Operation & Maintenance of 
WSUD Infrastructure 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
“..Councils are very sensitive 
to the risk of grant-funded or 
gifted assets that become long 
term financial liabilities due 
to their maintenance and 
renewal requirements.” 
Municipal Association of Victoria 
Submission to the Office of Living 
Victoria’s Melbourne’s Water Future, 
September 2013 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
How did this workshop come 
about? 
SIA supported initiatives 
 Stormwater Harvesting and Reuse Technical Tour, Adelaide 
2011 
 Industry Testing and Validation Program - Gross Pollutant Traps 
(GPT) 
 Regional Stormwater Projects Tour – Geelong, 2012 
IPWEA Vic support of stormwater initiatives 
 Independent verification of stormwater treatment devices 
(joint submission to OLV) 
 Stormwater Harvesting Guidelines (joint submission to OLV and 
Living Rivers) 
 Development of expertise in WSUD Assets management 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Various Components of WSUD 
WSUD – Storm water 
The differences between WSUD – treatment prior to 
discharge (TPD) and SWH (capture, treat and use) are not 
currently well defined and/or clearly understood by the 
industry. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
TPD (treatment prior to 
discharge) 
SWH (capture, treat & 
use)
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
Practice area Planning & 
Design 
Standards 
Functionality & 
Performance 
assessment 
rationale 
Operation & 
Maintenance 
Data & 
Experience 
Drainage, 
Conveyance, 
Flood mitigation 
Well established 
standards and 
tools (e.g. design 
tables, software) 
Well established 
practice 
50+ years of 
good data 
WSUD – TPD 
(treatment prior 
to discharge) 
Guidelines & 
recommendation 
(not standards), 
some software 
e.g. Music 
Not well 
established 
3 – 10 years; 
scattered data; 
some guidelines 
on O&M 
published 
Stormwater 
Harvesting 
(collection, 
treatment, use) 
Absence of 
established 
standards and 
tools 
Not established 1 -5 years; very 
little data
o The robust engineering basis for the planning, 
design, construction, operation and 
maintenance of urban stormwater harvesting 
(SWH) is yet to be developed. 
o In the absence of the established engineering 
basis for stormwater harvesting – designers of 
these schemes frequently resort to the 
approaches borrowed from the more 
traditional disciplines such as municipal 
drainage and water sensitive urban design 
(WSUD). 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Guidelines and References 
http://www.melbournewater.com.au/Planning-and-building/Forms-guidelines-and-standard-drawings/Documents/WSUD-Maintenance-manager-guidelines.pdf 
http://www.landcom.com.au/downloads/uploaded/WSUD_Book4_Maintenance_Draft_0409_5312.pdf 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
http://waterbydesign.com.au/stormwaterharvesting-2/
Life of Stormwater project 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Assets life cycle 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Life cycle costs 
The key components of a life cycle assessment: 
• Capital expenditure 
• Installation 
• Operation 
• Ongoing maintenance and labour costs 
• Replacement costs and timing for significant 
expenditure 
• Life span 
• Decommissioning costs 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Indicative LCC chart 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Budgeting for your assets 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Funding sources 
From “City of Melbourne WSUD Guidelines” page 26 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Sources of O&M budget 
o There is a difference in the source of funding 
between those two groups 
o Who can charge customers for water? Water 
retailers role and interest in SWH 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
TPD (treatment prior to 
discharge) 
SWH (capture, treat & 
use) 
Offset potable 
water costs 
End user 
contribution 
Council 
Rates 
Stormwater 
management 
levy 
WSUD offset 
Developers
Delivery options 
 Design – tender – construction 
 Typical delivery option 
 Estimated costs versus the Contractor costs 
 Contractor guarantees the delivery but not the performance 
 Hand over protocol (especially for bio filters/wetlands) 
 Commissioning protocols 
 Design and Construct 
 Not commonly associated with Stormwater projects but used extensively 
in waste water treatment 
 Performance guarantee provided by the Contractor 
 Can be expanded to “design, build and operate” 
 Generally more cost effective 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Known Issues 
 Large percentage of externally funded 
WSUD projects have underestimated project 
delivery costs 50% to 100% 
 These discrepancies only transpired at the 
Construction tender stage (once the 
funding contracts have been signed) 
 The accuracy of estimated O&M costs will 
be tested in the next few years 
Local Government have certain barriers to 
overcome in the selection of the best (not 
cheapest) advise in the areas of WSUD 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Part 1 Questions 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Part 2-Maintenance Planning 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Developing an asset 
