management [read-only] [compatibility mode]
 
Chapter 13
Chapter 13Chapter 13
Chapter 13
 
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
 
Create Your End User Adoption Strategy
Create Your End User Adoption StrategyCreate Your End User Adoption Strategy
Create Your End User Adoption Strategy
 
Stakeholders
StakeholdersStakeholders
Stakeholders
 
Stages of Project Development
Stages of Project DevelopmentStages of Project Development
Stages of Project Development
 
Stakeholder Management Knowledge Area
Stakeholder Management Knowledge AreaStakeholder Management Knowledge Area
Stakeholder Management Knowledge Area
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
Project initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder managementProject initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder management
 
Project Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or FailureProject Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or Failure
 

More from Sanjay Rajpoot

Hiring For Post Silicon validation in Bangalore.pdf
Hiring For Post Silicon validation in Bangalore.pdfHiring For Post Silicon validation in Bangalore.pdf
Hiring For Post Silicon validation in Bangalore.pdf
Sanjay Rajpoot
 
Hiring for Sr. Software Engineer
Hiring for Sr. Software EngineerHiring for Sr. Software Engineer
Hiring for Sr. Software Engineer
Sanjay Rajpoot
 
Hiring for Embedded Software Developer - SARACA Solutions
Hiring for Embedded Software Developer - SARACA SolutionsHiring for Embedded Software Developer - SARACA Solutions
Hiring for Embedded Software Developer - SARACA Solutions
Sanjay Rajpoot
 
Hiring for DFT Engineers in Bangalore
Hiring for DFT Engineers in BangaloreHiring for DFT Engineers in Bangalore
Hiring for DFT Engineers in Bangalore
Sanjay Rajpoot
 
Hiring for Global Support Engineer in Bangalore
Hiring for Global Support Engineer in BangaloreHiring for Global Support Engineer in Bangalore
Hiring for Global Support Engineer in Bangalore
Sanjay Rajpoot
 
Hiring For Advanced Quality Engineer in Gurgaon
Hiring For Advanced Quality Engineer in GurgaonHiring For Advanced Quality Engineer in Gurgaon
Hiring For Advanced Quality Engineer in Gurgaon
Sanjay Rajpoot
 
Info Graphics Engineer Jobs | SaracaSolutions
Info Graphics Engineer Jobs | SaracaSolutionsInfo Graphics Engineer Jobs | SaracaSolutions
Info Graphics Engineer Jobs | SaracaSolutions
Sanjay Rajpoot
 
Hardware Design Engineer Jobs | SaracaSolutions
Hardware Design Engineer Jobs | SaracaSolutionsHardware Design Engineer Jobs | SaracaSolutions
Hardware Design Engineer Jobs | SaracaSolutions
Sanjay Rajpoot
 
Control System Design Engineer Jobs - Saracasolutions
Control System Design Engineer Jobs - SaracasolutionsControl System Design Engineer Jobs - Saracasolutions
Control System Design Engineer Jobs - Saracasolutions
Sanjay Rajpoot
 
Feedback From Students About Testudaan PMP Exam Simulator
Feedback From Students About Testudaan PMP Exam SimulatorFeedback From Students About Testudaan PMP Exam Simulator
Feedback From Students About Testudaan PMP Exam Simulator
Sanjay Rajpoot
 
PMP Quiz - Question #4
PMP Quiz - Question #4PMP Quiz - Question #4
PMP Quiz - Question #4
Sanjay Rajpoot
 
Project Management Professional (PMP)® Exam Prep Course
Project Management Professional (PMP)® Exam Prep CourseProject Management Professional (PMP)® Exam Prep Course
Project Management Professional (PMP)® Exam Prep Course
Sanjay Rajpoot
 
PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...
PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...
PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...
Sanjay Rajpoot
 
Sample Exam Result Analysis of 200 Questions Simulated Test
Sample Exam Result Analysis of 200 Questions Simulated TestSample Exam Result Analysis of 200 Questions Simulated Test
Sample Exam Result Analysis of 200 Questions Simulated Test
Sanjay Rajpoot
 
6. Schedule Management
6. Schedule Management6. Schedule Management
6. Schedule Management
Sanjay Rajpoot
 
4. Communication Management
4. Communication Management4. Communication Management
4. Communication Management
Sanjay Rajpoot
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
Sanjay Rajpoot
 
