© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Maintenance Management of
Bridges and Underpasses
Javad Akhtar - Technical Director - Bridges
15 Nov 2009
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
The Challenges
• Large proportion of infrastructure built since
1980
• Recognition of particular threats to local
infrastructure
• Need increased emphasis to maintenance
whilst new construction continues apace
• Need to feedback maintenance issues to
improve designs
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
The Threats
• Environment – Flood, temperature changes, ground
• Breakdown of protective defences – paints, cover
concrete, waterproofing
• Structural Material Deterioration – degradation of
concrete, steel corrosion
• Traffic/Usage – Cyclic-fatigue damage, overloading,
impact
• Human – malicious damage, vandalism
• Failure of Secondary Elements – Parapets, joints,
drains, lights, bearings, monitoring systems
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Particular Threats to Structures
in The Middle East
• Extreme Temperatures
• Arid environment & salty ground – rapid build up of salts due to
evaporation/suction cycle and consequent concrete deterioration.
• Require high integrity waterproofing to protect buried concrete
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
General Threats – Examples
Impact Damage
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Impact
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats – Ground Conditions,
Cavities
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats – Hillside Movement
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats - Earthquake
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats - Terrorist
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats - Rockfall
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats - Landslide
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats – Flood-Scour
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats – Poor Workmanship
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Threats - Corrosion
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
So how do we Ensure safety
of our Bridges?
• Data collection about the Bridges
• Establish Routine and Operational
Maintenance Organisation
• Establish a cycle of Condition Inspections,
Load Capacity Assessments and
Refurbishment for Long-term Asset
Management
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Steps in attaining Bridge Maintenance Management System
2. Maintenance Operations System Full Asset Management
1. Data Collation and
Requirements
Collect and
collate
Structure Data
Requirements
of concerned
external
authorities
ADM
Requirements
and
Management
controls
Basic Structure InventorySuperficial
Inspections
and
Photographs
Maintenance Operations Centre
Inspectors
Works Contractor
Full Bridge Management Database
Implement Principal
Inspections of all Structures
and additional data collection
ADM Asset management
requirements
Procure Principal Inspections
and additional data collection -
surveys
Engineering Management Team
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Maintenance Category
• Routine and Operational
Maintenance
• Full Long Term Asset
Management
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Routine and Operational Maintenance
Aims
• To keep structure serviceable
• Respond to complaints and queries
• Manage Maintenance Contractor
• Program regular and preventative maintenance
• Emergency responce to accident damage by
“making safe”
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
• Preventative maintenance
• Innovation in products, equipment and
methods
• Anti-Graffiti coatings
• Durable finishes
• Environmentally friendly lighting and controls
• Automated data capture
Routine and Operational Maintenance
Best Value Maintenance Strategies
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Routine and Operational Maintenance
Essential Data For BMMS/Inventory
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
• Intelligent Lighting
• Remote Monitoring – automated defect
reporting
• Website
• Aesthetic Enhancements
• Integration with Public Transport Systems
• Architectural & Structural Refurbishments
Routine and Operational Maintenance
Potential Future Service Developments
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Long Term Asset Management
AIMS
• Assurance of Safety
• Assurance of reliable
service availability
• Maintain Asset Value
• Plan for major
refurbishment or
replacement
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
Long Term Asset Management
Approach
• Condition Classification of structures using Engineer-
led inspection cycles
• Assessment of the load carrying capacity
• Development of a framework for a bridge
management system.
• Asset Valuation and whole-life maintenance cost
evaluation to inform decision making
• Planned refurbishment – replacement
• Financial Planning
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
• Undertake at commencement and annually
• Aim is to visually inspect readily accessible parts of
structure (and particularly critical areas requiring
inspection in-between Principal Inspection cycle)
• Special access equipment or traffic closure usually
avoided
• Establish reference markers for settlement monitoring
• Identify and assess/monitor any cracks
Long Term Asset Management
General Inspections
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
• Undertake every 6-10 years
• Aim is to get within touching distance of all parts of
structure
• Special access equipment or traffic closure may be
involved
• May need to be done at off-peak traffic period
• Underwater Inspection/bed survey of River Crossings
• Concrete Testing for assessment of reinforcement
corrosion risk
Long Term Asset Management
Principal Inspections
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
• Establish condition of the structure
• Evaluate load carrying capacity
Long Term Asset Management
Load Assessment
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
• Assess rate of deterioration
• Evaluate maintenance/refurbishment treatments available
and their effectiveness, lifetime and cost
• traffic management costs (accounting for traffic flow rates and the
associated delay costs)
• cost of maintenance in the future discounted to present day
values
• implications for safety and traffic flow if the work is not
carried out immediately.
• Evaluate Residual Service life with/without refurbishment
Long Term Asset Management
Planned Major Refurbishments
© Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
• Asset Database
• Inspection Module
• Works Management Module
• Abnormal Load Management
• Deterioration Prediction Models
• Whole Life Costing
• Performance Measures, including Bridge Condition
Indicator
• Asset Valuation
Long Term Asset Management
Bridge Management System - Components