management strategy 
current asset stock 
condition of current assets 
operating and maintenance costs 
future renewal profile 
the funding base for operation, 
maintenance and renewal 
The strategy should be converted into action 
through the asset management plan 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Asset management plan 
The asset management plan generally requires 
three (3) different planning horizons: 
 20+ years for forecasts 
 4 years+ tied to the council plan, and 
 annual planning tied to the council budget 
The asset management plan is not a static 
document and should be regularly reviewed 
(every 4 -5 years) in the light of experience 
gained and lessons learnt by council. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Assets maintenance 
• Proactive planned maintenance 
• Reactive unplanned maintenance 
• Rectification 
• Maintenance of asset records 
• Conditions assessments audits 
• Renewal 
‘failing to plan means planning to fail’ 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Proactive maintenance 
Proactive maintenance is a set of scheduled 
tasks to ensure that the WSUD asset is 
operating as designed. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Reactive maintenance 
Reactive maintenance is 
undertaken when a problem 
or fault is identified that is 
beyond the scope of 
proactive maintenance. 
Reactive maintenance often 
requires a swift response, and 
may involve specialist 
equipment or skills. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Rectification 
Rectification of a WSUD asset is undertaken 
when the system is not functioning as 
intended, and proactive and reactive 
maintenance activities are unable to return 
the asset to functional condition. 
Asset condition assessment is typically required 
to inform the decision process e.g. to increase 
maintenance frequency or to rectify an asset 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Rectification assessment process 
o Problem 
o Cause 
o Investigation requirements 
o Rectification 
o Feasibility assessment 
o Why did it happen? 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Condition assessment & audits 
It is recommended that audits of WSUD systems are 
undertaken periodically to: 
• monitor the condition of assets 
• assess the effectiveness of maintenance (especially 
important when assets are maintained by an 
external party) 
• determine likely timeframes for renewal 
• It is recommended that audits are undertaken of: 
o each asset at least every 10 years 
o all assets covered by a maintenance contract at the start 
and end of the contract 
o a sample of assets covered by a maintenance contract 
each year 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
In house and outsourcing 
management options 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Maintenance options 
Maintenance of stormwater treatment systems may 
be: 
o undertaken in-house using works crews 
o outsourced to a single contractor 
o outsourced to separate contractors 
Maintenance contract should outline: 
o scope of works 
o project duration 
o performance criteria 
o activity specifications 
o reporting and audit requirements 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Assets maintenance plan 
Maintenance plans should be developed 
for all WSUD assets. 
The plans need to clearly identify the 
maintenance requirements and state who 
is responsible for the on-going 
maintenance. 
All maintenance plans should be approved 
by council prior to commencement of the 
maintenance period. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
In brief a maintenance plan should include: 
• inspection frequency 
• maintenance frequency 
• data collection/ storage requirements (i.e. during 
inspections) 
• detailed cleanout procedures (main element of the 
plans) including: 
o equipment needs 
o maintenance techniques 
o occupational health and safety 
o public safety 
o environmental management considerations 
• disposal requirements (of material removed) 
• access issues 
• stakeholder notification requirements 
• data collection requirements 
• design details 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Part 2 Questions 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Part 3 – Performance 
assessment of WSUD projects 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Targets TPD 
• All WSUD projects need to be measured, and their 
contribution to improving water quality logged as 
progress in meeting a water quality improvement 
target for that municipality 
Pollutant Target 
total suspended solids 80% reduction 
total phosphorus 45% reduction 
total nitrogen 45% reduction 
litter 70% reduction 
• Melbourne Water is providing support to all 
municipal councils to undertake municipal target 
setting and reporting 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Targets SWH 
• Product water quantity 
• Product water quality 
• Reliability of supply (is water available when 
most needed e.g. irrigation season) 
• Is system performing as designed 
o Ease of operation 
o Maintenance regime 
• Monitoring the environmental impact (e.g. soil 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