Communication Management
Communication ManagementCommunication Management
Communication Management
Sanjay Rajpoot
 
Newlast
NewlastNewlast

More from Sanjay Rajpoot (19)

Hiring For Post Silicon validation in Bangalore.pdf
Hiring For Post Silicon validation in Bangalore.pdfHiring For Post Silicon validation in Bangalore.pdf
Hiring For Post Silicon validation in Bangalore.pdf
 
Hiring for Sr. Software Engineer
Hiring for Sr. Software EngineerHiring for Sr. Software Engineer
Hiring for Sr. Software Engineer
 
Hiring for Embedded Software Developer - SARACA Solutions
Hiring for Embedded Software Developer - SARACA SolutionsHiring for Embedded Software Developer - SARACA Solutions
Hiring for Embedded Software Developer - SARACA Solutions
 
Hiring for DFT Engineers in Bangalore
Hiring for DFT Engineers in BangaloreHiring for DFT Engineers in Bangalore
Hiring for DFT Engineers in Bangalore
 
Hiring for Global Support Engineer in Bangalore
Hiring for Global Support Engineer in BangaloreHiring for Global Support Engineer in Bangalore
Hiring for Global Support Engineer in Bangalore
 
Hiring For Advanced Quality Engineer in Gurgaon
Hiring For Advanced Quality Engineer in GurgaonHiring For Advanced Quality Engineer in Gurgaon
Hiring For Advanced Quality Engineer in Gurgaon
 
Info Graphics Engineer Jobs | SaracaSolutions
Info Graphics Engineer Jobs | SaracaSolutionsInfo Graphics Engineer Jobs | SaracaSolutions
Info Graphics Engineer Jobs | SaracaSolutions
 
Hardware Design Engineer Jobs | SaracaSolutions
Hardware Design Engineer Jobs | SaracaSolutionsHardware Design Engineer Jobs | SaracaSolutions
Hardware Design Engineer Jobs | SaracaSolutions
 
Control System Design Engineer Jobs - Saracasolutions
Control System Design Engineer Jobs - SaracasolutionsControl System Design Engineer Jobs - Saracasolutions
Control System Design Engineer Jobs - Saracasolutions
 
Feedback From Students About Testudaan PMP Exam Simulator
Feedback From Students About Testudaan PMP Exam SimulatorFeedback From Students About Testudaan PMP Exam Simulator
Feedback From Students About Testudaan PMP Exam Simulator
 
PMP Quiz - Question #4
PMP Quiz - Question #4PMP Quiz - Question #4
PMP Quiz - Question #4
 
Project Management Professional (PMP)® Exam Prep Course
Project Management Professional (PMP)® Exam Prep CourseProject Management Professional (PMP)® Exam Prep Course
Project Management Professional (PMP)® Exam Prep Course
 
PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...
PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...
PMPBOK 5th Edition Vs PMBOK 6th Edition, Knowledge Area Changes and New Proce...
 
Sample Exam Result Analysis of 200 Questions Simulated Test
Sample Exam Result Analysis of 200 Questions Simulated TestSample Exam Result Analysis of 200 Questions Simulated Test
Sample Exam Result Analysis of 200 Questions Simulated Test
 
6. Schedule Management
6. Schedule Management6. Schedule Management
6. Schedule Management
 
4. Communication Management
4. Communication Management4. Communication Management
4. Communication Management
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
 
Communication Management
Communication ManagementCommunication Management
Communication Management
 
Newlast
NewlastNewlast
Newlast
 

Recently uploaded

June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 

Recently uploaded (20)

