WORK EXPERIENCES
Maintenance Superintendent / Plant Engineer June 2012 – Present
Kenmare Resources Moma, Mozambique
• Manage budget linked to maintenance and operational forecast. Opex and Capex yearly budgets and
planning.
• Supervise and assisting with monthly, weekly and major shut downs.
• Manage the Environmental, Health and Safety procedures, implementation of all EHS procedures
and policies. Ensures risk assessments are done as per Standing Operating Procedures.
• Accountable for Isolation and lockout procedures and implementation of all safety rules. Monthly
Nosa inspection audits and maintaining of Nosa 4 star files.
• Supervise the Electrical, Mechanical, Instrumentation and all Engineering shift supervisors
• Improved plant availability by improving preventative maintenance and shut downs by optimizing
maintenance and reducing downtimes.
• Manage daily, weekly and monthly engineering reports on availability, downtimes and shuts.
• Planning of long term maintenance, shut work and equipment change outs.
• Motivate, lead and evaluate subordinates through their goals and activities. Co-ordinate and
organise resources to meet production objectives by planning shift work R&R and leave rosters.
• Weekly review of supervisor performance by doing one on one meeting that includes, safety,
planning, coaching, preventative maintenance, resource development and training of subordinates.
• Planning and calculate pump positions at shore services for boosters and slimes pumps
• Manage the process control by monitoring, flowmeters, and densitometers, water level control,
digital pressure switches, and high bin alarms, buoyancy of 400T floating plant, Telemetering of
Tails, concentrate and water boosters. Pressure speed with high and low set point control.
• Analyzing and fault finding on pump trends.
• Managing of 22KV overhead High Tension power lines to plant, boosters and pump stations.
• Planning and maintaining the overhead High Tension line. Due to the floating moving plant upfront
planning needs to be done 4 months in advance.
• Supervise the maintenance of alternating current variable speed control drives from 200Kw up to
800Kw.
• Managing the power supply to dry mining, the planning of future moves and preventative
maintenance.
• Manage the maintenance and shuts of the dry mining plant that includes, 2 x hoppers, 9m and 24m
conveyors, slurry bin, slurry pump and jet water feed pump. There are 6 off 14/12 Warman slurry
boosters in series which are gearbox driven by 800Kw and 400Kw motors.
• Responsible for Root Cause Analysis and actions plans.
• Represent the company with contractual work and any external services
Page 2 of 4
*JACO BOTHA*
+2782 328 9173 (CELL - SOUTH AFRICA)
+258 843 893 982 (CELL - MOZAMBIQUE)
E-mail : bothjaco@gmail.com
Mechanical Supervisor Wet plant Sep 2010 – April 2012
RIO TINTO QMM Mineral sand Fort Dauphin, Madagascar
ď‚§ Transfer of mechanical/electrical/hydraulic knowledge to Madagascar workforce
ď‚§ Supervise the Dry Mining (Dozer Trap) maintenance and shut work.
 Assisted mine planning with dry mining path that includes booster placing’s and moves.
ď‚§ Supervise mechanical maintenance team to increase availability of equipments
ď‚§ Plan monthly, weekly and shut down activities on dredge and wet concentrator plant.
ď‚§ Improved turnaround time on breakdown by implementation of better practices and team work
ď‚§ Create and implement standard working procedure and risk assessment of mechanical activities
ď‚§ Increase safety awareness by leadership and example through daily activities
ď‚§ Organise and update the critical spares for dredge, slurry pumps and hydraulic systems
ď‚§ Lead the root cause analysis team on failure assessment
Mechanical Foreman and Engineer Sep 2006 – Aug 2010
Kenmare Resources Moma, Mozambique
Mining pond Maintenance Controller 0ct 2004 – Aug 2006
Rio Tinto Richards Bay Minerals Richards Bay, South
Africa
ď‚§ Assist the engineering contractor in the construction of the wet plant
ď‚§ Oversee the mechanical aspect of the commissioning and approval of design
ď‚§ Manage the maintenance and shuts of the dry mining plant that includes, 2 x hoppers, 2x 9m and
24m conveyors, slurry bin, slurry pump and jet water feed pump. There are 14 off 14/12 Warman
slurry boosters in series which are direct and gearbox driven by 750Kw and 1100Kw motors DC and
AC driven.