tests for irrigation) 
• Inspections 
• Performance Audits
Sample audit scope 
• assess the information like assets location, type and 
contributing catchment etc. 
• calculate the theoretical pollution load per each device 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
per year 
• inspect the sites, walk the catchment, confirm the types 
of assets e.g. GPT's. 
• adjust the theoretical model with observations 
• assess the theoretical loads against the practical history 
of cleans based on Council data 
• report and recommendations incl. confirm list/type of 
Council assets, assessment of the devices performs 
theory vs practice, any discrepancy between theory 
and records of cleaning, recommendations 
Typically this exercise delivers 10% saving on the annual 
cleaning budget (based on GPT audits)
Project stakeholders 
o Assets owner 
o Scheme Operator 
oWater supplier/distributor to end users 
o Customers 
o Regulators 
It is important to understand the responsibilities 
and risks (liabilities) associated with each of 
the listed groups. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Risk management plan is the most 
appropriate mechanism for legal 
compliance and liability 
management of WSUD projects 
A risk management plan should be 
included on the relevant Council’s 
risk register and/or on the Council’s 
Environmental Management System 
(EMS) 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Stormwater Harvesting Scheme 
Major Components 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Independent verification 
scheme for stormwater 
treatment devices 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Selecting the right treatment train to meet the 
water quality objectives is essential for the 
successful and sustainable operation of WSUD 
systems. 
At present, there are no standard methods or 
guidelines for the testing, validation and 
performance assessment of stormwater 
treatment devices in Australia which leaves a 
large number of stormwater practitioners 
dependent on in-house expertise and 
manufacturer’s advice in selecting appropriate 
stormwater treatment strategies and estimating 
costs to operate and maintain these assets. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Development of Storm 
Water Harvesting 
Guidelines 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
One of the major barriers to the wider 
uptake of WSUD and particularly SWH is 
the absence of comprehensive guidelines. 
Such guidelines would allow the 
stakeholders in schemes (councils, water 
authorities, regulators, consultants, 
contractors and other groups) to have a 
uniform reference document outlining 
current best practice including legislative 
framework, design/functionality, 
construction, operation and maintenance. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Conclusions 
• As the number of Storm water assets maintained by VIC 
Local Government increases – so does the need to have 
a well defined O&M strategy, clear understanding of 
expected performance, reliable estimate of all the costs 
and a competent team to support it 
• WSUD and Stormwater harvesting schemes continue to 
be managed through voluntary application of national 
and state guidelines 
• Definitions and interpretations vary greatly across the 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
industry 
• Verification and/or validation requirements for the 
performance are unclear 
• Number of industry initiatives both at the state and 
National level
Looking into the future 
 The pace that the stormwater market in Australia grows 
will, to a large degree, depend on the certainty that it 
can offer to the public, the clients and the government 
in delivering the stated objectives. Which requires, 
amongst other things, the clear path on how to achieve 
the stated objectives (i.e. Guidelines) and the means to 
verify that it actually works (i.e. validation and 
verification protocols). 
 The increased certainty in the requirements for and the 
performance of the stormwater treatment components 
delivered by these guidelines and protocols should allow 
the market to offer/request a guarantee of 
performance. 
 This guarantee should open more opportunities for 
funding, delivery, operation and maintenance of 
stormwater projects, leading to the greater uptake of 
stormwater treatment and utilization as a resource. 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229
Where to from now.. 
• As part of this IPWEA initiative we are currently researching 
the best practice in operation and maintenance of stormwater 
harvesting projects with the intention of being able to provide 
some benchmarking data for the industry to use 
• Collection of data from operational projects in various states 
across Australia (SA, NSW, QLD, VIC)has already commenced 
• O&M Questionnaires developed and will be distributed via 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229 
the IPWEA Vic website 
• The data collected will not identify the organization and will 
not be used for any commercial purposes 
• Findings will be published on IPWEA website for members to 
use
THANK YOU! 
Questions time 
http://iourivwatersolutions.com.au/ BH: 03 9502 4229