June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 

10. Stakeholder Management

  • 1. Stakeholder Management Saraca Solutions Pvt. Ltd. www.Testudaan.com1 Best PMP Exam Simulator
  • 2. • Stakeholders are individuals, persons or organizations who are actively involved in the project or have interests that may be positively or negatively affected by the performance or completion of the project • Stakeholders have varying levels of responsibility and authority and can change over the project life cycle Who are Project Stakeholders? 2 PMP OnlineTests and KnowledgeAreaTests
  • 3. Relationship Between Stakeholders And Project Project management team must continuously identify both external and internal stakeholders Project manager must manage the influence of various stakeholders in relation to the requirements and balance stakeholders interest www.Testudaan.com3 PMP OnlineTests and KnowledgeAreaTests
  • 4. Project Stakeholder Processes www.Testudaan.com4 PMP OnlineTests and KnowledgeAreaTests
  • 5. 13.1 Identify Stakeholders www.Testudaan.com5 PMP OnlineTests and KnowledgeAreaTests
  • 6. 13.1 Identify Stakeholders The process of (a) identifying all people, groups or organizations that could impact or be impacted by a decision, activity or outcome of the project, (b) analyzing and documenting relevant information regarding their interest, involvement, interdependencies, influence and potential impact on project success 13.1 Identify Stakeholders Inputs 1.Project charter 2. Procurement documents 3. Enterprise environmental factors 4. Organizational process assets Tools &Techniques 1.Stakeholder analysis 2. Expert judgment 3. Meetings Outputs 1. Stakeholder Register www.Testudaan.com6 PMP OnlineTests and KnowledgeAreaTests
  • 7. 13.1 Identify Stakeholders – Process Flow 4.1 Develop Project Charter 12.1 Plan Procurement Management Enterprise / Organization 5.2 Collect Requirements 8.1 Plan Quality Management 10.1 Plan Communications Management 11.1 Plan Risk Management 11.2 Identity Risks 12.1 Plan Procurement Management 13.1 Identity Stakeholders 13.2 Plan Stakeholder Management Stakeholder register Procurement documents Project charter Organizational Process assets Enterprise Environmental factors Stakeholder register Project Stakeholder Management www.Testudaan.com7 PMP OnlineTests and KnowledgeAreaTests
  • 8. Stakeholder Analysis • Identifies stakeholders interests, influence, and expectations and relates them to the purpose of the project In StakeholderAnalysis, consideration is given to such questions as:  Are they interested in the project succeeding?  Will they benefit from the success of the project?  Will they openly support the project, or not?  Are they ambivalent ?  Do they have reasons for wanting the project to fail?  If their views are negative or ambivalent, can they be persuaded to change? • A technique of systematically gathering and analyzing quantitative & qualitative information to determine whose interests should be taken into account throughout the project Identify Stakeholders –T &T www.Testudaan.com8 PMP OnlineTests and KnowledgeAreaTests
  • 9. Identify the potential impact OR support, each stakeholder could generate Power Interest HIGH HIGH LOW LOW People need to be kept in loop, you need these people to keep satisfied with the project even if they aren’t interested in it Are the decision makers who have the biggest impact on project success, so closely manage their expectations You shouldn’t have to worry too much about the people as they require the least amount of attention i.e. monitor People should be kept in the loop as the project progresses, If they are kept informed your project will get good buzz Power - level of authority and Interest - level of concern regarding the project outcomes .. Power/interest grid Stakeholders Analysis: Power / Interest Grid -Model www.Testudaan.com9 PMP OnlineTests and KnowledgeAreaTests
  • 10. 13.2 Plan Stakeholder Management 10 www.Testudaan.com PMP OnlineTests and KnowledgeAreaTests
  • 11. The process of developing appropriate management strategies to effectively engage stakeholders through the project life cycle, based on analysis of their needs, interest and potential impact on project success 13.2 Plan Stakeholder Management Inputs 1. Project management plan 2. Stakeholder 3. Register 4. Enterprise environmental factors 5. Organizational process assets Tools &Techniques 1. Expert judgment 2. Meetings 3. Analytical techniques Outputs 1. Stakeholder management plan 2. Project documents updates www.Testudaan.com11 PMP OnlineTests and KnowledgeAreaTests
  • 12. 13.2 Plan Stakeholder Management– Process Flow 4.1 Develop Project Charter Enterprise / Organization Project Documents 5.2 Collect Requirements 13.2 Plan Stakeholder Management 13.3 Manage Stakeholder Engagement Stakeholder Management plan Organizational process assets Enterprise Environmental factors Project Management plan Project Documents updates Project Stakeholder Management 13.1 Identity Stakeholders0 Stakeholder register www.Testudaan.com12 PMP OnlineTests and KnowledgeAreaTests