ď‚§ Represent the company for handover of equipments
ď‚§ Organise outstanding work related to start up and ramp up in production
ď‚§ Manage budget linked to maintenance and operational forecast
ď‚§ Motivate, lead and evaluate subordinates through their goals and activities
ď‚§ Create and implement the site maintenance strategy to insure maximal availability
ď‚§ Plan work orders and track availability of equipments through SAP
Page 3 of 4
*JACO BOTHA*
+2782 328 9173 (CELL - SOUTH AFRICA)
+258 843 893 982 (CELL - MOZAMBIQUE)
E-mail : bothjaco@gmail.com
Maintenance fitter Dec 2001 – Oct 2004
Rio Tinto Richards Bay Minerals Richards Bay, South
Africa
ď‚§ Performed maintenance on: -Warman envirotech and KSB pumps
-Ingersoll Rand and Atlas Copco compressors
-IHC dredge main pump
-Gearbox Conrad Stork
-Cutter gearbox and cutter wheel maintenance
- Hydraulics Vonn Roll TrĂĽnneger pumps/ accumulators
WORK EXPERIENCES
Mechanical Engineer Jun 1994 – Mar 1996
Chicago Bridge & Iron Construction Richards Bay, South Africa
Oswiecim, Poland
Secunda, South Africa
Milnerton, Cape Town, South Africa
Oswiecim Poland.
ď‚§ Started the construction project from beginning.
ď‚§ Manage and schedule pipe fabrication and contractors
ď‚§ Supervise the quality control on work by pressure testing of pipes and vessels
ď‚§ Coordinate the fitment of pipes and alignment of pumps, compressors
ď‚§ Commissioning of a liquid oxygen and nitrogen plant
ď‚§ Commissioning of furnaces and heaters
ď‚§ Calculate and supervise critical lifts
SKILLS, ABILITY & KNOWLEDGE
ď‚§ Languages ability: - Afrikaans Speak, Read, Write (Home Language)
- English Speak, Read, Write
- Zulu Speak, Read
- French Read
ď‚§ Ability to work in a Multiskills, multilanguage and multicultural environnement
Page 4 of 4
*JACO BOTHA*
+2782 328 9173 (CELL - SOUTH AFRICA)
+258 843 893 982 (CELL - MOZAMBIQUE)
E-mail : bothjaco@gmail.com
EDUCATION
National diploma (N6) Mechanical Engineering Obtained – Sep 1991
Newcastle Technical College, Richards Bay Technical College, South Africa
National diploma (N6) Electrical Engineering Obtained – Sep 1991
Newcastle Technical College, Richards Bay Technical College, South Africa
Certificate in Business Management (unfinished due to working oversea) Feb 2006 – Jan 2007
The graduate Institute of Management and Technology GIMT, Johannesburg South Africa
WORK REFERENCES
References are available up on request.

JacoBotha2015CV

  • 1.
    Page 1 of4 *JACO BOTHA* +2782 328 9173 (CELL - SOUTH AFRICA) +258 843 893 982 (CELL - MOZAMBIQUE) E-mail : bothjaco@gmail.com WORK EXPERIENCES Maintenance Superintendent / Plant Engineer June 2012 – Present Kenmare Resources Moma, Mozambique • Manage budget linked to maintenance and operational forecast. Opex and Capex yearly budgets and planning. • Supervise and assisting with monthly, weekly and major shut downs. • Manage the Environmental, Health and Safety procedures, implementation of all EHS procedures and policies. Ensures risk assessments are done as per Standing Operating Procedures. • Accountable for Isolation and lockout procedures and implementation of all safety rules. Monthly Nosa inspection audits and maintaining of Nosa 4 star files. • Supervise the Electrical, Mechanical, Instrumentation and all Engineering shift supervisors • Improved plant availability by improving preventative maintenance and shut downs by optimizing maintenance and reducing downtimes. • Manage daily, weekly and monthly engineering reports on availability, downtimes and shuts. • Planning of long term maintenance, shut work and equipment change outs. • Motivate, lead and evaluate subordinates through their goals and activities. Co-ordinate and organise resources to meet production objectives by planning shift work R&R and leave rosters. • Weekly review of supervisor performance by doing one on one meeting that includes, safety, planning, coaching, preventative maintenance, resource development and training of subordinates. • Planning and calculate pump positions at shore services for boosters and slimes pumps • Manage the process control by monitoring, flowmeters, and densitometers, water level control, digital pressure switches, and high bin alarms, buoyancy of 400T floating plant, Telemetering of Tails, concentrate and water boosters. Pressure speed with high and low set point control. • Analyzing and fault finding on pump trends. • Managing of 22KV overhead High Tension power lines to plant, boosters and pump stations. • Planning and maintaining the overhead High Tension line. Due to the floating moving plant upfront planning needs to be done 4 months in advance. • Supervise the maintenance of alternating current variable speed control drives from 200Kw up to 800Kw. • Managing the power supply to dry mining, the planning of future moves and preventative maintenance. • Manage the maintenance and shuts of the dry mining plant that includes, 2 x hoppers, 9m and 24m conveyors, slurry bin, slurry pump and jet water feed pump. There are 6 off 14/12 Warman slurry boosters in series which are gearbox driven by 800Kw and 400Kw motors. • Responsible for Root Cause Analysis and actions plans. • Represent the company with contractual work and any external services
  • 2.