More Related Content

Similar to Operation & maintenance of stormwater quality treatment assets

Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivsIouri Vaisman
 
Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015Iouri Vaisman
 
How to improve operational efficiency beyond stormwater bmp installation
How to improve operational efficiency beyond stormwater bmp installationHow to improve operational efficiency beyond stormwater bmp installation
How to improve operational efficiency beyond stormwater bmp installationHydro International
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
DesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfDesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfkahlaoui1
 
Ivs 2013 stormwater vic conference iouri draft 3
Ivs   2013 stormwater vic conference iouri draft 3Ivs   2013 stormwater vic conference iouri draft 3
Ivs 2013 stormwater vic conference iouri draft 3Iouri Vaisman
 
Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015Iouri Vaisman
 
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdfSTREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdfJeremyMichaelWilson
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018TECNALIA Marine Energy
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfHabtamuGaroma3
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guidelineZuzi Evangelista
 
BV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevCBV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevCTran Ngoc Minh
 
1 and 2 SRK WUL workshop introduction objectives and eWULAAS
1 and 2 SRK WUL workshop introduction objectives and eWULAAS1 and 2 SRK WUL workshop introduction objectives and eWULAAS
1 and 2 SRK WUL workshop introduction objectives and eWULAASsrkconsulting
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
Operations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningOperations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningGiancarlo Scotti
 

Similar to Operation & maintenance of stormwater quality treatment assets (20)

Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
 
Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015
 
How to improve operational efficiency beyond stormwater bmp installation
How to improve operational efficiency beyond stormwater bmp installationHow to improve operational efficiency beyond stormwater bmp installation
How to improve operational efficiency beyond stormwater bmp installation
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
DesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfDesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdf
 
Ivs 2013 stormwater vic conference iouri draft 3
Ivs   2013 stormwater vic conference iouri draft 3Ivs   2013 stormwater vic conference iouri draft 3
Ivs 2013 stormwater vic conference iouri draft 3
 
Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015
 
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdfSTREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdf
 
Hillsborough County's Major Building Repairs and Maintenance Program
Hillsborough County's Major Building Repairs and Maintenance ProgramHillsborough County's Major Building Repairs and Maintenance Program
Hillsborough County's Major Building Repairs and Maintenance Program
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guideline
 
BV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevCBV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevC
 
PROJECT_STEPS
PROJECT_STEPSPROJECT_STEPS
PROJECT_STEPS
 
Topic 1.ppt
Topic 1.pptTopic 1.ppt
Topic 1.ppt
 
1 and 2 SRK WUL workshop introduction objectives and eWULAAS
1 and 2 SRK WUL workshop introduction objectives and eWULAAS1 and 2 SRK WUL workshop introduction objectives and eWULAAS
1 and 2 SRK WUL workshop introduction objectives and eWULAAS
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Operations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioningOperations integritydesignconstructioncommissioning
Operations integritydesignconstructioncommissioning
 
Dam engineering 6
Dam engineering 6Dam engineering 6
Dam engineering 6
 

Recently uploaded

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Operation & maintenance of stormwater quality treatment assets