  • 13. AnalyticalTechniques • Current engagement levels of Stakeholders need to be routinely compared to planned engagement levels that have been deemed essential for successful project completion • Stakeholder engagement throughout the life cycle of the project is considered critical to project success • The engagement level of the Stakeholders can be classified as follows:  Unaware: Unaware of project and potential impacts  Resistant: Aware of project and potential impacts and resistant to change  Neutral: Aware of project yet neither supportive nor resistant  Supportive: Aware of project and potential impacts and supportive to change  Leading: Aware of project and potential impacts and actively engaged in ensuring the project is a success Plan Stakeholder Management –T &T www.Testudaan.com13 PMP OnlineTests and KnowledgeAreaTests
  • 14. Stakeholder Engagement Assessment Matrix • The current engagement can be documented using the stakeholder EngagementAssessment Matrix, where C indicates the current engagement and D indicate the desired engagement Actions and communication required to close the gap can be identified by the project team using expert judgment Stakeholder Unaware Resistant Neutral Supportive Leading Stakeholder 1 C D Stakeholder 2 C D Stakeholder 3 D C Plan Stakeholder Management –T &T www.Testudaan.com14 PMP OnlineTests and KnowledgeAreaTests
  • 15. Stakeholder Management plan: • Desired and current engagement levels of stakeholders • Scope and impact of change to stakeholders • Identified interrelationships and potential overlap between stakeholders • Stakeholder communication requirements • Information to be distributed to stakeholders , including language, format, content, and level of detail • Reason for the distribution of that information • Timeframe and frequency for distribution of required information to stakeholders • Method for updating and refining stakeholder management plan • Stakeholder management strategy Plan Stakeholder Management - Output www.Testudaan.com15 PMP OnlineTests and KnowledgeAreaTests
  • 16. Example : Stakeholder Management Strategies www.Testudaan.com16 PMP OnlineTests and KnowledgeAreaTests
  • 17. 13.3 Manage Stakeholder Engagement www.Testudaan.com17 PMP OnlineTests and KnowledgeAreaTests
  • 18. The process of developing appropriate management strategies to effectively engage stakeholders through the project life cycle, based on analysis of their needs, interest and potential impact on project success 13.3 Manage Stakeholder Engagement Inputs 1. Stakeholder management plan 2. communications management plan 3. Change log 4. Organizational process assets Tools &Techniques 1. Communication methods 2. Interpersonal skills 3. Management skills Outputs 1. Issue log 2. Change requests 3. Project management Plan updates 4. Project documents updates 5. Organizational process assets updates www.Testudaan.com18 PMP OnlineTests and KnowledgeAreaTests
  • 19. 13.3 Manage Stakeholder Engagement – Process Flow 10.1 Plan Communicati ons Management Project Documents 10.3 Control Communications 13.3 Manage Stakeholder Engagement 13.4 Control Stakeholder Engagement Issue log Chang log Communication management plan Project Documents updates Project Stakeholder Management 13.2 Plan Stakeholder Management Stakeholder Management plan 4.5 Perform Integrated Change Control 4.2 Develop project managements plan 4.5 Perform Integrated change Control 9.4 Manage projectTeamEnterprise / Organization Organizational Process assets Organizational Process assets updates Change requests Project Management Plan updates www.Testudaan.com19 PMP OnlineTests and KnowledgeAreaTests
  • 20. • Engaging stakeholders at appropriate project stages to obtain or confirm their continued commitment to the success of the project • Managing stakeholder expectations through negotiation and communication, ensuring project goals are achieved • Addressing potential concerns that have not yet become issues and anticipating future problems that may be raised by stakeholders • Clarifying and addressing issues that have been identified Manage Stakeholder Engagement - Activities www.Testudaan.com20 PMP OnlineTests and KnowledgeAreaTests
  • 21. Management Skills Used here to coordinate and harmonize the group toward accomplishing the project objectives. Such management skills might include: • Facilitating consensus toward project objectives • Influencing people to support the project • Negotiating agreements to satisfy project needs • Modifying organizational behaviour to accept the project outcomes Interpersonal Skills Applied by the project manager to manage stakeholders expectations, such skills might include, above all: • Building trust • Resolving conflict • Active listening • Overcoming resistance to change Manage Stakeholder Engagement –T &T www.Testudaan.com21 PMP OnlineTests and KnowledgeAreaTests