    Page 2 of4 *JACO BOTHA* +2782 328 9173 (CELL - SOUTH AFRICA) +258 843 893 982 (CELL - MOZAMBIQUE) E-mail : bothjaco@gmail.com Mechanical Supervisor Wet plant Sep 2010 – April 2012 RIO TINTO QMM Mineral sand Fort Dauphin, Madagascar  Transfer of mechanical/electrical/hydraulic knowledge to Madagascar workforce  Supervise the Dry Mining (Dozer Trap) maintenance and shut work.  Assisted mine planning with dry mining path that includes booster placing’s and moves.  Supervise mechanical maintenance team to increase availability of equipments  Plan monthly, weekly and shut down activities on dredge and wet concentrator plant.  Improved turnaround time on breakdown by implementation of better practices and team work  Create and implement standard working procedure and risk assessment of mechanical activities  Increase safety awareness by leadership and example through daily activities  Organise and update the critical spares for dredge, slurry pumps and hydraulic systems  Lead the root cause analysis team on failure assessment Mechanical Foreman and Engineer Sep 2006 – Aug 2010 Kenmare Resources Moma, Mozambique Mining pond Maintenance Controller 0ct 2004 – Aug 2006 Rio Tinto Richards Bay Minerals Richards Bay, South Africa  Assist the engineering contractor in the construction of the wet plant  Oversee the mechanical aspect of the commissioning and approval of design  Manage the maintenance and shuts of the dry mining plant that includes, 2 x hoppers, 2x 9m and 24m conveyors, slurry bin, slurry pump and jet water feed pump. There are 14 off 14/12 Warman slurry boosters in series which are direct and gearbox driven by 750Kw and 1100Kw motors DC and AC driven.  Represent the company for handover of equipments  Organise outstanding work related to start up and ramp up in production  Manage budget linked to maintenance and operational forecast  Motivate, lead and evaluate subordinates through their goals and activities  Create and implement the site maintenance strategy to insure maximal availability  Plan work orders and track availability of equipments through SAP
  • 3.
    Page 3 of4 *JACO BOTHA* +2782 328 9173 (CELL - SOUTH AFRICA) +258 843 893 982 (CELL - MOZAMBIQUE) E-mail : bothjaco@gmail.com Maintenance fitter Dec 2001 – Oct 2004 Rio Tinto Richards Bay Minerals Richards Bay, South Africa  Performed maintenance on: -Warman envirotech and KSB pumps -Ingersoll Rand and Atlas Copco compressors -IHC dredge main pump -Gearbox Conrad Stork -Cutter gearbox and cutter wheel maintenance - Hydraulics Vonn Roll Trünneger pumps/ accumulators WORK EXPERIENCES Mechanical Engineer Jun 1994 – Mar 1996 Chicago Bridge & Iron Construction Richards Bay, South Africa Oswiecim, Poland Secunda, South Africa Milnerton, Cape Town, South Africa Oswiecim Poland.  Started the construction project from beginning.  Manage and schedule pipe fabrication and contractors  Supervise the quality control on work by pressure testing of pipes and vessels  Coordinate the fitment of pipes and alignment of pumps, compressors  Commissioning of a liquid oxygen and nitrogen plant  Commissioning of furnaces and heaters  Calculate and supervise critical lifts SKILLS, ABILITY & KNOWLEDGE  Languages ability: - Afrikaans Speak, Read, Write (Home Language) - English Speak, Read, Write - Zulu Speak, Read - French Read  Ability to work in a Multiskills, multilanguage and multicultural environnement
  • 4.
    Page 4 of4 *JACO BOTHA* +2782 328 9173 (CELL - SOUTH AFRICA) +258 843 893 982 (CELL - MOZAMBIQUE) E-mail : bothjaco@gmail.com EDUCATION National diploma (N6) Mechanical Engineering Obtained – Sep 1991 Newcastle Technical College, Richards Bay Technical College, South Africa National diploma (N6) Electrical Engineering Obtained – Sep 1991 Newcastle Technical College, Richards Bay Technical College, South Africa Certificate in Business Management (unfinished due to working oversea) Feb 2006 – Jan 2007 The graduate Institute of Management and Technology GIMT, Johannesburg South Africa WORK REFERENCES References are available up on request.