  • 1. Operation & Maintenance of WSUD Infrastructure http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 2. “..Councils are very sensitive to the risk of grant-funded or gifted assets that become long term financial liabilities due to their maintenance and renewal requirements.” Municipal Association of Victoria Submission to the Office of Living Victoria’s Melbourne’s Water Future, September 2013 http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 3. How did this workshop come about? SIA supported initiatives  Stormwater Harvesting and Reuse Technical Tour, Adelaide 2011  Industry Testing and Validation Program - Gross Pollutant Traps (GPT)  Regional Stormwater Projects Tour – Geelong, 2012 IPWEA Vic support of stormwater initiatives  Independent verification of stormwater treatment devices (joint submission to OLV)  Stormwater Harvesting Guidelines (joint submission to OLV and Living Rivers)  Development of expertise in WSUD Assets management http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 4. Various Components of WSUD WSUD – Storm water The differences between WSUD – treatment prior to discharge (TPD) and SWH (capture, treat and use) are not currently well defined and/or clearly understood by the industry. http://iourivwatersolutions.com.au/ BH: 03 9502 4229 TPD (treatment prior to discharge) SWH (capture, treat & use)
  • 5. http://iourivwatersolutions.com.au/ BH: 03 9502 4229 Practice area Planning & Design Standards Functionality & Performance assessment rationale Operation & Maintenance Data & Experience Drainage, Conveyance, Flood mitigation Well established standards and tools (e.g. design tables, software) Well established practice 50+ years of good data WSUD – TPD (treatment prior to discharge) Guidelines & recommendation (not standards), some software e.g. Music Not well established 3 – 10 years; scattered data; some guidelines on O&M published Stormwater Harvesting (collection, treatment, use) Absence of established standards and tools Not established 1 -5 years; very little data
  • 6. o The robust engineering basis for the planning, design, construction, operation and maintenance of urban stormwater harvesting (SWH) is yet to be developed. o In the absence of the established engineering basis for stormwater harvesting – designers of these schemes frequently resort to the approaches borrowed from the more traditional disciplines such as municipal drainage and water sensitive urban design (WSUD). http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 7. Guidelines and References http://www.melbournewater.com.au/Planning-and-building/Forms-guidelines-and-standard-drawings/Documents/WSUD-Maintenance-manager-guidelines.pdf http://www.landcom.com.au/downloads/uploaded/WSUD_Book4_Maintenance_Draft_0409_5312.pdf http://iourivwatersolutions.com.au/ BH: 03 9502 4229 http://waterbydesign.com.au/stormwaterharvesting-2/
  • 8. Life of Stormwater project http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 9. Assets life cycle http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 10. Life cycle costs The key components of a life cycle assessment: • Capital expenditure • Installation • Operation • Ongoing maintenance and labour costs • Replacement costs and timing for significant expenditure • Life span • Decommissioning costs http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 11. Indicative LCC chart http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 12. Budgeting for your assets http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 13. Funding sources From “City of Melbourne WSUD Guidelines” page 26 http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 14. Sources of O&M budget o There is a difference in the source of funding between those two groups o Who can charge customers for water? Water retailers role and interest in SWH http://iourivwatersolutions.com.au/ BH: 03 9502 4229 TPD (treatment prior to discharge) SWH (capture, treat & use) Offset potable water costs End user contribution Council Rates Stormwater management levy WSUD offset Developers
  • 15. Delivery options  Design – tender – construction  Typical delivery option  Estimated costs versus the Contractor costs  Contractor guarantees the delivery but not the performance  Hand over protocol (especially for bio filters/wetlands)  Commissioning protocols  Design and Construct  Not commonly associated with Stormwater projects but used extensively in waste water treatment  Performance guarantee provided by the Contractor  Can be expanded to “design, build and operate”  Generally more cost effective http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 16. Known Issues  Large percentage of externally funded WSUD projects have underestimated project delivery costs 50% to 100%  These discrepancies only transpired at the Construction tender stage (once the funding contracts have been signed)  The accuracy of estimated O&M costs will be tested in the next few years Local Government have certain barriers to overcome in the selection of the best (not cheapest) advise in the areas of WSUD http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 17. Part 1 Questions http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 18. Part 2-Maintenance