More Related Content

What's hot

Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system
Jerry Brown
 
Alvin Eaton NEW 1 (3)
Alvin Eaton  NEW 1 (3)Alvin Eaton  NEW 1 (3)
Alvin Eaton NEW 1 (3)
Alvin Eaton
 
My CV
My CVMy CV
Norwegian subsea
Norwegian subseaNorwegian subsea
Norwegian subsea
Business Finland
 
Michael Carlin's Resume for the internet
Michael Carlin's Resume for the internetMichael Carlin's Resume for the internet
Michael Carlin's Resume for the internet
Michael Carlin
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
Afaq Ahmad
 
Mohamed elsayed updated
Mohamed elsayed updatedMohamed elsayed updated
Mohamed elsayed updated
Mohamed ElSayed
 
Resume - Derek Bohannan
Resume - Derek BohannanResume - Derek Bohannan
Resume - Derek Bohannan
Derek Bohannan
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
Mohamed Zawam
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICES
Berr Industry
 
Field Services Brochure_WEB
Field Services Brochure_WEBField Services Brochure_WEB
Field Services Brochure_WEB
John Greig
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CV
Jaco Botha
 
Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )
Zamig Aliyev
 
Resume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked inResume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked in
Robin Li
 
A.Resume
A.ResumeA.Resume
A.Resume
Amit Kumar
 
CustomerCopy_doc_doc
CustomerCopy_doc_docCustomerCopy_doc_doc
CustomerCopy_doc_doc
sumit kumar chaturvedi
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
gorga juliabner
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
GOPAKUMAR BALAKRISHNA PILLAI
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync
 

What's hot (19)

Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system
 
Alvin Eaton NEW 1 (3)
Alvin Eaton  NEW 1 (3)Alvin Eaton  NEW 1 (3)
Alvin Eaton NEW 1 (3)
 
My CV
My CVMy CV
My CV
 
Norwegian subsea
Norwegian subseaNorwegian subsea
Norwegian subsea
 
Michael Carlin's Resume for the internet
Michael Carlin's Resume for the internetMichael Carlin's Resume for the internet
Michael Carlin's Resume for the internet
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Mohamed elsayed updated
Mohamed elsayed updatedMohamed elsayed updated
Mohamed elsayed updated
 
Resume - Derek Bohannan
Resume - Derek BohannanResume - Derek Bohannan
Resume - Derek Bohannan
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICES
 
Field Services Brochure_WEB
Field Services Brochure_WEBField Services Brochure_WEB
Field Services Brochure_WEB
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CV
 
Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )Zamig Aliyev- CV ( V-2 )
Zamig Aliyev- CV ( V-2 )
 
Resume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked inResume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked in
 
A.Resume
A.ResumeA.Resume
A.Resume
 
CustomerCopy_doc_doc
CustomerCopy_doc_docCustomerCopy_doc_doc
CustomerCopy_doc_doc
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 