  • 22. 13.4 Control Stakeholder Engagement www.Testudaan.com22 PMP OnlineTests and KnowledgeAreaTests
  • 23. Control Stakeholder Engagement is the process of (a) monitoring overall project stakeholder relationships and (b) adjusting strategies and plans for engaging stakeholders 13.4 Control Stakeholder Engagement Inputs 1. Project management plan 2. Issue log 3. Work performance data 4. Project documents Tools &Techniques 1. Information management systems 2. Expert judgment 3. Meetings Outputs 1. Work performance information 2. Change requests 3. Project management Plan updates 4. Project documents updates 5. Organizational process assets updates www.Testudaan.com23 PMP OnlineTests and KnowledgeAreaTests
  • 24. 13.4 Control Stakeholder Engagement – Process Flow 4.3 Direct and Manage ProjectWork 4.5 Perform Integrated Change Control 13.4 Control Stakeholder Engagement Change Requests Project Management Plan Work performance Project Stakeholder Management 13.3 Manage Stakeholder Management Issue log 4.2 Develop project managements plan Enterprise / Organization 4.4 Monitor and Control Project work Project Documents Project documents Project documents updates Work performance information Organizational Process assets updates Project Management Plan updates www.Testudaan.com24 PMP OnlineTests and KnowledgeAreaTests
  • 25. • An information management system provides a standard tool for the project manager to capture, store and distribute information to stakeholders about the project cost, schedule progress, and performance • It also allows the project manager to consolidate reports from several systems and facilitate report distribution to the project stakeholders Distribution formats may include : • Table reporting • Spreadsheet analysis • Presentations • Graphical capabilities can be used to create visual representations of project performance information Information Management System Control Stakeholder Engagement –T &T www.Testudaan.com25 PMP OnlineTests and KnowledgeAreaTests
  • 26. End of Chapter Quiz: PMP Questions 1/3 Q.1 Dan is a senior project manager. He has been assigned to work on a new important project. He is currently documenting Project Manager Assigned and Authority Level, High Level Projects Risks. What else he need to write in that document? (A) Measurable Project Objectives (C) Stakeholders Requirements (B) ProjectApproval Requirements (D)All of the above Q.2 Jack is currently working as a manager in Spark Logistics. He has been given responsibility for moving infrastructure of Manoj Consulting Services to the newly procured office. He is currently identifying stakeholders of your project. Which of the following people's expectations should be closely managed as per salience model? (A) Interest – Legitimacy (C) Power - Urgency (B) Legitimacy - Power (D) Power - Legitimacy - Urgency 26 www.Testudaan.com PMP OnlineTests and KnowledgeAreaTests
  • 27. End of Chapter Quiz: PMP Questions 2/3 Q.3 An important part of stakeholder analysis is documenting quantifiable expectations. Which one of these expectations are quantifiable? (A) Project must reduce 15% cost of the Product. (C)A&B (B) Project should follow 6 sigma process (D) improve upon present customer satisfaction level of 7.5 Q.4 You are working as a Project Manager in an leading consulting company. You have been assigned a new project. You have already identified stakeholders and gathered other relevant information, such as their roles, departments, interests, knowledge, expectations, and influence levels.What would you do next? (A) Start assessing how key stakeholders are likely to react or respond in various situations (C) Start working on engagement strategy for each one of them (B) Analyze the potential impact or support each stakeholder could generate (D) None of the above 27 www.Testudaan.com PMP OnlineTests and KnowledgeAreaTests
  • 28. End of Chapter Quiz: Solutions 3/3 Q.1 CorrectAnswer is D. Explanation: Project charter is very important as it contains Project Title, Description, Duration, Initial Risks identified, Measurable Project Objectives, Project Approval Requirements and Stakeholders Requirements. Q.2 CorrectAnswer is D. Explanation: Stakeholders with Power, legitimate demands and urgency are required to be managed closely. . Q.3 CorrectAnswer is A Explanation. Correct option is A. 15% reduction of present product cost is a very clear quantifiable expectation. Option B is about following a stringent process involving six sigma methodology. Option D mentions regarding improvement upon present customer satisfaction level but not quantifies clearly as to what is customer satisfaction level that organization is aiming for. Q.4 CorrectAnswer is B Explanation: Impact Analysis is followed by stakeholder classification and then, approach strategy is prepared for each stakeholder. 28 www.Testudaan.com PMP OnlineTests and KnowledgeAreaTests
  • 29. Thank you www.Testudaan.com29 PMP OnlineTests and KnowledgeAreaTests