Planning http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 19. Developing an asset management strategy current asset stock condition of current assets operating and maintenance costs future renewal profile the funding base for operation, maintenance and renewal The strategy should be converted into action through the asset management plan http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 20. Asset management plan The asset management plan generally requires three (3) different planning horizons:  20+ years for forecasts  4 years+ tied to the council plan, and  annual planning tied to the council budget The asset management plan is not a static document and should be regularly reviewed (every 4 -5 years) in the light of experience gained and lessons learnt by council. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 21. Assets maintenance • Proactive planned maintenance • Reactive unplanned maintenance • Rectification • Maintenance of asset records • Conditions assessments audits • Renewal ‘failing to plan means planning to fail’ http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 22. Proactive maintenance Proactive maintenance is a set of scheduled tasks to ensure that the WSUD asset is operating as designed. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 23. Reactive maintenance Reactive maintenance is undertaken when a problem or fault is identified that is beyond the scope of proactive maintenance. Reactive maintenance often requires a swift response, and may involve specialist equipment or skills. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 24. Rectification Rectification of a WSUD asset is undertaken when the system is not functioning as intended, and proactive and reactive maintenance activities are unable to return the asset to functional condition. Asset condition assessment is typically required to inform the decision process e.g. to increase maintenance frequency or to rectify an asset http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 25. Rectification assessment process o Problem o Cause o Investigation requirements o Rectification o Feasibility assessment o Why did it happen? http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 26. Condition assessment & audits It is recommended that audits of WSUD systems are undertaken periodically to: • monitor the condition of assets • assess the effectiveness of maintenance (especially important when assets are maintained by an external party) • determine likely timeframes for renewal • It is recommended that audits are undertaken of: o each asset at least every 10 years o all assets covered by a maintenance contract at the start and end of the contract o a sample of assets covered by a maintenance contract each year http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 27. In house and outsourcing management options http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 28. Maintenance options Maintenance of stormwater treatment systems may be: o undertaken in-house using works crews o outsourced to a single contractor o outsourced to separate contractors Maintenance contract should outline: o scope of works o project duration o performance criteria o activity specifications o reporting and audit requirements http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 29. Assets maintenance plan Maintenance plans should be developed for all WSUD assets. The plans need to clearly identify the maintenance requirements and state who is responsible for the on-going maintenance. All maintenance plans should be approved by council prior to commencement of the maintenance period. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 30. In brief a maintenance plan should include: • inspection frequency • maintenance frequency • data collection/ storage requirements (i.e. during inspections) • detailed cleanout procedures (main element of the plans) including: o equipment needs o maintenance techniques o occupational health and safety o public safety o environmental management considerations • disposal requirements (of material removed) • access issues • stakeholder notification requirements • data collection requirements • design details http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 31. Part 2 Questions http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 32. Part 3 – Performance assessment of WSUD projects http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 33. Targets TPD • All WSUD projects need to be measured, and their contribution to improving water quality logged as progress in meeting a water quality improvement target for that municipality Pollutant Target total suspended solids 80% reduction total phosphorus 45% reduction total nitrogen 45% reduction litter 70% reduction • Melbourne Water is providing support to all municipal councils to undertake municipal target setting and reporting http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 34. Targets SWH • Product water quantity • Product water quality • Reliability of supply (is water available when most needed e.g. irrigation season) • Is system performing as designed o Ease of operation o Maintenance regime • Monitoring the environmental impact (e.g. soil http://iourivwatersolutions.com.au/ BH: 03 9502 4229 tests for irrigation) • Inspections • Performance Audits