Viewers also liked

summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...
Neha Singh
 
Elements Of An Effective Bridge Management Plan
Elements Of An Effective Bridge Management PlanElements Of An Effective Bridge Management Plan
Elements Of An Effective Bridge Management Plan
blovelace
 
Bridge,types of bridges
Bridge,types of bridgesBridge,types of bridges
Bridge,types of bridges
jitendra malviya
 
Interactive Visual Analysis for In-Depth Bridge Management
Interactive Visual Analysis for In-Depth Bridge ManagementInteractive Visual Analysis for In-Depth Bridge Management
Interactive Visual Analysis for In-Depth Bridge Management
Xiaoyu Wang
 
Bridge defects
Bridge defectsBridge defects
Bridge defects
Dr Fereidoun Dejahang
 
Non destructive testing of railway bridges
Non destructive testing of railway bridgesNon destructive testing of railway bridges
Non destructive testing of railway bridges
Harsh Singh
 
Bridge rehabilitation
Bridge rehabilitationBridge rehabilitation
Bridge rehabilitation
Hendro Widagdo
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
Halcrow
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
Satyaki Sikdar
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
Mandy Suzanne
 

Viewers also liked (10)

summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...
 
Elements Of An Effective Bridge Management Plan
Elements Of An Effective Bridge Management PlanElements Of An Effective Bridge Management Plan
Elements Of An Effective Bridge Management Plan
 
Bridge,types of bridges
Bridge,types of bridgesBridge,types of bridges
Bridge,types of bridges
 
Interactive Visual Analysis for In-Depth Bridge Management
Interactive Visual Analysis for In-Depth Bridge ManagementInteractive Visual Analysis for In-Depth Bridge Management
Interactive Visual Analysis for In-Depth Bridge Management
 
Bridge defects
Bridge defectsBridge defects
Bridge defects
 
Non destructive testing of railway bridges
Non destructive testing of railway bridgesNon destructive testing of railway bridges
Non destructive testing of railway bridges
 
Bridge rehabilitation
Bridge rehabilitationBridge rehabilitation
Bridge rehabilitation
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to 091115_Bridge Maintenance_Javad_Akhtar

Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEP
Jasim MK
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
salman al-kadhem
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Cv 2019
Cv  2019Cv  2019
150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad
Javad Akhtar
 
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
Association for Project Management
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
yogesh kumar
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
Vedam design & Techincal Consultancy Pvt Ltd.
 
Digital Connection Co.Ltd.
Digital Connection Co.Ltd.Digital Connection Co.Ltd.
Digital Connection Co.Ltd.
Mohammed wahab
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
ARUN MANGAL
 
CV Elect
CV ElectCV Elect
CV Elect
Prashant Bane
 
Abhishek
AbhishekAbhishek
Abhishek
Abhishek Rathod
 
Cdms ccs master as at 131017
Cdms ccs master as at 131017Cdms ccs master as at 131017
Cdms ccs master as at 131017
Damian Connelly
 
T.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsT.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy ts
SHAJI GEORGE
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Stephen McKnight
 
How to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoofHow to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoof
SIG Design and Technology
 
How to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoofHow to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoof
Su Butcher
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
Mohamed Salah
 
Facilities_management_nccb.ppt4567894365
Facilities_management_nccb.ppt4567894365Facilities_management_nccb.ppt4567894365
Facilities_management_nccb.ppt4567894365
SharanabasappaDegoan
 

Similar to 091115_Bridge Maintenance_Javad_Akhtar (20)

Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEP
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
Cv 2019
Cv  2019Cv  2019
Cv 2019
 
150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad150525_IQPS_Bridges_Dubai_2015_Javad
150525_IQPS_Bridges_Dubai_2015_Javad
 
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
Digital Connection Co.Ltd.
Digital Connection Co.Ltd.Digital Connection Co.Ltd.
Digital Connection Co.Ltd.
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
 