  • 35. Sample audit scope • assess the information like assets location, type and contributing catchment etc. • calculate the theoretical pollution load per each device http://iourivwatersolutions.com.au/ BH: 03 9502 4229 per year • inspect the sites, walk the catchment, confirm the types of assets e.g. GPT's. • adjust the theoretical model with observations • assess the theoretical loads against the practical history of cleans based on Council data • report and recommendations incl. confirm list/type of Council assets, assessment of the devices performs theory vs practice, any discrepancy between theory and records of cleaning, recommendations Typically this exercise delivers 10% saving on the annual cleaning budget (based on GPT audits)
  • 36. Project stakeholders o Assets owner o Scheme Operator oWater supplier/distributor to end users o Customers o Regulators It is important to understand the responsibilities and risks (liabilities) associated with each of the listed groups. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 37. Risk management plan is the most appropriate mechanism for legal compliance and liability management of WSUD projects A risk management plan should be included on the relevant Council’s risk register and/or on the Council’s Environmental Management System (EMS) http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 38. Stormwater Harvesting Scheme Major Components http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 40. Independent verification scheme for stormwater treatment devices http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 41. Selecting the right treatment train to meet the water quality objectives is essential for the successful and sustainable operation of WSUD systems. At present, there are no standard methods or guidelines for the testing, validation and performance assessment of stormwater treatment devices in Australia which leaves a large number of stormwater practitioners dependent on in-house expertise and manufacturer’s advice in selecting appropriate stormwater treatment strategies and estimating costs to operate and maintain these assets. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 42. Development of Storm Water Harvesting Guidelines http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 43. One of the major barriers to the wider uptake of WSUD and particularly SWH is the absence of comprehensive guidelines. Such guidelines would allow the stakeholders in schemes (councils, water authorities, regulators, consultants, contractors and other groups) to have a uniform reference document outlining current best practice including legislative framework, design/functionality, construction, operation and maintenance. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 44. Conclusions • As the number of Storm water assets maintained by VIC Local Government increases – so does the need to have a well defined O&M strategy, clear understanding of expected performance, reliable estimate of all the costs and a competent team to support it • WSUD and Stormwater harvesting schemes continue to be managed through voluntary application of national and state guidelines • Definitions and interpretations vary greatly across the http://iourivwatersolutions.com.au/ BH: 03 9502 4229 industry • Verification and/or validation requirements for the performance are unclear • Number of industry initiatives both at the state and National level
  • 45. Looking into the future  The pace that the stormwater market in Australia grows will, to a large degree, depend on the certainty that it can offer to the public, the clients and the government in delivering the stated objectives. Which requires, amongst other things, the clear path on how to achieve the stated objectives (i.e. Guidelines) and the means to verify that it actually works (i.e. validation and verification protocols).  The increased certainty in the requirements for and the performance of the stormwater treatment components delivered by these guidelines and protocols should allow the market to offer/request a guarantee of performance.  This guarantee should open more opportunities for funding, delivery, operation and maintenance of stormwater projects, leading to the greater uptake of stormwater treatment and utilization as a resource. http://iourivwatersolutions.com.au/ BH: 03 9502 4229
  • 46. Where to from now.. • As part of this IPWEA initiative we are currently researching the best practice in operation and maintenance of stormwater harvesting projects with the intention of being able to provide some benchmarking data for the industry to use • Collection of data from operational projects in various states across Australia (SA, NSW, QLD, VIC)has already commenced • O&M Questionnaires developed and will be distributed via http://iourivwatersolutions.com.au/ BH: 03 9502 4229 the IPWEA Vic website • The data collected will not identify the organization and will not be used for any commercial purposes • Findings will be published on IPWEA website for members to use
  • 47. THANK YOU! Questions time http://iourivwatersolutions.com.au/ BH: 03 9502 4229