CV Elect
CV ElectCV Elect
CV Elect
 
Abhishek
AbhishekAbhishek
Abhishek
 
Cdms ccs master as at 131017
Cdms ccs master as at 131017Cdms ccs master as at 131017
Cdms ccs master as at 131017
 
T.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsT.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy ts
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
How to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoofHow to avoid Leaky Roofs #PerfectRoof
How to avoid Leaky Roofs #PerfectRoof
 
How to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoofHow to Avoid Leaky Roofs #PerfectRoof
How to Avoid Leaky Roofs #PerfectRoof
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 
Facilities_management_nccb.ppt4567894365
Facilities_management_nccb.ppt4567894365Facilities_management_nccb.ppt4567894365
Facilities_management_nccb.ppt4567894365
 

More from Javad Akhtar

Zambezi River Crossing Feasibility Study
Zambezi River Crossing Feasibility StudyZambezi River Crossing Feasibility Study
Zambezi River Crossing Feasibility Study
Javad Akhtar
 
UK-Gantries
UK-GantriesUK-Gantries
UK-Gantries
Javad Akhtar
 
ODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_MozambiqueODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_Mozambique
Javad Akhtar
 
Bridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_UgandaBridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_Uganda
Javad Akhtar
 
BG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_NepalBG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_Nepal
Javad Akhtar
 
000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar
Javad Akhtar
 
0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_Akhtar0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_Akhtar
Javad Akhtar
 
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
Javad Akhtar
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
Javad Akhtar
 
110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar
Javad Akhtar
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
Javad Akhtar
 

More from Javad Akhtar (11)

Zambezi River Crossing Feasibility Study
Zambezi River Crossing Feasibility StudyZambezi River Crossing Feasibility Study
Zambezi River Crossing Feasibility Study
 
UK-Gantries
UK-GantriesUK-Gantries
UK-Gantries
 
ODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_MozambiqueODA-SCF_Bridges_Mozambique
ODA-SCF_Bridges_Mozambique
 
Bridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_UgandaBridges on Kapchorwa – Suam Road_Uganda
Bridges on Kapchorwa – Suam Road_Uganda
 
BG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_NepalBG4-KOTHIYAGHAT-Pontoon_Nepal
BG4-KOTHIYAGHAT-Pontoon_Nepal
 
000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar000301_Ms3_Gantry_Foundations_Javad_Akhtar
000301_Ms3_Gantry_Foundations_Javad_Akhtar
 
0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_Akhtar0011_Bridge_Refurbishment_Javad_Akhtar
0011_Bridge_Refurbishment_Javad_Akhtar
 
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
 
110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 

091115_Bridge Maintenance_Javad_Akhtar

  • 1. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Maintenance Management of Bridges and Underpasses Javad Akhtar - Technical Director - Bridges 15 Nov 2009
  • 2. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director The Challenges • Large proportion of infrastructure built since 1980 • Recognition of particular threats to local infrastructure • Need increased emphasis to maintenance whilst new construction continues apace • Need to feedback maintenance issues to improve designs
  • 3. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director The Threats • Environment – Flood, temperature changes, ground • Breakdown of protective defences – paints, cover concrete, waterproofing • Structural Material Deterioration – degradation of concrete, steel corrosion • Traffic/Usage – Cyclic-fatigue damage, overloading, impact • Human – malicious damage, vandalism • Failure of Secondary Elements – Parapets, joints, drains, lights, bearings, monitoring systems
  • 4. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Particular Threats to Structures in The Middle East • Extreme Temperatures • Arid environment & salty ground – rapid build up of salts due to evaporation/suction cycle and consequent concrete deterioration. • Require high integrity waterproofing to protect buried concrete
  • 5. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director General Threats – Examples Impact Damage
  • 6. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Impact
  • 7. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats – Ground Conditions, Cavities
  • 8. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats – Hillside Movement
  • 9. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats - Earthquake
  • 10. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats - Terrorist
  • 11. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats - Rockfall
  • 12. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats - Landslide
  • 13. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats – Flood-Scour
  • 14. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats – Poor Workmanship
  • 15. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Threats - Corrosion
  • 16. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director So how do we Ensure safety of our Bridges? • Data collection about the Bridges • Establish Routine and Operational Maintenance Organisation • Establish a cycle of Condition Inspections, Load Capacity Assessments and Refurbishment for Long-term Asset Management
  • 17. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Steps in attaining Bridge Maintenance Management System 2. Maintenance Operations System Full Asset Management 1. Data Collation and Requirements Collect and collate Structure Data Requirements of concerned external authorities ADM Requirements and Management controls Basic Structure InventorySuperficial Inspections and Photographs Maintenance Operations Centre Inspectors Works Contractor Full Bridge Management Database Implement Principal Inspections of all Structures and additional data collection ADM Asset management requirements Procure Principal Inspections and additional data collection - surveys Engineering Management Team
  • 18. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Maintenance Category • Routine and Operational Maintenance • Full Long Term Asset Management
  • 19. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Routine and Operational Maintenance Aims • To keep structure serviceable • Respond to complaints and queries • Manage Maintenance Contractor • Program regular and preventative maintenance • Emergency responce to accident damage by “making safe”
  • 20. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director • Preventative maintenance • Innovation in products, equipment and methods • Anti-Graffiti coatings • Durable finishes • Environmentally friendly lighting and controls • Automated data capture Routine and Operational Maintenance Best Value Maintenance Strategies
  • 21. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Routine and Operational Maintenance Essential Data For BMMS/Inventory
  • 22. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director • Intelligent Lighting • Remote Monitoring – automated defect reporting • Website • Aesthetic Enhancements • Integration with Public Transport Systems • Architectural & Structural Refurbishments Routine and Operational Maintenance Potential Future Service Developments
  • 23. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Long Term Asset Management AIMS • Assurance of Safety • Assurance of reliable service availability • Maintain Asset Value • Plan for major refurbishment or replacement
  • 24. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director Long Term Asset Management Approach • Condition Classification of structures using Engineer- led inspection cycles • Assessment of the load carrying capacity • Development of a framework for a bridge management system. • Asset Valuation and whole-life maintenance cost evaluation to inform decision making • Planned refurbishment – replacement • Financial Planning
  • 25. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director • Undertake at commencement and annually • Aim is to visually inspect readily accessible parts of structure (and particularly critical areas requiring inspection in-between Principal Inspection cycle) • Special access equipment or traffic closure usually avoided • Establish reference markers for settlement monitoring • Identify and assess/monitor any cracks Long Term Asset Management General Inspections
  • 26. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director • Undertake every 6-10 years • Aim is to get within touching distance of all parts of structure • Special access equipment or traffic closure may be involved • May need to be done at off-peak traffic period • Underwater Inspection/bed survey of River Crossings • Concrete Testing for assessment of reinforcement corrosion risk Long Term Asset Management Principal Inspections
  • 27. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
  • 28. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director
  • 29. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director • Establish condition of the structure • Evaluate load carrying capacity Long Term Asset Management Load Assessment
  • 30. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director • Assess rate of deterioration • Evaluate maintenance/refurbishment treatments available and their effectiveness, lifetime and cost • traffic management costs (accounting for traffic flow rates and the associated delay costs) • cost of maintenance in the future discounted to present day values • implications for safety and traffic flow if the work is not carried out immediately. • Evaluate Residual Service life with/without refurbishment Long Term Asset Management Planned Major Refurbishments
  • 31. © Hyder Consulting Middle East Ltd Javad Akhtar Technical Director • Asset Database • Inspection Module • Works Management Module • Abnormal Load Management • Deterioration Prediction Models • Whole Life Costing • Performance Measures, including Bridge Condition Indicator • Asset Valuation Long Term Asset Management Bridge Management System - Components